Attachment L-4 Sample Work Breakdown Structure.docx.pdf
PDF 375 KB Posted
- Attached to
- Request for Proposal (RFP) for the USCG POLAR STAR Service Life Extension Project (SLEP)
- Solicitation number
- 70Z02320RAPS00200
About this file
This document provides details for a request for proposal for the US Coast Guard's POLAR STAR Service Life Extension Project. The Coast Guard intends to award a single-award indefinite-delivery, indefinite-quantity contract for services to extend the service life of the Polar Star cutter. The contract will utilize firm-fixed-price and fixed-price award fee contract line items as specified in the solicitation. Offerors must be able to access materials subject to export regulations due to parts of the requirement. The solicitation provides additional information on this requirement for ship maintenance and modernization services.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POLAR STAR SLEP WBS Sample 1/13/2020
Contract WBS Structure Example
1 1.0 POLAR STAR SLEP
2 1.1 SLEP Funded WI (work items#69-109)
3 1.1.1 WI 69: Non-Recurring Engineering (NRE)
4 1.1.1.1 NRE for WI 74
5 1.1.1.1.1 Installation Drawing
5 1.1.1.1.2 Identification of Contractor Furnished Material
5 1.1.1.1.3 Completion of Contractor Ship check
5 1.1.1.1.4 Final Work Package
5 1.1.1.1.5 Submittal of production schedule
5 1.1.1.1.6 Availability Start Date
5 1.1.1.1.7 Completion of Installation labor
5 1.1.1.1.8 Acceptance Testing
5 1.1.1.1.9 Availability Completion
4 1.1.1.2 NRE for WI 75
5 1.1.1.2.1 Installation Drawing
5 1.1.1.2.2 Identification of Contractor Furnished Material
5 1.1.1.2.3 Completion of Contractor Ship check
5 1.1.1.2.4 Final Work Package
5 1.1.1.2.5 Submittal of production schedule
5 1.1.1.2.6 Availability Start Date
5 1.1.1.2.7 Completion of Installation labor
5 1.1.1.2.8 Acceptance Testing
5 1.1.1.2.9 Availability Completion
4 1.1.1.3 NRE for WI 76
5 1.1.1.3.1 (All WIs followed in similar method)
3 1.1.2 WI 70: PM
4 1.1.2.1 Project Management Plan
4 1.1.2.2 Project Management Reviews
4 1.1.2.3 IMS
4 1.1.2.4 Project Status Reviews
4 1.1.2.5 Severe Weather Plan
4 1.1.2.6 Environmental Management Plan
3 1.1.3 WI 72: NSWCPD CGMCS Installation
4 1.1.3.1 NSWCPD Coordination meetings
4 1.1.3.2 Meeting Minutes
3 1.1.4 WI 73: NSWCPD PPD Installation
4 1.1.4.1 NSWCPD Coordination meetings
1.1.4.2 Meeting Minutes
3 1.1.5 WI 74: Sewage System Grey Water Lift Stations, Install
POLAR STAR SLEP WBS Sample 1/13/2020
4 1.1.5.1 Design Phase
4 1.1.5.2 Installation Phase
4 1.1.5.3 Testing & Final Acceptance
4 1.1.5.4 Logistics Updates
4 1.1.5.5 On the Job Training
4 1.1.5.6 As Built Drawings
2 1.2 Recurring WI (work items: 1-68)
3 1.2.1 WI 1: Hull Plating
4 1.2.1.1 Planning Phase
4 1.2.1.2 Installation Phase
4 1.2.1.3 Commissioning & Tuning
4 1.2.1.4 Testing & Final Inspection
4 1.2.1.5 Logistics Updates
4 1.2.1.6 Non-labor