Typhoon Yutu

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

Insured: BERNADITA MARCELO Home: (670) 286-1361 Cellular: (670) 989-3011Home: LOT 011 G 176 IRONWOOD AVE 3RD HOUSE

ON LEFT

KAGMAN III, HI

Property: LOT 011 G 176 IRONWOOD AVE 3RD HOUSE

ON LEFT

KAGMAN III, HI

Claim Rep.: Casey Hoak

Estimator: Casey Hoak

Claim Number: CNMI-504441946 Policy Number: CNMI-504441946 Type of Loss: Hurricane

Date Contacted: 12/26/2019 7:00 PM Date of Loss: 10/24/2018 2:00 PM Date Received: 1/12/2019 2:34 AM

Date Inspected: 2/19/2019 11:00 PM Date Entered: 12/28/2019 2:37 AM

Date Est. Completed: 2/24/2019 12:08 AM

Price List: HIOI8X_JAN19 Restoration/Service/Remodel

Estimate: CNMI-504441946_RA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 2

12/27/2019: CMH

Batch 4 next set of 20 Attendees: Casey Hoak, Brunson Taulor, Jorge Rivera P.E.

On site inspection roof destroyed on both dwellings. Per Jorge a gable over the house and a shed over the Bathroom area. Saw cut 40 LF of the main house and add bond beam to both structures and j bolts to attach the roofs.

New main 200 amp panel meter, base and masthead with all new plugs, switches, light and GFI's where required. New doors both interior and exterior for all with paint vinyl floor in the main house. 2 windows in bedroom 1 and 1 each in the shower and toilet area all windows to get shutters. New ceiling joists and sheathing with paint, and in the kitchen remove the damaged concrete counter top and cabinets and replace with 8LF of base and a laminate counter top and add a sink and faucet for replace. The bath and toilet area will need new sink, toilet and a shower head.

All GFM has been utilized where applicable and per new FEMA guidance a dumpster, lead & asbestos testing and paint of all interior walls has been added to the estimate. No other damages were noted during the inspection.

INSPECTION SUMMARY

The applicant met at the damaged dwelling and the following was observed.

The dwelling is a one story two bedroom structure.

The dwelling is deemed to be repairable. There was 1 structural component damaged = Roof.

Reconstruction should take approximately 16 weeks from start of construction.

AGE

The house is 26 years old. It was built in 1993.

SQUARE FOOTAGE

DAMAGE AND REPAIR SUMMARY

See attached estimate for exact repair and line items.

LATITUDE 15.168599

LONGITUDE 145.781363

A: ROOF

The roof and roof framing were structurally compromised and totally destroyed. Both in the house and in the out building. They will need to be replaced.

B: INTERIOR

Interior is destroyed.

C: STRUCTURAL

The foundation is a slab and is deemed to be okay and does not need to be replaced.

D: MECHANICAL/PLUMBING/WATER SYSTEM

Mechanical/Plumbing had no issues and will not need to be replaced.

E: ELECTRICAL

All electrical needs to be replaced.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 3

CNMI-504441946_RA

ROOF

ROOF

DESCRIPTION QTY

1. 2" x 6" x 8' #2 treated pine (material only) 3.00 EA

2. 2" x 6" x 10' #2 treated pine (material only) 2.00 EA

3. 2" x 6" x 12' #2 treated pine (material only) 4.00 EA

4. 2" x 6" x 20' #2 treated pine (material only) 2.00 EA

5. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 5.00 EA

6. 2" x 10" x 12' #2 treated pine (material only) 7.00 EA

7. 2" x 10" x 14' #2 treated pine (material only) 46.00 EA

8. 2" x 12" x 12' #2 treated pine (material only) 8.00 EA

9. 2" x 12" x 14' #2 treated pine (material only) 4.00 EA

10. 2" x 12" x 20' #2 treated pine (material only) 4.00 EA

11. Install Sheathing - plywood - 1/2" - treated 182.50 SF

12. Material Only Sheathing - plywood - 1/2" - treated 182.50 SF

13. Install Sheathing - plywood - 3/4" - treated 896.00 SF

14. Material Only Sheathing - plywood - 3/4" - treated 896.00 SF

15. Labor to frame 2" x 6" non-bearing wall - 16" oc 71.11 SF

16. R&R Rafters - 2x10 - Labor only - (using rafter length) 624.15 LF

17. R&R Rafters - 2x12 - Labor only - (using rafter length) 216.71 LF

NOTES:

Roof 1

(A)F1

(B)F2

Roof 2 F3

31' 6"

' 8

' 8

' 4

Roof 1

757.62 Surface Area

111.10 Total Perimeter Length

7.58 Number of Squares

31.50 Total Ridge Length

DESCRIPTION QTY

------------------ ROOFING -----------------

18. Remove Metal roofing - ribbed - 24 gauge - up to 1" 757.62 SF

19. Install Metal roofing - ribbed - 24 gauge - up to 1" 757.62 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 4

CONTINUED - Roof 1

DESCRIPTION QTY

20. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 757.62 SF

21. Closure strips for metal roofing - inside and/or outside 63.00 LF

22. Flashing tape - self-adhesive 303.51 LF

Seal between the metal roof seams

23. Ridge vent - Metal roofing - floating ventilator 31.50 LF

24. Screw for 3/4 plywood 3865.00 EA

Additional screws for 3/4 plywood sheathing above Xactimate pricing. 6% waste added and labor to install included

25. Screws for 2X4 & 2x6 furring & fascia 893.00 EA

Additional screws for 2X4 & 2x6 furring & fascia above Xactimate pricing. 6% waste added. and labor to install included and labor to install included

26. Drip edge/gutter apron 63.00 LF

27. Install Gable trim for metal roofing - 26 gauge 48.10 LF

28. Material Only Gable trim for metal roofing - 26 gauge 48.10 LF

29. Ice & water barrier 757.62 SF

30. Install 2" x 4" lumber - treated (.667 BF per LF) 305.00 LF

Roof purlins

31. Material Only 2" x 4" lumber - treated (.667 BF per LF) 305.00 LF

Roof purlins

32. Install 2" x 6" lumber - treated (1 BF per LF) 174.10 LF

For Picture Frame Purlins

33. Material Only 2" x 6" lumber - treated (1 BF per LF) 174.10 LF

For Picture Frame Purlins

34. Install 2" x 6" lumber - treated (1 BF per LF) 189.00 LF

Rafter Blocking

35. Material Only 2" x 6" lumber - treated (1 BF per LF) 189.00 LF

Rafter Blocking

------------------ SOFFIT -----------------

36. Install Soffit - box framing - 1' overhang 83.79 LF

Calculation set for 16" overhang

37. Material Only Soffit - box framing - 1' overhang 83.79 LF

Calculation set for 16" overhang

38. Install Soffit & fascia - wood - 1' overhang 83.79 LF

Calculation set for 16" overhang

39. Material Only Soffit & fascia - wood - 1' overhang 83.79 LF

Calculation set for 16" overhang

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 5

CONTINUED - Roof 1

DESCRIPTION QTY

40. Baffle vent - foam 63.00 LF

Cut to fit as needed for vents

41. Soffit vent - linear 31.50 LF

------------------ PAINT -----------------

42. Prime & paint exterior soffit - wood 83.79 SF

43. Prime & paint exterior fascia - wood, 4"- 6" wide 126.00 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

44. Exterior - paint two coats 91.25 SF

45. Siding - hardboard panel - paint grade 91.25 SF

46. House wrap (air/moisture barrier) 91.25 SF

------------------ STRAPPING -----------------

47. Framing & Rough Carpentry (Bid Item) 46.00 EA

2x10 Joist hangers for rafters

48. Framing & Rough Carpentry (Bid Item) 144.00 EA

Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans

49. Framing hurricane tie 294.00 EA

For rafter tails and gable wall studs top and bottom

50. Install Framing hurricane tie 16.00 EA

For joist to top plate

51. Material Only Framing hurricane tie 16.00 EA

For joist to top plate

52. Framing strap - 24" long 25.00 EA

53. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 124.00 EA

4 @ each rafter section & 24 at the splice on the ridge

NOTES:

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 6

Roof 1

(A)F1

(B)F2

Roof 2 F3 11

' 2

10' 2" 10'

Roof 2

113.21 Surface Area

42.61 Total Perimeter Length

1.13 Number of Squares

DESCRIPTION QTY

------------------ ROOFING -----------------

54. Install Metal roofing - ribbed - 24 gauge - up to 1" 113.21 SF

55. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 113.21 SF

56. Closure strips for metal roofing - inside and/or outside 22.33 LF

57. Flashing tape - self-adhesive 67.59 LF

Seal between the metal roof seams

58. Screws for 3/4 sheathing 682.00 EA

Additional screws for 3/4 sheathing above Xactimate allowance. 6% waste added for screws & labor added

59. Screws for 2X4 & 2x6 furring & fascia 234.00 EA

Additional screws for 2x4 furring above Xactimate allowance. 6% waste added for screws

60. Drip edge/gutter apron 22.33 LF

61. Install Gable trim for metal roofing - 26 gauge 20.28 LF

62. Material Only Gable trim for metal roofing - 26 gauge 20.28 LF

63. Ice & water barrier 113.21 SF

64. Neoprene pipe jack flashing for metal roofing 1.00 EA

65. Install 2" x 4" lumber (.667 BF per LF) 33.50 LF

Roof purlins

66. Material Only 2" x 4" lumber (.667 BF per LF) 33.50 LF

Roof purlins

67. Install 2" x 6" lumber (1 BF per LF) 62.94 LF

For Picture Frame

68. Material Only 2" x 6" lumber (1 BF per LF) 62.94 LF

For Picture Frame

69. Install 2" x 6" lumber (1 BF per LF) 22.33 LF

Rafter Blocking

70. Material Only 2" x 6" lumber (1 BF per LF) 22.33 LF

Blocking For Rafters

------------------ SOFFIT -----------------

71. Install Soffit - box framing - 1' overhang 22.33 LF

Calculation set for 16" overhang

72. Material Only Soffit - box framing - 1' overhang 22.33 LF

Calculation set for 16" overhang

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 7

CONTINUED - Roof 2

DESCRIPTION QTY

73. Install Soffit & fascia - wood - 1' overhang 22.33 LF

Calculation set for 16" overhang

74. Material Only Soffit & fascia - wood - 1' overhang 22.33 LF

Calculation set for 16" overhang

75. Soffit vent - linear 11.17 LF

Cut to fit as needed for soffit vent

76. Baffle vent - foam 22.33 LF

------------------ PAINT -----------------

77. Prime & paint exterior soffit - wood 29.70 SF

78. Prime & paint exterior fascia - wood, 4"- 6" wide 44.67 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

------------------ STRAPPING -----------------

79. Framing & Rough Carpentry (Bid Item) 20.00 EA

2x6 joist hangers for rafter blocking in the roof.

80. Framing hurricane tie 18.00 EA

Rafter to wall hurricane tie - 2 per rafter per plans. (Not GFM)

NOTES:

Main Level Main Level

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

81. R&R Meter mast for overhead power - 2" conduit 1.00 EA

82. R&R Meter base - 200 amp 1.00 EA

83. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA

84. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA

85. Rewire - average residence - copper wiring 657.88 SF

86. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA

87. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 8

CONTINUED - Main Level

DESCRIPTION QTY

------------------ WALL REPAIRS-----------------

88. Concrete cutting - wall (per LF per inch of saw depth) 240.00 LF

89. Remove Concrete wall - labor & materials - Reinforced 1.00 CY

90. Concrete - General Laborer - per hour 4.00 HR

91. Concrete Post & Beam construction - Beams 2.67 CY

For both Gable & Shed roof

92. Concrete anchor bolt - 1/2" x 12" 109.00 EA

93. Install 2" x 6" lumber - treated (1 BF per LF) 377.50 LF

94. Material Only 2" x 6" lumber - treated (1 BF per LF) 377.50 LF

95. Sill seal foam - 6" 144.00 LF

------------------ SCAFFOLD -----------------

96. Scaffolding Setup & Take down - per hour 32.00 HR

------------------ GENERAL ITEMS -----------------

97. Clean the floor - Heavy 657.88 SF

98. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA

99. Asbestos test fee - full service survey - base fee 1.00 EA

100. Lead test fee - full service lead survey 1.00 EA

101. Seal the walls w/PVA primer - one coat 1820.00 SF

NOTES:

Livingroom

Kitchen

Hallway

Bedroom 1

Bedroom 2

Outdoor Bath

Shower

4'

3'

3'

2' 6" 3' 2"

3' 5"

9' 11"

10' 5"

4'

8' 6"

8' 9"

3' 1"

3' 7"

8'

7'

1'

0"

2'

15' 7" Livingroom Height: 8'

272.00 SF Walls

427.83 SF Walls & Ceiling

17.31 SY Flooring

34.00 LF Ceil. Perimeter

155.83 SF Ceiling

155.83 SF Floor

34.00 LF Floor Perimeter

Missing Wall 1' 10" X 8' Opens into HALLWAY

Missing Wall 15' 7" X 8' Opens into KITCHEN

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 9

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

102. R&R Switch 2.00 EA

103. R&R Light fixture 1.00 EA

104. R&R Outlet 2.00 EA

------------------ DOORS & WINDOWS -----------------

105. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

106. Door lockset & deadbolt - exterior 1.00 EA

107. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

108. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

109. Security/storm shutter - roll-up type 45.00 SF

------------------ INSULATION -----------------

110. Batt insulation - 10" - R30 - paper faced 155.83 SF

------------------ WALLS & CEILINGS -----------------

111. Install Sheathing - plywood - 1/2" - treated 155.83 SF

112. Material Only Sheathing - plywood - 1/2" - treated 155.83 SF

113. Seal & paint plywood sheathing 155.83 SF

114. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 155.83 SF

115. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 155.83 SF

116. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 155.83 SF

117. Cove molding - 3/4" 34.00 LF

------------------ FLOORING -----------------

118. Floor preparation for resilient flooring 155.83 SF

119. Remove Vinyl floor covering (sheet goods) 155.83 SF

120. Vinyl floor covering (sheet goods) 179.21 SF

15% added for waste

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 10

Livingroom

Kitchen

Hallway

Bedroom 1

Bedroom 2

Outdoor Bath

Shower

2'

4'

3'

3'

15' 7"

1'

2'

8'

7'

3'4' 1"

9'

9' 3" Kitchen Height: 8'

270.00 SF Walls

423.24 SF Walls & Ceiling

17.03 SY Flooring

33.75 LF Ceil. Perimeter

153.24 SF Ceiling

153.24 SF Floor

33.75 LF Floor Perimeter

Missing Wall 15' 7" X 8' Opens into LIVINGROOM

Missing Wall 1' 9" X 8' Opens into HALLWAY

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

121. R&R Switch 1.00 EA

122. R&R Light fixture 1.00 EA

123. R&R Outlet 1.00 EA

------------------ DOORS & WINDOWS -----------------

124. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

125. Door lockset & deadbolt - exterior 1.00 EA

126. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

127. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

128. Security/storm shutter - roll-up type 14.00 SF

------------------ INSULATION -----------------

129. Batt insulation - 10" - R30 - paper faced 153.24 SF

------------------ WALLS & CEILINGS -----------------

130. Install Sheathing - plywood - 1/2" - treated 153.24 SF

131. Material Only Sheathing - plywood - 1/2" - treated 153.24 SF

132. Seal & paint plywood sheathing 153.24 SF

133. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 153.24 SF

134. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 153.24 SF

135. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 153.24 SF

136. Cove molding - 3/4" 33.75 LF

------------------ FLOORING -----------------

137. Floor preparation for resilient flooring 153.24 SF

138. Remove Vinyl floor covering (sheet goods) 153.24 SF

139. Vinyl floor covering (sheet goods) 176.22 SF

15% added for waste

------------------ CABINETRY -----------------

140. Remove Countertop - concrete 24.00 SF

141. R&R Cabinetry - lower (base) units 8.00 LF

142. Countertop - flat laid plastic laminate 8.00 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 11

CONTINUED - Kitchen

DESCRIPTION QTY

------------------ PLUMBING -----------------

143. R&R Sink - double 1.00 EA

144. Sink faucet - Kitchen 1.00 EA

------------------GENERAL ITEMS -----------------

145. 5 lb. ABC fire extinguisher 1.00 EA

NOTES:

Livingroom

Kitchen

Hallway

Bedroom 1

Bedroom 2

Outdoor Bath

Shower

2' 6"

1' 2"

8"

1' 10"

2' 4"

1'

2'

1'

0"

2'

2'

2'

Hallway Height: 8'

120.67 SF Walls

141.08 SF Walls & Ceiling

2.27 SY Flooring

15.08 LF Ceil. Perimeter

20.42 SF Ceiling

20.42 SF Floor

15.08 LF Floor Perimeter

Missing Wall 2' X 8' Opens into KITCHEN

Missing Wall 2' 1" X 8' Opens into LIVINGROOM

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

146. Smoke detector 1.00 EA

147. Carbon monoxide detector 1.00 EA

------------------ INSULATION -----------------

148. Batt insulation - 10" - R30 - paper faced 20.42 SF

------------------ WALLS & CEILINGS -----------------

149. Install Sheathing - plywood - 1/2" - treated 20.42 SF

150. Material Only Sheathing - plywood - 1/2" - treated 20.42 SF

151. Seal & paint plywood sheathing 20.42 SF

152. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 20.42 SF

153. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 20.42 SF

154. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 20.42 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 12

CONTINUED - Hallway

DESCRIPTION QTY

155. Cove molding - 3/4" 15.08 LF

------------------ FLOORING -----------------

156. Floor preparation for resilient flooring 20.42 SF

157. Vinyl floor covering (sheet goods) 23.48 SF

15% added for waste

NOTES:

Livingroom

Kitchen

Hallway

Bedroom 1

Bedroom 2

Outdoor Bath

Shower

8'

7'

4'

5' 2"

5' 5"

5' 3"

5' 9"

4'

2'

1"

3'

2'

1"

3'

8' 11"2' 2'

2' 6"

1' 2"

8" 2' 4"

Bedroom 1 Height: 8'

388.00 SF Walls

517.39 SF Walls & Ceiling

14.38 SY Flooring

48.50 LF Ceil. Perimeter

129.39 SF Ceiling

129.39 SF Floor

48.50 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

158. R&R Switch 2.00 EA

159. R&R Light fixture 1.00 EA

160. R&R Outlet 2.00 EA

161. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

162. R&R Interior door unit 1.00 EA

163. Door knob - interior 1.00 EA

164. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

165. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

166. Security/storm shutter - roll-up type 45.00 SF

------------------ INSULATION -----------------

167. Batt insulation - 10" - R30 - paper faced 129.39 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 13

CONTINUED - Bedroom 1

DESCRIPTION QTY

------------------ WALLS & CEILINGS -----------------

168. Install Sheathing - plywood - 1/2" - treated 129.39 SF

169. Material Only Sheathing - plywood - 1/2" - treated 129.39 SF

170. Seal & paint plywood sheathing 129.39 SF

171. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 129.39 SF

172. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 129.39 SF

173. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 129.39 SF

174. Cove molding - 3/4" 48.50 LF

------------------ FLOORING -----------------

175. Floor preparation for resilient flooring 129.39 SF

176. Vinyl floor covering (sheet goods) 148.80 SF

15% added for waste

------------------ CABINETRY -----------------

177. Remove Cabinetry - full height unit 4.00 LF

NOTES:

Livingroom

Kitchen

Hallway

Bedroom 1

Bedroom 2

Outdoor Bath

Shower

8'

7'

2' 6"

2' 4"8"

2'

2'

8' 11"

4'

2'

2'

0"

3'

3'

1"

4' 4' 10"

5' 4"

5' 7"

5' 10"

Bedroom 2 Height: 8'

390.67 SF Walls

522.00 SF Walls & Ceiling

14.59 SY Flooring

48.83 LF Ceil. Perimeter

131.33 SF Ceiling

131.33 SF Floor

48.83 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

178. R&R Switch 1.00 EA

179. R&R Light fixture 1.00 EA

180. R&R Outlet 4.00 EA

181. Smoke detector 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 14

CONTINUED - Bedroom 2

DESCRIPTION QTY

182. Carbon monoxide detector 1.00 EA

183. R&R Interior door unit 1.00 EA

184. Door knob - interior 1.00 EA

185. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

186. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

187. Storm window - aluminum, 12-24 sf 2.00 EA

188. Security/storm shutter - roll-up type 45.00 SF

------------------ INSULATION -----------------

189. Batt insulation - 10" - R30 - paper faced 131.33 SF

------------------ WALLS & CEILINGS -----------------

190. Install Sheathing - plywood - 1/2" - treated 131.33 SF

191. Material Only Sheathing - plywood - 1/2" - treated 131.33 SF

192. Seal & paint plywood sheathing 131.33 SF

193. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 131.33 SF

194. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 131.33 SF

195. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 131.33 SF

196. Cove molding - 3/4" 48.83 LF

------------------ FLOORING -----------------

197. Floor preparation for resilient flooring 131.33 SF

198. Vinyl floor covering (sheet goods) 151.03 SF

15% added for waste

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 15

Livingroom

Kitchen

Hallway

Bedroom 1

Bedroom 2

Outdoor Bath

Shower

2' 1'

1'

1'

1'

1"

7'

2'

1'

1'

1'

1'

8' Outdoor Bath Height: 8'

189.33 SF Walls

223.17 SF Walls & Ceiling

3.76 SY Flooring

23.67 LF Ceil. Perimeter

33.83 SF Ceiling

33.83 SF Floor

23.67 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

199. R&R Switch 1.00 EA

200. R&R Light fixture 1.00 EA

------------------ PLUMBING -----------------

201. Sink faucet - Bathroom 1.00 EA

202. Pedestal sink 1.00 EA

203. R&R Toilet 1.00 EA

------------------ DOORS & WINDOWS -----------------

204. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

205. Door lockset & deadbolt - exterior 1.00 EA

206. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

207. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

208. Storm window - aluminum, 3-11 sf 1.00 EA

209. Security/storm shutter - roll-up type 7.50 SF

------------------ INSULATION -----------------

210. Batt insulation - 10" - R30 - paper faced 33.83 SF

------------------ WALLS & CEILINGS -----------------

211. Install Sheathing - plywood - 1/2" - treated 33.83 SF

212. Material Only Sheathing - plywood - 1/2" - treated 33.83 SF

213. Seal & paint plywood sheathing 33.83 SF

214. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 33.83 SF

215. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 33.83 SF

216. Cove molding - 3/4" 23.67 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 16

Livingroom

Kitchen

Hallway

Bedroom 1

Bedroom 2

Outdoor Bath

Shower

7'

2'

1'

1'

1'

1'

8'

2' 1'

2'

1'

1'

Shower Height: 8'

189.33 SF Walls

223.17 SF Walls & Ceiling

3.76 SY Flooring

23.67 LF Ceil. Perimeter

33.83 SF Ceiling

33.83 SF Floor

23.67 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

217. R&R Switch 1.00 EA

218. R&R Light fixture 1.00 EA

------------------ PLUMBING -----------------

219. Shower faucet 1.00 EA

------------------ DOORS & WINDOWS -----------------

220. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

221. Door lockset & deadbolt - exterior 1.00 EA

222. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

223. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

224. Storm window - aluminum, 3-11 sf 1.00 EA

225. Security/storm shutter - roll-up type 7.50 SF

------------------ INSULATION -----------------

226. Batt insulation - 10" - R30 - paper faced 33.83 SF

------------------ WALLS & CEILINGS -----------------

227. Install Sheathing - plywood - 1/2" - treated 33.83 SF

228. Material Only Sheathing - plywood - 1/2" - treated 33.83 SF

229. Seal & paint plywood sheathing 33.83 SF

230. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 33.83 SF

231. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 33.83 SF

232. Cove molding - 3/4" 23.67 LF

CNMI DATA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 17

CNMI Data1' 4"

CNMI Data Height: 4"

1.57 SF Walls

2.92 SF Walls & Ceiling

0.15 SY Flooring

4.70 LF Ceil. Perimeter

1.36 SF Ceiling

1.36 SF Floor

4.70 LF Floor Perimeter

DESCRIPTION QTY

233. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO

234. Material Only LATITUDE DAMAGED DWELLING 15.17 DE

15.168599

235. Material Only LONGITUDE DAMAGED DWELLING 145.78 DE

145.781363

236. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO

237. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO

238. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 YS

239. DOES DWELLING HAVE A WELL 0.00 NO

240. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO

241. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1993.00 YR

242. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO

243. Material Only ENCROACHMENT ISSUES 0.00 NO

244. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO

245. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 NO

246. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 694.00 SF

247. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO

248. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

249. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

Roof

250. Material Only IS DWELLING DESTROYED 0.00 NO

251. Material Only FOUNDATION TYPE 0.00 UN

Slab

252. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO

253. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 YS

254. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS

255. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO

256. Material Only LATITUDE OUT BUILDING 15.17 DE

15.168595

257. Material Only LONGITUDE OUT BUILDING 145.78 DE

145.781241

258. Material Only LATITUDE POWER POLE 15.17 DE

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 18

CONTINUED - CNMI Data

DESCRIPTION QTY

15.168356

259. Material Only LONGITUDE POWER POLE 145.78 DE

145.781396

260. Material Only LATITUDE WATER METER 15.17 DE

15.168360

261. Material Only LONGITUDE WATER METER 145.78 DE

145.781352

262. Material Only LATITUDE WATER TANK 0.00 NO

263. Material Only LONGITUDE WATER TANK 0.00 NO

NOTES:

Labor Minimums Applied

DESCRIPTION QTY

264. Finish hardware labor minimum 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 19

Grand Total Areas:

1,821.57 SF Walls 659.23 SF Ceiling SF Walls and Ceiling2,480.80

659.23 SF Floor 73.25 SY Flooring 232.20 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 232.20 LF Ceil. Perimeter

659.23 Floor Area 762.69 Total Area 1,821.57 Interior Wall Area 1,393.52 Exterior Wall Area 148.70 Exterior Perimeter of

Walls

870.83 Surface Area 8.71 Number of Squares 153.71 Total Perimeter Length

31.50 Total Ridge Length 0.00 Total Hip Length

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 20

1 Main Level - Scope

Date Taken: 12/27/2019

Taken By: Casey Hoak

2 Main Level - Scope

Date Taken: 12/27/2019

Taken By: Casey Hoak

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 21

3 Main Level - Scope

Date Taken: 12/27/2019

Taken By: Casey Hoak

4 Main Level - Scope

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 22

5 Main Level - Scope

Date Taken: 12/27/2019

Taken By: Casey Hoak

6 Main Level - Exterior

Date Taken: 12/27/2019

Taken By: Casey Hoak

Gabel over main house shed over bath area, Saw cut main roof and bond beeam for both roofs with J bolts.

New meter, base, masthead and panel.

Lead, asbestos scaffold, dumpster and paint for interior walls only.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 23

7 Main Level - Exterior

Date Taken: 12/27/2019

Taken By: Casey Hoak

8 Main Level - Exterior

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 24

9 Main Level - Exterior

Date Taken: 12/27/2019

Taken By: Casey Hoak

10 Main Level - Exterior

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 25

11 Main Level - Exterior

Date Taken: 12/27/2019

Taken By: Casey Hoak

12 Main Level - Exterior

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 26

13 Main Level - Exterior

Date Taken: 12/27/2019

Taken By: Casey Hoak

14 Main Level - Exterior

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 27

15 Main Level - Exterior

Date Taken: 12/27/2019

Taken By: Casey Hoak

16 Main Level - Exterior

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 28

17 Main Level - Exterior

Date Taken: 12/27/2019

Taken By: Casey Hoak

18 Main Level - Exterior

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 29

19 Main Level - Exterior

Date Taken: 12/27/2019

Taken By: Casey Hoak

20 Main Level - Exterior

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 30

21 Main Level - Exterior

Date Taken: 12/27/2019

Taken By: Casey Hoak

22 Main Level/Livingroom - Living Room Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, ceiling, vinyl floor, door exteriorand add shutters

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 31

23 Main Level/Livingroom - Living Room Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, ceiling, vinyl floor, door exterior

24 Main Level/Livingroom - Living Room Date Taken: 12/27/2019

Taken By: Casey Hoak door exterior

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 32

25 Main Level/Livingroom - Living Room Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, ceiling, vinyl floor, door exterior

26 Main Level/Livingroom - Living Room Date Taken: 12/27/2019

Taken By: Casey Hoak

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 33

27 Main Level/Livingroom - Living Room Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, ceiling, vinyl floor, door exterior

28 Main Level/Livingroom - Living Room Date Taken: 12/27/2019

Taken By: Casey Hoak

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 34

29 Main Level/Kitchen - Kitchen

Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, floor, ceilings, remove concrete counter top, replace 8LF cabinet and laminate counter top, exterior door, and add shutter

30 Main Level/Kitchen - Kitchen

Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, floor, remove concrete counter top, replace 8LF cabinet and laminate counter top, exterior door, and add shutter

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 35

31 Main Level/Kitchen - Kitchen

Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, floor, remove concrete counter top, replace 8LF cabinet and laminate counter top, exterior door, and add shutter

32 Main Level/Kitchen - Kitchen

Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, floor, remove concrete counter top, replace 8LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 36

33 Main Level/Kitchen - Kitchen

Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, floor, remove concrete counter top, replace 8LF cabinet and laminate counter top, exterior door, and add shutter

34 Main Level/Kitchen - Kitchen

Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, floor, remove concrete counter top, replace 8LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 37

35 Main Level/Kitchen - Kitchen

Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, floor, remove concrete counter top, replace 8LF cabinet and laminate counter top, exterior door, and add shutter

36 Main Level/Hallway - Hallway

Date Taken: 12/27/2019

Floor, ceiling and add smoke and co2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 38

37 Main Level/Hallway - Hallway

Date Taken: 12/27/2019

Taken By: Casey Hoak

Floor, ceiling and add smoke and co2

38 Main Level/Hallway - Hallway

Date Taken: 12/27/2019

Floor, ceiling and add smoke and co2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 39

39 Main Level/Hallway - Hallway

Date Taken: 12/27/2019

Taken By: Casey Hoak

Floor, ceiling and add smoke and co2

40 Main Level/Bedroom 1 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric, shutters, vinyl floor, ceilign, and interior door

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 40

41 Main Level/Bedroom 1 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

42 Main Level/Bedroom 1 - Bedroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 41

43 Main Level/Bedroom 1 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

44 Main Level/Bedroom 1 - Bedroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 42

45 Main Level/Bedroom 1 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

46 Main Level/Bedroom 1 - Bedroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 43

47 Main Level/Bedroom 1 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

48 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and shutters, vinyl floor, ceilin, and interior doorremove 4 LF of FH Cabinets

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 44

49 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and shutters, vinyl floor, ceilin, and interior door

50 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and shutters, vinyl floor, ceilin, and interior door

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 45

51 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and shutters, vinyl floor, ceilin, and interior door

52 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 46

53 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and shutters, vinyl floor, ceilin, and interior door

54 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 47

55 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and shutters, vinyl floor, ceilin, and interior door

56 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 48

57 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and shutters, vinyl floor, ceilin, and interior door

58 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 49

59 Main Level/Bedroom 2 - Bedroom Date Taken: 12/27/2019

Taken By: Casey Hoak

Replace electric 2 4x4 windows and shutters, vinyl floor, ceilin, and interior door

60 Main Level/Outdoor Bath - Shower Side Date Taken: 12/27/2019

Taken By: Casey Hoak

Exterior door, shower head, 1 2x2 window and shuuter and electric

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 50

61 Main Level/Outdoor Bath - Shower Side Date Taken: 12/27/2019

Taken By: Casey Hoak

Exterior door, shower head, 1 2x2 window and shuuter and electric

62 Main Level/Outdoor Bath - Shower Side Date Taken: 12/27/2019

Taken By: Casey Hoak

Exterior door, shower head, 1 2x2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 51

63 Main Level/Outdoor Bath - Shower Side Date Taken: 12/27/2019

Taken By: Casey Hoak

Exterior door, shower head, 1 2x2 window and shuuter and electric

64 Main Level/Shower - Toilet Side

Date Taken: 12/27/2019

Taken By: Casey Hoak

New toilet, sink exterior door 1 2x2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 52

65 Main Level/Shower - Toilet Side

Date Taken: 12/27/2019

Taken By: Casey Hoak

New toilet, sink exterior door 1 2x2 window and shuuter and electric

66 Main Level/Shower - Toilet Side

Date Taken: 12/27/2019

Taken By: Casey Hoak

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-504441946_RA 12/27/2019 Page: 53

67 Main Level/Shower - Toilet Side

Date Taken: 12/27/2019

Taken By: Casey Hoak

File details come from the government source that posted it. Updated .