CNMI-399560925_RA_Scope.pdf
PDF 2 MB Posted
- Attached to
- PHC Housing Repair - Saipan
- Solicitation number
- 70FBR920B00000002
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Typhoon Yutu
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
Insured: VANESSA FAYE ANDRES Home: (670) 285-3293 Cellular: (671) 727-6472Home: LOT 010 K 341 MWARE MWAR AVE 2ND
RIGHT AFTER SCHOOL 1ST LEFT
DAN DAN, HI 96701
Property: LOT 010 K 341 MWARE MWAR AVE 2ND
RIGHT AFTER SCHOOL 1ST LEFT
DAN DAN, HI 96701
Claim Rep.: Casey Hoak
Estimator: Casey Hoak
Claim Number: CNMI-399560925 Policy Number: CNMI-399560925 Type of Loss: Hurricane
Date Contacted: 6/25/2019 2:30 PM Date of Loss: 10/25/2018 Date Received: 6/25/2019 6:51 PM
Date Inspected: 6/26/2019 9:00 AM Date Entered: 6/25/2019 6:55 PM
Date Est. Completed: 7/1/2019 2:34 AM
Price List: HIOI8X_JAN19 Restoration/Service/Remodel
Estimate: CNMI-399560925_RA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 2
12/27/2019 CMH
Batch Four Second set of 20 Attendees: Casey Hoak, Brunson Taylor, Jorge Rivera.
On site inspection of the dwelling found the following. The applicant has fixed all the damaged windows and flooring in the home. The roof over Kitchen two will need to be replaced with a shed roof per the PE Jorge Rivera. 2x12 roof joists on 12 inch centers will be needed to cover the span. A new bond beam will be poured and J bolts to attach the roof to the dwelling. The main panel and all electrical in the kitchen 2 area will be replaced along with GFI's in the house under the concrete portion. Interior doors that were damaged and the 2 exterior doors in the kitchen two will need replacing and painting. The glass block wall in the bathroom has not been repaired and will need to be fixed. Per FEMA guidance a dumpster small, lead & asbestos testing and painting of the interior have been added to the scope.
Windows were replaced already so only shutters will be needed for the entire home. No other damages were noted at this time. All GFM has been used where applicable and highlighted in bold in the estimate.
INSPECTION SUMMARY 6/27/2019
The applicant met at the damaged dwelling and the following was observed.
The dwelling is one story, block home with a concrete roof. There is an add-on Outdoor Kitchen and Bathroom added in 2012 that is block with metal roof. This area sustained roof damage as well as window damage and is not included in the scope. The bathroom is OK as it has a concrete roof.
There were 7 occupants and 3 bedrooms occupied at the time of the storm.
The dwelling is deemed to be repairable There was 1 structural component damaged, the Roof over the outdoor kitchen Reconstruction should take approximately 16 weeks from start of construction.
AGE:2002
DAMAGE AND REPAIR SUMMARY
See attached estimate for exact repair and line items.
LATITUDE: 15.133058
LONGITUDE: 145.733288
A: ROOF: Metal style roof was damaged beyond repair along with framing and will need replacing
B: INTERIOR: Interior damage includes windows, adding window shutters, flooring, doors and painting of the doors, and minor electric for GFI and smoke alarms. The glass block shower wall was damaged from a flying door during the event.
C: STRUCTURAL: The slab appears to be intact and will not need replacement.
D: MECHANICAL/PLUMBING/WATER SYSTEM; Mechanical one split unit damaged and replaced.
E: ELECTRICAL: Electrical is ok except for GFI and smoke detectors.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 3
CNMI-399560925_RA
DOCUMENT1
ROOF
ROOF
DESCRIPTION QTY
129. 2" x 6" x 8' #2 treated pine (material only) 4.00 EA
128. 2" x 6" x 20' #2 treated pine (material only) 6.00 EA
130. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 15.00 EA
126. 2" x 12" x 8' #2 treated pine (material only) 3.00 EA
125. 2" x 12" x 20' #2 treated pine (material only) 31.00 EA
123. Install Sheathing - plywood - 1/2" - treated 321.74 SF
132. Material Only Sheathing - plywood - 1/2" - treated 321.74 SF
119. Install Sheathing - plywood - 3/4" - treated 576.00 SF
133. Material Only Sheathing - plywood - 3/4" - treated 576.00 SF
131. Labor to frame 2" x 6" non-bearing wall - 16" oc 157.77 SF
127. R&R Rafters - 2x12 - Labor only - (using rafter length) 638.93 LF
NOTES:
Roof1 F1 27
' 1 1"
20' 1" 19' 10"
Roof1
561.32 Surface Area
96.05 Total Perimeter Length
5.61 Number of Squares
DESCRIPTION QTY
------------------ ROOFING -----------------
134. Remove Metal roofing - ribbed - 24 gauge - up to 1" 561.32 SF
136. Install Metal roofing - ribbed - 24 gauge - up to 1" 561.32 SF
137. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 561.32 SF
138. Closure strips for metal roofing - inside and/or outside 55.83 LF
139. Flashing tape - self-adhesive 411.06 LF
Seal between the metal roof seams
140. Screws for 3/4 sheathing 2817.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 4
CONTINUED - Roof1
DESCRIPTION QTY
Additional screws for 3/4 sheathing above Xactimate allowance. 6% waste added for screws as well as labor to install
141. Screws for 2x4 & 2x6 furring & fascia 774.00 EA
Additional screws for 2x4 & 2x6 furring & fascia above Xactimate allowance. 6% waste added for screws as well as labor to install
145. Drip edge/gutter apron 55.83 LF
146. Install Gable trim for metal roofing - 26 gauge 40.21 LF
147. Material Only Gable trim for metal roofing - 26 gauge 40.21 LF
148. Ice & water barrier 561.32 SF
149. Flashing, 20" wide 27.92 LF
151. Install 2" x 4" lumber (.667 BF per LF) 223.33 LF
Roof purlins
152. Material Only 2" x 4" lumber (.667 BF per LF) 223.33 LF
Roof purlins
153. Install 2" x 6" lumber (1 BF per LF) 96.05 LF
For Picture Frame
154. Material Only 2" x 6" lumber (1 BF per LF) 96.05 LF
For Picture Frame
155. Install 2" x 6" lumber (1 BF per LF) 279.17 LF
Rafter Blocking
156. Material Only 2" x 6" lumber (1 BF per LF) 279.17 LF
Blocking For Rafters
------------------ SOFFIT -----------------
157. Install Soffit - box framing - 1' overhang 27.92 LF
Calculation set for 16" overhang
158. Material Only Soffit - box framing - 1' overhang 27.92 LF
Calculation set for 16" overhang
159. Install Soffit & fascia - wood - 1' overhang 27.92 LF
Calculation set for 16" overhang
160. Material Only Soffit & fascia - wood - 1' overhang 27.92 LF
Calculation set for 16" overhang
161. Soffit vent - linear 27.92 LF
Cut to fit for soffit vent
162. Baffle vent - foam 27.92 LF
------------------ PAINT -----------------
164. Prime & paint exterior soffit - wood 37.13 SF
165. Prime & paint exterior fascia - wood, 4"- 6" wide 55.83 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 5
CONTINUED - Roof1
DESCRIPTION QTY
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
166. Exterior - paint two coats 160.87 SF
167. House wrap (air/moisture barrier) 160.87 SF
168. Siding - hardboard panel - paint grade 160.87 SF
------------------ STRAPPING -----------------
169. Framing & Rough Carpentry (Bid Item) 27.00 EA
2x10 Joist hangers for rafters
170. Framing & Rough Carpentry (Bid Item) 182.00 EA
2x6 joist hangers for rafter blocking in the roof.
171. Framing hurricane tie 84.00 EA
Rafter to wall hurricane tie - 2 per rafter per plans. (Not GFM)
NOTES:
Main Level Main Level
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
173. R&R Meter mast for overhead power - 2" conduit 1.00 EA
174. R&R Meter base - 200 amp 1.00 EA
175. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA
176. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA
177. Rewire - average residence - copper wiring 502.58 SF
180. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA
181. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF
------------------ WALL REPAIRS-----------------
186. Concrete Post & Beam construction - Beams 1.35 CY
187. Concrete anchor bolt - 1/2" x 12" 69.00 EA
190. Install 2" x 6" lumber - treated (1 BF per LF) 182.00 LF
191. Material Only 2" x 6" lumber - treated (1 BF per LF) 182.00 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 6
CONTINUED - Main Level
DESCRIPTION QTY
192. Sill seal foam - 6" 91.00 LF
------------------ SCAFFOLD -----------------
193. Scaffolding Setup & Take down - per hour 32.00 HR
------------------ GENERAL ITEMS -----------------
195. Clean the floor - Heavy 1570.28 SF
196. Dumpster load - Approx. 12 yards, 1-3 tons of debris 1.00 EA
197. Asbestos test fee - full service survey - base fee 1.00 EA
198. Lead test fee - full service lead survey 1.00 EA
199. Seal the walls w/PVA primer - one coat 3364.00 SF
283. R&R Concrete slab on grade - 4" - finished in place 28.00 SF
For septic tank lid
284. R&R Concrete slab reinforcement - #3 (3/8") - grid, 12" ea way 28.00 SF
For septic tank lid
NOTES:
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
I G
FC
I
Kitchen
2'
3'
1"
2'
6'
1'10
6' 4' 6"
4' 8" 3' 2" 3' 4"
5' 1'
1'
1'
6' 1'
13' 8" Living Room Height: 8'
378.67 SF Walls
608.72 SF Walls & Ceiling
25.56 SY Flooring
47.33 LF Ceil. Perimeter
230.06 SF Ceiling
230.06 SF Floor
47.33 LF Floor Perimeter
Missing Wall 13' 8" X 8' Opens into KITCHEN
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
3. Security/storm shutter 66.50 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 7
CONTINUED - Living Room
DESCRIPTION QTY
NOTES:
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
IG
FC
I
Kitchen
8' 4"
8' 3' 3"
2'
4'
4'
2' 1"
1' 11"
4'
13' 8"
3' 4'
5'
5'
" 3'
9'
5"3" Kitchen Height: 8'
288.67 SF Walls
445.75 SF Walls & Ceiling
17.45 SY Flooring
36.08 LF Ceil. Perimeter
157.08 SF Ceiling
157.08 SF Floor
36.08 LF Floor Perimeter
Missing Wall 3' 3" X 8' Opens into HALLWAY
Missing Wall 13' 8" X 8' Opens into LIVING_ROOM
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
9. R&R Ground fault interrupter (GFI) outlet 2.00 EA
NOTES:
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
IG
FC
I
Kitchen
3'5' 4"3' 1" 3' 3" 3' 1"
5'
5'
3' 4'
5'
5'
" 3'
9'
3' 13' 2"
4' 7"3'
7' 3" 8' 3"
3' 3'
1"
4'
' 3
' 5
3'
7'
8'
' 5
4'
' 8
5'
Kitchen 2 Height: 8'
730.60 SF Walls
1233.11 SF Walls & Ceiling
55.83 SY Flooring
91.33 LF Ceil. Perimeter
502.51 SF Ceiling
502.51 SF Floor
91.33 LF Floor Perimeter
DESCRIPTION QTY
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 8
CONTINUED - Kitchen 2
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
207. R&R Switch 3.00 EA
208. R&R Light fixture 2.00 EA
209. R&R Outlet 4.00 EA
210. R&R Ground fault interrupter (GFI) outlet 1.00 EA
------------------ DOORS & WINDOWS -----------------
223. R&R Exterior door - metal - insulated - flush or panel style 2.00 EA
224. Door lockset & deadbolt - exterior 2.00 EA
225. Paint door slab only - 2 coats (per side) 4.00 EA
Painting all 6 sides of door
229. Security/storm shutter 90.50 SF
------------------ INSULATION -----------------
232. Batt insulation - 10" - R30 - paper faced 502.51 SF
------------------ WALLS & CEILINGS -----------------
233. Remove Sheathing - plywood - 1/2" - treated 502.51 SF
234. Install Sheathing - plywood - 1/2" - treated 502.51 SF
235. Material Only Sheathing - plywood - 1/2" - treated 502.51 SF
236. Seal & paint plywood sheathing 502.51 SF
237. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 502.51 SF
238. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 502.51 SF
239. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 502.51 SF
240. Cove molding - 3/4" 91.33 LF
------------------GENERAL ITEMS -----------------
254. 5 lb. ABC fire extinguisher 1.00 EA
NOTES:
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 9
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
I G
FC
I
Kitchen
4' 2'
2'
3'
0"4'
4' 4' 1"
4' 3"
3' 3"
3' 7"
2'
6'
1'10
11' 4" Bedroom 1 Height: 8'
340.00 SF Walls
452.39 SF Walls & Ceiling
12.49 SY Flooring
42.50 LF Ceil. Perimeter
112.39 SF Ceiling
112.39 SF Floor
42.50 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
206. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
16. Interior door unit - Standard grade 1.00 EA
17. Door knob - interior - Standard grade 1.00 EA
18. Paint door slab only - 2 coats (per side) 2.00 EA
19. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
281. Security/storm shutter 45.00 SF
NOTES:
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
I G
FC
I
Kitchen
4'
2'
4"2"
3'
1"
11' 4"
4' 3'
3'
3'
3'
0"
11' 6" Bedroom 2 Height: 8'
354.67 SF Walls
477.44 SF Walls & Ceiling
13.64 SY Flooring
44.33 LF Ceil. Perimeter
122.78 SF Ceiling
122.78 SF Floor
44.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
205. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
28. Interior door unit - Standard grade 1.00 EA
29. Door knob - interior - Standard grade 1.00 EA
30. Paint door slab only - 2 coats (per side) 2.00 EA
31. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
34. Security/storm shutter 14.00 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 10
CONTINUED - Bedroom 2
DESCRIPTION QTY
NOTES:
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
IG
FC
I
Kitchen
4' 5'
5'
0"
4'
4'
11' 4"
11' 6"
2' 1"
1' 11"
2'
4'
4'
5'
13' 5"
13' 11" Bedroom 3 Height: 8'
438.67 SF Walls
626.50 SF Walls & Ceiling
20.87 SY Flooring
54.83 LF Ceil. Perimeter
187.83 SF Ceiling
187.83 SF Floor
54.83 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
204. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
40. Interior door unit - Standard grade 1.00 EA
41. Door knob - interior - Standard grade 1.00 EA
42. Paint door slab only - 2 coats (per side) 2.00 EA
43. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
44. Security/storm shutter 22.50 SF
NOTES:
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 11
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
IG
FC
I
Kitchen
2'
3' 7"
3' 11"
3' 1"
3' 5"
5'
5'
2' 6"3' 1"
3' 3"
Bathroom 1 Height: 8'
220.00 SF Walls
264.06 SF Walls & Ceiling
4.90 SY Flooring
27.50 LF Ceil. Perimeter
44.06 SF Ceiling
44.06 SF Floor
27.50 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
50. R&R Ground fault interrupter (GFI) outlet 1.00 EA
------------------ DOORS & WINDOWS -----------------
51. Security/storm shutter 7.50 SF
NOTES:
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
IG
FC
I
Kitchen
2'
3' 1"
3' 3" 2' 11"
2'
2"6"
2'
0"
8' 4"
8'
5'
5'
Bathroom 2 Height: 8'
216.00 SF Walls
260.00 SF Walls & Ceiling
4.89 SY Flooring
27.00 LF Ceil. Perimeter
44.00 SF Ceiling
44.00 SF Floor
27.00 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
53. R&R Ground fault interrupter (GFI) outlet 1.00 EA
------------------ DOORS & WINDOWS -----------------
200. Interior door unit - Standard grade 1.00 EA
201. Door knob - interior - Standard grade 1.00 EA
202. Paint door slab only - 2 coats (per side) 2.00 EA
203. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
54. R&R Block - glass - 3"x 8"x 8" 12.92 SF
For damage to the shower wall block glass
55. Security/storm shutter 7.50 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 12
CONTINUED - Bathroom 2
DESCRIPTION QTY
NOTES:
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
IG
FC
I
Kitchen
3' 3"
3' 7"
5'
2'
2"6"
2'
0"
Hallway Height: 8'
118.00 SF Walls
136.42 SF Walls & Ceiling
2.05 SY Flooring
14.75 LF Ceil. Perimeter
18.42 SF Ceiling
18.42 SF Floor
14.75 LF Floor Perimeter
Missing Wall 3' 3" X 8' Opens into KITCHEN
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
57. Smoke detector 1.00 EA
58. Carbon monoxide detector 1.00 EA
NOTES:
CNMI DATA
CNMI Data1' 4"
CNMI Data Height: 4"
1.57 SF Walls
2.92 SF Walls & Ceiling
0.15 SY Flooring
4.70 LF Ceil. Perimeter
1.36 SF Ceiling
1.36 SF Floor
4.70 LF Floor Perimeter
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 13
DESCRIPTION QTY
63. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO
64. Material Only LATITUDE DAMAGED DWELLING 15.13 DE
15.133058
65. Material Only LONGITUDE DAMAGED DWELLING 145.73 DE
145.733288
66. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO
67. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO
68. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 YS
69. DOES DWELLING HAVE A WELL 1.00 NO
70. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO
71. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 2002.00 YR
72. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO
73. Material Only ENCROACHMENT ISSUES 0.00 NO
74. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO
75. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 NO
76. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 1040.00 SF
77. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO
78. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
79. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
ROOF over Outdoor Kitchen
80. Material Only IS DWELLING DESTROYED 0.00 NO
81. Material Only FOUNDATION TYPE 0.00 UN
82. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO
83. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
84. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO
85. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS
86. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
ROOF over Kitchen 2
87. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO
88. Material Only LATITUDE SEPTIC 15.13 DE
15.133058
89. Material Only LONGITUDE SEPTIC 61242.25 DE
145,733167
90. Material Only LATITUDE POWER POLE 15.13 DE
15.133049
91. Material Only LONGITUDE POWER POLE 145.73 DE
145.733487
92. Material Only LATITUDE WATER METER 15.13 DE
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 14
CONTINUED - CNMI Data
DESCRIPTION QTY
15.132939
93. Material Only LONGITUDE WATER METER 145.73 DE
145.733496
94. Material Only LATITUDE WATER TANK 15.13 DE
15.132971
95. Material Only LONGITUDE WATER TANK 145.73 DE
145.733145
NOTES:
Labor Minimums Applied
DESCRIPTION QTY
97. Finish hardware labor minimum 1.00 EA
NOTES:
Grand Total Areas:
3,365.57 SF Walls 1,571.63 SF Ceiling SF Walls and Ceiling4,937.20 1,571.63 SF Floor 174.63 SY Flooring 425.20 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 425.20 LF Ceil. Perimeter
1,571.63 Floor Area 1,668.07 Total Area 3,365.57 Interior Wall Area 1,568.05 Exterior Wall Area 176.95 Exterior Perimeter of
Walls
561.32 Surface Area 5.61 Number of Squares 96.05 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 15
1 DOCUMENT1/Main Level - Scope Date Taken: 12/27/2019
Taken By: Casey Hoak
2 DOCUMENT1/Main Level - Scope Date Taken: 12/27/2019
Taken By: Casey Hoak
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 16
3 DOCUMENT1/Main Level - Scope Date Taken: 12/27/2019
Taken By: Casey Hoak
4 DOCUMENT1/Main Level - Scope
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 17
5 DOCUMENT1/Main Level - Scope Date Taken: 12/27/2019
Taken By: Casey Hoak
6 DOCUMENT1/Main Level - Front
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 18
7 DOCUMENT1/Main Level - Front
Date Taken: 12/27/2019
Taken By: Casey Hoak
Door damaged
8 DOCUMENT1/Main Level - Right
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 19
9 DOCUMENT1/Main Level - Right
Date Taken: 12/27/2019
Taken By: Casey Hoak
Slab on septic damaged
10 DOCUMENT1/Main Level - Rear
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 20
11 DOCUMENT1/Main Level - Rear
Date Taken: 12/27/2019
Taken By: Casey Hoak
Back door damaged
12 DOCUMENT1/Main Level - Image103
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 21
13 DOCUMENT1/Main Level - Image104 Date Taken: 12/27/2019
Taken By: Casey Hoak
14 DOCUMENT1/Main Level - Image105 Date Taken: 12/27/2019
Broken septic top
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 22
15 DOCUMENT1/Main Level - Left
Date Taken: 12/27/2019
Taken By: Casey Hoak
16 DOCUMENT1/Main Level - Left
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 23
17 DOCUMENT1/Main Level/Living Room - Living Room Date Taken: 12/27/2019
Taken By: Casey Hoak
Applicant has replaced floor and damaged window
18 DOCUMENT1/Main Level/Living Room - Living Room Date Taken: 12/27/2019
Taken By: Casey Hoak
Applicant has replaced floor and damaged window
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 24
19 DOCUMENT1/Main Level/Living Room - Living Room Date Taken: 12/27/2019
Taken By: Casey Hoak
Applicant has replaced floor and damaged window
20 DOCUMENT1/Main Level/Living Room - Living Room Date Taken: 12/27/2019
Taken By: Casey Hoak
Applicant has replaced floor and damaged window
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 25
21 DOCUMENT1/Main Level/Kitchen - Kitchen Date Taken: 12/27/2019
Taken By: Casey Hoak
No damage floor replaced
22 DOCUMENT1/Main Level/Kitchen - Kitchen Date Taken: 12/27/2019
No damage floor replaced
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 26
23 DOCUMENT1/Main Level/Kitchen - Kitchen Date Taken: 12/27/2019
Taken By: Casey Hoak
No damage floor replaced
24 DOCUMENT1/Main Level/Kitchen - Kitchen Date Taken: 12/27/2019
No damage floor replaced
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 27
25 DOCUMENT1/Main Level/Kitchen - Kitchen Date Taken: 12/27/2019
Taken By: Casey Hoak
No damage floor replaced
26 DOCUMENT1/Main Level/Kitchen 2 - Kitchen 2 Date Taken: 12/27/2019
Taken By: Casey Hoak
Roof damage, ceiling replace electrical and sutters for windpws.
Both exterior doors damaged
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 28
27 DOCUMENT1/Main Level/Kitchen 2 - Kitchen 2 Date Taken: 12/27/2019
Taken By: Casey Hoak
Roof damage, ceiling replace electrical and sutters for windpws.
Both exterior doors damaged
28 DOCUMENT1/Main Level/Kitchen 2 - Kitchen 2 Date Taken: 12/27/2019
Taken By: Casey Hoak
Roof damage, ceiling replace
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 29
29 DOCUMENT1/Main Level/Kitchen 2 - Kitchen 2 Date Taken: 12/27/2019
Taken By: Casey Hoak
Roof damage, ceiling replace electrical and sutters for windpws.
Both exterior doors damaged
30 DOCUMENT1/Main Level/Kitchen 2 - Kitchen 2 Date Taken: 12/27/2019
Taken By: Casey Hoak
Roof damage, ceiling replace
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 30
31 DOCUMENT1/Main Level/Kitchen 2 - Kitchen 2 Date Taken: 12/27/2019
Taken By: Casey Hoak
Roof damage, ceiling replace electrical and sutters for windpws.
Both exterior doors damaged
32 DOCUMENT1/Main Level/Kitchen 2 - Kitchen 2 Date Taken: 12/27/2019
Taken By: Casey Hoak
Roof damage, ceiling replace
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 31
33 DOCUMENT1/Main Level/Bedroom 1 - Image66 Date Taken: 12/27/2019
Taken By: Casey Hoak
Floor and windows fixed door needs replaced and 1 smoke
34 DOCUMENT1/Main Level/Bedroom 1 - Image67 Date Taken: 12/27/2019
Taken By: Casey Hoak
Floor and windows fixed door needs replaced and 1 smoke
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 32
35 DOCUMENT1/Main Level/Bedroom 1 - Image68 Date Taken: 12/27/2019
Taken By: Casey Hoak
Floor and windows fixed door needs replaced and 1 smoke
36 DOCUMENT1/Main Level/Bedroom 1 - Image69 Date Taken: 12/27/2019
Taken By: Casey Hoak
Floor and windows fixed door needs replaced and 1 smoke
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 33
37 DOCUMENT1/Main Level/Bedroom 2 - Bedroom 2 Date Taken: 12/27/2019
Taken By: Casey Hoak
Window and floor replaced
38 DOCUMENT1/Main Level/Bedroom 2 - Bedroom 2 Date Taken: 12/27/2019
Window and floor replaced
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 34
39 DOCUMENT1/Main Level/Bedroom 3 - Bedroom 3 Date Taken: 12/27/2019
Taken By: Casey Hoak
Door damage and 1 smoke
40 DOCUMENT1/Main Level/Bedroom 3 - Bedroom 3 Date Taken: 12/27/2019
Door damage and 1 smoke
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 35
41 DOCUMENT1/Main Level/Bedroom 3 - Bedroom 3 Date Taken: 12/27/2019
Taken By: Casey Hoak
Door damage and 1 smoke
42 DOCUMENT1/Main Level/Bathroom 1 - Bathroom 1 Date Taken: 12/27/2019
No damage GFI only
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 36
43 DOCUMENT1/Main Level/Bathroom 1 - Bathroom 1 Date Taken: 12/27/2019
Taken By: Casey Hoak
No damage GFI only
44 DOCUMENT1/Main Level/Bathroom 1 - Bathroom 1 Date Taken: 12/27/2019
No damage GFI only
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 37
45 DOCUMENT1/Main Level/Bathroom 1 - Bathroom 1 Date Taken: 12/27/2019
Taken By: Casey Hoak
No damage GFI only
46 DOCUMENT1/Main Level/Bathroom 2 - Bathroom 2 Date Taken: 12/27/2019
Glass block, door and gfi
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 38
47 DOCUMENT1/Main Level/Bathroom 2 - Bathroom 2 Date Taken: 12/27/2019
Taken By: Casey Hoak
Glass block, door and gfi
48 DOCUMENT1/Main Level/Bathroom 2 - Bathroom 2 Date Taken: 12/27/2019
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-399560925_RA 12/26/2019 Page: 39
49 DOCUMENT1/Main Level/Bathroom 2 - Bathroom 2 Date Taken: 12/27/2019
CNMI-399560925_RA 12/26/2019 Page: 40
Main Level
Carport
Bathroom 1
Living Room
Bathroom 2Hallway
Bedroom 1
Bedroom 2
Bedroom 3
Kitchen 2
G
FC
IG
FC
I
Kitchen
Main Level
18' 8"14'
4'
8'
8'
1"
8' 10"
8' 8"
9' 4"
' 2
' 8
' 5
8'
8' 2"
8'
8'
11' 10"
' 6
11' 4"
11' 6"
5'
8' 4"
3' 3"
3' 7"
5'
0"
5'
9'
1"
' 1
0"
' 2
' 1
0"
6'
13' 5"
13' 11"
8'
8'
5'
5'
9' 8"
9' 10"
' 9
2' 1"
1' 11"
13' 8"
18' 6"
CNMI-399560925_RA 12/26/2019 Page: 41
ROOF
Roof1
F1
ROOF
' 1 1"
20' 1" 19' 10"
CNMI-399560925_RA 12/26/2019 Page: 42
PLOT
PLOT (A1)
DD (A2)
Water Tank (A3)
Water Meter (A4) Power Pole (A5)
MwarMware Street (A6)
DRIVEWAY (A7)
SEPTIC (A8)
PLOT
72' 3"
45' 5"
' 1
1"
4'
3'
3' 4"
3'
100' 2"
9'
8' 7"
' 2
2'
CNMI-399560925_RA 12/26/2019 Page: 43
CNMI DATA
CNMI Data
CNMI DATA
1'1' 4"
File details come from the government source that posted it. Updated .