Dewberry
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
Insured: ROSE IGITOL Home: (670) 288-5426 Home: ALAGUAN ST 1STY WHITE RED TRIM
KOBLERVILLE, HI
Property: ALAGUAN ST 1STY WHITE RED TRIM
KOBLERVILLE, HI
Claim Rep.: Casey Hoak
Estimator: Casey Hoak
Claim Number: CNMI-412635492 Policy Number: CNMI-412635492\ Type of Loss: Hurricane
Date Contacted: 11/24/2019 5:00 AM Date of Loss: 10/24/2018 2:00 PM Date Received: 1/12/2019 2:09 AM
Date Inspected: 2/20/2019 10:00 PM Date Entered: 11/24/2019 2:12 AM
Date Est. Completed: 2/21/2019 11:04 PM
Price List: HIOI8X_JAN19 Restoration/Service/Remodel
Estimate: CNMI-412635492_RA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 2
11/25/2019 CMH
Site visits Batch 4 next 20 Attendees: Casey Hoak DeDe Hubbard, Brunson Taylor, Jorge Rivera PE.
Home is a 3 bedroom CMU block home with a concrete roof on front half and Metal over the rear addition. Per the PE Jorge a shed roof will be done for the back of the home. No saw cut is needed but a bond beam will be poured on the all the rear and front walls. J bolts will be used in the bond beam and wedge bolts on the the two ends. 2x12's on twelve inch centers will be needed to cover the span. The main concrete roof has been leaking into the dwelling in bedroom 1 and will need to sealed. In the interior of the main home there is 2 windows damaged in bed 2 and it both need a shutter as well. The rest of the main home is shuttered already but the rear addition will need all the openings shuttered. The Rafters will serve as the joists and insulation will be added over the rear area. 1 exterior door off kitchen two and 3 interior doors all in the rear of the home. A new 200 amp panel, breaker, masthead and meter base along with a rewire of only the rear portion with plugs, lights, switches and GFI's in the kitchen. The main home will get smokes in the bedrooms and CO in the Living Room. Paint for all new doors and all treated lumber installed inside and out. All GFM has been utilized where applicable and a new set of photos detailing damages to date have been added to the file.
INSPECTION SUMMARY
The applicant met at the damaged dwelling and the following was observed.
The dwelling is a 1 story concrete dwelling with a partial concrete roof and partial tin roof on slab foundation. There are 2 occupants and 1 occupied bedroom. The metal roof was ripped from the dwelling causing damages. Applicant has made partial repairs to the roof. Addressing only the damages caused by the disaster in the portion of the dwelling that is covered by the concrete roof. There were 2 windows broken and damage to the vinyl flooring.
The dwelling is deemed to be repairable.
There was 1 structural component damaged which was the Roof.
Reconstruction should take approximately 16 weeks from start of construction.
Total Square Footage of Damaged Dwelling
AGE: The dwelling was built in approximately 1984
DAMAGE AND REPAIR SUMMARY
See attached estimate for exact repair and line items.
LATITUDE: 15.121622
LONGITUDE: 145.699385
A: ROOF: Only the portion of the tin roof is addressed in the estimate. The entire roof from framing up will need to be replaced.
B: INTERIOR: All windows and doors will need to be replaced in the back portion of the dwelling that was covered by the tin roof. The flooring in the back portion was tile which was not damaged. The front portion of the dwelling under the concrete roof had 2 broken windows in bedroom 2 that are included in the estimate. All vinyl tile flooring is damaged from the standing water and is included to replace. Including a final clean in the estimate once all work is complete.
C: STRUCTURAL: The foundation is slab and was not damaged.
D: MECHANICAL/PLUMBING/WATER SYSTEM: There was 1 split unit in bedroom 1 which was broken during the storm which is included in the estimate. No other mechanical or plumbing damages.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 3
E: ELECTRICAL: Due to the damages, all electrical needs to be replaced. Adding smoke alarms in all bedrooms and a CO2 detector in the living room to the estimate.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 4
CNMI-412635492_RA
ROOF
ROOF
DESCRIPTION QTY
186. 2" x 6" x 20' #2 treated pine (material only) 10.00 EA
187. 2" x 6" x 10' #2 treated pine (material only) 2.00 EA
188. 2" x 6" x 18' #2 treated pine (material only) 4.00 EA
189. 2" x 6" x 14' #2 treated pine (material only) 2.00 EA
190. 2" x 6" x 8' #2 & better Fir / Larch (material only) 6.00 EA
191. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 28.00 EA
For Gable end walls
221. 2" x 12" x 10' #2 treated pine (material only) 1.00 EA
224. 2" x 12" x 14' #2 treated pine (material only) 1.00 EA
222. 2" x 12" x 16' #2 treated pine (material only) 1.00 EA
236. 2" x 12" x 18' #2 treated pine (material only) 23.00 EA
220. 2" x 12" x 20' #2 treated pine (material only) 44.00 EA
192. Sheathing - plywood - 1/2" - treated 570.90 SF
237. Sheathing - plywood - 1/2" - treated 570.90 SF
194. Sheathing - plywood - 3/4" - treated 1152.00 SF
238. Sheathing - plywood - 3/4" - treated 1152.00 SF
223. 2" x 12" x 8' #2 treated pine (material only) 2.00 EA
193. Labor to frame 2" x 6" non-bearing wall - 16" oc 285.45 SF
For Gable end walls
226. Rafters - 2x12 - Labor only - (using rafter length) 1279.13 LF
NOTES:
Roof1 F1
Roof2F2
' 6
' 3
2'
2'
49' 5"
' 7
' 4
26' 3"
1'
1'
" 35' 10"
' 9
Roof1
1132.35 Surface Area
130.90 Total Perimeter Length
11.32 Number of Squares
DESCRIPTION QTY
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 5
CONTINUED - Roof1
DESCRIPTION QTY
------------------ ROOFING -----------------
239. Metal roofing - ribbed - 24 gauge - up to 1" 1132.36 SF
241. Metal roofing - ribbed - 24 gauge - up to 1" 1132.36 SF
242. Metal roofing - ribbed - 24 gauge - up to 1" 1132.36 SF
243. Closure strips for metal roofing - inside and/or outside 89.00 LF
244. Flashing tape - self-adhesive 696.60 LF
Seal between the metal roof seams
246. Additional screws for 3/4 sheathing 4018.00 EA
Additional screws for 3/4 sheathing above Xactimate allowance. 6% waste added for screws Labor included
247. Additional screws for 2x4 & 2x6 furring & fascia 2826.00 EA
Additional screws for 2x4 & 2x6 furring & fascia above Xactimate allowance. 6% waste added for screws Labor included
251. Drip edge/gutter apron 89.00 LF
252. Gable trim for metal roofing - 26 gauge 41.90 LF
253. Gable trim for metal roofing - 26 gauge 41.90 LF
254. Ice & water barrier 1132.36 SF
256. 2" x 4" lumber (.667 BF per LF) 356.00 LF
Roof purlins
257. 2" x 4" lumber (.667 BF per LF) 356.00 LF
Roof purlins
258. 2" x 6" lumber (1 BF per LF) 217.91 LF
For Picture Frame
259. 2" x 6" lumber (1 BF per LF) 217.91 LF
For Picture Frame
260. 2" x 6" lumber (1 BF per LF) 222.50 LF
Rafter Blocking
261. 2" x 6" lumber (1 BF per LF) 222.50 LF
Blocking For Rafters
------------------ SOFFIT -----------------
262. Soffit - box framing - 1' overhang 89.00 LF
Calculation set for 16" overhang
264. Soffit - box framing - 1' overhang 89.00 LF
Calculation set for 16" overhang
265. Soffit & fascia - wood - 1' overhang 89.00 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 6
CONTINUED - Roof1
DESCRIPTION QTY
Calculation set for 16" overhang
266. Soffit & fascia - wood - 1' overhang 89.00 LF
Calculation set for 16" overhang
267. Soffit vent - linear 44.50 LF
Cut to fit as needed for soffit vent
268. Baffle vent - foam 89.00 LF
------------------ PAINT -----------------
270. Prime & paint exterior soffit - wood 118.37 SF
272. Prime & paint exterior fascia - wood, 4"- 6" wide 178.00 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
273. Exterior - paint two coats 285.45 SF
274. House wrap (air/moisture barrier) 285.45 SF
275. Siding - hardboard panel - paint grade 285.45 SF
------------------ STRAPPING -----------------
276. 2x6 joist hangers for rafter blocking 175.00 EA
2x6 joist hangers for rafter blocking in the roof.
277. Framing hurricane tie 68.00 EA
Rafter to wall hurricane tie - 2 per rafter per plans. (Not GFM)
NOTES:
Roof1 F1
Roof2F2
24' 6" 12' 9"
' 1
0"
' 2
' 1 1"
' 1
1"
' 8
Roof2
914.56 Surface Area
130.41 Total Perimeter Length
9.15 Number of Squares
DESCRIPTION QTY
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 7
CONTINUED - Roof2
DESCRIPTION QTY
665. Elastomeric roof coating - Flat roof 914.56 SF
Seal the roof surface
NOTES:
Main Level Main Level
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
281. Breaker panel - 200 amp w/arc fault breakers 1.00 EA
282. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA
304. Meter mast for overhead power - 2 1/2" conduit 1.00 EA
305. Meter base - 200 amp 1.00 EA
283. Rewire - average residence - copper wiring 961.23 SF
Rewire under new roof only
284. Ground fault interrupter (GFI) outlet 2.00 EA
285. Exterior light fixture 2.00 EA
306. Grounding rod - copper clad with clamp, 8' 2.00 EA
326. Trunk cable - aluminum - 4 wire 2/0 5.00 LF
------------------ WALL REPAIRS-----------------
292. Concrete Post & Beam construction - Beams 2.05 CY
To pour a bond beam on top of existing wall - includes rebar
293. Concrete anchor bolt - 1/2" x 10" 101.00 EA
294. Wedge anchor bolt - 1/2" x 8 1/2" 26.00 EA
295. Epoxy crack and joint filler (EA) 26.00 EA
296. 2" x 6" lumber - treated (1 BF per LF) 678.17 LF
For double sill plate on the perimeter
297. 2" x 6" lumber - treated (1 BF per LF) 678.17 LF
For double sill plate on the perimeter
298. Sill seal foam - 6" 208.83 LF
------------------ SCAFFOLD -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 8
CONTINUED - Main Level
DESCRIPTION QTY
299. Scaffolding Setup & Take down - per hour 32.00 HR
------------------ GENERAL ITEMS -----------------
302. Clean the floor - Heavy 1702.99 SF
301. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA
NOTES:
Kitchen 2 Storage Utility Room
Bedroom 3 Kitchen 1
Bedroom 1
Bath
Bedroom 2
Living Room
5'
0"
5'
2'
2'
7' 3"
7' 1"
2' 6" 2"
4"
1'
10"
8'
10' 9"
Kitchen 1 Height: 8'
216.67 SF Walls
304.46 SF Walls & Ceiling
9.75 SY Flooring
27.08 LF Ceil. Perimeter
87.79 SF Ceiling
87.79 SF Floor
27.08 LF Floor Perimeter
Missing Wall 10' 9" X 8' Opens into LIVING_ROOM
DESCRIPTION QTY
------------------GENERAL ITEMS -----------------
377. 5 lb. ABC fire extinguisher 1.00 EA
NOTES:
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 9
Kitchen 2 Storage Utility Room
Bedroom 3 Kitchen 1
Bedroom 1 Bath
Bedroom 2
Living Room
2'
' 1 0"
4'
0"
7'
' 2
4'
3' 8' 8"
8' 10"13' 1' 8"
20' 4"
20' 8"
2' 7"
4' 8"
4' 10"
17' 2"
17' 6" 13' 3"
9' 1" 15' 11" 6' 5"
18' 7"
18' 9"
3' 3" 3' 7"
2'
' 6
' 4
1'
4' 5"
4' 9"
17' 5"
17' 9"7' 4" 2' 7"
9' 11"
12' 3"
8'
17' 3"
2' 7"
19' 9"
20' 1"
Kitchen 2 Height: 8'
656.00 SF Walls
1061.56 SF Walls & Ceiling
45.06 SY Flooring
82.00 LF Ceil. Perimeter
405.56 SF Ceiling
405.56 SF Floor
82.00 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
378. Switch 2.00 EA
379. Light fixture 2.00 EA
380. Outlet 2.00 EA
381. Ground fault interrupter (GFI) outlet 1.00 EA
------------------ DOORS & WINDOWS -----------------
386. Exterior door - metal - insulated - flush or panel style 1.00 EA
387. Door lockset & deadbolt - exterior 1.00 EA
388. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
389. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
392. Security/storm shutter 125.88 SF
------------------ INSULATION -----------------
393. Batt insulation - 10" - R30 - paper faced 405.56 SF
------------------ WALLS & CEILINGS -----------------
609. Sheathing - plywood - 1/2" - treated 405.56 SF
610. Sheathing - plywood - 1/2" - treated 405.56 SF
611. Sheathing - plywood - 1/2" - treated 405.56 SF
612. Seal & paint plywood sheathing 405.56 SF
401. Cove molding - 3/4" 82.00 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 10
Kitchen 2 Storage Utility Room
Bedroom 3 Kitchen 1
Bedroom 1
Bath
Bedroom 2
Living Room
2'
4'
4'
1"
7'
8'
2'
' 2
2'
2'
0"
12' 2"
5'
0"
5'
2'
4'
2'
2' 7" 4' 3"
5' 9"
Bedroom 1 Height: 8'
434.67 SF Walls
617.17 SF Walls & Ceiling
20.28 SY Flooring
54.33 LF Ceil. Perimeter
182.50 SF Ceiling
182.50 SF Floor
54.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
490. Smoke detector 1.00 EA
------------------ WALLS & CEILINGS -----------------
643. Texture drywall - smooth / skim coat 182.50 SF
Fix ceiling where water has come in through the concrete roof
NOTES:
Kitchen 2 Storage Utility Room
Bedroom 3 Kitchen 1
Bedroom 1
Bath
Bedroom 2
Living Room
4' 3' 8"
3' 10"
3' 4"
3' 8"
' 4
2' 6" 10"
6"
8"
10"
7'
7' 2"
4'
3'
3'
3'
Bedroom 2 Height: 8'
336.00 SF Walls
446.00 SF Walls & Ceiling
12.22 SY Flooring
42.00 LF Ceil. Perimeter
110.00 SF Ceiling
110.00 SF Floor
42.00 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
544. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
634. Storm window - aluminum, 12-24 sf 2.00 EA
635. Security/storm shutter 45.00 SF
639. Ornamental iron - security grill - window 45.00 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 11
Kitchen 2 Storage Utility Room
Bedroom 3 Kitchen 1
Bedroom 1
Bath
Bedroom 2
Living Room
7' 2"
7'
2' 6"
1' 1"
7"
5"
1'
0"
2'
8'
11' 4"
11'
4' 3'
3'
2'
1"
Bedroom 3 Height: 8'
336.00 SF Walls
446.00 SF Walls & Ceiling
12.22 SY Flooring
42.00 LF Ceil. Perimeter
110.00 SF Ceiling
110.00 SF Floor
42.00 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
463. Smoke detector 1.00 EA
NOTES:
Kitchen 2 Storage Utility Room
Bedroom 3 Kitchen 1
Bedroom 1
Bath
Bedroom 2
Living Room
3' 3'
0"
' 3
' 5
"3'
9'
9'
5'
5'
3'
4' 6"
4' 8"
11' 11"
12' 3" 3'
12' 6"
12' 8"
3' 11" 4' 3"
2'
' 1
7' 3" 7' 1"
2'
2'
12' 2"
Utility Room Height: 8'
594.67 SF Walls
921.19 SF Walls & Ceiling
36.28 SY Flooring
74.33 LF Ceil. Perimeter
326.52 SF Ceiling
326.52 SF Floor
74.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
432. Switch 1.00 EA
433. Light fixture 2.00 EA
434. Outlet 3.00 EA
------------------ DOORS & WINDOWS -----------------
438. Interior door unit 1.00 EA
439. Door knob - interior 1.00 EA
442. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
443. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
446. Security/storm shutter 90.00 SF
------------------ INSULATION -----------------
447. Batt insulation - 10" - R30 - paper faced 326.52 SF
------------------ WALLS & CEILINGS -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 12
CONTINUED - Utility Room
DESCRIPTION QTY
613. Sheathing - plywood - 1/2" - treated 326.52 SF
614. Sheathing - plywood - 1/2" - treated 326.52 SF
615. Sheathing - plywood - 1/2" - treated 326.52 SF
616. Seal & paint plywood sheathing 326.52 SF
617. Cove molding - 3/4" 74.33 LF
NOTES:
Kitchen 2 Storage Utility Room
Bedroom 3 Kitchen 1
Bedroom 1
Bath
Bedroom 2
Living Room
2'
' 1
2' 7"5' 7"
8' 11"
9' 1"
2'
' 6
' 4
2' 2'
11' 4" 11'
2' 6"
4" 1'
10"
Storage Height: 8'
516.00 SF Walls
775.25 SF Walls & Ceiling
28.81 SY Flooring
64.50 LF Ceil. Perimeter
259.25 SF Ceiling
259.25 SF Floor
64.50 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
405. Switch 2.00 EA
406. Light fixture 2.00 EA
407. Outlet 3.00 EA
------------------ DOORS & WINDOWS -----------------
411. Interior door unit 2.00 EA
412. Door knob - interior 2.00 EA
416. Paint door/window trim & jamb - 2 coats (per side) 4.00 EA
638. Paint door slab only - 2 coats (per side) 4.00 EA
Painting all 6 sides of door
419. Security/storm shutter 31.50 SF
------------------ INSULATION -----------------
420. Batt insulation - 10" - R30 - paper faced 259.25 SF
------------------ WALLS & CEILINGS -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 13
CONTINUED - Storage
DESCRIPTION QTY
421. Sheathing - plywood - 1/2" - treated 259.25 SF
422. Sheathing - plywood - 1/2" - treated 259.25 SF
423. Sheathing - plywood - 1/2" - treated 259.25 SF
424. Seal & paint plywood sheathing 259.25 SF
428. Cove molding - 3/4" 64.50 LF
NOTES:
Kitchen 2 Storage Utility Room
Bedroom 3 Kitchen 1
Bedroom 1
Bath
Bedroom 2
Living Room
2'
3'
3'
9"
2'
4'
2'
2'
10' 9"
2'
2' 6"
1' 1"
2' 6"
6"10"
' 4
4'
3' 5"
3' 8" 3' 10"
Living Room Height: 8'
414.00 SF Walls
607.38 SF Walls & Ceiling
21.49 SY Flooring
51.75 LF Ceil. Perimeter
193.38 SF Ceiling
193.38 SF Floor
51.75 LF Floor Perimeter
Missing Wall 10' 9" X 8' Opens into KITCHEN_1
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
572. Carbon monoxide detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
CNMI DATA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 14
CNMI Data1' 4"
CNMI Data Height: 4"
1.57 SF Walls
2.92 SF Walls & Ceiling
0.15 SY Flooring
4.70 LF Ceil. Perimeter
1.36 SF Ceiling
1.36 SF Floor
4.70 LF Floor Perimeter
DESCRIPTION QTY
126. ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO
127. LATITUDE DAMAGED DWELLING 15.12 DE
15.121622
128. LONGITUDE DAMAGED DWELLING 145.70 DE
145.699385
129. 55 GAL DRUMS VISIBLE LEAKING 0.00 NO
130. PETROLEUM ABOVE GROUND TANKS 0.00 NO
131. DOES DWELLING HAVE A SEPTIC TANK 0.00 NO
No Septic, Connected to Sewer
132. DOES DWELLING HAVE A WELL 1.00 NO
133. UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO
134. APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1984.00 YR
135. ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO
136. ENCROACHMENT ISSUES 0.00 NO
137. IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 YS
138. DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 EA
139. TOTAL SQUARE FOOTAGE OF DWELLING 1641.00 SF
140. UNUNUSAL SITE CONDITIONS 0.00 NO
141. DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
142. HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
Roof
143. IS DWELLING DESTROYED 0.00 NO
144. FOUNDATION TYPE 0.00 UN
Slab
145. DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO
146. DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
147. DID THE MILITAY PROVIDE THE ROOFING 0.00 NO
148. DID THE MILITARY PROVIDE A TENT 0.00 YS
149. HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
Roof
150. DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO
151. LATITUDE OUT BUILDING 0.00 DE
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 15
CONTINUED - CNMI Data
DESCRIPTION QTY
152. LONGITUDE OUT BUILDING 0.00 DE
153. LATITUDE POWER POLE 15.12 DE
15.121450
154. LONGITUDE POWER POLE 145.70 DE
145.699439
155. LATITUDE WATER METER 15.12 DE
15.121561
156. LONGITUDE WATER METER 145.70 DE
145.699428
157. LATITUDE WATER TANK 0.00 DE
158. LONGITUDE WATER TANK 0.00 DE
NOTES:
Labor Minimums Applied
DESCRIPTION QTY
344. Finish hardware labor minimum 1.00 EA
346. Door labor minimum 1.00 EA
640. Ornamental iron labor minimum 1.00 EA
645. Drywall labor minimum 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 16
Grand Total Areas:
3,681.57 SF Walls 1,704.35 SF Ceiling SF Walls and Ceiling5,385.92 1,704.35 SF Floor 189.37 SY Flooring 464.70 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 464.70 LF Ceil. Perimeter
1,704.35 Floor Area 1,816.60 Total Area 3,681.57 Interior Wall Area 2,264.72 Exterior Wall Area 213.54 Exterior Perimeter of
Walls
2,046.91 Surface Area 20.47 Number of Squares 261.31 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 17
1 Main Level - Sketch
Date Taken: 11/25/2019
Taken By: Darlene Hbbard
2 Main Level - Scope Notes
Date Taken: 11/25/2019
Taken By: Darlene Hbbard
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 18
3 Main Level - Scope Notes
Date Taken: 11/25/2019
Taken By: Darlene Hbbard
4 Main Level - Scope Notes
Date Taken: 11/25/2019
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 19
5 Main Level - Scope Notes
Date Taken: 11/25/2019
Taken By: Darlene Hbbard
6 Main Level - Front Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
Site visit with all parties listed. Front dwelling has concrete roof which will need sill coat applied to entire concrete roof. It was then determined by Jorge Rivera, PE to remove back metal portion of roof and install shed roof. No saw cut needed, pour bond beam to front and back portion.
Electric is to replace 1 mast and replace 200 amp meter.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 20
7 Main Level - Front Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
Entry into living room
8 Main Level - Front Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 21
9 Main Level - Front Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
Entry into kitchen 2
10 Main Level - Front Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 22
11 Main Level - Left Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
12 Main Level - Left Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 23
13 Main Level - Left Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
Left back corner
14 Main Level - Back Elevation
Date Taken: 11/24/2019
Back corner looking left
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 24
15 Main Level - Back Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
Back corner looking right
16 Main Level - Right Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 25
17 Main Level - Right Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
18 Main Level - Right Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 26
19 Main Level - Right Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
20 Main Level - Front Elevation
Date Taken: 11/24/2019
Meter base
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 27
21 Main Level - Front Elevation
Date Taken: 11/24/2019
Taken By: Casey Hoak
Burglar bars to be removed
22 Main Level - Front Elevation
Date Taken: 11/24/2019
Entry into living room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 28
23 Main Level/Kitchen 1 - 39-Kitchen Date Taken: 11/24/2019
Taken By: Casey Hoak
Has not been used as kitchen
24 Main Level/Kitchen 1 - 40-Kitchen Date Taken: 2/20/2019
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 29
25 Main Level/Kitchen 1 - 41-Kitchen Date Taken: 2/20/2019
Taken By: Casey Hoak
26 Main Level/Kitchen 1 - 42-Kitchen Date Taken: 2/20/2019
Concrete roof, no damage to ceiling
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 30
27 Main Level/Kitchen 2 - Kitchen 2
Date Taken: 11/24/2019
Taken By: Casey Hoak
Remove ceiling and joists, replace ceiling,insulation and molding.
Electric=replace 2 lights, 2 switch, 2 plugs. R/R 1 exterior door. Windows ok, add (2) 8' 6"X4 shutters, (1)12'9" shutter. Flooring ok. Add fire extinguisher.
28 Main Level/Kitchen 2 - Kitchen 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 31
29 Main Level/Kitchen 2 - Kitchen 2
Date Taken: 11/24/2019
Taken By: Casey Hoak
30 Main Level/Kitchen 2 - Kitchen 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 32
31 Main Level/Kitchen 2 - Kitchen 2
Date Taken: 11/24/2019
Taken By: Casey Hoak
32 Main Level/Kitchen 2 - Kitchen 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 33
33 Main Level/Kitchen 2 - Kitchen 2
Date Taken: 11/24/2019
Taken By: Casey Hoak
34 Main Level/Kitchen 2 - Kitchen 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 34
35 Main Level/Kitchen 2 - Kitchen 2
Date Taken: 11/24/2019
Taken By: Casey Hoak
36 Main Level/Bedroom 1 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
Add 1 smoke detector. Window has shutters.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 35
37 Main Level/Bedroom 1 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
38 Main Level/Bedroom 1 - Bedroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 36
39 Main Level/Bedroom 1 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
40 Main Level/Bedroom 1 - Bedroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 37
41 Main Level/Bedroom 1 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
42 Main Level/Bedroom 2 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
Broken window, R/R 4X4 window, add 4X4 shutter. Add smoke detector.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 38
43 Main Level/Bedroom 2 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
44 Main Level/Bedroom 2 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
Remove burgar bars, R/R 4X4 window, add 4X4 shutter
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 39
45 Main Level/Bedroom 2 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
46 Main Level/Bedroom 2 - 56- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 40
47 Main Level/Bedroom 2 - 54- Bedroom 2 Date Taken: 11/24/2019
Taken By: Casey Hoak
48 Main Level/Bedroom 2 - 55- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 41
49 Main Level/Bedroom 2 - 53- Bedroom 2 Date Taken: 11/24/2019
Taken By: Casey Hoak
50 Main Level/Bedroom 2 - 52- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 42
51 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
Add smoke detector
52 Main Level/Bedroom 3 - Bedroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 43
53 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
54 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019
No damage
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 44
55 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019
Taken By: Casey Hoak
No damage to ceiling, concrete roof
56 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019
No damage to flooring
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 45
57 Main Level/Bath - Bathroom
Date Taken: 11/24/2019
Taken By: Casey Hoak
No damage
58 Main Level/Bath - Bathroom
Date Taken: 11/24/2019
No damage to fixtures
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 46
59 Main Level/Bath - Bathroom
Date Taken: 11/24/2019
Taken By: Casey Hoak
No damage to door
60 Main Level/Bath - Bathroom
Date Taken: 11/24/2019
Replace plug with GFI
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 47
61 Main Level/Utility Room - Utility Room Date Taken: 11/24/2019
Taken By: Casey Hoak
Remove existing joists, Replace ceiling, insulation and molding.
Electric=replace 2 lights, 1 switch, 3 plugs.
62 Main Level/Utility Room - Utility Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 48
63 Main Level/Utility Room - Utility Room Date Taken: 11/24/2019
Taken By: Casey Hoak
64 Main Level/Utility Room - Utility Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 49
65 Main Level/Utility Room - Utility Room Date Taken: 11/24/2019
Taken By: Casey Hoak
66 Main Level/Utility Room - Utility Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 50
67 Main Level/Utility Room - Utility Room Date Taken: 11/24/2019
Taken By: Casey Hoak
68 Main Level/Storage - 25- Storeroom Date Taken: 2/20/2019
Taken By: Darlene Hbbard
Replace ceiling, no joists, add insulation and molding. R/R 1 interior door. Electric=replace 2 lights, 2 switch, 3 plugs. Windows ok, add (1) 6X4 shutter.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 51
69 Main Level/Storage - 26- Storeroom Date Taken: 2/20/2019
Taken By: Darlene Hbbard
Damage to ceiling, roof
70 Main Level/Storage - 27- Storeroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 52
71 Main Level/Storage - 28- Storeroom Date Taken: 2/20/2019
Taken By: Darlene Hbbard
72 Main Level/Storage - 29- Storeroom Date Taken: 2/20/2019
Damage to ceiling and roof
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 53
73 Main Level/Storage - 30- Storeroom Date Taken: 2/20/2019
Taken By: Darlene Hbbard
Entry into kitchen
74 Main Level/Storage - Image94
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 54
75 Main Level/Storage - Image95
Date Taken: 11/24/2019
Taken By: Casey Hoak
76 Main Level/Storage - Image96
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 55
77 Main Level/Storage - Image97
Date Taken: 11/24/2019
Taken By: Casey Hoak
78 Living Room - 47-Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 56
79 Living Room - 48-Living Room
Date Taken: 2/20/2019
Taken By: Darlene Hbbard
Entry door
80 Living Room - 49-Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 57
81 Living Room - 50-Living Room
Date Taken: 2/20/2019
Taken By: Darlene Hbbard
Roof concrete, no ceiling damage
82 Living Room - 51-Living Room
Date Taken: 2/20/2019
Damage to vinyl tile
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412635492_RA 12/8/2019 Page: 58
83 Living Room - Image125
Date Taken: 11/24/2019
Taken By: Casey Hoak
Main panel is in cabinet in living room
84 57-Bedroom 2
Date Taken: 2/20/2019
Damage to flooring
CNMI-412635492_RA 12/8/2019 Page: 59
Main Level
Kitchen 2 Storage Utility Room
Bedroom 3 Kitchen 1
Bedroom 1
Bath
Bedroom 2
Living Room
Main Level
CNMI-412635492_RA 12/8/2019 Page: 60
ROOF
Roof1 F1
Roof2F2
ROOF
CNMI-412635492_RA 12/8/2019 Page: 61
PLOT
Plot (A1)
Alaguan (A2)
Power Pole (A3)
Water Meter (A4)
Damaged Dwelling (A5)
PLOT
CNMI-412635492_RA 12/8/2019 Page: 62