MEMORANDUM OF AGREEMENT
BETWEEN THE UNITED STATES COAST GUARD (USCG)
AND
THE PUERTO RICO STATE HISTORIC PRESERVATION OFFICER (SHPO)
REGARDING
HURRICANE RECONSTITUTION PROJECT
USCG BASE DETACHMENT BORINQUEN AND AIR STATION BORINQUEN,
AGUADILLA, PUERTO RICO
SHPO: 07-06-20-02
WHEREAS, the USCG plans to repair and replace hurricane-damaged facilities that are located within Base Detachment Borinquen and Air Station Borinquen, in Aguadilla, Puerto Rico as part of the Hurricane Reconstitution Project (hereinafter, the “Project”); and
WHEREAS, the USCG plans to carry out the Project on federally controlled land and is therefore, considered an undertaking that is subject to review under Section 106 of the National Historic Preservation Act (NHPA), 54 U.S.C. 306 § 108 et seq., and its implementing regulations, see 36 C.F.R. Part 800; and
WHEREAS, the USCG in consultation with the SHPO has defined the undertaking’s area of potential effects (APE) as the area identified in Attachment (A); and
WHEREAS, the USCG in consultation with the SHPO has determined that the potential Base Borinquen Field Historic District is eligible for listing in the National Register of Historic Places (NRHP); and
WHEREAS, the USCG in consultation with the SHPO has determined that the undertaking will have an adverse effect on the potential NRHP-eligible Base Borinquen Field Historic District, resulting from the demolition of the La Plaza Complex, the demolition of 86 housing units, the repair of 97 housing units, the construction of 12 housing duplexes, the construction of a new 34 unit Unaccompanied Personnel Housing facility, the construction of a new pool and clubhouse, the construction of a new security facility, and the construction of a new community center.
These actions will also permanently alter the district’s street layouts. Site plans illustrating the demolition and new construction are provided by Attachment (B); and
WHEREAS, the USCG in consultation with the SHPO has determined that the La Plaza Complex and 85 of the 86 of the housing units to be demolished are NRHP-eligible under Criteria A and Criteria C; and
WHEREAS, the USCG consulted with the Ramey Air Force Base Historical Association and the City of Aguadilla, PR and both parties have been invited to sign this MOA as Concurring Parties; and
Regarding the Hurricane Reconstitution Project Execution Plan U.S. Coast Guard Base Detachment Borinquen and Air Station Borinquen, in Aguadilla, Puerto Rico
WHEREAS, in accordance with 36 CFR Part 800.6 (a)(4), the USCG invited the public to participate in a 30-day project review and comment between June 11, 2021 and July 11, 2021.
This invitation was published in local newspapers, to include the El Vocero, Primera Hora, Nuevo Dia, and San Juan Daily Star and provided a project overview and information on how to access both electronic and written copies of the draft Environmental Assessment that contained a project specific Cultural Resources Evaluation; and
WHEREAS, in accordance with 36 C.F.R. § 800.6(a)(1), the USCG has notified the Advisory Council on Historic Preservation (ACHP) of its adverse effect determination providing the specified documentation, and the ACHP has chosen not to participate in the consultation, pursuant to 36 C.F.R. § 800.6(a)(1)(iii);
NOW, THEREFORE, the USCG and the SHPO enter into this Memorandum of Agreement (MOA) to ensure that the undertaking shall be implemented in accordance with the following stipulations in order to take into account the effect of the undertaking on historic properties.
STIPULATIONS
The USCG shall ensure that the following measures are carried out by a professional meeting the applicable Secretary of the Interior’s Professional Qualifications Standards:
A. ARCHITECTURAL DOCUMENTATION
Prior to demolition, all structures to be demolished within the potential Borinquen Field Historic District (as illustrated and described by Attachment (B)), will be documented using the HABS Level II format. The USCG shall ensure that all documentation is completed and accepted by SHPO prior to demolition and that copies are made available to the appropriate local archives designated by the
SHPO.
B. REHABILITATION
Six housing structures representing each category of historical housing will be repaired and preserved going forward in accordance with The Secretary of the Interior’s Standards for Rehabilitation with Guidelines for Rehabilitating Historic Buildings (NPS 1992). The six housing units are as follows:
Address Structure Type 11 Cliff Rd Type A 66 Hook Rd Type B 102 Northeast Road Type C 171 Circle F Type D 156 L St. Type F 103 Cliff Rd. Type G
These buildings will be repaired and preserved going forward in accordance with The Secretary of the Interior’s Standards for Rehabilitation with Guidelines for Rehabilitating Historic Buildings (NPS 1992).
C. NEW CONSTRUCTION
The basis of design for the new Community Center, the UPH facility, and duplexes are the conceptual renderings provided by Attachment (C).
The SHPO shall be given the opportunity to review and comment on the design of the new Community Center, the UPH facility, the new duplexes, and all associated infrastructure. Review and comment will occur at the 35% Building and Site Design and 65% Building and Site Design phases. The SHPO will have 30 days to provide written comments on the 35% design and the 65% design, respectively. The USCG will review all comments and provide written responses to the SHPO detailing how each comment is being incorporated or in the event the comment cannot be incorporated, the budget and mission constraints that drove that decision.
The USCG shall ensure that the design for each new building is compatible with guidelines set forth in the Secretary of the Interior’s Standards for Rehabilitation (NPS 1992), specifically Standard 9 which states:
New additions, exterior alterations, or related new construction shall not destroy historic materials that characterize the property. The new work shall be differentiated from the old and shall be compatible with the massing, size, scale, and architectural features to protect the historic integrity of the property and its environment.
Design of new buildings shall be compatible with the historic and architectural qualities of the potential NRHP-eligible Borinquen Field Historic District
D. ARCHAEOLOGY
A phase IA archeological literature study and a pedestrian study will be completed prior to beginning construction. Draft reports will be provided to the SHPO. The SHPO will provide any comments back to the USCG within 30 days for incorporation into final reports, which will also be provided to the SHPO.
Based on the results of the phase 1A study, the USCG will determine, in consultation with the SHPO, whether additional identification efforts are necessary, in accordance with 36 CFR 800.4(b) and (c), or to implement an Unanticipated Discovery Plan.
Prior to commencing any earth moving activities, the USCG will develop an Unanticipated Discovery Plan to cover all areas disturbed by the Project. The plan will be written by a qualified archeologist. Should a potential resource be encountered, Administration Condition III (Post Review Discoveries) of this agreement will be followed.
Additionally, an archeologist will be on-site during all ground disturbing activities and will monitor for the discovery of any potential cultural resources.
E. INTERPRETATIVE HISTORICAL DISPLAYS AND MARKERS
The USCG will provide a qualified architectural historian to research, develop, and design appropriate interpretative displays and wayside markers at the following locations:
a. The New Community Center – In the Center Plaza
b. Preserved Housing Units – Prominent Location in front yard
Displays and waysides shall meet NPS graphic identity standards. Examples are provided by Attachment (D).
Draft displays and wayside text and graphics will be submitted to the SHPO for review and comment. The SHPO will have 30 days to respond with written comments. Accepted wayside and interpretive displays/markers will be installed by the USCG within one (1) year of the completion of the project. Photographs of all installed interpretive displays/markers and waysides will be submitted to the SHPO for their project file.
ADMINISTRATIVE CONDITIONS
I. AUTHORITY.
The MOA is generally authorized under the provisions of Section 106 of the NHPA and its implementing regulations. In accordance with 14 U.S.C. § 701(b), the USCG is authorized to enter into this MOA with the SHPO.
II. DURATION
This Agreement will expire with the completion of the undertaking and its stipulations or if its terms are not carried out within five (5) years from the date of its execution. Prior to such time, the USCG may consult with the other signatories to reconsider the terms of the Agreement and amend it in accordance with Administration Condition V (Amendments).
III. POST-REVIEW DISCOVERIES
If during construction previously unknown archeological resources are discovered, all work in the immediate vicinity of the discovery will be halted, signatories to the MOA will be notified, and procedures of 36 C.F.R. § 800.13(c) followed. In the event that human remains are discovered during construction, the ACHP’s Policy Statement Regarding Treatment of Burial Sites, Human Remains and Funerary Objects will be followed.
IV. DISPUTE RESOLUTION
Should any signatory to this MOA object to any actions proposed or the manner in which the terms of this MOA are implemented, the USCG shall consult with such party to resolve the objection. If the USCG determines that such objection cannot be resolved, the USCG will:
a. Forward all documentation relevant to the dispute, including the USCG’s proposed resolution, to the ACHP. The ACHP shall provide the USCG with its advice on the resolution of the objection within thirty (30) days of receiving adequate documentation. Prior to reaching a final decision on the dispute, the USCG shall prepare a written response that takes into account any timely advice or comments regarding the dispute from the ACHP, signatories and concurring parties, and provide them with a copy of this written response. The USCG will then proceed according to its final decision.
b. If the ACHP does not provide its advice regarding the dispute within the thirty (30)-day time period, the USCG may make a final decision on the dispute and proceed accordingly. Prior to reaching such a final decision, the USCG shall prepare a written response that takes into account any timely comments regarding the dispute from the signatories and concurring parties to the MOA and provide them and the ACHP with a copy of such written response.
c. The USCG's responsibilities to carry out all other actions subject to the terms of this MOA that are not the subject of the dispute remain unchanged.
V. AMENDMENTS
This Agreement may be amended when such an amendment is agreed to in writing by all signatories. The amendment will be effective on the date a copy signed by all of the signatories is filed with the ACHP.
VI. TERMINATION
If any signatory to this MOA determines that its terms will not or cannot be carried out, that party shall immediately consult with the other parties to attempt to develop an amendment per Administrative Condition V (Amendments). If within thirty (30) days (or another time period agreed to by all signatories) an amendment cannot be reached, any signatory may terminate the MOA upon written notification to the other signatories.
Once the MOA is terminated and prior to work continuing on the undertaking, the USCG must either (a) execute an Agreement pursuant to 36 C.F.R. § 800.6, or (b) request, take into account, and respond to the comments of the ACHP under 36 C.F.R. § 800.7. The USCG shall notify the signatories as to the course of action it will pursue.
VII. ANTI-DEFICIENCY
Nothing in this MOA shall require or authorize any agency or employee of the Federal Government to make or authorize any expenditure or obligation of funds exceeding appropriated funding, to obligate any payment of money before it is appropriated, to indemnify any other party absent specific statutory authorization, or to violate the Anti- Deficiency Act, 31 U.S.C. §§ 1341(a)(1)(A) and 1341 (a)(1)(B).
VIII. OTHER PROVISIONS
Nothing in this MOA is intended to conflict with current law or regulation or the directives of the Department of Homeland Security, the USCG, or any other party. If a term of this MOA is inconsistent with such authority, then that term shall be invalid, but the remaining terms and conditions of this MOA shall remain in full force and effect.
EXECUTION of this MOA by the USCG and the SHPO, its subsequent acceptance by the ACHP, and implementation of its terms confirm and document that the USCG has taken into account the effects of this undertaking on historic properties and afforded the ACHP an opportunity to comment.
ATTACHMENT A:
Area of Potential Effects (APE) Map
US
CG
A ir
St at io n
Bo rin qu en
Ag ua di lla , P ue rto
R ico
US
CG
S
FR
L Pr oj ec t N o:
-11
Ar ea o f P ot en tia l E ffe ct s μ
ATTACHMENT B:
Impacts to Potential Base Borinquen Field
Historic District
162B 162A
223A 223B
160B 160A 158B 158A
222A 222B
154B 154A156B 156A
221A 221B 22A 220B
5A
5B
7A
7B
9A
9B
1A
1B
0A
0B
8A
8B
4A
4B
6A
6A
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X
X X
X X
X X
XXX
X
X X
X
X
X
X X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
3B
3A
1B
1A
0B
0A
2B
2A
163A 163B
161B 161A
159B 159A
157B 157A
155B 155A
5A
5B
167A 167B
169A 169B
171A
171B
179A179B
175A17 7A
7B
6A
6B
174B 174A
166A 166B16 4A
4B
168A 168B
3B
3A
2B
2A
170A
170B
178B178A
175B
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X
X X X
X
X
X
1 6
1 5
1 5
X
X
X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X X
X
X X
X X
X X
X X
X
XX
X X
X X X X
X
B B
D D
D
D D
D D
D
D D
D D
DDDD
D
D D D
LA
P
LA
ZA
C
O M
M . C
EN
TE
R
D F
F F
F F
G G
G G
G
G G
GF
F
F
F
F
F
F
G G
G
G G
G
G
G G
G
G
G
G G
G
FF
F F
C
E
H O
O K
R O
AD
HO
O
K
RO
AD
NORTHEAST ROAD
C
LI
FF
R
O
AD
CL
IF
F
RO
AD
SIXTH STREET
F CIRCLE
F CIRCLE
FIFTH STREET
HO
O
K
RO
AD
FIFTH STREET
W
IN
G R
O
AD
W
IN
G R
O
AD
GATE
"L " S
TR
EE
T
NORTHEAST ROAD
SCHOOL DRIVE
C
IR
CL
E
CSIXTH STREET
A
B
C
D
F
D
A A
A A
A A
A A
A A
A A
A
A A
A
A
A
B
BB
B B
B
B
B
B B
B
B
B
BB
B B
B
B
B
B B
B B
B B
B B
B B
B B
B
BB
B
G F
E
F
C
C
C
C
G
D
D
D
D
D
D
D
D
D
D
D D D D
D D
D
DD
CL
IF
F
RO
AD
R STREET
HARRISON DRIVE
LE
M
AY
D
RI
VE
CL
IF
F
RO
AD
G
LE
G
EN
D H
O U
SI
N
G U
N
IT
S / B
LD
G
S
TO
BE
D
EM
O
LI
SH
ED
H O
U
SI
N G
U N
IT
S
TO
B
E R
EP
AI
R
ED
P
R
ES
ER
VE
(5 S
TR
U
C
TU
R
ES
T O
TA
L)
H O
U
SI
N G
U N
IT
S
TO
B
E D
EM
O
LI
SH
ED
U
N D
ER
R
FP
-1
H O
U
SI
N G
U N
IT
S
TO
B
E R
EP
AI
R
ED
N O
A C
TI
O
N , B
U T
PR
ES
ER
VE
D
N O
A C
TI
O
N
S H E E T
IDDESIGNED BY:
DESCRIPTION MARK
EDITED BY:
DATE
CHECKEDBY:
DRAWN BY:
PLOTTING SCALE:SCALE:
USCG DRAWING N0.
SHEETOF
USCG PROJECT NO.
USCG FILENAME
A/E COMPANY:
CONSULTING A/E:
PROJECT ENGINEER:A/E PROJECT NO.:
G
F E D C B A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
U S
C O A S T
G U A R D
C
IV
IL
E N G
IN
E E R
IN
G
P501180057
1:1AS SHOWN
FACILITIES DESIGN & CONSTRUCTION CENTER (FDCC)
2000 CENTER ST., BERKELEY, CA 94704
AGUADILLAPUERTO RICO
11062658
LT. JOEL AMENDOLARA / TRANSYSTEMS
BASE DETACHMENT AND AIR STATION BORINQUEN
A R C H
IT
E C
TU
R A L
USCG BORINQUEN HURRICANE REBUILD
5505 ROBIN HOOD RD., SUITE K
NORFOLK, VA 23513
TRANSYSTEMS
510-835-2761
C H
IL
D
W O
R K
O R
D
ER
15/28/2021 FINAL D-B RFP SUBMITTAL
IF
T
H
IS
D R
AW
IN
G
IS
L
ES
S
TH
AN
2" X
4"
IT
IS
A R
ED
U
C
ED
S
IZ
E D
R
AW
IN
G
A
EXISTING SITE PLAN
TTTT
RWS
1"
0'
-0
C
O
VE
R
AL
L
EX
IS
TI
N G
S
IT
E
PL
AN
1"
0'
-0
A1 O
VE
R
AL
L
EX
IS
TI
N
G S
IT
E
PL
AN
"P
AN
H
AN
D
LE
" A
R
EA
7 10
69 72
175A
161AB
159AB
163AB
155AB
157AB
167AB
169AB
1A B
179AB
174AB
166AB 168AB
3A
B
178AB
170AB16
4A
B
6A B
2A
B
7A
B
5A
B
156AB
112-114
108-110
152AB
150AB
151AB
200AB
153AB
196AB
194AB
2A
B
0A
B
8A
B
4A
B
198AB
M
ET
I, 3A
B
2A
B
1A
B
0A
B
1A
B
9A B
7A
B
5A B
B
A
B
D X X
X X
X
X X
X
X
X
X
U
SC
G A ir St at io n B or in qu en
A gu ad ill a, Pu er to
R ic o U
SC
G
SF
R
L Pr oj ec tN o:
-1
: Pr op os ed to b e D em ol is he d Li ke ly
N ot
E lig ib le fo r N
R H
P
X
X
X X
X
X X
X X
X X
X
8-
8-
A
A
A
A
A
A
B B
B
B
B
B
B
B
B
B
B
B
B
B
B
B B
B D
D
D
D
D D
D
D
D
D
D D
D D
D D
D
D D
D
D
D D D D D
D
D
D
D D
D
D D
D D
B
A
A A
A A
A A
A A
A A
A
B B
B B
B B
B B
B B
B
B B
B
B
G
G
G
G
G
GG
G
G
G
G
GG
G
G G
G G
G
C
C
C
C
C
C
F
F
F
F F
F
F
F
F F
F
E
E
XXX
X X
X
X X X
X X
X
X X
X
X
XX XX
X X
X X
X X X
X
X
*B uil din gs ha ve no t b ee n for ma lly ev alu at ed fo r e lig ibi lity
; h ow ev er
, S
HP
O an d
US
CG
te nt ati ve ly ch ar ac te riz ed un its as e lig ibl e or n ot el igi ble pu rs ua nt to
P ro gr am m ati c A gr ee m en t d ra fte d in
Th e ex te rio rs of all e xis tin g h ou sin g un its to re m ain w ill be m ain tai ne d.
A t a ll e xis tin g ho us ing un its to re m ain m ar ke d for pr es er va tio n, the o rig ina l in te rio rs wi ll a lso be m ain ta ine d.
E xis tin g ho us ing un its to re ma in bu t n ot ma rk ed fo r p re se rva tio n ma y i n t he fu tu re h av e i nte rio r r en ov at ion an d r ep lac em en t o f f ini sh es
. M an y o f th es e un its n o l on ge r h av e or igi na l in ter ior fin ish es
La P la za
X
XX
X
X
XXX
B
B
B
B
DDD
D
D
X
G
F
F
F
F G
G
G
G
F G
X
M ay be El ig ib le fo rN R
H P*
Pr op os ed to be
X
X
³ Ju
G
B
Ex is tin g
C om m un ity C en te r
U
SC
G A ir St at io n B or in qu en
A gu ad ill a, P ue rt o R ic o
U
SC
G S
FR
L
Pr oj ec t N o:
7-
X Pr op os ed to b e
D em ol is he d
Li ke ly N ot E lig ib le fo r N R
H P
C
C
C C
G G
G G
G G
G G
G
G G
G G
G
G
G G
F
F F
F F
F F
F
*B uil din gs ha ve no t b ee n for ma lly ev alu at ed fo r e lig ibi lity
; h ow ev er
, S
HP
O an d
US
CG
te nt ati ve ly ch ar ac te riz ed un its as e lig ibl e or n ot el igi ble pu rs ua nt to
P ro gr am m ati c A gr ee m en t d ra fte d in
Th e ex te rio rs of all e xis tin g h ou sin g un its to re m ain w ill be m ain tai ne d.
A t a ll e xis tin g ho us ing un its to re m ain m ar ke d for pr es er va tio n, th e o rig ina l in ter ior s w ill als o be m ain tai ne d.
Ex ist ing ho us ing u nit s t o re m ain b ut no t m ar ke d for pr es er va tio n m ay in th e fut ur e ha ve in te rio r r en ov ati on an d re pla ce m en t o f fi nis he s.
Ma ny of th es e un its no lo ng er h av e o rig ina l in te rio r f ini sh es
Li ke ly E lig ib le fo r N R
H P*
Pr op os ed to be
Ju
³
Type A Housing Unit
ATTACHMENT C:
Conceptual Renderings am ey A ir F or ce
S ch oo l S ig n
C on ce pt in te gr at ed pr op os ed a s e du ca tio na l m ar ke r
Fi na l d es ig n de te rm in ed in c on su lta tio n w ith
S H
PO
Pl az a In tro du ce s a ct ua l c om m un ity p la za sp ac e.
S tre ng th en s in te ra ct io ns o f t he c om m un ity , w hi ch is a tr ad iti on al as pe ct fo un d th ro ug ho ut
P ue rto R ic o
C on ce pt ua l d es ig n U til iz e m od er n ar ch ite ct ur al fe at ur es n ot fo un d at e xi st in g bu ild in gs
C on ce pt
D es ig n of C om m un ity
S er vi ce
B ui ld in g
U na cc om pa ni ed P er so nn el
H ou si ng
(U
PH
) B ui ld in g
Ba se
P ro je ct
R eq ui re m ts
A rc hi te ct ur al d es ig n di ffe re nt ia te d w ith e xi st in g ar ea B as e pr oj ec t i nc lu de s 2 su ite s
Ex pa ns io n op tio n fo r t ot al o f 3 su ite s
Ex te rio r c ol or s a nd fi ni sh su bj ec t t o ad ju st m t up le x
H ou si ng
B ui ld in gs eq ui re m rc hi te ct ur al d es ig n di ffe re nt ia te d w ith e xi st in g ar ea B as e pr oj ec t o f 6 d up le x ho m es to ta lin g u ni ts
(3 -b ed , 2
-b at h ea ch
O th er b ui ld
-r ea dy lo ts fo r f ut ur e gr ow th O pt io na l p ro je ct fo r a dd iti on al to ta lin g u ni
ATTACHMENT D:
Wayside and Interpretive Markers/Monuments Examples
Regarding the U.S. Coast Guard
A – EXAMPLE WAYSIDE
MARKER
WAYSIDE MARKER EXAMPLE
WAYSIDE MARKER CONCEPTUAL SCALE AND DESIGN