Dewberry

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

Insured: DORIS MARIE JOSEPH Home: (670) 783-8192 Home: 4TH HOUSE WEST SIDE FEDDOS LANE LOT

5168-RI

FINA SISU, HI 96701

Property: 4TH HOUSE WEST SIDE FEDDOS LANE LOT

5168-RI

FINA SISU, HI 96701

Claim Rep.: Darlene Hubbard

Estimator: Darlene Hubbard

Claim Number: CNMI-412622015 Policy Number: CNMI-412622015 Type of Loss: Hurricane

Date Contacted: 12/3/2019 8:00 AM Date of Loss: 10/25/2018 Date Received: 1/11/2019 3:11 PM

Date Inspected: 2/14/2019 10:00 AM Date Entered: 12/3/2019 3:14 PM

Date Est. Completed: 2/15/2019 8:51 AM

Price List: HIOI8X_JAN19 Restoration/Service/Remodel

Estimate: CNMI-412622015_RA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 2

12/3/2019 DDH:

Site Visit, Attending: DeDe Hubbard, Brunson Taylor, Jorge Rivera, PE Dwelling is a 2 bedroom CMU dwelling with a metal roof which was destroyed in the disaster and was repaired by applicant. It was determined by Jorge Rivera, PE to replace existing roof with a gable roof. No saw cut or bond beam will be needed, just leveling to top of wall. The estimate includes general demo labor hours to demo existing metal roof covering the porch which is attached to the existing roof. Electrical includes to replace 5 existing exterior lights, the mast head and meter base. Included in the estimate is to replace is the main panel which is to be replaced with a 200 amp panel. A new rewire of the entire dwelling will need to be done with the actual plugs, switches, outlets and GFIs, smoke detectors added to the bedrooms and a C/O in the hall. All rooms include R/R ceiling/joists and replace ceiling, joists, insulation and molding. No broken windows, only adding shutter. All windows have framed-in wooden screens which will not need to be removed for shutters. 3 exterior doors are in estimate to R/R and paint all 6 sides. 2 interior bedroom doors are to be replaced and painted. The two bedrooms have AC openings that are estimated to enclose. No damage to tile floor. GFM has been utilized in the appropriate areas and new photos of the home detailing the status to date were added to the file.

INSPECTION SUMMARY

The applicant met at the damaged dwelling and the following was observed.

The dwelling is one story 2 bedroom structure. The dwelling is deemed to be repairable There were 1 structural components damaged = Roof.

Reconstruction should take approximately 16 weeks from start of construction.

AGE House is 12 years old

Total Square Footage of Damaged Dwelling

DAMAGE AND REPAIR SUMMARY

See attached estimate for exact repair and line items.

LATITUDE: 15.144582

LONGITUDE: 145.721905

A: ROOF The roof including roof and framing was destroyed and needs replacing.

B: INTERIOR The majority of interior items were affected

C: STRUCTURAL The foundation is a slab and the slab appears to be intact and does not need replacing.

D: MECHANICAL/PLUMBING/WATER SYSTEM No Issues

E: ELECTRICAL All electrical needs replacing.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 3

CNMI-412622015_RA

ROOF

ROOF

DESCRIPTION QTY

442. 2" x 6" x 8' #2 treated pine (material only) 3.00 EA

436. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 4.00 EA

435. 2" x 6" x 12' #2 treated pine (material only) 8.00 EA

441. 2" x 6" x 20' #2 treated pine (material only) 12.00 EA

421. 2" x 10" x 12' #2 treated pine (material only) 34.00 EA

420. 2" x 12" x 8' #2 treated pine (material only) 2.00 EA

422. 2" x 12" x 12' #2 treated pine (material only) 4.00 EA

419. 2" x 12" x 20' #2 treated pine (material only) 4.00 EA

447. Install Sheathing - OSB - 1/2" 140.18 SF

432. Material Only Sheathing - OSB - 1/2" 140.18 SF

448. Install Sheathing - plywood - 3/4" - treated 576.00 SF

446. Material Only Sheathing - plywood - 3/4" - treated 576.00 SF

433. R&R Labor to frame 2" x 6" non-bearing wall - 16" oc 97.52 SF

For gable end walls

445. Rafters - 2x6 - Labor only - (using rafter length) 201.75 LF

For Collar Ties

443. R&R Rafters - 2x10 - Labor only - (using rafter length) 392.81 LF

444. Rafters - 2x12 - Labor only - (using rafter length) 140.88 LF

For ridge beam and fascia

NOTES:

Roof1

(A)F1

(B)F2

23' 8"

' 7

' 3

' 7

' 3

' 5

Roof1

546.86 Surface Area

93.55 Total Perimeter Length

5.47 Number of Squares

23.67 Total Ridge Length

DESCRIPTION QTY

------------------ ROOFING -----------------

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 4

CONTINUED - Roof1

DESCRIPTION QTY

376. Remove Metal roofing - ribbed - 24 gauge - up to 1" 546.86 SF

378. Install Metal roofing - ribbed - 24 gauge - up to 1" 546.86 SF

379. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 546.86 SF

380. Closure strips for metal roofing - inside and/or outside 47.33 LF

381. Flashing tape - self-adhesive 209.08 LF

Seal between the metal roof seams

383. Ridge vent - Metal roofing - floating ventilator 23.67 LF

384. Additional screws for 3/4 plywood sheathing 1939.00 EA

Additional screws and labor for 3/4 plywood sheathing above Xactimate pricing. 6% waste added Labor included

385. Additional screws for 2X4 and 2X6 furring and fascia 721.00 EA

Additional screws and labor for 2X4 and 2X6 furring and fascia above Xactimate pricing. 6% waste added Labor included

389. Drip edge/gutter apron 47.33 LF

390. Install Gable trim for metal roofing - 26 gauge 46.21 LF

391. Material Only Gable trim for metal roofing - 26 gauge 46.21 LF

392. Ice & water barrier 546.86 SF

394. Install 2" x 4" lumber - treated (.667 BF per LF) 181.33 LF

Roof purlins

395. Material Only 2" x 4" lumber - treated (.667 BF per LF) 181.33 LF

Roof purlins

396. Install 2" x 6" lumber - treated (1 BF per LF) 140.88 LF

For Picture Frame Purlins

397. Material Only 2" x 6" lumber - treated (1 BF per LF) 140.88 LF

For Picture Frame Purlins

398. Install 2" x 6" lumber - treated (1 BF per LF) 94.67 LF

Rafter Blocking

399. Material Only 2" x 6" lumber - treated (1 BF per LF) 94.67 LF

Rafter Blocking

------------------ SOFFIT -----------------

400. Install Soffit - box framing - 1' overhang 62.95 LF

Calculation set for 16" overhang

401. Material Only Soffit - box framing - 1' overhang 62.95 LF

Calculation set for 16" overhang

402. Install Soffit & fascia - wood - 1' overhang 62.95 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 5

CONTINUED - Roof1

DESCRIPTION QTY

Calculation set for 16" overhang

403. Material Only Soffit & fascia - wood - 1' overhang 62.95 LF

Calculation set for 16" overhang

404. Baffle vent - foam 47.33 LF

Cut to fit as needed for vents

405. Soffit vent - linear 23.67 LF

------------------ PAINT -----------------

406. Prime & paint exterior soffit - wood 62.95 SF

407. Prime & paint exterior fascia - wood, 4"- 6" wide 94.67 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

408. Exterior - paint two coats 70.09 SF

409. Siding - hardboard panel - paint grade 70.09 SF

410. House wrap (air/moisture barrier) 70.09 SF

------------------ STRAPPING -----------------

411. Hangers for rafters 34.00 EA

Hangers for rafters at the ridge beam.

412. Hangers rafter blocking 72.00 EA

Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans

413. Framing hurricane tie 124.00 EA

For rafter tails and gable wall studs top and bottom

414. Install Framing hurricane tie 38.00 EA

For joist to top plate

415. Material Only Framing hurricane tie 38.00 EA

For joist to top plate

417. Framing strap - 24" long 19.00 EA

418. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 92.00 EA

4 @ each rafter section & 24 at the splice on the ridge

NOTES:

Main Level

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 6

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

162. R&R Meter mast for overhead power - 2" conduit 1.00 EA

164. R&R Meter base - 200 amp 1.00 EA

165. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA

166. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA

167. Rewire - average residence - copper wiring 794.28 SF

169. R&R Exterior light fixture 5.00 EA

170. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA

171. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF

------------------ WALL REPAIRS-----------------

176. Concrete Post & Beam construction - Beams 1.00 CY

To pour a bond beam on top of existing wall - includes rebar Minimum amount to level up existing walls

178. Wedge anchor bolt - 1/2" x 8 1/2" 136.00 EA

For cold joint between top of wall and new bond beam.

180. Epoxy crack and joint filler (per LF of crack) 136.00 LF

181. Install 2" x 6" lumber - treated (1 BF per LF) 360.50 LF

For double sill plate on the perimeter

182. Material Only 2" x 6" lumber - treated (1 BF per LF) 360.50 LF

For double sill plate on the perimeter

183. Sill seal foam - 6" 119.50 LF

------------------ SCAFFOLD -----------------

184. Scaffolding Setup & Take down - per hour 32.00 HR

------------------ GENERAL ITEMS -----------------

186. Clean the floor - Heavy 794.28 SF

188. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA

NOTES:

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 7

Living Room

Kitchen

Bedroom 2

Hallway

Bedroom 1

Covered Porch

2'

3'

3'

2'

2'

2' 6" 11" 10' 7"

4' 7' 11"

8'

4' 3"9' 9"

9' 5" Living Room Height: 8'

257.33 SF Walls

375.88 SF Walls & Ceiling

13.17 SY Flooring

32.17 LF Ceil. Perimeter

118.54 SF Ceiling

118.54 SF Floor

32.17 LF Floor Perimeter

Missing Wall 8' 7" X 8' Opens into KITCHEN

Missing Wall 4' 3" X 8' Opens into HALLWAY

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

189. R&R Switch 5.00 EA

190. R&R Light fixture 1.00 EA

191. R&R Outlet 2.00 EA

------------------ DOORS & WINDOWS -----------------

207. R&R Exterior door - metal - insulated - flush or panel style 2.00 EA

209. Door lockset & deadbolt - exterior 2.00 EA

210. Paint door slab only - 2 coats (per side) 4.00 EA

Painting all 6 sides of door

212. Paint door/window trim & jamb - 2 coats (per side) 4.00 EA

216. Security/storm shutter 22.50 SF

------------------ INSULATION -----------------

220. Batt insulation - 10" - R30 - paper faced 118.54 SF

------------------ WALLS & CEILINGS -----------------

222. Remove Sheathing - plywood - 1/2" - treated 118.54 SF

223. Install Sheathing - plywood - 1/2" - treated 118.54 SF

224. Material Only Sheathing - plywood - 1/2" - treated 118.54 SF

225. Seal & paint plywood sheathing 118.54 SF

226. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 118.54 SF

227. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 118.54 SF

228. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 118.54 SF

229. Cove molding - 3/4" 32.17 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 8

Living Room

Kitchen

Bedroom 2

Hallway

Bedroom 1

Covered Porch

1'

1" 2'

8'

9'

2'

2'

2'

5'

5'

0" 2'

7'

7'

1'

1'

8' 10"

8' 8" Kitchen Height: 8'

228.00 SF Walls

322.50 SF Walls & Ceiling

10.50 SY Flooring

28.50 LF Ceil. Perimeter

94.50 SF Ceiling

94.50 SF Floor

28.50 LF Floor Perimeter

Missing Wall 1' 11" X 8' Opens into HALLWAY

Missing Wall 8' 7" X 8' Opens into LIVING_ROOM

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

244. R&R Switch 1.00 EA

245. R&R Light fixture 1.00 EA

246. R&R Outlet 1.00 EA

247. R&R Ground fault interrupter (GFI) outlet 2.00 EA

------------------ DOORS & WINDOWS -----------------

252. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

253. Door lockset & deadbolt - exterior 1.00 EA

254. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

255. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

256. Security/storm shutter 12.50 SF

------------------ INSULATION -----------------

257. Batt insulation - 10" - R30 - paper faced 94.50 SF

------------------ WALLS & CEILINGS -----------------

258. Remove Sheathing - plywood - 1/2" - treated 94.50 SF

259. Install Sheathing - plywood - 1/2" - treated 94.50 SF

260. Material Only Sheathing - plywood - 1/2" - treated 94.50 SF

261. Seal & paint plywood sheathing 94.50 SF

262. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 94.50 SF

263. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 94.50 SF

264. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 94.50 SF

265. Cove molding - 3/4" 28.50 LF

------------------ GENERAL -----------------

352. 5 lb. ABC fire extinguisher 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 9

Living Room

Kitchen

Bedroom 2

Hallway

Bedroom 1

Covered Porch

4' 2'

2'

4'

4'

9' 9"

9' 5"

6'

6'

3' 1"

3' 3" 4'

1' 9"

6' 8"

7'

4' 4"

4' 6" Bedroom 1 Height: 8'

370.67 SF Walls

482.54 SF Walls & Ceiling

12.43 SY Flooring

46.33 LF Ceil. Perimeter

111.88 SF Ceiling

111.88 SF Floor

46.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

325. R&R Switch 1.00 EA

326. R&R Light fixture 1.00 EA

327. R&R Outlet 3.00 EA

329. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

331. R&R Interior door unit 1.00 EA

332. Door knob - interior 1.00 EA

335. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

336. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

337. Security/storm shutter 35.00 SF

------------------ INSULATION -----------------

338. Batt insulation - 10" - R30 - paper faced 111.88 SF

------------------ WALLS & CEILINGS -----------------

339. Remove Sheathing - plywood - 1/2" - treated 111.88 SF

340. Install Sheathing - plywood - 1/2" - treated 111.88 SF

341. Material Only Sheathing - plywood - 1/2" - treated 111.88 SF

342. Seal & paint plywood sheathing 111.88 SF

343. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 111.88 SF

344. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 111.88 SF

345. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 111.88 SF

346. Cove molding - 3/4" 46.33 LF

------------------ A/C OPENING -----------------

347. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

348. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

349. Install Sheathing - plywood - 3/4" - treated 8.00 SF

350. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF

351. Seal & paint plywood sheathing 8.00 SF

To paint A/C Hole in exterior wall

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 10

CONTINUED - Bedroom 1

DESCRIPTION QTY

NOTES:

Living Room

Kitchen

Bedroom 2

Hallway

Bedroom 1

Covered Porch

4'

1' 2"

1' 4"

2'

7"9"

1'

8' 10"

8' 8"

8'

8'

1"

4'

2' 10"

3'

3' 2"

3' 6" Bedroom 2 Height: 8'

294.67 SF Walls

372.94 SF Walls & Ceiling

8.70 SY Flooring

36.83 LF Ceil. Perimeter

78.28 SF Ceiling

78.28 SF Floor

36.83 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

271. R&R Switch 1.00 EA

272. R&R Light fixture 1.00 EA

273. R&R Outlet 2.00 EA

275. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

277. R&R Interior door unit 1.00 EA

278. Door knob - interior 1.00 EA

281. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

282. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

283. Security/storm shutter 22.50 SF

------------------ INSULATION -----------------

284. Batt insulation - 10" - R30 - paper faced 78.28 SF

------------------ WALLS & CEILINGS -----------------

285. Remove Sheathing - plywood - 1/2" - treated 78.28 SF

286. Install Sheathing - plywood - 1/2" - treated 78.28 SF

287. Material Only Sheathing - plywood - 1/2" - treated 78.28 SF

288. Seal & paint plywood sheathing 78.28 SF

289. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 78.28 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 11

CONTINUED - Bedroom 2

DESCRIPTION QTY

290. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 78.28 SF

291. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 78.28 SF

292. Cove molding - 3/4" 36.83 LF

------------------ A/C OPENING -----------------

293. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

294. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

295. Install Sheathing - plywood - 3/4" - treated 8.00 SF

296. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF

297. Seal & paint plywood sheathing 8.00 SF

To paint A/C Hole in exterior wall

NOTES:

Living Room

Kitchen

Bedroom 2

Hallway

Bedroom 1

Covered Porch

6'

6'

4' 3"

1'

1"

2'

2'

7"9"

1'

1' 2"

1' 4"

3' 1"

3' 3" Hallway Height: 8'

120.00 SF Walls

146.92 SF Walls & Ceiling

2.99 SY Flooring

15.00 LF Ceil. Perimeter

26.92 SF Ceiling

26.92 SF Floor

15.00 LF Floor Perimeter

Missing Wall 4' 3" X 8' Opens into LIVING_ROOM

Missing Wall 2' 1" X 8' Opens into KITCHEN

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

303. Carbon monoxide detector 1.00 EA

------------------ INSULATION -----------------

311. Batt insulation - 10" - R30 - paper faced 26.92 SF

------------------ WALLS & CEILINGS -----------------

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 12

CONTINUED - Hallway

DESCRIPTION QTY

312. Remove Sheathing - plywood - 1/2" - treated 26.92 SF

313. Install Sheathing - plywood - 1/2" - treated 26.92 SF

314. Material Only Sheathing - plywood - 1/2" - treated 26.92 SF

315. Seal & paint plywood sheathing 26.92 SF

316. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 26.92 SF

317. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 26.92 SF

318. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 26.92 SF

319. Cove molding - 3/4" 15.00 LF

NOTES:

Living Room Kitchen

Bedroom 2

Hallway Bedroom 1

Covered Porch

23' 23' 8"

' 1

0"

' 4

9'2' 6" 10' 7" 4'

7' 11" 2' 2" Covered Porch Height: 8'

621.33 SF Walls

985.50 SF Walls & Ceiling

40.46 SY Flooring

77.67 LF Ceil. Perimeter

364.17 SF Ceiling

364.17 SF Floor

77.67 LF Floor Perimeter

DESCRIPTION QTY

354. General Demolition - per hour 10.00 HR

Additional labor hours to demo metal covering for porch as it is attached to the existing roof

CNMI

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 13

CNMI Data1' 4"

CNMI Data Height: 4"

1.57 SF Walls

2.92 SF Walls & Ceiling

0.15 SY Flooring

4.70 LF Ceil. Perimeter

1.36 SF Ceiling

1.36 SF Floor

4.70 LF Floor Perimeter

DESCRIPTION QTY

116. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO

117. Material Only LATITUDE DAMAGED DWELLING 15.14 DE

15.144582

118. Material Only LONGITUDE DAMAGED DWELLING 145.72 DE

145.721905

119. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO

120. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO

121. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 NO

122. DOES DWELLING HAVE A WELL 0.00 NO

123. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO

124. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 2007.00 YR

125. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO

126. Material Only ENCROACHMENT ISSUES 0.00 NO

127. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO

128. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 NO

129. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 480.00 SF

130. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO

131. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

132. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

Roof

133. Material Only IS DWELLING DESTROYED 0.00 NO

134. Material Only FOUNDATION TYPE 1.00 UN

Slab

135. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO

136. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

137. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO

138. Material Only DID THE MILITARY PROVIDE A TENT 1.00 YS

139. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

Roof

140. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO

141. Material Only LATITUDE OUT BUILDING 15.14 DE

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 14

CONTINUED - CNMI Data

DESCRIPTION QTY

15.144421

142. Material Only LONGITUDE OUT BUILDING 145.72 DE

145.721565

143. Material Only LATITUDE POWER POLE 15.14 DE

15.144623

144. Material Only LONGITUDE POWER POLE 145.72 DE

145.722033

145. Material Only LATITUDE WATER METER 15.14 DE

15.144320

146. Material Only LONGITUDE WATER METER 14.72 DE

14.721835

147. Material Only LATITUDE WATER TANK 15.14 DE

15.144499

148. Material Only LONGITUDE WATER TANK 145.72 DE

145.721768

NOTES:

Labor Minimums Applied

DESCRIPTION QTY

206. Finish hardware labor minimum 1.00 EA

382. Window labor minimum 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 15

Grand Total Areas:

1,893.57 SF Walls 795.63 SF Ceiling SF Walls and Ceiling2,689.20

795.63 SF Floor 88.40 SY Flooring 241.20 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 241.20 LF Ceil. Perimeter

795.63 Floor Area 855.33 Total Area 1,893.57 Interior Wall Area 1,130.53 Exterior Wall Area 124.20 Exterior Perimeter of

Walls

546.86 Surface Area 5.47 Number of Squares 93.55 Total Perimeter Length

23.67 Total Ridge Length 0.00 Total Hip Length

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 16

1 Main Level - Scope Notes

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Site visit was conducted with DeDe Hubbard, Brunson Taylor and Jorge Rivera, PE. It was determined by Jorge Rivera, PE to replace existing roof with a gable roof. No saw cut or bond beam will be needed, just leveling to top of wall. The estimate includes general demo labor hours to demo existing metal roof covering the porch which is attached to the existing roof. Electrical includes to replace 5 existing exterior lights, the mast head and meter base. Included to replace is the main panel to be replaced with a 200 amp panel. All rooms with R/R ceiling/joists and replace ceiling, joists, insulation and molding. No broken windows, only shutter. All windows framed-in wooden screens that will not need to be removed for shutters. 3 exterior doors are in

2 Main Level - Scope Notes

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 17

3 Main Level - Scope Notes

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

4 Main Level - Front Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 18

5 Main Level - Front Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Front left corner

6 Main Level - Front Elevation

Date Taken: 12/3/2019

Front right corner

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 19

7 Main Level - Left Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

8 Main Level - Left Elevation

Date Taken: 12/3/2019

Exterior door leading into living room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 20

9 Main Level - Left Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Windows have framed-in screens that will not have to be removed for shutters

10 Main Level - Left Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Dwelling has 2 window units that will be included to frame in.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 21

11 Main Level - Left Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Front corner, has light installed which will be included to replace

12 Main Level - Left Elevation

Date Taken: 12/3/2019

Back Left corner

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 22

13 Main Level - Left Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Photo of top of wall. No saw cut needed only level off

14 Main Level - Back Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Back right corner, light will be replaced

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 23

15 Main Level - Right Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Exterior door leading into kitchen

16 Main Level - Right Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Left front corner with light to be replaced

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 24

17 Main Level - Front Elevation

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Meter base and exterior light to be replaced

18 Main Level - 45-Out Building

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

No interior bathroom, outhouse is shared.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 25

19 Main Level/Living Room - Living Room Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Main panel to be replaced with 200amp panel. Damage to ceiling and roof. Remove ceiling and joists.

Replace ceiling, joists, add insulation, molding and paint. Electric=5 switches (2 switches control the exterior lights), 1lights, 2 outlets. No broken windows, add 22.5SF shutter.

R&R 2 damaged exterior door, paint trim and all 6 sides of the door. No damage to tile floor.

20 Main Level/Living Room - Living Room Date Taken: 12/3/2019

Exterior door

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 26

21 Main Level/Living Room - Living Room Date Taken: 12/3/2019

Taken By: Darlene Hbbard

2nd damaged exterior door

22 Main Level/Living Room - Living Room Date Taken: 12/3/2019

R/R ceiling and joists, replace light

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 27

23 Main Level/Living Room - Living Room Date Taken: 12/3/2019

Taken By: Darlene Hbbard

24 Main Level/Living Room - Living Room Date Taken: 12/3/2019

No damage to floor

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 28

25 Main Level/Living Room - Living Room Date Taken: 12/3/2019

Taken By: Darlene Hbbard

3 switch plug

26 Main Level/Living Room - Living Room Date Taken: 12/3/2019

2 switches to replace

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 29

27 Main Level/Kitchen - Kitchen

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof. Remove ceiling and joists. Replace ceiling, joists, add insulation, molding and paint. Electric=2 switches, 1 lights, 2 GFI and 1 outlets. No broken windows, add 12.5SF shutter. R&R 1 exterior door, paint trim and all 6 sides of the door. No damage to tile floor.

28 Main Level/Kitchen - Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 30

29 Main Level/Kitchen - Kitchen

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Light to be replaced

30 Main Level/Kitchen - Kitchen

Date Taken: 12/3/2019

Replace with GFI

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 31

31 Main Level/Kitchen - Kitchen

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Replace exterior door

32 Main Level/Kitchen - Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 32

33 Main Level/Kitchen - Kitchen

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Cabinet faces have been removed, GFI to be replaced to the left of the cabinet

34 Main Level/Kitchen - Kitchen

Date Taken: 12/3/2019

Outlet to replace

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 33

35 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof. Remove ceiling and joists. Replace ceiling, joists, add insulation, molding and paint. Electric=1 switches, 1 lights, 3 outlets, add 1 smoke alarm. No broken windows, add 35SF shutter.

Enclose 1 AC opening. R&R 1 interior door, paint all 6 sides. No damage to tile floor.

36 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019

AC opening to enclose

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 34

37 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019

Taken By: Darlene Hbbard

38 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019

No damage to window, shutter only

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 35

39 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019

Taken By: Darlene Hbbard

40 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019

Replacing ceiling, joists and light

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 36

41 Main Level/Bedroom 1 - Bedroom Date Taken: 12/3/2019

Taken By: Darlene Hbbard

No damage to floor

42 Main Level/Bedroom 1 - Bedroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 37

43 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof. Remove ceiling and joists. Replace ceiling, joists, add insulation, molding and paint. Electric=1 switches, 1 lights, 3 outlets, add 1 smoke alarm. No broken windows, add 22.5SF shutter.

Enclose 1 AC opening. R&R 1 interior door, paint all 6 sides. No damage to tile floor.

44 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019

No damage to windows, shutters only

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 38

45 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019

Taken By: Darlene Hbbard

AC opening and outlet

46 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019

Replace ceiling, joists and 1 light

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 39

47 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019

Taken By: Darlene Hbbard

No damage to floor

48 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019

Replacing outlet

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 40

49 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Replacing 2nd outlet

50 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019

3rd outlet

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 41

51 Main Level/Bedroom 2 - Bedroom Date Taken: 12/3/2019

Taken By: Darlene Hbbard

1 switch replace

52 Main Level/Hallway - Hallway

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof. Remove ceiling and joists. Replace ceiling, joists, add insulation, molding and paint. Electric=add 1 C/O. Enclose 1 AC opening. No damage to tile floor.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 42

53 Main Level/Hallway - Hallway

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

54 Main Level/Hallway - Hallway

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 43

55 Main Level/Hallway - Hallway

Date Taken: 12/3/2019

Taken By: Darlene Hbbard

56 Main Level/Hallway - Hallway

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412622015_RA 12/7/2019 Page: 44

57 Main Level/Covered Porch - Covered Porch Date Taken: 12/3/2019

Taken By: Darlene Hbbard

Metal covering may need to be demoed when removing metal roof

58 Main Level/Covered Porch - Covered Porch Date Taken: 12/3/2019

Metal roof may need to be removed

CNMI-412622015_RA 12/7/2019 Page: 45

Main Level

Living Room

Kitchen

Bedroom 2

Hallway

Bedroom 1

Covered Porch

CNMI-412622015_RA 12/7/2019 Page: 46

ROOF

Roof1

(A)F1

(B)F2

ROOF

CNMI-412622015_RA 12/7/2019 Page: 47

PLOT

Lot (A1)

Dwelling (A2)Water Tank (A3)

FEDDOS LANE (A4)

Power Pole (A5)

House (A6)Out Building (A7)

Water Meter (A8)

PLOT

CNMI-412622015_RA 12/7/2019 Page: 48