Dewberry
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
Insured: DORIS MARIE JOSEPH Home: (670) 783-8192 Home: 4TH HOUSE WEST SIDE FEDDOS LANE LOT
5168-RI
FINA SISU, HI 96701
Property: 4TH HOUSE WEST SIDE FEDDOS LANE LOT
5168-RI
FINA SISU, HI 96701
Claim Rep.: Darlene Hubbard
Estimator: Darlene Hubbard
Claim Number: CNMI-412622015 Policy Number: CNMI-412622015 Type of Loss: Hurricane
Date Contacted: 12/3/2019 8:00 AM Date of Loss: 10/25/2018 Date Received: 1/11/2019 3:11 PM
Date Inspected: 2/14/2019 10:00 AM Date Entered: 12/3/2019 3:14 PM
Date Est. Completed: 2/15/2019 8:51 AM
Price List: HIOI8X_JAN19 Restoration/Service/Remodel
Estimate: CNMI-412622015_RA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 2
12/3/2019 DDH:
Site Visit, Attending: DeDe Hubbard, Brunson Taylor, Jorge Rivera, PE Dwelling is a 2 bedroom CMU dwelling with a metal roof which was destroyed in the disaster and was repaired by applicant. It was determined by Jorge Rivera, PE to replace existing roof with a gable roof. No saw cut or bond beam will be needed, just leveling to top of wall. The estimate includes general demo labor hours to demo existing metal roof covering the porch which is attached to the existing roof. Electrical includes to replace 5 existing exterior lights, the mast head and meter base. Included in the estimate is to replace is the main panel which is to be replaced with a 200 amp panel. A new rewire of the entire dwelling will need to be done with the actual plugs, switches, outlets and GFIs, smoke detectors added to the bedrooms and a C/O in the hall. All rooms include R/R ceiling/joists and replace ceiling, joists, insulation and molding. No broken windows, only adding shutter. All windows have framed-in wooden screens which will not need to be removed for shutters. 3 exterior doors are in estimate to R/R and paint all 6 sides. 2 interior bedroom doors are to be replaced and painted. The two bedrooms have AC openings that are estimated to enclose. No damage to tile floor. GFM has been utilized in the appropriate areas and new photos of the home detailing the status to date were added to the file.
INSPECTION SUMMARY
The applicant met at the damaged dwelling and the following was observed.
The dwelling is one story 2 bedroom structure. The dwelling is deemed to be repairable There were 1 structural components damaged = Roof.
Reconstruction should take approximately 16 weeks from start of construction.
AGE House is 12 years old
Total Square Footage of Damaged Dwelling
DAMAGE AND REPAIR SUMMARY
See attached estimate for exact repair and line items.
LATITUDE: 15.144582
LONGITUDE: 145.721905
A: ROOF The roof including roof and framing was destroyed and needs replacing.
B: INTERIOR The majority of interior items were affected
C: STRUCTURAL The foundation is a slab and the slab appears to be intact and does not need replacing.
D: MECHANICAL/PLUMBING/WATER SYSTEM No Issues
E: ELECTRICAL All electrical needs replacing.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 3
CNMI-412622015_RA
ROOF
ROOF
DESCRIPTION QTY
442. 2" x 6" x 8' #2 treated pine (material only) 3.00 EA
436. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 4.00 EA
435. 2" x 6" x 12' #2 treated pine (material only) 8.00 EA
441. 2" x 6" x 20' #2 treated pine (material only) 12.00 EA
421. 2" x 10" x 12' #2 treated pine (material only) 34.00 EA
420. 2" x 12" x 8' #2 treated pine (material only) 2.00 EA
422. 2" x 12" x 12' #2 treated pine (material only) 4.00 EA
419. 2" x 12" x 20' #2 treated pine (material only) 4.00 EA
447. Install Sheathing - OSB - 1/2" 140.18 SF
432. Material Only Sheathing - OSB - 1/2" 140.18 SF
448. Install Sheathing - plywood - 3/4" - treated 576.00 SF
446. Material Only Sheathing - plywood - 3/4" - treated 576.00 SF
433. R&R Labor to frame 2" x 6" non-bearing wall - 16" oc 97.52 SF
For gable end walls
445. Rafters - 2x6 - Labor only - (using rafter length) 201.75 LF
For Collar Ties
443. R&R Rafters - 2x10 - Labor only - (using rafter length) 392.81 LF
444. Rafters - 2x12 - Labor only - (using rafter length) 140.88 LF
For ridge beam and fascia
NOTES:
Roof1
(A)F1
(B)F2
23' 8"
' 7
' 3
' 7
' 3
' 5
Roof1
546.86 Surface Area
93.55 Total Perimeter Length
5.47 Number of Squares
23.67 Total Ridge Length
DESCRIPTION QTY
------------------ ROOFING -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 4
CONTINUED - Roof1
DESCRIPTION QTY
376. Remove Metal roofing - ribbed - 24 gauge - up to 1" 546.86 SF
378. Install Metal roofing - ribbed - 24 gauge - up to 1" 546.86 SF
379. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 546.86 SF
380. Closure strips for metal roofing - inside and/or outside 47.33 LF
381. Flashing tape - self-adhesive 209.08 LF
Seal between the metal roof seams
383. Ridge vent - Metal roofing - floating ventilator 23.67 LF
384. Additional screws for 3/4 plywood sheathing 1939.00 EA
Additional screws and labor for 3/4 plywood sheathing above Xactimate pricing. 6% waste added Labor included
385. Additional screws for 2X4 and 2X6 furring and fascia 721.00 EA
Additional screws and labor for 2X4 and 2X6 furring and fascia above Xactimate pricing. 6% waste added Labor included
389. Drip edge/gutter apron 47.33 LF
390. Install Gable trim for metal roofing - 26 gauge 46.21 LF
391. Material Only Gable trim for metal roofing - 26 gauge 46.21 LF
392. Ice & water barrier 546.86 SF
394. Install 2" x 4" lumber - treated (.667 BF per LF) 181.33 LF
Roof purlins
395. Material Only 2" x 4" lumber - treated (.667 BF per LF) 181.33 LF
Roof purlins
396. Install 2" x 6" lumber - treated (1 BF per LF) 140.88 LF
For Picture Frame Purlins
397. Material Only 2" x 6" lumber - treated (1 BF per LF) 140.88 LF
For Picture Frame Purlins
398. Install 2" x 6" lumber - treated (1 BF per LF) 94.67 LF
Rafter Blocking
399. Material Only 2" x 6" lumber - treated (1 BF per LF) 94.67 LF
Rafter Blocking
------------------ SOFFIT -----------------
400. Install Soffit - box framing - 1' overhang 62.95 LF
Calculation set for 16" overhang
401. Material Only Soffit - box framing - 1' overhang 62.95 LF
Calculation set for 16" overhang
402. Install Soffit & fascia - wood - 1' overhang 62.95 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 5
CONTINUED - Roof1
DESCRIPTION QTY
Calculation set for 16" overhang
403. Material Only Soffit & fascia - wood - 1' overhang 62.95 LF
Calculation set for 16" overhang
404. Baffle vent - foam 47.33 LF
Cut to fit as needed for vents
405. Soffit vent - linear 23.67 LF
------------------ PAINT -----------------
406. Prime & paint exterior soffit - wood 62.95 SF
407. Prime & paint exterior fascia - wood, 4"- 6" wide 94.67 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
408. Exterior - paint two coats 70.09 SF
409. Siding - hardboard panel - paint grade 70.09 SF
410. House wrap (air/moisture barrier) 70.09 SF
------------------ STRAPPING -----------------
411. Hangers for rafters 34.00 EA
Hangers for rafters at the ridge beam.
412. Hangers rafter blocking 72.00 EA
Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans
413. Framing hurricane tie 124.00 EA
For rafter tails and gable wall studs top and bottom
414. Install Framing hurricane tie 38.00 EA
For joist to top plate
415. Material Only Framing hurricane tie 38.00 EA
For joist to top plate
417. Framing strap - 24" long 19.00 EA
418. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 92.00 EA
4 @ each rafter section & 24 at the splice on the ridge
NOTES:
Main Level
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 6
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
162. R&R Meter mast for overhead power - 2" conduit 1.00 EA
164. R&R Meter base - 200 amp 1.00 EA
165. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA
166. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA
167. Rewire - average residence - copper wiring 794.28 SF
169. R&R Exterior light fixture 5.00 EA
170. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA
171. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF
------------------ WALL REPAIRS-----------------
176. Concrete Post & Beam construction - Beams 1.00 CY
To pour a bond beam on top of existing wall - includes rebar Minimum amount to level up existing walls
178. Wedge anchor bolt - 1/2" x 8 1/2" 136.00 EA
For cold joint between top of wall and new bond beam.
180. Epoxy crack and joint filler (per LF of crack) 136.00 LF
181. Install 2" x 6" lumber - treated (1 BF per LF) 360.50 LF
For double sill plate on the perimeter
182. Material Only 2" x 6" lumber - treated (1 BF per LF) 360.50 LF
For double sill plate on the perimeter
183. Sill seal foam - 6" 119.50 LF
------------------ SCAFFOLD -----------------
184. Scaffolding Setup & Take down - per hour 32.00 HR
------------------ GENERAL ITEMS -----------------
186. Clean the floor - Heavy 794.28 SF
188. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA
NOTES:
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 7
Living Room
Kitchen
Bedroom 2
Hallway
Bedroom 1
Covered Porch
2'
3'
3'
2'
2'
2' 6" 11" 10' 7"
4' 7' 11"
8'
4' 3"9' 9"
9' 5" Living Room Height: 8'
257.33 SF Walls
375.88 SF Walls & Ceiling
13.17 SY Flooring
32.17 LF Ceil. Perimeter
118.54 SF Ceiling
118.54 SF Floor
32.17 LF Floor Perimeter
Missing Wall 8' 7" X 8' Opens into KITCHEN
Missing Wall 4' 3" X 8' Opens into HALLWAY
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
189. R&R Switch 5.00 EA
190. R&R Light fixture 1.00 EA
191. R&R Outlet 2.00 EA
------------------ DOORS & WINDOWS -----------------
207. R&R Exterior door - metal - insulated - flush or panel style 2.00 EA
209. Door lockset & deadbolt - exterior 2.00 EA
210. Paint door slab only - 2 coats (per side) 4.00 EA
Painting all 6 sides of door
212. Paint door/window trim & jamb - 2 coats (per side) 4.00 EA
216. Security/storm shutter 22.50 SF
------------------ INSULATION -----------------
220. Batt insulation - 10" - R30 - paper faced 118.54 SF
------------------ WALLS & CEILINGS -----------------
222. Remove Sheathing - plywood - 1/2" - treated 118.54 SF
223. Install Sheathing - plywood - 1/2" - treated 118.54 SF
224. Material Only Sheathing - plywood - 1/2" - treated 118.54 SF
225. Seal & paint plywood sheathing 118.54 SF
226. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 118.54 SF
227. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 118.54 SF
228. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 118.54 SF
229. Cove molding - 3/4" 32.17 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 8
Living Room
Kitchen
Bedroom 2
Hallway
Bedroom 1
Covered Porch
1'
1" 2'
8'
9'
2'
2'
2'
5'
5'
0" 2'
7'
7'
1'
1'
8' 10"
8' 8" Kitchen Height: 8'
228.00 SF Walls
322.50 SF Walls & Ceiling
10.50 SY Flooring
28.50 LF Ceil. Perimeter
94.50 SF Ceiling
94.50 SF Floor
28.50 LF Floor Perimeter
Missing Wall 1' 11" X 8' Opens into HALLWAY
Missing Wall 8' 7" X 8' Opens into LIVING_ROOM
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
244. R&R Switch 1.00 EA
245. R&R Light fixture 1.00 EA
246. R&R Outlet 1.00 EA
247. R&R Ground fault interrupter (GFI) outlet 2.00 EA
------------------ DOORS & WINDOWS -----------------
252. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
253. Door lockset & deadbolt - exterior 1.00 EA
254. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
255. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
256. Security/storm shutter 12.50 SF
------------------ INSULATION -----------------
257. Batt insulation - 10" - R30 - paper faced 94.50 SF
------------------ WALLS & CEILINGS -----------------
258. Remove Sheathing - plywood - 1/2" - treated 94.50 SF
259. Install Sheathing - plywood - 1/2" - treated 94.50 SF
260. Material Only Sheathing - plywood - 1/2" - treated 94.50 SF
261. Seal & paint plywood sheathing 94.50 SF
262. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 94.50 SF
263. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 94.50 SF
264. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 94.50 SF
265. Cove molding - 3/4" 28.50 LF
------------------ GENERAL -----------------
352. 5 lb. ABC fire extinguisher 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 9
Living Room
Kitchen
Bedroom 2
Hallway
Bedroom 1
Covered Porch
4' 2'
2'
4'
4'
9' 9"
9' 5"
6'
6'
3' 1"
3' 3" 4'
1' 9"
6' 8"
7'
4' 4"
4' 6" Bedroom 1 Height: 8'
370.67 SF Walls
482.54 SF Walls & Ceiling
12.43 SY Flooring
46.33 LF Ceil. Perimeter
111.88 SF Ceiling
111.88 SF Floor
46.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
325. R&R Switch 1.00 EA
326. R&R Light fixture 1.00 EA
327. R&R Outlet 3.00 EA
329. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
331. R&R Interior door unit 1.00 EA
332. Door knob - interior 1.00 EA
335. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
336. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
337. Security/storm shutter 35.00 SF
------------------ INSULATION -----------------
338. Batt insulation - 10" - R30 - paper faced 111.88 SF
------------------ WALLS & CEILINGS -----------------
339. Remove Sheathing - plywood - 1/2" - treated 111.88 SF
340. Install Sheathing - plywood - 1/2" - treated 111.88 SF
341. Material Only Sheathing - plywood - 1/2" - treated 111.88 SF
342. Seal & paint plywood sheathing 111.88 SF
343. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 111.88 SF
344. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 111.88 SF
345. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 111.88 SF
346. Cove molding - 3/4" 46.33 LF
------------------ A/C OPENING -----------------
347. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
348. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
349. Install Sheathing - plywood - 3/4" - treated 8.00 SF
350. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF
351. Seal & paint plywood sheathing 8.00 SF
To paint A/C Hole in exterior wall
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 10
CONTINUED - Bedroom 1
DESCRIPTION QTY
NOTES:
Living Room
Kitchen
Bedroom 2
Hallway
Bedroom 1
Covered Porch
4'
1' 2"
1' 4"
2'
7"9"
1'
8' 10"
8' 8"
8'
8'
1"
4'
2' 10"
3'
3' 2"
3' 6" Bedroom 2 Height: 8'
294.67 SF Walls
372.94 SF Walls & Ceiling
8.70 SY Flooring
36.83 LF Ceil. Perimeter
78.28 SF Ceiling
78.28 SF Floor
36.83 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
271. R&R Switch 1.00 EA
272. R&R Light fixture 1.00 EA
273. R&R Outlet 2.00 EA
275. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
277. R&R Interior door unit 1.00 EA
278. Door knob - interior 1.00 EA
281. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
282. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
283. Security/storm shutter 22.50 SF
------------------ INSULATION -----------------
284. Batt insulation - 10" - R30 - paper faced 78.28 SF
------------------ WALLS & CEILINGS -----------------
285. Remove Sheathing - plywood - 1/2" - treated 78.28 SF
286. Install Sheathing - plywood - 1/2" - treated 78.28 SF
287. Material Only Sheathing - plywood - 1/2" - treated 78.28 SF
288. Seal & paint plywood sheathing 78.28 SF
289. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 78.28 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 11
CONTINUED - Bedroom 2
DESCRIPTION QTY
290. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 78.28 SF
291. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 78.28 SF
292. Cove molding - 3/4" 36.83 LF
------------------ A/C OPENING -----------------
293. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
294. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
295. Install Sheathing - plywood - 3/4" - treated 8.00 SF
296. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF
297. Seal & paint plywood sheathing 8.00 SF
To paint A/C Hole in exterior wall
NOTES:
Living Room
Kitchen
Bedroom 2
Hallway
Bedroom 1
Covered Porch
6'
6'
4' 3"
1'
1"
2'
2'
7"9"
1'
1' 2"
1' 4"
3' 1"
3' 3" Hallway Height: 8'
120.00 SF Walls
146.92 SF Walls & Ceiling
2.99 SY Flooring
15.00 LF Ceil. Perimeter
26.92 SF Ceiling
26.92 SF Floor
15.00 LF Floor Perimeter
Missing Wall 4' 3" X 8' Opens into LIVING_ROOM
Missing Wall 2' 1" X 8' Opens into KITCHEN
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
303. Carbon monoxide detector 1.00 EA
------------------ INSULATION -----------------
311. Batt insulation - 10" - R30 - paper faced 26.92 SF
------------------ WALLS & CEILINGS -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 12
CONTINUED - Hallway
DESCRIPTION QTY
312. Remove Sheathing - plywood - 1/2" - treated 26.92 SF
313. Install Sheathing - plywood - 1/2" - treated 26.92 SF
314. Material Only Sheathing - plywood - 1/2" - treated 26.92 SF
315. Seal & paint plywood sheathing 26.92 SF
316. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 26.92 SF
317. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 26.92 SF
318. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 26.92 SF
319. Cove molding - 3/4" 15.00 LF
NOTES:
Living Room Kitchen
Bedroom 2
Hallway Bedroom 1
Covered Porch
23' 23' 8"
' 1
0"
' 4
9'2' 6" 10' 7" 4'
7' 11" 2' 2" Covered Porch Height: 8'
621.33 SF Walls
985.50 SF Walls & Ceiling
40.46 SY Flooring
77.67 LF Ceil. Perimeter
364.17 SF Ceiling
364.17 SF Floor
77.67 LF Floor Perimeter
DESCRIPTION QTY
354. General Demolition - per hour 10.00 HR
Additional labor hours to demo metal covering for porch as it is attached to the existing roof
CNMI
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 13
CNMI Data1' 4"
CNMI Data Height: 4"
1.57 SF Walls
2.92 SF Walls & Ceiling
0.15 SY Flooring
4.70 LF Ceil. Perimeter
1.36 SF Ceiling
1.36 SF Floor
4.70 LF Floor Perimeter
DESCRIPTION QTY
116. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO
117. Material Only LATITUDE DAMAGED DWELLING 15.14 DE
15.144582
118. Material Only LONGITUDE DAMAGED DWELLING 145.72 DE
145.721905
119. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO
120. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO
121. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 NO
122. DOES DWELLING HAVE A WELL 0.00 NO
123. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO
124. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 2007.00 YR
125. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO
126. Material Only ENCROACHMENT ISSUES 0.00 NO
127. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO
128. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 NO
129. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 480.00 SF
130. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO
131. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
132. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
Roof
133. Material Only IS DWELLING DESTROYED 0.00 NO
134. Material Only FOUNDATION TYPE 1.00 UN
Slab
135. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO
136. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
137. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO
138. Material Only DID THE MILITARY PROVIDE A TENT 1.00 YS
139. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
Roof
140. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO
141. Material Only LATITUDE OUT BUILDING 15.14 DE
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 14
CONTINUED - CNMI Data
DESCRIPTION QTY
15.144421
142. Material Only LONGITUDE OUT BUILDING 145.72 DE
145.721565
143. Material Only LATITUDE POWER POLE 15.14 DE
15.144623
144. Material Only LONGITUDE POWER POLE 145.72 DE
145.722033
145. Material Only LATITUDE WATER METER 15.14 DE
15.144320
146. Material Only LONGITUDE WATER METER 14.72 DE
14.721835
147. Material Only LATITUDE WATER TANK 15.14 DE
15.144499
148. Material Only LONGITUDE WATER TANK 145.72 DE
145.721768
NOTES:
Labor Minimums Applied
DESCRIPTION QTY
206. Finish hardware labor minimum 1.00 EA
382. Window labor minimum 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 15
Grand Total Areas:
1,893.57 SF Walls 795.63 SF Ceiling SF Walls and Ceiling2,689.20
795.63 SF Floor 88.40 SY Flooring 241.20 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 241.20 LF Ceil. Perimeter
795.63 Floor Area 855.33 Total Area 1,893.57 Interior Wall Area 1,130.53 Exterior Wall Area 124.20 Exterior Perimeter of
Walls
546.86 Surface Area 5.47 Number of Squares 93.55 Total Perimeter Length
23.67 Total Ridge Length 0.00 Total Hip Length
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 16
1 Main Level - Scope Notes
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Site visit was conducted with DeDe Hubbard, Brunson Taylor and Jorge Rivera, PE. It was determined by Jorge Rivera, PE to replace existing roof with a gable roof. No saw cut or bond beam will be needed, just leveling to top of wall. The estimate includes general demo labor hours to demo existing metal roof covering the porch which is attached to the existing roof. Electrical includes to replace 5 existing exterior lights, the mast head and meter base. Included to replace is the main panel to be replaced with a 200 amp panel. All rooms with R/R ceiling/joists and replace ceiling, joists, insulation and molding. No broken windows, only shutter. All windows framed-in wooden screens that will not need to be removed for shutters. 3 exterior doors are in
2 Main Level - Scope Notes
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 17
3 Main Level - Scope Notes
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
4 Main Level - Front Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 18
5 Main Level - Front Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Front left corner
6 Main Level - Front Elevation
Date Taken: 12/3/2019
Front right corner
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 19
7 Main Level - Left Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
8 Main Level - Left Elevation
Date Taken: 12/3/2019
Exterior door leading into living room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 20
9 Main Level - Left Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Windows have framed-in screens that will not have to be removed for shutters
10 Main Level - Left Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Dwelling has 2 window units that will be included to frame in.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 21
11 Main Level - Left Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Front corner, has light installed which will be included to replace
12 Main Level - Left Elevation
Date Taken: 12/3/2019
Back Left corner
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 22
13 Main Level - Left Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Photo of top of wall. No saw cut needed only level off
14 Main Level - Back Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Back right corner, light will be replaced
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 23
15 Main Level - Right Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Exterior door leading into kitchen
16 Main Level - Right Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Left front corner with light to be replaced
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 24
17 Main Level - Front Elevation
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Meter base and exterior light to be replaced
18 Main Level - 45-Out Building
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
No interior bathroom, outhouse is shared.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 25
19 Main Level/Living Room - Living Room Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Main panel to be replaced with 200amp panel. Damage to ceiling and roof. Remove ceiling and joists.
Replace ceiling, joists, add insulation, molding and paint. Electric=5 switches (2 switches control the exterior lights), 1lights, 2 outlets. No broken windows, add 22.5SF shutter.
R&R 2 damaged exterior door, paint trim and all 6 sides of the door. No damage to tile floor.
20 Main Level/Living Room - Living Room Date Taken: 12/3/2019
Exterior door
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 26
21 Main Level/Living Room - Living Room Date Taken: 12/3/2019
Taken By: Darlene Hbbard
2nd damaged exterior door
22 Main Level/Living Room - Living Room Date Taken: 12/3/2019
R/R ceiling and joists, replace light
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 27
23 Main Level/Living Room - Living Room Date Taken: 12/3/2019
Taken By: Darlene Hbbard
24 Main Level/Living Room - Living Room Date Taken: 12/3/2019
No damage to floor
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 28
25 Main Level/Living Room - Living Room Date Taken: 12/3/2019
Taken By: Darlene Hbbard
3 switch plug
26 Main Level/Living Room - Living Room Date Taken: 12/3/2019
2 switches to replace
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 29
27 Main Level/Kitchen - Kitchen
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof. Remove ceiling and joists. Replace ceiling, joists, add insulation, molding and paint. Electric=2 switches, 1 lights, 2 GFI and 1 outlets. No broken windows, add 12.5SF shutter. R&R 1 exterior door, paint trim and all 6 sides of the door. No damage to tile floor.
28 Main Level/Kitchen - Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 30
29 Main Level/Kitchen - Kitchen
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Light to be replaced
30 Main Level/Kitchen - Kitchen
Date Taken: 12/3/2019
Replace with GFI
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 31
31 Main Level/Kitchen - Kitchen
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Replace exterior door
32 Main Level/Kitchen - Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 32
33 Main Level/Kitchen - Kitchen
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Cabinet faces have been removed, GFI to be replaced to the left of the cabinet
34 Main Level/Kitchen - Kitchen
Date Taken: 12/3/2019
Outlet to replace
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 33
35 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof. Remove ceiling and joists. Replace ceiling, joists, add insulation, molding and paint. Electric=1 switches, 1 lights, 3 outlets, add 1 smoke alarm. No broken windows, add 35SF shutter.
Enclose 1 AC opening. R&R 1 interior door, paint all 6 sides. No damage to tile floor.
36 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019
AC opening to enclose
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 34
37 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019
Taken By: Darlene Hbbard
38 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019
No damage to window, shutter only
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 35
39 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019
Taken By: Darlene Hbbard
40 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019
Replacing ceiling, joists and light
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 36
41 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019
Taken By: Darlene Hbbard
No damage to floor
42 Main Level/Bedroom 1 - Bedroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 37
43 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof. Remove ceiling and joists. Replace ceiling, joists, add insulation, molding and paint. Electric=1 switches, 1 lights, 3 outlets, add 1 smoke alarm. No broken windows, add 22.5SF shutter.
Enclose 1 AC opening. R&R 1 interior door, paint all 6 sides. No damage to tile floor.
44 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019
No damage to windows, shutters only
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 38
45 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019
Taken By: Darlene Hbbard
AC opening and outlet
46 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019
Replace ceiling, joists and 1 light
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 39
47 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019
Taken By: Darlene Hbbard
No damage to floor
48 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019
Replacing outlet
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 40
49 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Replacing 2nd outlet
50 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019
3rd outlet
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 41
51 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019
Taken By: Darlene Hbbard
1 switch replace
52 Main Level/Hallway - Hallway
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof. Remove ceiling and joists. Replace ceiling, joists, add insulation, molding and paint. Electric=add 1 C/O. Enclose 1 AC opening. No damage to tile floor.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 42
53 Main Level/Hallway - Hallway
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
54 Main Level/Hallway - Hallway
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 43
55 Main Level/Hallway - Hallway
Date Taken: 12/3/2019
Taken By: Darlene Hbbard
56 Main Level/Hallway - Hallway
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412622015_RA 12/7/2019 Page: 44
57 Main Level/Covered Porch - Covered Porch Date Taken: 12/3/2019
Taken By: Darlene Hbbard
Metal covering may need to be demoed when removing metal roof
58 Main Level/Covered Porch - Covered Porch Date Taken: 12/3/2019
Metal roof may need to be removed
CNMI-412622015_RA 12/7/2019 Page: 45
Main Level
Living Room
Kitchen
Bedroom 2
Hallway
Bedroom 1
Covered Porch
CNMI-412622015_RA 12/7/2019 Page: 46
ROOF
Roof1
(A)F1
(B)F2
ROOF
CNMI-412622015_RA 12/7/2019 Page: 47
PLOT
Lot (A1)
Dwelling (A2)Water Tank (A3)
FEDDOS LANE (A4)
Power Pole (A5)
House (A6)Out Building (A7)
Water Meter (A8)
PLOT
CNMI-412622015_RA 12/7/2019 Page: 48
CNMI
CNMI Data
CNMI