AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1

1. CONTRACT ID CODE

I

PA

E OF PAGES

I 5

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER

5. PROJECT NUMBER (If applicable)

0001 09/02/2021 NA

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE INA

Contracting Division USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

70Z04721RBRNQN100

9B. DATED (SEE ITEM 11)

08/02/2021

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE I FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers � is extended. D is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor D is not D is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Rebuild Base Detachment and Air ST A Borinquen Aguadilla, Puerto Rico

THIS AMENDMENT IS ISSUED ONLY TO THOSE OFFERORS UNDER THE NATIONAL MULTIPLE AWARD

CONSTRUCTION IDIQ CONTRACT (NMACC II) USCG DEPARTMENT OF HOMELAND SECURITY

(SEE CONTINUATION SHEET)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of parson authorized to sign) (Signature of Contracting Officer)

R

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

Solicitation 70Z04721RBRNQN100 IS AMENDED AS FOLLOWS:

Task Order Announcement

IV. Submission Instructions:

CLOSING DATE:

ADD after FDCC-PROPOSALS@uscg.mil: DoDSAFE can be utilized for submission of completed proposals; however, all proposals must be submitted via email to FDCC- PROPOSALS@uscg.mil .

Task Order Announcement

VI. Basis of Evaluation:

DELETE Non Price Factor 1- Construction Logistics: The contractor’s proposal will be evaluated based on the contractor’s identification and understanding demonstrated in response to the submittal requirements “construction logistics” for Factor 1.

Evaluations will be on how each contractor showcases their safe approach to demolition and new construction in an isolated location outside the continental United States, indicating particular methods to reduce impacts to the residential concurrently used community, and a master logistics sequence of work schedule that includes multiple underground utilities. Higher ratings may be given to a more detailed level of accuracy within the five page limit. Narratives should address priority of each utilities discipline work, sequence of work in congested areas, and switching from existing utilities to newly commissioned services. Higher ratings may be given to a contractor that not only demonstrates innovation and creativity, within their technical proposals, but also explains how it specifically benefits the Coast Guard.

Non Price Factor 2- Procurement of Labor and Materials: The contractor’s proposal will be evaluated based on the contractor’s identification and understanding demonstrated in response to the submittal requirements “procurement of labor and materials” for Factor 2. Higher ratings may be given to contractors showing arrangements with sub-contractors in Puerto Rico. Higher ratings may be given to contractors with demonstrated extensive professional experience in Puerto Rico, relationships with workforces in Puerto Rico, and ability to procure materials on an island. Contractors may list amount of previous sample projects and years of experience in Puerto Rico, which further supports higher ratings. Strategies that exhibit a strong understanding of site challenges and actions necessary to avoid delays in skilled labor and delivery of adequate, quality materials. Additionally, higher ratings may be given to a contractor that demonstrates innovation and creativity within their technical proposals, where innovation and creativity provides specific benefit to the mailto:FDCC-PROPOSALS@uscg.mil mailto:FDCC-PROPOSALS@uscg.mil mailto:FDCC-PROPOSALS@uscg.mil

Coast Guard. Higher ratings may be given for contractor’s that submit signed teaming agreements with subcontractors.

ADD Non Price Factor 1- Procurement of Labor and Materials: The contractor’s proposal will be evaluated based on the contractor’s identification and understanding demonstrated in response to the submittal requirements “procurement of labor and materials” for Factor 1. Higher ratings may be given to contractors showing arrangements with sub-contractors in Puerto Rico. Higher ratings may be given to contractors with demonstrated extensive professional experience in Puerto Rico, relationships with workforces in Puerto Rico, and ability to procure materials on an island. Contractors may list amount of previous sample projects and years of experience in Puerto Rico, which further supports higher ratings. Strategies that exhibit a strong understanding of site challenges and actions necessary to avoid delays in skilled labor and delivery of adequate, quality materials. Additionally, higher ratings may be given to a contractor that demonstrates innovation and creativity within their technical proposals, where innovation and creativity provides specific benefit to the Coast Guard. Higher ratings may be given for contractor’s that submit signed teaming agreements with subcontractors.

Non Price Factor 2- Construction Logistics: The contractor’s proposal will be evaluated based on the contractor’s identification and understanding demonstrated in response to the submittal requirements “construction logistics” for Factor 2. Evaluations will be on how each contractor showcases their safe approach to demolition and new construction in an isolated location outside the continental United States, indicating particular methods to reduce impacts to the residential concurrently used community, and a master logistics sequence of work schedule that includes multiple underground utilities. Higher ratings may be given to a more detailed level of accuracy within the five page limit. Narratives should address priority of each utilities discipline work, sequence of work in congested areas, and switching from existing utilities to newly commissioned services. Higher ratings may be given to a contractor that not only demonstrates innovation and creativity, within their technical proposals, but also explains how it specifically benefits the Coast Guard.

The following questions were received in response to the solicitation:

7. Section V. AWARD ON INITIAL RESPONSES, Non-Price Submission, labels Factor 1 as

Procurement of Labor and Materials and Factor 2 as Construction Logistics. Section VI. BASIS

OF EVALUATION labels Factor 1 as Construction Logistics and Factor 2 as Procurement of

Labor and Materials. Please clarify the correct factor titles.

RESPONSE: The Task Order Announcement has been corrected in Amendment 0003.

8. Will the Government please provide the site visit sign-in sheet?

RESPONSE: The sign in sheet is included in this Amendment 0003.

9. Please Confirm that the limit of 5 pages is for each individual factor.

RESPONSE: Each factor has a page limit of 5 pages for the narrative.

10. Please provide the preferred location for the Representations and Certifications to be within the proposal.

RESPONSE: Representations and Certifications will be included as a part of your price proposal.

END OF AMENDMENT

FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF REJECTION