About this file
This request for proposal is for a single award indefinite-delivery, indefinite-quantity contract to extend the service life of the Polar Star Security Cutter. The Coast Guard intends to issue task orders under the contract consisting of firm-fixed price and fixed price award fee contract line items. The scope of work will include services to extend the service life of the cutter through 2039. The North American Industry Classification System code for ship repair and maintenance is 336611 and the small business size standard is 1,250 employees. Offerors must be able to access materials subject to export controls under the Export Administration Regulations and International Traffic in Arms Regulations. Proposals are due in response to solicitation number 70Z02320RAPS00200 by the date specified in the attached request for proposal format.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Worksheet Instructions This workbook contains three (3) worksheets to include these instructions.
| The cells on the pricing worksheets will be color coded as follows: |
| Cells with the fill color of yellow indicate where the Offeror shall enter proposed pricing. |
| Cells with the fill color of gray indicates cells that are intentionally blank. |
| "Work Item (WI) Pricing" worksheet |
| 1) This worksheet shall be used to calculate a total evaluated price based on the formulas already entered into the workbook. |
| 2) The Offeror shall submit proposed pricing by filling out all yellow highlighted price cells. Enter pricing data to the cent (two decimal places). |
| 3) Maximum Annual Incentive is the maximum amount to be earned for completing the associated Work Item (WI). Once the work item has been completed, this incentive is no longer available in future periods. |
| 4) CG Mandated Quantity indicates both the year a WI must be completed as well as the quantity for that year. For the quantities shown, they are all one (1) with the exception of the WI #60 which requires two (2) to be done in the year 2022 and another two in 2023. A blank cell (gray) in this column indicates that the scheduled year for this WI is at the discretion of the Offeror but need not be entered here. |
| 5) Some WIs show a quantity of one (1) for each of the five years (2021-2025). Examples include WI #s 1 through 6 amongst several others. This indicates that the WI must be done each year (annually). |
| 6) Even where a WI is only to be performed once during the five years, the Offeror must enter a proposed price for each of the five years. |
| "Growth & Voyage Repairs Pricing" worksheet |
| 1) This worksheet shall be to capture unit pricing and pricing rates for potential work that is not included in the WIs shown on the "Work Item (WI) Pricing" worksheet. |
| 2) The 16 items in the SCHEDULE OF SUPPLIES/SERVICES are the same for each of the five (5) years (2021-2025). |
| 3) For 15 of the 16 items, the Offeror shall submit proposed pricing by entering unit pricing data to the cent (two decimal places). The exception to this is Item #2 where the Offeror is to enter a multiple. See the description for Item #2 for additional details. |
| 4) The Estimated Quantity is for evaluation purposes only. See disclaimer at the top of this worksheet. |
| 5) For each of the 16 items, the Offeror must enter a proposed price (or multiple) for all five years (2021-2025). |
Work Item (WI) Pricing WBS Number Funding Work Item CLIN Maxium Annual Incentive Price CG Mandated Quantity
| Dry Dock 2021 Work Item Pricelist | ||||||
| 2.4.2 | OE | WI #1 Hull Plating (U/W Body) Inspect | 00001 | 1 | ||
| 2.4.3 | OE | WI #2 Hull Plating (U/W Body) Ultrasonic Testing | 00002 | 1 | ||
| 2.4.4 | OE | WI #3 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | 00003 | 1 | ||
| 2.4.5 | OE | WI #4 Centerline Propulsion Hub Remove and Reinstall | 00004 | 1 | ||
| 2.4.6 | OE | WI #5 Port Propulsion Hub Remove and Reinstall | 00005 | 1 | ||
| 2.4.7 | OE | WI #6 STBD Propulsion Hub Remove and Reinstall | 00006 | 1 | ||
| 2.4.8 | OE | WI #7 Centerline Propulsion Shafting Remove and Reinstall | 00007 | |||
| 2.4.9 | OE | Wi #8 Port Propulsion Shafting Remove and Reinstall | 00008 | |||
| 2.4.10 | OE | WI #9 STBD Propulsion Shafting Remove and Reinstall | 00009 | |||
| 2.4.11 | OE | WI #10 Sea Strainers (Hayward) Open, Clean, Inspect | 00010 | 1 | ||
| 2.4.12 | OE | WI #11 Sea Valves and Waster Pieces, Overhaul or Renew | 00011 | 1 | ||
| 2.4.13 | OE | WI #12 Boiler, Biennial Maintenance and Inspect | 00012 | 1 | ||
| 2.4.14 | OE | WI #13 Rudder and Rudder Stock, Remove and Inspect | 00013 | |||
| 2.4.15 | OE | WI #14 Cathodic Protection /Zinc Anodes, Renew | 00014 | 1 | ||
| 2.4.16 | OE | WI #15 Temporary Fuel Oil Offload and Storage, Dry-Dock | 00015 | 1 | ||
| 2.4.17 | OE | WI #16 Dry-Dock | 00016 | 1 | ||
| 2.4.18 | OE | WI #17 Dock and Sea Trial Performance, Support, Provide | 00017 | 1 | ||
| 2.4.19 | OE | WI #18 Miranda Davit, Annual Inspect | 00018 | 1 | ||
| 2.4.20 | OE | WI #19 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | 00019 | 1 | ||
| 2.4.21 | OE | WI #20 Allied K280-70 Crane, Port, Annual Inspect and Repair | 00020 | 1 | ||
| 2.4.22 | OE | WI #21 Allied T60-60 Crane, Annual Inspect and Repair | 00021 | 1 | ||
| 2.4.23 | OE | WI #22 Fuel Oil Purifier (FOP) Overhaul, 4000 Hour | 00022 | |||
| 2.4.24 | OE | WI #23 Lube Oil Purifier (LOP) Overhaul, 4000 Hour | 00023 | 1 | ||
| 2.4.25 | OE | WI #24 Hydraulic Oil Purifier (HOP) Overhaul, 4000 Hour | 00024 | |||
| 2.4.26 | OE | WI #25 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | 00025 | 1 | ||
| 2.4.27 | OE | WI #26 Shaft Handling Equipment, Maintenance and Storage | 00026 | 1 | ||
| 2.4.28 | OE | WI #27 Elevators, Annual Maintenance and Certification | 00027 | 1 | ||
| 2.4.29 | OE | WI #28 Dumbwaiter, Annual Maintenance and Certification | 00028 | |||
| 2.4.30 | OE | WI #29 Fixed Fire Suppression Systems, Annual Inspect and Certification | 00029 | 1 | ||
| 2.4.31 | OE | WI #30 Anchor Windlass, Service & Inspect | 00030 | 1 | ||
| 2.4.32 | OE | WI #31 Voids (Non-Assessable), Internal Surfaces, Preserve | 00031 | |||
| 2.4.33 | OE | WI #32 U/W Body, Preserve 100% | 00032 | |||
| 2.4.34 | OE | WI #33 U/W Body, Preserve (Partial) | 00033 | |||
| 2.4.35 | OE | WI #34 Stern Tube Interior Surfaces, Preserve 100% | 00034 | |||
| 2.4.36 | OE | WI #35 Anchor Chain(s) and Ground Tackle, Inspect & Repair | 00035 | 1 | ||
| 2.4.37 | OE | WI #36 Lube Oil Purifier (LOP) Overhaul 8,000 Hour | 00036 | |||
| 2.4.38 | OE | WI #37 Fuel Oil Purifier (FOP) Overhaul 8,000 Hour | 00037 | 1 | ||
| 2.4.39 | OE | WI #38 Hydraulic Oil Purifier (HOP) Overhaul, 8000 Hour | 00038 | 1 | ||
| 2.4.40 | OE | WI #39 Vent Ducts (Galley & Scullery), Commercial Cleaning | 00039 | |||
| 2.4.41 | OE | WI #40 Vent Ducts (Laundry Exhaust), Commercial Cleaning | 00040 | |||
| 2.4.42 | OE | WI #41 Evaporators (General), Overhaul | 00041 | |||
| 2.4.43 | OE | WI #42 Voids (Accessible), Clean and Inspect | 00042 | |||
| 2.4.44 | OE | WI #43 Flight Deck Nets, Overhaul 5 year | 00043 | |||
| 2.4.45 | OE | WI #44 Sewage Holding Tank(s) Clean/Inspect | 00044 | |||
| 2.4.46 | OE | WI #45 Tanks (Potable Water), Clean/Inspect | 00045 | |||
| 2.4.47 | OE | WI #46 Potable Water Pneumatic Tank and Hot Water Storage Tank, Clean, Inspect, Hydrotest | 00046 | |||
| 2.4.48 | OE | WI #47 Tanks (Diesel Fuel Oil), Clean and Inspect (2022) | 00047 | |||
| 2.4.49 | OE | WI #48 Tanks (Aviation Fuel), Clean and Inspect | 00048 | |||
| 2.4.50 | OE | WI #49 Voids (Non-Accessible), Leak Test | 00049 | |||
| 2.4.51 | OE | WI #50 Appendages (U/W), Leak Test | 00050 | |||
| 2.4.52 | OE | WI #51 Fire Prevention and Protection, Provide | 00051 | 1 | ||
| 2.4.53 | OE | WI #52 Flex Hose Assemblies, Renew (2021) | 00052 | 1 | ||
| 2.4.54 | OE | WI #53 Flex Hose Assemblies, Renew (2022) | 00053 | |||
| 2.4.55 | OE | WI #54 Flex Hose Assemblies, Renew (2023) | 00054 | |||
| 2.4.56 | OE | WI #55 Flex Hose Assemblies, Renew (2024) | 00055 | |||
| 2.4.57 | OE | WI #56 Flex Hose Assemblies, Renew (2025) | 00056 | |||
| 2.4.58 | OE | WI #57 Distilling Plant Pumps and Motors, Overhaul | 00057 | |||
| 2.4.59 | OE | WI #58 Main Reduction Gear (MRG), Maintenance and Inspection | 00058 | |||
| 2.4.60 | OE | WI #59 Main Propulsion Motors (MRM), Clean and Inspect | 00059 | |||
| 2.4.61 | OE | WI #60 Main Propulsion Generators (MRG), Clean and Inspect | 00060 | |||
| 2.4.62 | OE | WI #61 Tanks (Diesel Fuel Oil), Clean and Inspect (2024) | 00061 | |||
| 2.4.63 | OE | WI #62 Boiler, Strength and Integrity Inspection | 00062 | |||
| 2.4.64 | OE | WI #63 Tanks (Boilers Feedwater), Preserve "100%" | 00063 | |||
| 2.4.65 | OE | WI #64 Warping Capstan, Inspect and Repair | 00064 | 1 | ||
| 2.4.66 | OE | WI #65 Ship Services Diesel Generator Exhaust Stack Uptakes, Commercial Clean | 00065 | 1 | ||
| 2.4.67 | OE | WI #66 Main Diesel Engine Exhaust Stack Uptakes, Commercial Clean | 00066 | 1 | ||
| 2.4.68 | OE | WI #67 Boiler Exhaust Stack Uptakes, Commercial Clean | 00067 | 1 | ||
| 2.4.69 | OE | WI #68 Compressed Air Receivers and System Valves (all), Clean, Inspect, Hydro and Lift | 00068 | 1 | ||
| 1.2.1 | PC&I | WI #69 Non-Recurring Engineering | 00069 | $213,200.00 | 1 | |
| 1.2.2 | PC&I | WI #70 Project Management and Planning, Perform [PoP=18 months for 2021; 12 months for 2022-2025] | 00070 | 1 | ||
| 1.2.3 | PC&I | WI #71 Weight and Moment, Management | 00071 | 1 | ||
| 1.2.4 | PC&I | WI #72 NSWCPD CGMCS Installation, Coordinate | 00072 | 1 | ||
| 1.2.5 | PC&I | WI #73 NSWCPD PPD Installation, Coordinate | 00073 | 1 | ||
| 1.2.6 | PC&I | WI #74 Sewage System Grey Water Lift Stations, Install | 00074 | $322,400.00 | ||
| 1.2.7 | PC&I | WI #75 Sewage Retention Tank, Add | 00075 | $322,400.00 | ||
| 1.2.8 | PC&I | WI #76 Piping, Renewal | 00076 | $213,200.00 | ||
| 1.2.9 | PC&I | WI #77 Gyro Repeaters, Recapitalize | 00077 | $213,200.00 | ||
| 1.2.10 | PC&I | WI #78 Boiler, Recapitalize Ancillaries | 00078 | $213,200.00 | ||
| 1.2.11 | PC&I | WI #79 1MC, Renewal | 00079 | $213,200.00 | 1 | |
| 1.2.12 | PC&I | WI #80 6MC, Refurbish | 00080 | $213,200.00 | ||
| 1.2.13 | PC&I | WI #81 Ship Service Air Compressors, Recapitalize | 00081 | $213,200.00 | ||
| 1.2.14 | PC&I | WI #82 Start Air System, Modify | 00082 | $104,000.00 | ||
| 1.2.15 | PC&I | WI #83 Oily Water Separator, Recapitalize | 00083 | $322,400.00 | ||
| 1.2.16 | PC&I | WI #84 Fire Pump Manual Bus Transfer, Recapitalize | 00084 | $41,600.00 | ||
| 1.2.17 | PC&I | WI #85 Dumbwaiter, Recapitalize | 00085 | $213,200.00 | ||
| 1.2.18 | PC&I | WI #86 Elevators, Upgrade | 00086 | $213,200.00 | ||
| 1.2.19 | PC&I | WI #87 Small Boat Davit Control Equipment, Relocation | 00087 | $213,200.00 | ||
| 1.2.20 | PC&I | WI #88 Commissary Equipment, Recapitalize | 00088 | $104,000.00 | ||
| 1.2.21 | PC&I | WI #89 Fire Detection System, Recapitalize | 00089 | $104,000.00 | ||
| 1.2.22 | PC&I | WI #90 400 Hz System, Modify | 00090 | $213,200.00 | ||
| 1.2.23 | PC&I | WI #91 False Overhead, Remove | 00091 | $104,000.00 | 1 | |
| 1.2.24 | PC&I | WI #92 Heating Ventilation and Air Conditioning System, Groom, (Zones 1) | 00092 | |||
| 1.2.25 | PC&I | WI #93 Heating Ventilation and Air Conditioning System, Groom, (Zones 2) | 00093 | |||
| 1.2.26 | PC&I | WI #94 Heating Ventilation and Air Conditioning System, Groom, (Zones 3) | 00094 | |||
| 1.2.27 | PC&I | WI #95 Heating Ventilation and Air Conditioning System, Groom, (Zones 4) | 00095 | |||
| 1.2.28 | PC&I | WI #96 Heating Ventilation and Air Conditioning System, Groom, (Zones 5) | 00096 | |||
| 1.2.29 | PC&I | WI #97 Heating Ventilation and Air Conditioning System, Groom, (Zones 6) | 00097 | |||
| 1.2.30 | PC&I | WI #98 Heating Ventilation and Air Conditioning System, Groom, (Zones 7) | 00098 | |||
| 1.2.31 | PC&I | WI #99 Heating Ventilation and Air Conditioning System, Groom, (Zones 8) | 00099 | |||
| 1.2.32 | PC&I | WI #100 Heating Ventilation and Air Conditioning System, Groom, (Zones 9) | 00100 | |||
| 1.2.33 | PC&I | WI #101 Heating Ventilation and Air Conditioning System, Groom, (Zones 10) | 00101 | |||
| 1.2.34 | PC&I | WI #102 Heating Ventilation and Air Conditioning System, Groom, (Zones 11) | 00102 | |||
| 1.2.35 | PC&I | WI #103 False Overhead, Recapitalize | 00103 | $104,000.00 | ||
| 1.2.36 | PC&I | WI #104 Evaporator Salinity Monitoring, Recapitalize | 00104 | $41,600.00 | ||
| 1.2.37 | PC&I | WI #105 Ancillary Pump and Motor Assemblies, Recapitalize | 00105 | $322,400.00 | ||
| 1.2.38 | PC&I | WI #106 Flooding Alarms, Recapitalize | 00106 | $41,600.00 | ||
| 1.2.39 | PC&I | WI #107 Wing Shaft Disconnect Coupling, Recapitalize | 00107 | $460,200.00 | ||
| 1.2.40 | PC&I | WI #108 Centerline Disconnect Coupling, Recapitalize | 00108 | $460,200.00 | ||
| 1.2.41 | OE | WI #109 Temporary Services, Contractor Facility, Provide | 00109 | 1 | ||
| 2.4.70 | OE | WI #110 Anticipated Growth | 00110 | $0.00 | 1 | |
| 2.4.71 | OE | WI #111 Voyage Repairs | 00111 | $0.00 | 1 | |
| Planned Total | $0.00 | $0.00 | ||||
| Total Year One Evaluated Price | $0.00 |
| Dry Dock 2022 Work Item Pricelist | ||||||
| 2.4.2 | OE | WI #1 Hull Plating (U/W Body) Inspect | 10001 | 1 | ||
| 2.4.3 | OE | WI #2 Hull Plating (U/W Body) Ultrasonic Testing | 10002 | 1 | ||
| 2.4.4 | OE | WI #3 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | 10003 | 1 | ||
| 2.4.5 | OE | WI #4 Centerline Propulsion Hub Remove and Reinstall | 10004 | 1 | ||
| 2.4.6 | OE | WI #5 Port Propulsion Hub Remove and Reinstall | 10005 | 1 | ||
| 2.4.7 | OE | WI #6 STBD Propulsion Hub Remove and Reinstall | 10006 | 1 | ||
| 2.4.8 | OE | WI #7 Centerline Propulsion Shafting Remove and Reinstall | 10007 | 1 | ||
| 2.4.9 | OE | Wi #8 Port Propulsion Shafting Remove and Reinstall | 10008 | |||
| 2.4.10 | OE | WI #9 STBD Propulsion Shafting Remove and Reinstall | 10009 | |||
| 2.4.11 | OE | WI #10 Sea Strainers (Hayward) Open, Clean, Inspect | 10010 | 1 | ||
| 2.4.12 | OE | WI #11 Sea Valves and Waster Pieces, Overhaul or Renew | 10011 | |||
| 2.4.13 | OE | WI #12 Boiler, Biennial Maintenance and Inspect | 10012 | |||
| 2.4.14 | OE | WI #13 Rudder and Rudder Stock, Remove and Inspect | 10013 | 1 | ||
| 2.4.15 | OE | WI #14 Cathodic Protection /Zinc Anodes, Renew | 10014 | 1 | ||
| 2.4.16 | OE | WI #15 Temporary Fuel Oil Offload and Storage, Dry-Dock | 10015 | 1 | ||
| 2.4.17 | OE | WI #16 Dry-Dock | 10016 | 1 | ||
| 2.4.18 | OE | WI #17 Dock and Sea Trial Performance, Support, Provide | 10017 | 1 | ||
| 2.4.19 | OE | WI #18 Miranda Davit, Annual Inspect | 10018 | 1 | ||
| 2.4.20 | OE | WI #19 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | 10019 | 1 | ||
| 2.4.21 | OE | WI #20 Allied K280-70 Crane, Port, Annual Inspect and Repair | 10020 | 1 | ||
| 2.4.22 | OE | WI #21 Allied T60-60 Crane, Annual Inspect and Repair | 10021 | 1 | ||
| 2.4.23 | OE | WI #22 Fuel Oil Purifier (FOP) Overhaul, 4000 Hour | 10022 | 1 | ||
| 2.4.24 | OE | WI #23 Lube Oil Purifier (LOP) Overhaul, 4000 Hour | 10023 | |||
| 2.4.25 | OE | WI #24 Hydraulic Oil Purifier (HOP) Overhaul, 4000 Hour | 10024 | |||
| 2.4.26 | OE | WI #25 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | 10025 | 1 | ||
| 2.4.27 | OE | WI #26 Shaft Handling Equipment, Maintenance and Storage | 10026 | 1 | ||
| 2.4.28 | OE | WI #27 Elevators, Annual Maintenance and Certification | 10027 | 1 | ||
| 2.4.29 | OE | WI #28 Dumbwaiter, Annual Maintenance and Certification | 10028 | |||
| 2.4.30 | OE | WI #29 Fixed Fire Suppression Systems, Annual Inspect and Certification | 10029 | 1 | ||
| 2.4.31 | OE | WI #30 Anchor Windlass, Service & Inspect | 10030 | |||
| 2.4.32 | OE | WI #31 Voids (Non-Assessable), Internal Surfaces, Preserve | 10031 | |||
| 2.4.33 | OE | WI #32 U/W Body, Preserve 100% | 10032 | |||
| 2.4.34 | OE | WI #33 U/W Body, Preserve (Partial) | 10033 | |||
| 2.4.35 | OE | WI #34 Stern Tube Interior Surfaces, Preserve 100% | 10034 | |||
| 2.4.36 | OE | WI #35 Anchor Chain(s) and Ground Tackle, Inspect & Repair | 10035 | |||
| 2.4.37 | OE | WI #36 Lube Oil Purifier (LOP) Overhaul 8,000 Hour | 10036 | 1 | ||
| 2.4.38 | OE | WI #37 Fuel Oil Purifier (FOP) Overhaul 8,000 Hour | 10037 | |||
| 2.4.39 | OE | WI #38 Hydraulic Oil Purifier (HOP) Overhaul, 8000 Hour | 10038 | |||
| 2.4.40 | OE | WI #39 Vent Ducts (Galley & Scullery), Commercial Cleaning | 10039 | 1 | ||
| 2.4.41 | OE | WI #40 Vent Ducts (Laundry Exhaust), Commercial Cleaning | 10040 | 1 | ||
| 2.4.42 | OE | WI #41 Evaporators (General), Overhaul | 10041 | |||
| 2.4.43 | OE | WI #42 Voids (Accessible), Clean and Inspect | 10042 | 1 | ||
| 2.4.44 | OE | WI #43 Flight Deck Nets, Overhaul 5 year | 10043 | |||
| 2.4.45 | OE | WI #44 Sewage Holding Tank(s) Clean/Inspect | 10044 | 1 | ||
| 2.4.46 | OE | WI #45 Tanks (Potable Water), Clean/Inspect | 10045 | 1 | ||
| 2.4.47 | OE | WI #46 Potable Water Pneumatic Tank and Hot Water Storage Tank, Clean, Inspect, Hydrotest | 10046 | 1 | ||
| 2.4.48 | OE | WI #47 Tanks (Diesel Fuel Oil), Clean and Inspect (2022) | 10047 | 1 | ||
| 2.4.49 | OE | WI #48 Tanks (Aviation Fuel), Clean and Inspect | 10048 | |||
| 2.4.50 | OE | WI #49 Voids (Non-Accessible), Leak Test | 10049 | |||
| 2.4.51 | OE | WI #50 Appendages (U/W), Leak Test | 10050 | 1 | ||
| 2.4.52 | OE | WI #51 Fire Prevention and Protection, Provide | 10051 | 1 | ||
| 2.4.53 | OE | WI #52 Flex Hose Assemblies, Renew (2021) | 10052 | |||
| 2.4.54 | OE | WI #53 Flex Hose Assemblies, Renew (2022) | 10053 | 1 | ||
| 2.4.55 | OE | WI #54 Flex Hose Assemblies, Renew (2023) | 10054 | |||
| 2.4.56 | OE | WI #55 Flex Hose Assemblies, Renew (2024) | 10055 | |||
| 2.4.57 | OE | WI #56 Flex Hose Assemblies, Renew (2025) | 10056 | |||
| 2.4.58 | OE | WI #57 Distilling Plant Pumps and Motors, Overhaul | 10057 | |||
| 2.4.59 | OE | WI #58 Main Reduction Gear (MRG), Maintenance and Inspection | 10058 | 1 | ||
| 2.4.60 | OE | WI #59 Main Propulsion Motors (MRM), Clean and Inspect | 10059 | 1 | ||
| 2.4.61 | OE | WI #60 Main Propulsion Generators (MRG), Clean and Inspect | 10060 | 2 | ||
| 2.4.62 | OE | WI #61 Tanks (Diesel Fuel Oil), Clean and Inspect (2024) | 10061 | |||
| 2.4.63 | OE | WI #62 Boiler, Strength and Integrity Inspection | 10062 | |||
| 2.4.64 | OE | WI #63 Tanks (Boilers Feedwater), Preserve "100%" | 10063 | 1 | ||
| 2.4.65 | OE | WI #64 Warping Capstan, Inspect and Repair | 10064 | |||
| 2.4.66 | OE | WI #65 Ship Services Diesel Generator Exhaust Stack Uptakes, Commercial Clean | 10065 | |||
| 2.4.67 | OE | WI #66 Main Diesel Engine Exhaust Stack Uptakes, Commercial Clean | 10066 | |||
| 2.4.68 | OE | WI #67 Boiler Exhaust Stack Uptakes, Commercial Clean | 10067 | |||
| 2.4.69 | OE | WI #68 Compressed Air Receivers and System Valves (all), Clean, Inspect, Hydro and Lift | 10068 | |||
| 1.2.1 | PC&I | WI #69 Non-Recurring Engineering | ||||
| 1.2.2 | PC&I | WI #70 Project Management and Planning, Perform [PoP=12 months for 2022-2025] | 10070 | |||
| 1.2.3 | PC&I | WI #71 Weight and Moment, Management | 10071 | 1 | ||
| 1.2.4 | PC&I | WI #72 NSWCPD CGMCS Installation, Coordinate | 10072 | |||
| 1.2.5 | PC&I | WI #73 NSWCPD PPD Installation, Coordinate | 10073 | |||
| 1.2.6 | PC&I | WI #74 Sewage System Grey Water Lift Stations, Install | 10074 | $322,400.00 | ||
| 1.2.7 | PC&I | WI #75 Sewage Retention Tank, Add | 10075 | $322,400.00 | ||
| 1.2.8 | PC&I | WI #76 Piping, Renewal | 10076 | $213,200.00 | ||
| 1.2.9 | PC&I | WI #77 Gyro Repeaters, Recapitalize | 10077 | $213,200.00 | ||
| 1.2.10 | PC&I | WI #78 Boiler, Recapitalize Ancillaries | 10078 | $213,200.00 | ||
| 1.2.11 | PC&I | WI #79 1MC, Renewal | 10079 | $213,200.00 | ||
| 1.2.12 | PC&I | WI #80 6MC, Refurbish | 10080 | $213,200.00 | ||
| 1.2.13 | PC&I | WI #81 Ship Service Air Compressors, Recapitalize | 10081 | $213,200.00 | ||
| 1.2.14 | PC&I | WI #82 Start Air System, Modify | 10082 | $104,000.00 | ||
| 1.2.15 | PC&I | WI #83 Oily Water Separator, Recapitalize | 10083 | $322,400.00 | ||
| 1.2.16 | PC&I | WI #84 Fire Pump Manual Bus Transfer, Recapitalize | 10084 | $41,600.00 | ||
| 1.2.17 | PC&I | WI #85 Dumbwaiter, Recapitalize | 10085 | $213,200.00 | ||
| 1.2.18 | PC&I | WI #86 Elevators, Upgrade | 10086 | $213,200.00 | ||
| 1.2.19 | PC&I | WI #87 Small Boat Davit Control Equipment, Relocation | 10087 | $213,200.00 | ||
| 1.2.20 | PC&I | WI #88 Commissary Equipment, Recapitalize | 10088 | $104,000.00 | ||
| 1.2.21 | PC&I | WI #89 Fire Detection System, Recapitalize | 10089 | $104,000.00 | ||
| 1.2.22 | PC&I | WI #90 400 Hz System, Modify | 10090 | $213,200.00 | ||
| 1.2.23 | PC&I | WI #91 False Overhead, Remove | 10091 | $104,000.00 | ||
| 1.2.24 | PC&I | WI #92 Heating Ventilation and Air Conditioning System, Groom, (Zones 1) | 10092 | |||
| 1.2.25 | PC&I | WI #93 Heating Ventilation and Air Conditioning System, Groom, (Zones 2) | 10093 | |||
| 1.2.26 | PC&I | WI #94 Heating Ventilation and Air Conditioning System, Groom, (Zones 3) | 10094 | |||
| 1.2.27 | PC&I | WI #95 Heating Ventilation and Air Conditioning System, Groom, (Zones 4) | 10095 | |||
| 1.2.28 | PC&I | WI #96 Heating Ventilation and Air Conditioning System, Groom, (Zones 5) | 10096 | |||
| 1.2.29 | PC&I | WI #97 Heating Ventilation and Air Conditioning System, Groom, (Zones 6) | 10097 | |||
| 1.2.30 | PC&I | WI #98 Heating Ventilation and Air Conditioning System, Groom, (Zones 7) | 10098 | |||
| 1.2.31 | PC&I | WI #99 Heating Ventilation and Air Conditioning System, Groom, (Zones 8) | 10099 | |||
| 1.2.32 | PC&I | WI #100 Heating Ventilation and Air Conditioning System, Groom, (Zones 9) | 10100 | |||
| 1.2.33 | PC&I | WI #101 Heating Ventilation and Air Conditioning System, Groom, (Zones 10) | 10101 | |||
| 1.2.34 | PC&I | WI #102 Heating Ventilation and Air Conditioning System, Groom, (Zones 11) | 10102 | |||
| 1.2.35 | PC&I | WI #103 False Overhead, Recapitalize | 10103 | $104,000.00 | ||
| 1.2.36 | PC&I | WI #104 Evaporator Salinity Monitoring, Recapitalize | 10104 | $41,600.00 | ||
| 1.2.37 | PC&I | WI #105 Ancillary Pump and Motor Assemblies, Recapitalize | 10105 | $322,400.00 | ||
| 1.2.38 | PC&I | WI #106 Flooding Alarms, Recapitalize | 10106 | $41,600.00 | ||
| 1.2.39 | PC&I | WI #107 Wing Shaft Disconnect Coupling, Recapitalize | 10107 | $460,200.00 | 1 | |
| 1.2.40 | PC&I | WI #108 Centerline Disconnect Coupling, Recapitalize | 10108 | $460,200.00 | ||
| 1.2.41 | OE | WI #109 Temporary Services, Contractor Facility, Provide | 10109 | $0.00 | 1 | |
| 2.4.70 | OE | WI #110 Anticipated Growth | 10110 | $0.00 | 1 | |
| 2.4.71 | OE | WI #111 Voyage Repairs | 10111 | $0.00 | 1 | |
| Planned Total | $0.00 | $0.00 | ||||
| Total Year One Evaluated Price | $0.00 |
| Dry Dock 2023 Work Item Pricelist | ||||||
| 2.4.2 | OE | WI #1 Hull Plating (U/W Body) Inspect | 20001 | 1 | ||
| 2.4.3 | OE | WI #2 Hull Plating (U/W Body) Ultrasonic Testing | 20002 | 1 | ||
| 2.4.4 | OE | WI #3 Propulsion Shafting, Strain Guage and Air Gap Readings (All) | 20003 | 1 | ||
| 2.4.5 | OE | WI #4 Centerline Propulsion Hub Remove and Reinstall | 20004 | 1 | ||
| 2.4.6 | OE | WI #5 Port Propulsion Hub Remove and Reinstall | 20005 | 1 | ||
| 2.4.7 | OE | WI #6 STBD Propulsion Hub Remove and Reinstall | 20006 | 1 | ||
| 2.4.8 | OE | WI #7 Centerline Propulsion Shafting Remove and Reinstall | 20007 | |||
| 2.4.9 | OE | Wi #8 Port Propulsion Shafting Remove and Reinstall | 20008 | 1 | ||
| 2.4.10 | OE | WI #9 STBD Propulsion Shafting Remove and Reinstall | 20009 | 1 | ||
| 2.4.11 | OE | WI #10 Sea Strainers (Hayward) Open, Clean, Inspect | 20010 | 1 | ||
| 2.4.12 | OE | WI #11 Sea Valves and Waster Pieces, Overhaul or Renew | 20011 | 1 | ||
| 2.4.13 | OE | WI #12 Boiler, Biennial Maintenance and Inspect | 20012 | |||
| 2.4.14 | OE | WI #13 Rudder and Rudder Stock, Remove and Inspect | 20013 | |||
| 2.4.15 | OE | WI #14 Cathodic Protection /Zinc Anodes, Renew | 20014 | 1 | ||
| 2.4.16 | OE | WI #15 Temporary Fuel Oil Offload and Storage, Dry-Dock | 20015 | 1 | ||
| 2.4.17 | OE | WI #16 Dry-Dock | 20016 | 1 | ||
| 2.4.18 | OE | WI #17 Dock and Sea Trial Performance, Support, Provide | 20017 | 1 | ||
| 2.4.19 | OE | WI #18 Miranda Davit, Annual Inspect | 20018 | 1 | ||
| 2.4.20 | OE | WI #19 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | 20019 | 1 | ||
| 2.4.21 | OE | WI #20 Allied K280-70 Crane, Port, Annual Inspect and Repair | 20020 | 1 | ||
| 2.4.22 | OE | WI #21 Allied T60-60 Crane, Annual Inspect and Repair | 20021 | 1 | ||
| 2.4.23 | OE | WI #22 Fuel Oil Purifier (FOP) Overhaul, 4000 Hour | 20022 | |||
| 2.4.24 | OE | WI #23 Lube Oil Purifier (LOP) Overhaul, 4000 Hour | 20023 | |||
| 2.4.25 | OE | WI #24 Hydraulic Oil Purifier (HOP) Overhaul, 4000 Hour | 20024 | 1 | ||
| 2.4.26 | OE | WI #25 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | 20025 | 1 | ||
| 2.4.27 | OE | WI #26 Shaft Handling Equipment, Maintenance and Storage | 20026 | 1 | ||
| 2.4.28 | OE | WI #27 Elevators, Annual Maintenance and Certification | 20027 | 1 | ||
| 2.4.29 | OE | WI #28 Dumbwaiter, Annual Maintenance and Certification | 20028 | |||
| 2.4.30 | OE | WI #29 Fixed Fire Suppression Systems, Annual Inspect and Certification | 20029 | 1 | ||
| 2.4.31 | OE | WI #30 Anchor Windlass, Service & Inspect | 20030 | 1 | ||
| 2.4.32 | OE | WI #31 Voids (Non-Assessable), Internal Surfaces, Preserve | 20031 | 1 | ||
| 2.4.33 | OE | WI #32 U/W Body, Preserve 100% | 20032 | 1 | ||
| 2.4.34 | OE | WI #33 U/W Body, Preserve (Partial) | 20033 | |||
| 2.4.35 | OE | WI #34 Stern Tube Interior Surfaces, Preserve 100% | 20034 | |||
| 2.4.36 | OE | WI #35 Anchor Chain(s) and Ground Tackle, Inspect & Repair | 20035 | |||
| 2.4.37 | OE | WI #36 Lube Oil Purifier (LOP) Overhaul 8,000 Hour | 20036 | |||
| 2.4.38 | OE | WI #37 Fuel Oil Purifier (FOP) Overhaul 8,000 Hour | 20037 | 1 | ||
| 2.4.39 | OE | WI #38 Hydraulic Oil Purifier (HOP) Overhaul, 8000 Hour | 20038 | |||
| 2.4.40 | OE | WI #39 Vent Ducts (Galley & Scullery), Commercial Cleaning | 20039 | |||
| 2.4.41 | OE | WI #40 Vent Ducts (Laundry Exhaust), Commercial Cleaning | 20040 | |||
| 2.4.42 | OE | WI #41 Evaporators (General), Overhaul | 20041 | 1 | ||
| 2.4.43 | OE | WI #42 Voids (Accessible), Clean and Inspect | 20042 | |||
| 2.4.44 | OE | WI #43 Flight Deck Nets, Overhaul 5 year | 20043 | 1 | ||
| 2.4.45 | OE | WI #44 Sewage Holding Tank(s) Clean/Inspect | 20044 | |||
| 2.4.46 | OE | WI #45 Tanks (Potable Water), Clean/Inspect | 20045 | |||
| 2.4.47 | OE | WI #46 Potable Water Pneumatic Tank and Hot Water Storage Tank, Clean, Inspect, Hydrotest | 20046 | |||
| 2.4.48 | OE | WI #47 Tanks (Diesel Fuel Oil), Clean and Inspect (2022) | 20047 | |||
| 2.4.49 | OE | WI #48 Tanks (Aviation Fuel), Clean and Inspect | 20048 | 1 | ||
| 2.4.50 | OE | WI #49 Voids (Non-Accessible), Leak Test | 20049 | 1 | ||
| 2.4.51 | OE | WI #50 Appendages (U/W), Leak Test | 20050 | |||
| 2.4.52 | OE | WI #51 Fire Prevention and Protection, Provide | 20051 | 1 | ||
| 2.4.53 | OE | WI #52 Flex Hose Assemblies, Renew (2021) | 20052 | |||
| 2.4.54 | OE | WI #53 Flex Hose Assemblies, Renew (2022) | 20053 | |||
| 2.4.55 | OE | WI #54 Flex Hose Assemblies, Renew (2023) | 20054 | 1 | ||
| 2.4.56 | OE | WI #55 Flex Hose Assemblies, Renew (2024) | 20055 | |||
| 2.4.57 | OE | WI #56 Flex Hose Assemblies, Renew (2025) | 20056 | |||
| 2.4.58 | OE | WI #57 Distilling Plant Pumps and Motors, Overhaul | 20057 | 1 | ||
| 2.4.59 | OE | WI #58 Main Reduction Gear (MRG), Maintenance and Inspection | 20058 | |||
| 2.4.60 | OE | WI #59 Main Propulsion Motors (MRM), Clean and Inspect | 20059 | 1 | ||
| 2.4.61 | OE | WI #60 Main Propulsion Generators (MRG), Clean and Inspect | 20060 | 2 | ||
| 2.4.62 | OE | WI #61 Tanks (Diesel Fuel Oil), Clean and Inspect (2024) | 20061 | |||
| 2.4.63 | OE | WI #62 Boiler, Strength and Integrity Inspection | 20062 | 1 | ||
| 2.4.64 | OE | WI #63 Tanks (Boilers Feedwater), Preserve "100%" | 20063 | |||
| 2.4.65 | OE | WI #64 Warping Capstan, Inspect and Repair | 20064 | 1 | ||
| 2.4.66 | OE | WI #65 Ship Services Diesel Generator Exhaust Stack Uptakes, Commercial Clean | 20065 | |||
| 2.4.67 | OE | WI #66 Main Diesel Engine Exhaust Stack Uptakes, Commercial Clean | 20066 | |||
| 2.4.68 | OE | WI #67 Boiler Exhaust Stack Uptakes, Commercial Clean | 20067 | 1 | ||
| 2.4.69 | OE | WI #68 Compressed Air Receivers and System Valves (all), Clean, Inspect, Hydro and Lift | 20068 | |||
| 1.2.1 | PC&I | WI #69 Non-Recurring Engineering | ||||
| 1.2.2 | PC&I | WI #70 Project Management and Planning, Perform [PoP=12 months for 2022-2025] | 20070 | |||
| 1.2.3 | PC&I | WI #71 Weight and Moment, Management | 20071 | 1 | ||
| 1.2.4 | PC&I | WI #72 NSWCPD CGMCS Installation, Coordinate | 20072 | |||
| 1.2.5 | PC&I | WI #73 NSWCPD PPD Installation, Coordinate | 20073 | |||
| 1.2.6 | PC&I | WI #74 Sewage System Grey Water Lift Stations, Install | 20074 | $322,400.00 | ||
| 1.2.7 | PC&I | WI #75 Sewage Retention Tank, Add | 20075 | $322,400.00 | ||
| 1.2.8 | PC&I | WI #76 Piping, Renewal | 20076 | $213,200.00 | ||
| 1.2.9 | PC&I | WI #77 Gyro Repeaters, Recapitalize | 20077 | $213,200.00 | ||
| 1.2.10 | PC&I | WI #78 Boiler, Recapitalize Ancillaries | 20078 | $213,200.00 | ||
| 1.2.11 | PC&I | WI #79 1MC, Renewal | 20079 | $213,200.00 | ||
| 1.2.12 | PC&I | WI #80 6MC, Refurbish | 20080 | $213,200.00 | ||
| 1.2.13 | PC&I | WI #81 Ship Service Air Compressors, Recapitalize | 20081 | $213,200.00 | ||
| 1.2.14 | PC&I | WI #82 Start Air System, Modify | 20082 | $104,000.00 | ||
| 1.2.15 | PC&I | WI #83 Oily Water Separator, Recapitalize | 20083 | $322,400.00 | ||
| 1.2.16 | PC&I | WI #84 Fire Pump Manual Bus Transfer, Recapitalize | 20084 | $41,600.00 | ||
| 1.2.17 | PC&I | WI #85 Dumbwaiter, Recapitalize | 20085 | $213,200.00 | ||
| 1.2.18 | PC&I | WI #86 Elevators, Upgrade | 20086 | $213,200.00 | ||
| 1.2.19 | PC&I | WI #87 Small Boat Davit Control Equipment, Relocation | 20087 | $213,200.00 | ||
| 1.2.20 | PC&I | WI #88 Commissary Equipment, Recapitalize | 20088 | $104,000.00 | ||
| 1.2.21 | PC&I | WI #89 Fire Detection System, Recapitalize | 20089 | $104,000.00 | ||
| 1.2.22 | PC&I | WI #90 400 Hz System, Modify | 20090 | $213,200.00 | ||
| 1.2.23 | PC&I | WI #91 False Overhead, Remove | 20091 | $104,000.00 | ||
| 1.2.24 | PC&I | WI #92 Heating Ventilation and Air Conditioning System, Groom, (Zones 1) | 20092 | |||
| 1.2.25 | PC&I | WI #93 Heating Ventilation and Air Conditioning System, Groom, (Zones 2) | 20093 | |||
| 1.2.26 | PC&I | WI #94 Heating Ventilation and Air Conditioning System, Groom, (Zones 3) | 20094 | |||
| 1.2.27 | PC&I | WI #95 Heating Ventilation and Air Conditioning System, Groom, (Zones 4) | 20095 | |||
| 1.2.28 | PC&I | WI #96 Heating Ventilation and Air Conditioning System, Groom, (Zones 5) | 20096 | |||
| 1.2.29 | PC&I | WI #97 Heating Ventilation and Air Conditioning System, Groom, (Zones 6) | 20097 | |||
| 1.2.30 | PC&I | WI #98 Heating Ventilation and Air Conditioning System, Groom, (Zones 7) | 20098 | |||
| 1.2.31 | PC&I | WI #99 Heating Ventilation and Air Conditioning System, Groom, (Zones 8) | 20099 | |||
| 1.2.32 | PC&I | WI #100 Heating Ventilation and Air Conditioning System, Groom, (Zones 9) | 20100 | |||
| 1.2.33 | PC&I | WI #101 Heating Ventilation and Air Conditioning System, Groom, (Zones 10) | 20101 | |||
| 1.2.34 | PC&I | WI #102 Heating Ventilation and Air Conditioning System, Groom, (Zones 11) | 20102 | |||
| 1.2.35 | PC&I | WI #103 False Overhead, Recapitalize | 20103 | $104,000.00 | ||
| 1.2.36 | PC&I | WI #104 Evaporator Salinity Monitoring, Recapitalize | 20104 | $41,600.00 | ||
| 1.2.37 | PC&I | WI #105 Ancillary Pump and Motor Assemblies, Recapitalize | 20105 | $322,400.00 | ||
| 1.2.38 | PC&I | WI #106 Flooding Alarms, Recapitalize | 20106 | $41,600.00 | ||
| 1.2.39 | PC&I | WI #107 Wing Shaft Disconnect Coupling, Recapitalize | 20107 | $460,200.00 | ||
| 1.2.40 | PC&I | WI #108 Centerline Disconnect Coupling, Recapitalize | 20108 | $460,200.00 | 1 | |
| 1.2.41 | OE | WI #109 Temporary Services, Contractor Facility, Provide | 20109 | 1 | ||
| 2.4.70 | OE | WI #110 Anticipated Growth | 20110 | $0.00 | 1 | |
| 2.4.71 | OE | WI #111 Voyage Repairs | 20111 | $0.00 | 1 | |
| Planned Total | $0.00 | $0.00 | ||||
| Total Year Three Evaluated Price | $0.00 |
| Dry Dock 2024 Work Item Pricelist | ||||||
| 2.4.2 | OE | WI #1 Hull Plating (U/W Body) Inspect | 30001 | 1 | ||
| 2.4.3 | OE | WI #2 Hull Plating (U/W Body) Ultrasonic Testing | 30002 | 1 | ||
| 2.4.4 | OE | WI #3 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | 30003 | 1 | ||
| 2.4.5 | OE | WI #4 Centerline Propulsion Hub Remove and Reinstall | 30004 | 1 | ||
| 2.4.6 | OE | WI #5 Port Propulsion Hub Remove and Reinstall | 30005 | 1 | ||
| 2.4.7 | OE | WI #6 STBD Propulsion Hub Remove and Reinstall | 30006 | 1 | ||
| 2.4.8 | OE | WI #7 Centerline Propulsion Shafting Remove and Reinstall | 30007 | |||
| 2.4.9 | OE | Wi #8 Port Propulsion Shafting Remove and Reinstall | 30008 | |||
| 2.4.10 | OE | WI #9 STBD Propulsion Shafting Remove and Reinstall | 30009 | |||
| 2.4.11 | OE | WI #10 Sea Strainers (Hayward) Open, Clean, Inspect | 30010 | 1 | ||
| 2.4.12 | OE | WI #11 Sea Valves and Waster Pieces, Overhaul or Renew | 30011 | |||
| 2.4.13 | OE | WI #12 Boiler, Biennial Maintenance and Inspect | 30012 | |||
| 2.4.14 | OE | WI #13 Rudder and Rudder Stock, Remove and Inspect | 30013 | |||
| 2.4.15 | OE | WI #14 Cathodic Protection /Zinc Anodes, Renew | 30014 | 1 | ||
| 2.4.16 | OE | WI #15 Temporary Fuel Oil Offload and Storage, Dry-Dock | 30015 | 1 | ||
| 2.4.17 | OE | WI #16 Dry-Dock | 30016 | 1 | ||
| 2.4.18 | OE | WI #17 Dock and Sea Trial Performance, Support, Provide | 30017 | 1 | ||
| 2.4.19 | OE | WI #18 Miranda Davit, Annual Inspect | 30018 | 1 | ||
| 2.4.20 | OE | WI #19 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | 30019 | 1 | ||
| 2.4.21 | OE | WI #20 Allied K280-70 Crane, Port, Annual Inspect and Repair | 30020 | 1 | ||
| 2.4.22 | OE | WI #21 Allied T60-60 Crane, Annual Inspect and Repair | 30021 | 1 | ||
| 2.4.23 | OE | WI #22 Fuel Oil Purifier (FOP) Overhaul, 4000 Hour | 30022 | 1 | ||
| 2.4.24 | OE | WI #23 Lube Oil Purifier (LOP) Overhaul, 4000 Hour | 30023 | |||
| 2.4.25 | OE | WI #24 Hydraulic Oil Purifier (HOP) Overhaul, 4000 Hour | 30024 | |||
| 2.4.26 | OE | WI #25 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | 30025 | 1 | ||
| 2.4.27 | OE | WI #26 Shaft Handling Equipment, Maintenance and Storage | 30026 | 1 | ||
| 2.4.28 | OE | WI #27 Elevators, Annual Maintenance and Certification | 30027 | 1 | ||
| 2.4.29 | OE | WI #28 Dumbwaiter, Annual Maintenance and Certification | 30028 | 1 | ||
| 2.4.30 | OE | WI #29 Fixed Fire Suppression Systems, Annual Inspect and Certification | 30029 | 1 | ||
| 2.4.31 | OE | WI #30 Anchor Windlass, Service & Inspect | 30030 | |||
| 2.4.32 | OE | WI #31 Voids (Non-Assessable), Internal Surfaces, Preserve | 30031 | |||
| 2.4.33 | OE | WI #32 U/W Body, Preserve 100% | 30032 | |||
| 2.4.34 | OE | WI #33 U/W Body, Preserve (Partial) | 30033 | |||
| 2.4.35 | OE | WI #34 Stern Tube Interior Surfaces, Preserve 100% | 30034 | |||
| 2.4.36 | OE | WI #35 Anchor Chain(s) and Ground Tackle, Inspect & Repair | 30035 | 1 | ||
| 2.4.37 | OE | WI #36 Lube Oil Purifier (LOP) Overhaul 8,000 Hour | 30036 | |||
| 2.4.38 | OE | WI #37 Fuel Oil Purifier (FOP) Overhaul 8,000 Hour | 30037 | |||
| 2.4.39 | OE | WI #38 Hydraulic Oil Purifier (HOP) Overhaul, 8000 Hour | 30038 | |||
| 2.4.40 | OE | WI #39 Vent Ducts (Galley & Scullery), Commercial Cleaning | 30039 | 1 | ||
| 2.4.41 | OE | WI #40 Vent Ducts (Laundry Exhaust), Commercial Cleaning | 30040 | 1 | ||
| 2.4.42 | OE | WI #41 Evaporators (General), Overhaul | 30041 | |||
| 2.4.43 | OE | WI #42 Voids (Accessible), Clean and Inspect | 30042 | |||
| 2.4.44 | OE | WI #43 Flight Deck Nets, Overhaul 5 year | 30043 | |||
| 2.4.45 | OE | WI #44 Sewage Holding Tank(s) Clean/Inspect | 30044 | |||
| 2.4.46 | OE | WI #45 Tanks (Potable Water), Clean/Inspect | 30045 | |||
| 2.4.47 | OE | WI #46 Potable Water Pneumatic Tank and Hot Water Storage Tank, Clean, Inspect, Hydrotest | 30046 | |||
| 2.4.48 | OE | WI #47 Tanks (Diesel Fuel Oil), Clean and Inspect (2022) | 30047 | 1 | ||
| 2.4.49 | OE | WI #48 Tanks (Aviation Fuel), Clean and Inspect | 30048 | |||
| 2.4.50 | OE | WI #49 Voids (Non-Accessible), Leak Test | 30049 | |||
| 2.4.51 | OE | WI #50 Appendages (U/W), Leak Test | 30050 | |||
| 2.4.52 | OE | WI #51 Fire Prevention and Protection, Provide | 30051 | 1 | ||
| 2.4.53 | OE | WI #52 Flex Hose Assemblies, Renew (2021) | 30052 | |||
| 2.4.54 | OE | WI #53 Flex Hose Assemblies, Renew (2022) | 30053 | |||
| 2.4.55 | OE | WI #54 Flex Hose Assemblies, Renew (2023) | 30054 | |||
| 2.4.56 | OE | WI #55 Flex Hose Assemblies, Renew (2024) | 30055 | 1 | ||
| 2.4.57 | OE | WI #56 Flex Hose Assemblies, Renew (2025) | 30056 | |||
| 2.4.58 | OE | WI #57 Distilling Plant Pumps and Motors, Overhaul | 30057 | |||
| 2.4.59 | OE | WI #58 Main Reduction Gear (MRG), Maintenance and Inspection | 30058 | |||
| 2.4.60 | OE | WI #59 Main Propulsion Motors (MRM), Clean and Inspect | 30059 | |||
| 2.4.61 | OE | WI #60 Main Propulsion Generators (MRG), Clean and Inspect | 30060 | |||
| 2.4.62 | OE | WI #61 Tanks (Diesel Fuel Oil), Clean and Inspect (2024) | 30061 | 1 | ||
| 2.4.63 | OE | WI #62 Boiler, Strength and Integrity Inspection | 30062 | |||
| 2.4.64 | OE | WI #63 Tanks (Boilers Feedwater), Preserve "100%" | 30063 | |||
| 2.4.65 | OE | WI #64 Warping Capstan, Inspect and Repair | 30064 | |||
| 2.4.66 | OE | WI #65 Ship Services Diesel Generator Exhaust Stack Uptakes, Commercial Clean | 30065 | |||
| 2.4.67 | OE | WI #66 Main Diesel Engine Exhaust Stack Uptakes, Commercial Clean | 30066 | |||
| 2.4.68 | OE | WI #67 Boiler Exhaust Stack Uptakes, Commercial Clean | 30067 | |||
| 2.4.69 | OE | WI #68 Compressed Air Receivers and System Valves (all), Clean, Inspect, Hydro and Lift | 30068 | |||
| 1.2.1 | PC&I | WI #69 Non-Recurring Engineering | ||||
| 1.2.2 | PC&I | WI #70 Project Management and Planning, Perform [PoP=12 months for 2022-2025] | 30070 | |||
| 1.2.3 | PC&I | WI #71 Weight and Moment, Management | 30071 | 1 | ||
| 1.2.4 | PC&I | WI #72 NSWCPD CGMCS Installation, Coordinate | 30072 | |||
| 1.2.5 | PC&I | WI #73 NSWCPD PPD Installation, Coordinate | 30073 | |||
| 1.2.6 | PC&I | WI #74 Sewage System Grey Water Lift Stations, Install | 30074 | $322,400.00 | ||
| 1.2.7 | PC&I | WI #75 Sewage Retention Tank, Add | 30075 | $322,400.00 | ||
| 1.2.8 | PC&I | WI #76 Piping, Renewal | 30076 | $213,200.00 | ||
| 1.2.9 | PC&I | WI #77 Gyro Repeaters, Recapitalize | 30077 | $213,200.00 | ||
| 1.2.10 | PC&I | WI #78 Boiler, Recapitalize Ancillaries | 30078 | $213,200.00 | ||
| 1.2.11 | PC&I | WI #79 1MC, Renewal | 30079 | $213,200.00 | ||
| 1.2.12 | PC&I | WI #80 6MC, Refurbish | 30080 | $213,200.00 | ||
| 1.2.13 | PC&I | WI #81 Ship Service Air Compressors, Recapitalize | 30081 | $213,200.00 | ||
| 1.2.14 | PC&I | WI #82 Start Air System, Modify | 30082 | $104,000.00 | ||
| 1.2.15 | PC&I | WI #83 Oily Water Separator, Recapitalize | 30083 | $322,400.00 | ||
| 1.2.16 | PC&I | WI #84 Fire Pump Manual Bus Transfer, Recapitalize | 30084 | $41,600.00 | ||
| 1.2.17 | PC&I | WI #85 Dumbwaiter, Recapitalize | 30085 | $213,200.00 | ||
| 1.2.18 | PC&I | WI #86 Elevators, Upgrade | 30086 | $213,200.00 | ||
| 1.2.19 | PC&I | WI #87 Small Boat Davit Control Equipment, Relocation | 30087 | $213,200.00 | ||
| 1.2.20 | PC&I | WI #88 Commissary Equipment, Recapitalize | 30088 | $104,000.00 | ||
| 1.2.21 | PC&I | WI #89 Fire Detection System, Recapitalize | 30089 | $104,000.00 | ||
| 1.2.22 | PC&I | WI #90 400 Hz System, Modify | 30090 | $213,200.00 | ||
| 1.2.23 | PC&I | WI #91 False Overhead, Remove | 30091 | $104,000.00 | ||
| 1.2.24 | PC&I | WI #92 Heating Ventilation and Air Conditioning System, Groom, (Zones 1) | 30092 | |||
| 1.2.25 | PC&I | WI #93 Heating Ventilation and Air Conditioning System, Groom, (Zones 2) | 30093 | |||
| 1.2.26 | PC&I | WI #94 Heating Ventilation and Air Conditioning System, Groom, (Zones 3) | 30094 | |||
| 1.2.27 | PC&I | WI #95 Heating Ventilation and Air Conditioning System, Groom, (Zones 4) | 30095 | |||
| 1.2.28 | PC&I | WI #96 Heating Ventilation and Air Conditioning System, Groom, (Zones 5) | 30096 | |||
| 1.2.29 | PC&I | WI #97 Heating Ventilation and Air Conditioning System, Groom, (Zones 6) | 30097 | |||
| 1.2.30 | PC&I | WI #98 Heating Ventilation and Air Conditioning System, Groom, (Zones 7) | 30098 | |||
| 1.2.31 | PC&I | WI #99 Heating Ventilation and Air Conditioning System, Groom, (Zones 8) | 30099 | |||
| 1.2.32 | PC&I | WI #100 Heating Ventilation and Air Conditioning System, Groom, (Zones 9) | 30100 | |||
| 1.2.33 | PC&I | WI #101 Heating Ventilation and Air Conditioning System, Groom, (Zones 10) | 30101 | |||
| 1.2.34 | PC&I | WI #102 Heating Ventilation and Air Conditioning System, Groom, (Zones 11) | 30102 | |||
| 1.2.35 | PC&I | WI #103 False Overhead, Recapitalize | 30103 | $104,000.00 | ||
| 1.2.36 | PC&I | WI #104 Evaporator Salinity Monitoring, Recapitalize | 30104 | $41,600.00 | ||
| 1.2.37 | PC&I | WI #105 Ancillary Pump and Motor Assemblies, Recapitalize | 30105 | $322,400.00 | ||
| 1.2.38 | PC&I | WI #106 Flooding Alarms, Recapitalize | 30106 | $41,600.00 | ||
| 1.2.39 | PC&I | WI #107 Wing Shaft Disconnect Coupling, Recapitalize | 30107 | $460,200.00 | ||
| 1.2.40 | PC&I | WI #108 Centerline Disconnect Coupling, Recapitalize | 30108 | $460,200.00 | ||
| 1.2.41 | OE | WI #109 Temporary Services, Contractor Facility, Provide | 30109 | 1 | ||
| 2.4.70 | OE | WI #110 Anticipated Growth | 30110 | $0.00 | 1 | |
| 2.4.71 | OE | WI #111 Voyage Repairs | 30111 | $0.00 | 1 | |
| Planned Total | $0.00 | $0.00 | ||||
| Total Year Four Evaluated Price | $0.00 |
| Dry Dock 2025 Work Item Pricelist | ||||||
| 2.4.2 | OE | WI #1 Hull Plating (U/W Body) Inspect | 40001 | 1 | ||
| 2.4.3 | OE | WI #2 Hull Plating (U/W Body) Ultrasonic Testing | 40002 | 1 | ||
| 2.4.4 | OE | WI #3 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | 40003 | 1 | ||
| 2.4.5 | OE | WI #4 Centerline Propulsion Hub Remove and Reinstall | 40004 | 1 | ||
| 2.4.6 | OE | WI #5 Port Propulsion Hub Remove and Reinstall | 40005 | 1 | ||
| 2.4.7 | OE | WI #6 STBD Propulsion Hub Remove and Reinstall | 40006 | 1 | ||
| 2.4.8 | OE | WI #7 Centerline Propulsion Shafting Remove and Reinstall | 40007 | |||
| 2.4.9 | OE | Wi #8 Port Propulsion Shafting Remove and Reinstall | 40008 | |||
| 2.4.10 | OE | WI #9 STBD Propulsion Shafting Remove and Reinstall | 40009 | |||
| 2.4.11 | OE | WI #10 Sea Strainers (Hayward) Open, Clean, Inspect | 40010 | 1 | ||
| 2.4.12 | OE | WI #11 Sea Valves and Waster Pieces, Overhaul or Renew | 40011 | 1 | ||
| 2.4.13 | OE | WI #12 Boiler, Biennial Maintenance and Inspect | 40012 | 1 | ||
| 2.4.14 | OE | WI #13 Rudder and Rudder Stock, Remove and Inspect | 40013 | |||
| 2.4.15 | OE | WI #14 Cathodic Protection /Zinc Anodes, Renew | 40014 | 1 | ||
| 2.4.16 | OE | WI #15 Temporary Fuel Oil Offload and Storage, Dry-Dock | 40015 | 1 | ||
| 2.4.17 | OE | WI #16 Dry-Dock | 40016 | 1 | ||
| 2.4.18 | OE | WI #17 Dock and Sea Trial Performance, Support, Provide | 40017 | 1 | ||
| 2.4.19 | OE | WI #18 Miranda Davit, Annual Inspect | 40018 | 1 | ||
| 2.4.20 | OE | WI #19 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | 40019 | 1 | ||
| 2.4.21 | OE | WI #20 Allied K280-70 Crane, Port, Annual Inspect and Repair | 40020 | 1 | ||
| 2.4.22 | OE | WI #21 Allied T60-60 Crane, Annual Inspect and Repair | 40021 | 1 | ||
| 2.4.23 | OE | WI #22 Fuel Oil Purifier (FOP) Overhaul, 4000 Hour | 40022 | |||
| 2.4.24 | OE | WI #23 Lube Oil Purifier (LOP) Overhaul, 4000 Hour | 40023 | 1 | ||
| 2.4.25 | OE | WI #24 Hydraulic Oil Purifier (HOP) Overhaul, 4000 Hour | 40024 | |||
| 2.4.26 | OE | WI #25 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | 40025 | 1 | ||
| 2.4.27 | OE | WI #26 Shaft Handling Equipment, Maintenance and Storage | 40026 | 1 | ||
| 2.4.28 | OE | WI #27 Elevators, Annual Maintenance and Certification | 40027 | 1 | ||
| 2.4.29 | OE | WI #28 Dumbwaiter, Annual Maintenance and Certification | 40028 | 1 | ||
| 2.4.30 | OE | WI #29 Fixed Fire Suppression Systems, Annual Inspect and Certification | 40029 | 1 | ||
| 2.4.31 | OE | WI #30 Anchor Windlass, Service & Inspect | 40030 | 1 | ||
| 2.4.32 | OE | WI #31 Voids (Non-Assessable), Internal Surfaces, Preserve | 40031 | |||
| 2.4.33 | OE | WI #32 U/W Body, Preserve 100% | 40032 | |||
| 2.4.34 | OE | WI #33 U/W Body, Preserve (Partial) | 40033 | |||
| 2.4.35 | OE | WI #34 Stern Tube Interior Surfaces, Preserve 100% | 40034 | |||
| 2.4.36 | OE | WI #35 Anchor Chain(s) and Ground Tackle, Inspect & Repair | 40035 | |||
| 2.4.37 | OE | WI #36 Lube Oil Purifier (LOP) Overhaul 8,000 Hour | 40036 | |||
| 2.4.38 | OE | WI #37 Fuel Oil Purifier (FOP) Overhaul 8,000 Hour | 40037 | 1 | ||
| 2.4.39 | OE | WI #38 Hydraulic Oil Purifier (HOP) Overhaul, 8000 Hour | 40038 | 1 | ||
| 2.4.40 | OE | WI #39 Vent Ducts (Galley & Scullery), Commercial Cleaning | 40039 | |||
| 2.4.41 | OE | WI #40 Vent Ducts (Laundry Exhaust), Commercial Cleaning | 40040 | |||
| 2.4.42 | OE | WI #41 Evaporators (General), Overhaul | 40041 | |||
| 2.4.43 | OE | WI #42 Voids (Accessible), Clean and Inspect | 40042 | |||
| 2.4.44 | OE | WI #43 Flight Deck Nets, Overhaul 5 year | 40043 | |||
| 2.4.45 | OE | WI #44 Sewage Holding Tank(s) Clean/Inspect | 40044 | |||
| 2.4.46 | OE | WI #45 Tanks (Potable Water), Clean/Inspect | 40045 | |||
| 2.4.47 | OE | WI #46 Potable Water Pneumatic Tank and Hot Water Storage Tank, Clean, Inspect, Hydrotest | 40046 | |||
| 2.4.48 | OE | WI #47 Tanks (Diesel Fuel Oil), Clean and Inspect (2022) | 40047 | |||
| 2.4.49 | OE | WI #48 Tanks (Aviation Fuel), Clean and Inspect | 40048 | |||
| 2.4.50 | OE | WI #49 Voids (Non-Accessible), Leak Test | 40049 | |||
| 2.4.51 | OE | WI #50 Appendages (U/W), Leak Test | 40050 | |||
| 2.4.52 | OE | WI #51 Fire Prevention and Protection, Provide | 40051 | 1 | ||
| 2.4.53 | OE | WI #52 Flex Hose Assemblies, Renew (2021) | 40052 | |||
| 2.4.54 | OE | WI #53 Flex Hose Assemblies, Renew (2022) | 40053 | |||
| 2.4.55 | OE | WI #54 Flex Hose Assemblies, Renew (2023) | 40054 | |||
| 2.4.56 | OE | WI #55 Flex Hose Assemblies, Renew (2024) | 40055 | |||
| 2.4.57 | OE | WI #56 Flex Hose Assemblies, Renew (2025) | 40056 | 1 | ||
| 2.4.58 | OE | WI #57 Distilling Plant Pumps and Motors, Overhaul | 40057 | |||
| 2.4.59 | OE | WI #58 Main Reduction Gear (MRG), Maintenance and Inspection | 40058 | |||
| 2.4.60 | OE | WI #59 Main Propulsion Motors (MRM), Clean and Inspect | 40059 | |||
| 2.4.61 | OE | WI #60 Main Propulsion Generators (MRG), Clean and Inspect | 40060 | |||
| 2.4.62 | OE | WI #61 Tanks (Diesel Fuel Oil), Clean and Inspect (2024) | 40061 | |||
| 2.4.63 | OE | WI #62 Boiler, Strength and Integrity Inspection | 40062 | |||
| 2.4.64 | OE | WI #63 Tanks (Boilers Feedwater), Preserve "100%" | 40063 | |||
| 2.4.65 | OE | WI #64 Warping Capstan, Inspect and Repair | 40064 | 1 | ||
| 2.4.66 | OE | WI #65 Ship Services Diesel Generator Exhaust Stack Uptakes, Commercial Clean | 40065 | |||
| 2.4.67 | OE | WI #66 Main Diesel Engine Exhaust Stack Uptakes, Commercial Clean | 40066 | |||
| 2.4.68 | OE | WI #67 Boiler Exhaust Stack Uptakes, Commercial Clean | 40067 | 1 | ||
| 2.4.69 | OE | WI #68 Compressed Air Receivers and System Valves (all), Clean, Inspect, Hydro and Lift | 40068 | 1 | ||
| 1.2.1 | PC&I | WI #69 Non-Recurring Engineering | ||||
| 1.2.2 | PC&I | WI #70 Project Management and Planning, Perform [PoP=12 months for 2022-2025] | 40070 | |||
| 1.2.3 | PC&I | WI #71 Weight and Moment, Management | 40071 | 1 | ||
| 1.2.4 | PC&I | WI #72 NSWCPD CGMCS Installation, Coordinate | 40072 | |||
| 1.2.5 | PC&I | WI #73 NSWCPD PPD Installation, Coordinate | 40073 | |||
| 1.2.6 | PC&I | WI #74 Sewage System Grey Water Lift Stations, Install | 40074 | $322,400.00 | ||
| 1.2.7 | PC&I | WI #75 Sewage Retention Tank, Add | 40075 | $322,400.00 | ||
| 1.2.8 | PC&I | WI #76 Piping, Renewal | 40076 | $213,200.00 | ||
| 1.2.9 | PC&I | WI #77 Gyro Repeaters, Recapitalize | 40077 | $213,200.00 | ||
| 1.2.10 | PC&I | WI #78 Boiler, Recapitalize Ancillaries | 40078 | $213,200.00 | ||
| 1.2.11 | PC&I | WI #79 1MC, Renewal | 40079 | $213,200.00 | ||
| 1.2.12 | PC&I | WI #80 6MC, Refurbish | 40080 | $213,200.00 | ||
| 1.2.13 | PC&I | WI #81 Ship Service Air Compressors, Recapitalize | 40081 | $213,200.00 | ||
| 1.2.14 | PC&I | WI #82 Start Air System, Modify | 40082 | $104,000.00 | ||
| 1.2.15 | PC&I | WI #83 Oily Water Separator, Recapitalize | 40083 | $322,400.00 | ||
| 1.2.16 | PC&I | WI #84 Fire Pump Manual Bus Transfer, Recapitalize | 40084 | $41,600.00 | ||
| 1.2.17 | PC&I | WI #85 Dumbwaiter, Recapitalize | 40085 | $213,200.00 | ||
| 1.2.18 | PC&I | WI #86 Elevators, Upgrade | 40086 | $213,200.00 | ||
| 1.2.19 | PC&I | WI #87 Small Boat Davit Control Equipment, Relocation | 40087 | $213,200.00 | ||
| 1.2.20 | PC&I | WI #88 Commissary Equipment, Recapitalize | 40088 | $104,000.00 | ||
| 1.2.21 | PC&I | WI #89 Fire Detection System, Recapitalize | 40089 | $104,000.00 | ||
| 1.2.22 | PC&I | WI #90 400 Hz System, Modify | 40090 | $213,200.00 | ||
| 1.2.23 | PC&I | WI #91 False Overhead, Remove | 40091 | $104,000.00 | ||
| 1.2.24 | PC&I | WI #92 Heating Ventilation and Air Conditioning System, Groom, (Zones 1) | 40092 | |||
| 1.2.25 | PC&I | WI #93 Heating Ventilation and Air Conditioning System, Groom, (Zones 2) | 40093 | |||
| 1.2.26 | PC&I | WI #94 Heating Ventilation and Air Conditioning System, Groom, (Zones 3) | 40094 | |||
| 1.2.27 | PC&I | WI #95 Heating Ventilation and Air Conditioning System, Groom, (Zones 4) | 40095 | |||
| 1.2.28 | PC&I | WI #96 Heating Ventilation and Air Conditioning System, Groom, (Zones 5) | 40096 | |||
| 1.2.29 | PC&I | WI #97 Heating Ventilation and Air Conditioning System, Groom, (Zones 6) | 40097 | |||
| 1.2.30 | PC&I | WI #98 Heating Ventilation and Air Conditioning System, Groom, (Zones 7) | 40098 | |||
| 1.2.31 | PC&I | WI #99 Heating Ventilation and Air Conditioning System, Groom, (Zones 8) | 40099 | |||
| 1.2.32 | PC&I | WI #100 Heating Ventilation and Air Conditioning System, Groom, (Zones 9) | 40100 | |||
| 1.2.33 | PC&I | WI #101 Heating Ventilation and Air Conditioning System, Groom, (Zones 10) | 40101 | |||
| 1.2.34 | PC&I | WI #102 Heating Ventilation and Air Conditioning System, Groom, (Zones 11) | 40102 | |||
| 1.2.35 | PC&I | WI #103 False Overhead, Recapitalize | 40103 | $104,000.00 | ||
| 1.2.36 | PC&I | WI #104 Evaporator Salinity Monitoring, Recapitalize | 40104 | $41,600.00 | ||
| 1.2.37 | PC&I | WI #105 Ancillary Pump and Motor Assemblies, Recapitalize | 40105 | $322,400.00 | ||
| 1.2.38 | PC&I | WI #106 Flooding Alarms, Recapitalize | 40106 | $41,600.00 | ||
| 1.2.39 | PC&I | WI #107 Wing Shaft Disconnect Coupling, Recapitalize | 40107 | $460,200.00 | ||
| 1.2.40 | PC&I | WI #108 Centerline Disconnect Coupling, Recapitalize | 40108 | $460,200.00 | ||
| 1.2.41 | OE | WI #109 Temporary Services, Contractor Facility, Provide | 40109 | 1 | ||
| 2.4.70 | OE | WI #110 Anticipated Growth | 40110 | $0.00 | 1 | |
| 2.4.71 | OE | WI #111 Voyage Repairs | 40111 | $0.00 | 1 | |
| Planned Total | $0.00 | $0.00 | ||||
| Total Year Five Evaluated Price | $0.00 | |||||
| Total Price for all Availabilities | $0.00 | |||||
| Maximum Available Incentive | $5,200,000.00 | |||||
| Total Evaluated Price | $5,200,000.00 |
Growth & Voyage Repairs Pricing TASK ORDER GROWTH, NEW TASK ORDERS, NEW TASK ORDER CLIN PRICING. Quantities below are estimated for evaluation purposes only; order quantities may or may not exceed the number of units specified. The unit price will be the maximum rate used in any task order changes or new task orders during execution of this contract.
| ITEM | SCHEDULE OF SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| Dry Dock 2021 Growth & Voyage Repairs Pricelist | |||||
| 1 | Composite Labor Rate: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 17. | 19,000 | hours | $0.00 | |
| 2 | Loading Rate: All inclusive loading rate to be added to materials and subcontracts. Should be entered as a percent multiple e.g. For a loading rate of 15%, enter 115). | 730,000 | % | $0.00 | |
| 3 | Dry Dock Extension/ Lay Days: in accordance with HSAR 3052.217-94 | 30 | days | $0.00 | |
| 4 | Temporary Services Provide Extension: The price per day consists of a daily rate for all services in the "Temporary Services" Task Order Work Item except Heavy Lift and Hazardous Waste | 30 | days | $0.00 | |
| 5 | Crane Hour: Price for crane service per hour including operator and riggers | 125 | hours | $0.00 | |
| 6 | Forklift Hour: Forklift service per hour including operator and riggers | 100 | hours | $0.00 | |
| 7 | Oily Rag Disposal | 200 | lbs. | $0.00 | |
| 8 | Filter Disposal | 75 | each | $0.00 | |
| 9 | Bilge Water Oily Waste Disposal | 15,000 | gal. | $0.00 | |
| 10 | Jacket Water Disposal | 1,000 | gal. | $0.00 | |
| 11 | Lead Testing | 100 | each | $0.00 | |
| 12 | Asbestos Testing | 100 | each | $0.00 | |
| 13 | Hydraulic Fluid Disposal | 2,500 | gal. | $0.00 | |
| 14 | Marine Chemist Certification | 30 | each | $0.00 | |
| 15 | Manlift Rental 135' including fuel | 2 | weeks | $0.00 | |
| 16 | Manlift Rental 60' including fuel | 2 | weeks | $0.00 | |
| Total | $0.00 |
| Dry Dock 2022 Growth & Voyage Repairs Pricelist | |||||
| 1 | Composite Labor Rate: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 17. | 16,500 | hours | $0.00 | |
| 2 | Loading Rate: All inclusive loading rate to be added to materials and subcontracts. Should be entered as a percent multiple e.g. For a loading rate of 15%, enter 115). | 600,000 | % | $0.00 | |
| 3 | Dry Dock Extension/ Lay Days: in accordance with HSAR 3052.217-94 | 30 | days | $0.00 | |
| 4 | Temporary Services Provide Extension: The price per day consists of a daily rate for all services in the "Temporary Services" Task Order Work Item except Heavy Lift and Hazardous Waste | 30 | days | $0.00 | |
| 5 | Crane Hour: Price for crane service per hour including operator and riggers | 130 | hours | $0.00 | |
| 6 | Forklift Hour: Forklift service per hour including operator and riggers | 130 | hours | $0.00 | |
| 7 | Oily Rag Disposal | 200 | lbs. | $0.00 | |
| 8 | Filter Disposal | 75 | each | $0.00 | |
| 9 | Bilge Water Oily Waste Disposal | 15,000 | gal. | $0.00 | |
| 10 | Jacket Water Disposal | 1,000 | gal. | $0.00 | |
| 11 | Lead Testing | 100 | each | $0.00 | |
| 12 | Asbestos Testing | 100 | each | $0.00 | |
| 13 | Hydraulic Fluid Disposal | 2,500 | gal. | $0.00 | |
| 14 | Marine Chemist Certification | 30 | each | $0.00 | |
| 15 | Manlift Rental 135' including fuel | 2 | weeks | $0.00 | |
| 16 | Manlift Rental 60' including fuel | 2 | weeks | $0.00 | |
| Total | $0.00 |
| Dry Dock 2023 Growth & Voyage Repairs Pricelist | |||||
| 1 | Composite Labor Rate: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 17. | 31,000 | hours | $0.00 | |
| 2 | Loading Rate: All inclusive loading rate to be added to materials and subcontracts. Should be entered as a percent multiple e.g. For a loading rate of 15%, enter 115). | 770,000 | % | $0.00 | |
| 3 | Dry Dock Extension/ Lay Days: in accordance with HSAR 3052.217-94 | 30 | days | $0.00 | |
| 4 | Temporary Services Provide Extension: The price per day consists of a daily rate for all services in the "Temporary Services" Task Order Work Item except Heavy Lift and Hazardous Waste | 30 | days | $0.00 | |
| 5 | Crane Hour: Price for crane service per hour including operator and riggers | 140 | hours | $0.00 | |
| 6 | Forklift Hour: Forklift service per hour including operator and riggers | 140 | hours | $0.00 | |
| 7 | Oily Rag Disposal | 200 | lbs. | $0.00 | |
| 8 | Filter Disposal | 75 | each | $0.00 | |
| 9 | Bilge Water Oily Waste Disposal | 15,000 | gal. | $0.00 | |
| 10 | Jacket Water Disposal | 1,000 | gal. | $0.00 | |
| 11 | Lead Testing | 100 | each | $0.00 | |
| 12 | Asbestos Testing | 100 | each | $0.00 | |
| 13 | Hydraulic Fluid Disposal | 2,500 | gal. | $0.00 | |
| 14 | Marine Chemist Certification | 30 | each | $0.00 | |
| 15 | Manlift Rental 135' including fuel | 2 | weeks | $0.00 | |
| 16 | Manlift Rental 60' including fuel | 2 | weeks | $0.00 | |
| Total | $0.00 |
| Dry Dock 2024 Growth & Voyage Repairs Pricelist | |||||
| 1 | Composite Labor Rate: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 17. | 18,000 | hours | $0.00 | |
| 2 | Loading Rate: All inclusive loading rate to be added to materials and subcontracts. Should be entered as a percent multiple e.g. For a loading rate of 15%, enter 115). | 615,000 | % | $0.00 | |
| 3 | Dry Dock Extension/ Lay Days: in accordance with HSAR 3052.217-94 | 30 | days | $0.00 | |
| 4 | Temporary Services Provide Extension: The price per day consists of a daily rate for all services in the "Temporary Services" Task Order Work Item except Heavy Lift and Hazardous Waste | 30 | days | $0.00 | |
| 5 | Crane Hour: Price for crane service per hour including operator and riggers | 135 | hours | $0.00 | |
| 6 | Forklift Hour: Forklift service per hour including operator and riggers | 135 | hours | $0.00 | |
| 7 | Oily Rag Disposal | 200 | lbs. | $0.00 | |
| 8 | Filter Disposal | 75 | each | $0.00 | |
| 9 | Bilge Water Oily Waste Disposal | 15,000 | gal. | $0.00 | |
| 10 | Jacket Water Disposal | 1,000 | gal. | $0.00 | |
| 11 | Lead Testing | 100 | each | $0.00 | |
| 12 | Asbestos Testing | 100 | each | $0.00 | |
| 13 | Hydraulic Fluid Disposal | 2,500 | gal. | $0.00 | |
| 14 | Marine Chemist Certification | 30 | each | $0.00 | |
| 15 | Manlift Rental 135' including fuel | 2 | weeks | $0.00 | |
| 16 | Manlift Rental 60' including fuel | 2 | weeks | $0.00 | |
| Total | $0.00 |
| Dry Dock 2025 Growth & Voyage Repairs Pricelist | |||||
| 1 | Composite Labor Rate: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 17. | 21,000 | hours | $0.00 | |
| 2 | Loading Rate: All inclusive loading rate to be added to materials and subcontracts. Should be entered as a percent multiple e.g. For a loading rate of 15%, enter 115). | 780,000 | % | $0.00 | |
| 3 | Dry Dock Extension/ Lay Days: in accordance with HSAR 3052.217-94 | 30 | days | $0.00 | |
| 4 | Temporary Services Provide Extension: The price per day consists of a daily rate for all services in the "Temporary Services" Task Order Work Item except Heavy Lift and Hazardous Waste | 30 | days | $0.00 | |
| 5 | Crane Hour: Price for crane service per hour including operator and riggers | 125 | hours | $0.00 | |
| 6 | Forklift Hour: Forklift service per hour including operator and riggers | 100 | hours | $0.00 | |
| 7 | Oily Rag Disposal | 200 | lbs. | $0.00 | |
| 8 | Filter Disposal | 75 | each | $0.00 | |
| 9 | Bilge Water Oily Waste Disposal | 15,000 | gal. | $0.00 | |
| 10 | Jacket Water Disposal | 1,000 | gal. | $0.00 | |
| 11 | Lead Testing | 100 | each | $0.00 | |
| 12 | Asbestos Testing | 100 | each | $0.00 | |
| 13 | Hydraulic Fluid Disposal | 2,500 | gal. | $0.00 | |
| 14 | Marine Chemist Certification | 30 | each | $0.00 | |
| 15 | Manlift Rental 135' including fuel | 2 | weeks | $0.00 | |
| 16 | Manlift Rental 60' including fuel | 2 | weeks | $0.00 |