Dewberry

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

Insured: ROSE IGITOL Home: (670) 288-5426 Home: ALAGUAN ST 1STY WHITE RED TRIM

KOBLERVILLE, HI

Property: ALAGUAN ST 1STY WHITE RED TRIM

KOBLERVILLE, HI

Claim Rep.: Casey Hoak

Estimator: Casey Hoak

Claim Number: CNMI-412635492 Policy Number: CNMI-412635492\ Type of Loss: Hurricane

Date Contacted: 11/24/2019 5:00 AM Date of Loss: 10/24/2018 2:00 PM Date Received: 1/12/2019 2:09 AM

Date Inspected: 2/20/2019 10:00 PM Date Entered: 11/24/2019 2:12 AM

Date Est. Completed: 2/21/2019 11:04 PM

Price List: HIOI8X_JAN19 Restoration/Service/Remodel

Estimate: CNMI-412635492_RA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 2

11/25/2019 CMH

Site visits Batch 4 next 20 Attendees: Casey Hoak DeDe Hubbard, Brunson Taylor, Jorge Rivera PE.

Home is a 3 bedroom CMU block home with a concrete roof on front half and Metal over the rear addition. Per the PE Jorge a shed roof will be done for the back of the home. No saw cut is needed but a bond beam will be poured on the all the rear and front walls. J bolts will be used in the bond beam and wedge bolts on the the two ends. 2x12's on twelve inch centers will be needed to cover the span. The main concrete roof has been leaking into the dwelling in bedroom 1 and will need to sealed. In the interior of the main home there is 2 windows damaged in bed 2 and it both need a shutter as well. The rest of the main home is shuttered already but the rear addition will need all the openings shuttered. The Rafters will serve as the joists and insulation will be added over the rear area. 1 exterior door off kitchen two and 3 interior doors all in the rear of the home. A new 200 amp panel, breaker, masthead and meter base along with a rewire of only the rear portion with plugs, lights, switches and GFI's in the kitchen. The main home will get smokes in the bedrooms and CO in the Living Room. Paint for all new doors and all treated lumber installed inside and out. All GFM has been utilized where applicable and a new set of photos detailing damages to date have been added to the file.

INSPECTION SUMMARY

The applicant met at the damaged dwelling and the following was observed.

The dwelling is a 1 story concrete dwelling with a partial concrete roof and partial tin roof on slab foundation. There are 2 occupants and 1 occupied bedroom. The metal roof was ripped from the dwelling causing damages. Applicant has made partial repairs to the roof. Addressing only the damages caused by the disaster in the portion of the dwelling that is covered by the concrete roof. There were 2 windows broken and damage to the vinyl flooring.

The dwelling is deemed to be repairable.

There was 1 structural component damaged which was the Roof.

Reconstruction should take approximately 16 weeks from start of construction.

Total Square Footage of Damaged Dwelling

AGE: The dwelling was built in approximately 1984

DAMAGE AND REPAIR SUMMARY

See attached estimate for exact repair and line items.

LATITUDE: 15.121622

LONGITUDE: 145.699385

A: ROOF: Only the portion of the tin roof is addressed in the estimate. The entire roof from framing up will need to be replaced.

B: INTERIOR: All windows and doors will need to be replaced in the back portion of the dwelling that was covered by the tin roof. The flooring in the back portion was tile which was not damaged. The front portion of the dwelling under the concrete roof had 2 broken windows in bedroom 2 that are included in the estimate. All vinyl tile flooring is damaged from the standing water and is included to replace. Including a final clean in the estimate once all work is complete.

C: STRUCTURAL: The foundation is slab and was not damaged.

D: MECHANICAL/PLUMBING/WATER SYSTEM: There was 1 split unit in bedroom 1 which was broken during the storm which is included in the estimate. No other mechanical or plumbing damages.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 3

E: ELECTRICAL: Due to the damages, all electrical needs to be replaced. Adding smoke alarms in all bedrooms and a CO2 detector in the living room to the estimate.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 4

CNMI-412635492_RA

ROOF

ROOF

DESCRIPTION QTY

186. 2" x 6" x 20' #2 treated pine (material only) 10.00 EA

187. 2" x 6" x 10' #2 treated pine (material only) 2.00 EA

188. 2" x 6" x 18' #2 treated pine (material only) 4.00 EA

189. 2" x 6" x 14' #2 treated pine (material only) 2.00 EA

190. 2" x 6" x 8' #2 & better Fir / Larch (material only) 6.00 EA

191. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 28.00 EA

For Gable end walls

221. 2" x 12" x 10' #2 treated pine (material only) 1.00 EA

224. 2" x 12" x 14' #2 treated pine (material only) 1.00 EA

222. 2" x 12" x 16' #2 treated pine (material only) 1.00 EA

236. 2" x 12" x 18' #2 treated pine (material only) 23.00 EA

220. 2" x 12" x 20' #2 treated pine (material only) 44.00 EA

192. Sheathing - plywood - 1/2" - treated 570.90 SF

237. Sheathing - plywood - 1/2" - treated 570.90 SF

194. Sheathing - plywood - 3/4" - treated 1152.00 SF

238. Sheathing - plywood - 3/4" - treated 1152.00 SF

223. 2" x 12" x 8' #2 treated pine (material only) 2.00 EA

193. Labor to frame 2" x 6" non-bearing wall - 16" oc 285.45 SF

For Gable end walls

226. Rafters - 2x12 - Labor only - (using rafter length) 1279.13 LF

NOTES:

Roof1 F1

Roof2F2

' 6

' 3

2'

2'

49' 5"

' 7

' 4

26' 3"

1'

1'

" 35' 10"

' 9

Roof1

1132.35 Surface Area

130.90 Total Perimeter Length

11.32 Number of Squares

DESCRIPTION QTY

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 5

CONTINUED - Roof1

DESCRIPTION QTY

------------------ ROOFING -----------------

239. Metal roofing - ribbed - 24 gauge - up to 1" 1132.36 SF

241. Metal roofing - ribbed - 24 gauge - up to 1" 1132.36 SF

242. Metal roofing - ribbed - 24 gauge - up to 1" 1132.36 SF

243. Closure strips for metal roofing - inside and/or outside 89.00 LF

244. Flashing tape - self-adhesive 696.60 LF

Seal between the metal roof seams

246. Additional screws for 3/4 sheathing 4018.00 EA

Additional screws for 3/4 sheathing above Xactimate allowance. 6% waste added for screws Labor included

247. Additional screws for 2x4 & 2x6 furring & fascia 2826.00 EA

Additional screws for 2x4 & 2x6 furring & fascia above Xactimate allowance. 6% waste added for screws Labor included

251. Drip edge/gutter apron 89.00 LF

252. Gable trim for metal roofing - 26 gauge 41.90 LF

253. Gable trim for metal roofing - 26 gauge 41.90 LF

254. Ice & water barrier 1132.36 SF

256. 2" x 4" lumber (.667 BF per LF) 356.00 LF

Roof purlins

257. 2" x 4" lumber (.667 BF per LF) 356.00 LF

Roof purlins

258. 2" x 6" lumber (1 BF per LF) 217.91 LF

For Picture Frame

259. 2" x 6" lumber (1 BF per LF) 217.91 LF

For Picture Frame

260. 2" x 6" lumber (1 BF per LF) 222.50 LF

Rafter Blocking

261. 2" x 6" lumber (1 BF per LF) 222.50 LF

Blocking For Rafters

------------------ SOFFIT -----------------

262. Soffit - box framing - 1' overhang 89.00 LF

Calculation set for 16" overhang

264. Soffit - box framing - 1' overhang 89.00 LF

Calculation set for 16" overhang

265. Soffit & fascia - wood - 1' overhang 89.00 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 6

CONTINUED - Roof1

DESCRIPTION QTY

Calculation set for 16" overhang

266. Soffit & fascia - wood - 1' overhang 89.00 LF

Calculation set for 16" overhang

267. Soffit vent - linear 44.50 LF

Cut to fit as needed for soffit vent

268. Baffle vent - foam 89.00 LF

------------------ PAINT -----------------

270. Prime & paint exterior soffit - wood 118.37 SF

272. Prime & paint exterior fascia - wood, 4"- 6" wide 178.00 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

273. Exterior - paint two coats 285.45 SF

274. House wrap (air/moisture barrier) 285.45 SF

275. Siding - hardboard panel - paint grade 285.45 SF

------------------ STRAPPING -----------------

276. 2x6 joist hangers for rafter blocking 175.00 EA

2x6 joist hangers for rafter blocking in the roof.

277. Framing hurricane tie 68.00 EA

Rafter to wall hurricane tie - 2 per rafter per plans. (Not GFM)

NOTES:

Roof1 F1

Roof2F2

24' 6" 12' 9"

' 1

0"

' 2

' 1 1"

' 1

1"

' 8

Roof2

914.56 Surface Area

130.41 Total Perimeter Length

9.15 Number of Squares

DESCRIPTION QTY

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 7

CONTINUED - Roof2

DESCRIPTION QTY

665. Elastomeric roof coating - Flat roof 914.56 SF

Seal the roof surface

NOTES:

Main Level Main Level

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

281. Breaker panel - 200 amp w/arc fault breakers 1.00 EA

282. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA

304. Meter mast for overhead power - 2 1/2" conduit 1.00 EA

305. Meter base - 200 amp 1.00 EA

283. Rewire - average residence - copper wiring 961.23 SF

Rewire under new roof only

284. Ground fault interrupter (GFI) outlet 2.00 EA

285. Exterior light fixture 2.00 EA

306. Grounding rod - copper clad with clamp, 8' 2.00 EA

326. Trunk cable - aluminum - 4 wire 2/0 5.00 LF

------------------ WALL REPAIRS-----------------

292. Concrete Post & Beam construction - Beams 2.05 CY

To pour a bond beam on top of existing wall - includes rebar

293. Concrete anchor bolt - 1/2" x 10" 101.00 EA

294. Wedge anchor bolt - 1/2" x 8 1/2" 26.00 EA

295. Epoxy crack and joint filler (EA) 26.00 EA

296. 2" x 6" lumber - treated (1 BF per LF) 678.17 LF

For double sill plate on the perimeter

297. 2" x 6" lumber - treated (1 BF per LF) 678.17 LF

For double sill plate on the perimeter

298. Sill seal foam - 6" 208.83 LF

------------------ SCAFFOLD -----------------

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 8

CONTINUED - Main Level

DESCRIPTION QTY

299. Scaffolding Setup & Take down - per hour 32.00 HR

------------------ GENERAL ITEMS -----------------

302. Clean the floor - Heavy 1702.99 SF

301. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA

NOTES:

Kitchen 2 Storage Utility Room

Bedroom 3 Kitchen 1

Bedroom 1

Bath

Bedroom 2

Living Room

5'

0"

5'

2'

2'

7' 3"

7' 1"

2' 6" 2"

4"

1'

10"

8'

10' 9"

Kitchen 1 Height: 8'

216.67 SF Walls

304.46 SF Walls & Ceiling

9.75 SY Flooring

27.08 LF Ceil. Perimeter

87.79 SF Ceiling

87.79 SF Floor

27.08 LF Floor Perimeter

Missing Wall 10' 9" X 8' Opens into LIVING_ROOM

DESCRIPTION QTY

------------------GENERAL ITEMS -----------------

377. 5 lb. ABC fire extinguisher 1.00 EA

NOTES:

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 9

Kitchen 2 Storage Utility Room

Bedroom 3 Kitchen 1

Bedroom 1 Bath

Bedroom 2

Living Room

2'

' 1 0"

4'

0"

7'

' 2

4'

3' 8' 8"

8' 10"13' 1' 8"

20' 4"

20' 8"

2' 7"

4' 8"

4' 10"

17' 2"

17' 6" 13' 3"

9' 1" 15' 11" 6' 5"

18' 7"

18' 9"

3' 3" 3' 7"

2'

' 6

' 4

1'

4' 5"

4' 9"

17' 5"

17' 9"7' 4" 2' 7"

9' 11"

12' 3"

8'

17' 3"

2' 7"

19' 9"

20' 1"

Kitchen 2 Height: 8'

656.00 SF Walls

1061.56 SF Walls & Ceiling

45.06 SY Flooring

82.00 LF Ceil. Perimeter

405.56 SF Ceiling

405.56 SF Floor

82.00 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

378. Switch 2.00 EA

379. Light fixture 2.00 EA

380. Outlet 2.00 EA

381. Ground fault interrupter (GFI) outlet 1.00 EA

------------------ DOORS & WINDOWS -----------------

386. Exterior door - metal - insulated - flush or panel style 1.00 EA

387. Door lockset & deadbolt - exterior 1.00 EA

388. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

389. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

392. Security/storm shutter 125.88 SF

------------------ INSULATION -----------------

393. Batt insulation - 10" - R30 - paper faced 405.56 SF

------------------ WALLS & CEILINGS -----------------

609. Sheathing - plywood - 1/2" - treated 405.56 SF

610. Sheathing - plywood - 1/2" - treated 405.56 SF

611. Sheathing - plywood - 1/2" - treated 405.56 SF

612. Seal & paint plywood sheathing 405.56 SF

401. Cove molding - 3/4" 82.00 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 10

Kitchen 2 Storage Utility Room

Bedroom 3 Kitchen 1

Bedroom 1

Bath

Bedroom 2

Living Room

2'

4'

4'

1"

7'

8'

2'

' 2

2'

2'

0"

12' 2"

5'

0"

5'

2'

4'

2'

2' 7" 4' 3"

5' 9"

Bedroom 1 Height: 8'

434.67 SF Walls

617.17 SF Walls & Ceiling

20.28 SY Flooring

54.33 LF Ceil. Perimeter

182.50 SF Ceiling

182.50 SF Floor

54.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

490. Smoke detector 1.00 EA

------------------ WALLS & CEILINGS -----------------

643. Texture drywall - smooth / skim coat 182.50 SF

Fix ceiling where water has come in through the concrete roof

NOTES:

Kitchen 2 Storage Utility Room

Bedroom 3 Kitchen 1

Bedroom 1

Bath

Bedroom 2

Living Room

4' 3' 8"

3' 10"

3' 4"

3' 8"

' 4

2' 6" 10"

6"

8"

10"

7'

7' 2"

4'

3'

3'

3'

Bedroom 2 Height: 8'

336.00 SF Walls

446.00 SF Walls & Ceiling

12.22 SY Flooring

42.00 LF Ceil. Perimeter

110.00 SF Ceiling

110.00 SF Floor

42.00 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

544. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

634. Storm window - aluminum, 12-24 sf 2.00 EA

635. Security/storm shutter 45.00 SF

639. Ornamental iron - security grill - window 45.00 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 11

Kitchen 2 Storage Utility Room

Bedroom 3 Kitchen 1

Bedroom 1

Bath

Bedroom 2

Living Room

7' 2"

7'

2' 6"

1' 1"

7"

5"

1'

0"

2'

8'

11' 4"

11'

4' 3'

3'

2'

1"

Bedroom 3 Height: 8'

336.00 SF Walls

446.00 SF Walls & Ceiling

12.22 SY Flooring

42.00 LF Ceil. Perimeter

110.00 SF Ceiling

110.00 SF Floor

42.00 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

463. Smoke detector 1.00 EA

NOTES:

Kitchen 2 Storage Utility Room

Bedroom 3 Kitchen 1

Bedroom 1

Bath

Bedroom 2

Living Room

3' 3'

0"

' 3

' 5

"3'

9'

9'

5'

5'

3'

4' 6"

4' 8"

11' 11"

12' 3" 3'

12' 6"

12' 8"

3' 11" 4' 3"

2'

' 1

7' 3" 7' 1"

2'

2'

12' 2"

Utility Room Height: 8'

594.67 SF Walls

921.19 SF Walls & Ceiling

36.28 SY Flooring

74.33 LF Ceil. Perimeter

326.52 SF Ceiling

326.52 SF Floor

74.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

432. Switch 1.00 EA

433. Light fixture 2.00 EA

434. Outlet 3.00 EA

------------------ DOORS & WINDOWS -----------------

438. Interior door unit 1.00 EA

439. Door knob - interior 1.00 EA

442. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

443. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

446. Security/storm shutter 90.00 SF

------------------ INSULATION -----------------

447. Batt insulation - 10" - R30 - paper faced 326.52 SF

------------------ WALLS & CEILINGS -----------------

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 12

CONTINUED - Utility Room

DESCRIPTION QTY

613. Sheathing - plywood - 1/2" - treated 326.52 SF

614. Sheathing - plywood - 1/2" - treated 326.52 SF

615. Sheathing - plywood - 1/2" - treated 326.52 SF

616. Seal & paint plywood sheathing 326.52 SF

617. Cove molding - 3/4" 74.33 LF

NOTES:

Kitchen 2 Storage Utility Room

Bedroom 3 Kitchen 1

Bedroom 1

Bath

Bedroom 2

Living Room

2'

' 1

2' 7"5' 7"

8' 11"

9' 1"

2'

' 6

' 4

2' 2'

11' 4" 11'

2' 6"

4" 1'

10"

Storage Height: 8'

516.00 SF Walls

775.25 SF Walls & Ceiling

28.81 SY Flooring

64.50 LF Ceil. Perimeter

259.25 SF Ceiling

259.25 SF Floor

64.50 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

405. Switch 2.00 EA

406. Light fixture 2.00 EA

407. Outlet 3.00 EA

------------------ DOORS & WINDOWS -----------------

411. Interior door unit 2.00 EA

412. Door knob - interior 2.00 EA

416. Paint door/window trim & jamb - 2 coats (per side) 4.00 EA

638. Paint door slab only - 2 coats (per side) 4.00 EA

Painting all 6 sides of door

419. Security/storm shutter 31.50 SF

------------------ INSULATION -----------------

420. Batt insulation - 10" - R30 - paper faced 259.25 SF

------------------ WALLS & CEILINGS -----------------

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 13

CONTINUED - Storage

DESCRIPTION QTY

421. Sheathing - plywood - 1/2" - treated 259.25 SF

422. Sheathing - plywood - 1/2" - treated 259.25 SF

423. Sheathing - plywood - 1/2" - treated 259.25 SF

424. Seal & paint plywood sheathing 259.25 SF

428. Cove molding - 3/4" 64.50 LF

NOTES:

Kitchen 2 Storage Utility Room

Bedroom 3 Kitchen 1

Bedroom 1

Bath

Bedroom 2

Living Room

2'

3'

3'

9"

2'

4'

2'

2'

10' 9"

2'

2' 6"

1' 1"

2' 6"

6"10"

' 4

4'

3' 5"

3' 8" 3' 10"

Living Room Height: 8'

414.00 SF Walls

607.38 SF Walls & Ceiling

21.49 SY Flooring

51.75 LF Ceil. Perimeter

193.38 SF Ceiling

193.38 SF Floor

51.75 LF Floor Perimeter

Missing Wall 10' 9" X 8' Opens into KITCHEN_1

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

572. Carbon monoxide detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

CNMI DATA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 14

CNMI Data1' 4"

CNMI Data Height: 4"

1.57 SF Walls

2.92 SF Walls & Ceiling

0.15 SY Flooring

4.70 LF Ceil. Perimeter

1.36 SF Ceiling

1.36 SF Floor

4.70 LF Floor Perimeter

DESCRIPTION QTY

126. ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO

127. LATITUDE DAMAGED DWELLING 15.12 DE

15.121622

128. LONGITUDE DAMAGED DWELLING 145.70 DE

145.699385

129. 55 GAL DRUMS VISIBLE LEAKING 0.00 NO

130. PETROLEUM ABOVE GROUND TANKS 0.00 NO

131. DOES DWELLING HAVE A SEPTIC TANK 0.00 NO

No Septic, Connected to Sewer

132. DOES DWELLING HAVE A WELL 1.00 NO

133. UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO

134. APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1984.00 YR

135. ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO

136. ENCROACHMENT ISSUES 0.00 NO

137. IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 YS

138. DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 EA

139. TOTAL SQUARE FOOTAGE OF DWELLING 1641.00 SF

140. UNUNUSAL SITE CONDITIONS 0.00 NO

141. DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

142. HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

Roof

143. IS DWELLING DESTROYED 0.00 NO

144. FOUNDATION TYPE 0.00 UN

Slab

145. DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO

146. DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

147. DID THE MILITAY PROVIDE THE ROOFING 0.00 NO

148. DID THE MILITARY PROVIDE A TENT 0.00 YS

149. HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

Roof

150. DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO

151. LATITUDE OUT BUILDING 0.00 DE

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 15

CONTINUED - CNMI Data

DESCRIPTION QTY

152. LONGITUDE OUT BUILDING 0.00 DE

153. LATITUDE POWER POLE 15.12 DE

15.121450

154. LONGITUDE POWER POLE 145.70 DE

145.699439

155. LATITUDE WATER METER 15.12 DE

15.121561

156. LONGITUDE WATER METER 145.70 DE

145.699428

157. LATITUDE WATER TANK 0.00 DE

158. LONGITUDE WATER TANK 0.00 DE

NOTES:

Labor Minimums Applied

DESCRIPTION QTY

344. Finish hardware labor minimum 1.00 EA

346. Door labor minimum 1.00 EA

640. Ornamental iron labor minimum 1.00 EA

645. Drywall labor minimum 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 16

Grand Total Areas:

3,681.57 SF Walls 1,704.35 SF Ceiling SF Walls and Ceiling5,385.92 1,704.35 SF Floor 189.37 SY Flooring 464.70 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 464.70 LF Ceil. Perimeter

1,704.35 Floor Area 1,816.60 Total Area 3,681.57 Interior Wall Area 2,264.72 Exterior Wall Area 213.54 Exterior Perimeter of

Walls

2,046.91 Surface Area 20.47 Number of Squares 261.31 Total Perimeter Length

0.00 Total Ridge Length 0.00 Total Hip Length

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 17

1 Main Level - Sketch

Date Taken: 11/25/2019

Taken By: Darlene Hbbard

2 Main Level - Scope Notes

Date Taken: 11/25/2019

Taken By: Darlene Hbbard

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 18

3 Main Level - Scope Notes

Date Taken: 11/25/2019

Taken By: Darlene Hbbard

4 Main Level - Scope Notes

Date Taken: 11/25/2019

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 19

5 Main Level - Scope Notes

Date Taken: 11/25/2019

Taken By: Darlene Hbbard

6 Main Level - Front Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

Site visit with all parties listed. Front dwelling has concrete roof which will need sill coat applied to entire concrete roof. It was then determined by Jorge Rivera, PE to remove back metal portion of roof and install shed roof. No saw cut needed, pour bond beam to front and back portion.

Electric is to replace 1 mast and replace 200 amp meter.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 20

7 Main Level - Front Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

Entry into living room

8 Main Level - Front Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 21

9 Main Level - Front Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

Entry into kitchen 2

10 Main Level - Front Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 22

11 Main Level - Left Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

12 Main Level - Left Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 23

13 Main Level - Left Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

Left back corner

14 Main Level - Back Elevation

Date Taken: 11/24/2019

Back corner looking left

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 24

15 Main Level - Back Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

Back corner looking right

16 Main Level - Right Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 25

17 Main Level - Right Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

18 Main Level - Right Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 26

19 Main Level - Right Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

20 Main Level - Front Elevation

Date Taken: 11/24/2019

Meter base

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 27

21 Main Level - Front Elevation

Date Taken: 11/24/2019

Taken By: Casey Hoak

Burglar bars to be removed

22 Main Level - Front Elevation

Date Taken: 11/24/2019

Entry into living room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 28

23 Main Level/Kitchen 1 - 39-Kitchen Date Taken: 11/24/2019

Taken By: Casey Hoak

Has not been used as kitchen

24 Main Level/Kitchen 1 - 40-Kitchen Date Taken: 2/20/2019

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 29

25 Main Level/Kitchen 1 - 41-Kitchen Date Taken: 2/20/2019

Taken By: Casey Hoak

26 Main Level/Kitchen 1 - 42-Kitchen Date Taken: 2/20/2019

Concrete roof, no damage to ceiling

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 30

27 Main Level/Kitchen 2 - Kitchen 2

Date Taken: 11/24/2019

Taken By: Casey Hoak

Remove ceiling and joists, replace ceiling,insulation and molding.

Electric=replace 2 lights, 2 switch, 2 plugs. R/R 1 exterior door. Windows ok, add (2) 8' 6"X4 shutters, (1)12'9" shutter. Flooring ok. Add fire extinguisher.

28 Main Level/Kitchen 2 - Kitchen 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 31

29 Main Level/Kitchen 2 - Kitchen 2

Date Taken: 11/24/2019

Taken By: Casey Hoak

30 Main Level/Kitchen 2 - Kitchen 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 32

31 Main Level/Kitchen 2 - Kitchen 2

Date Taken: 11/24/2019

Taken By: Casey Hoak

32 Main Level/Kitchen 2 - Kitchen 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 33

33 Main Level/Kitchen 2 - Kitchen 2

Date Taken: 11/24/2019

Taken By: Casey Hoak

34 Main Level/Kitchen 2 - Kitchen 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 34

35 Main Level/Kitchen 2 - Kitchen 2

Date Taken: 11/24/2019

Taken By: Casey Hoak

36 Main Level/Bedroom 1 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

Add 1 smoke detector. Window has shutters.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 35

37 Main Level/Bedroom 1 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

38 Main Level/Bedroom 1 - Bedroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 36

39 Main Level/Bedroom 1 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

40 Main Level/Bedroom 1 - Bedroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 37

41 Main Level/Bedroom 1 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

42 Main Level/Bedroom 2 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

Broken window, R/R 4X4 window, add 4X4 shutter. Add smoke detector.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 38

43 Main Level/Bedroom 2 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

44 Main Level/Bedroom 2 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

Remove burgar bars, R/R 4X4 window, add 4X4 shutter

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 39

45 Main Level/Bedroom 2 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

46 Main Level/Bedroom 2 - 56- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 40

47 Main Level/Bedroom 2 - 54- Bedroom 2 Date Taken: 11/24/2019

Taken By: Casey Hoak

48 Main Level/Bedroom 2 - 55- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 41

49 Main Level/Bedroom 2 - 53- Bedroom 2 Date Taken: 11/24/2019

Taken By: Casey Hoak

50 Main Level/Bedroom 2 - 52- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 42

51 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

Add smoke detector

52 Main Level/Bedroom 3 - Bedroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 43

53 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

54 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019

No damage

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 44

55 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019

Taken By: Casey Hoak

No damage to ceiling, concrete roof

56 Main Level/Bedroom 3 - Bedroom Date Taken: 11/24/2019

No damage to flooring

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 45

57 Main Level/Bath - Bathroom

Date Taken: 11/24/2019

Taken By: Casey Hoak

No damage

58 Main Level/Bath - Bathroom

Date Taken: 11/24/2019

No damage to fixtures

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 46

59 Main Level/Bath - Bathroom

Date Taken: 11/24/2019

Taken By: Casey Hoak

No damage to door

60 Main Level/Bath - Bathroom

Date Taken: 11/24/2019

Replace plug with GFI

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 47

61 Main Level/Utility Room - Utility Room Date Taken: 11/24/2019

Taken By: Casey Hoak

Remove existing joists, Replace ceiling, insulation and molding.

Electric=replace 2 lights, 1 switch, 3 plugs.

62 Main Level/Utility Room - Utility Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 48

63 Main Level/Utility Room - Utility Room Date Taken: 11/24/2019

Taken By: Casey Hoak

64 Main Level/Utility Room - Utility Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 49

65 Main Level/Utility Room - Utility Room Date Taken: 11/24/2019

Taken By: Casey Hoak

66 Main Level/Utility Room - Utility Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 50

67 Main Level/Utility Room - Utility Room Date Taken: 11/24/2019

Taken By: Casey Hoak

68 Main Level/Storage - 25- Storeroom Date Taken: 2/20/2019

Taken By: Darlene Hbbard

Replace ceiling, no joists, add insulation and molding. R/R 1 interior door. Electric=replace 2 lights, 2 switch, 3 plugs. Windows ok, add (1) 6X4 shutter.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 51

69 Main Level/Storage - 26- Storeroom Date Taken: 2/20/2019

Taken By: Darlene Hbbard

Damage to ceiling, roof

70 Main Level/Storage - 27- Storeroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 52

71 Main Level/Storage - 28- Storeroom Date Taken: 2/20/2019

Taken By: Darlene Hbbard

72 Main Level/Storage - 29- Storeroom Date Taken: 2/20/2019

Damage to ceiling and roof

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 53

73 Main Level/Storage - 30- Storeroom Date Taken: 2/20/2019

Taken By: Darlene Hbbard

Entry into kitchen

74 Main Level/Storage - Image94

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 54

75 Main Level/Storage - Image95

Date Taken: 11/24/2019

Taken By: Casey Hoak

76 Main Level/Storage - Image96

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 55

77 Main Level/Storage - Image97

Date Taken: 11/24/2019

Taken By: Casey Hoak

78 Living Room - 47-Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 56

79 Living Room - 48-Living Room

Date Taken: 2/20/2019

Taken By: Darlene Hbbard

Entry door

80 Living Room - 49-Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 57

81 Living Room - 50-Living Room

Date Taken: 2/20/2019

Taken By: Darlene Hbbard

Roof concrete, no ceiling damage

82 Living Room - 51-Living Room

Date Taken: 2/20/2019

Damage to vinyl tile

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412635492_RA 12/8/2019 Page: 58

83 Living Room - Image125

Date Taken: 11/24/2019

Taken By: Casey Hoak

Main panel is in cabinet in living room

84 57-Bedroom 2

Date Taken: 2/20/2019

Damage to flooring

CNMI-412635492_RA 12/8/2019 Page: 59

Main Level

Kitchen 2 Storage Utility Room

Bedroom 3 Kitchen 1

Bedroom 1

Bath

Bedroom 2

Living Room

Main Level

CNMI-412635492_RA 12/8/2019 Page: 60

ROOF

Roof1 F1

Roof2F2

ROOF

CNMI-412635492_RA 12/8/2019 Page: 61

PLOT

Plot (A1)

Alaguan (A2)

Power Pole (A3)

Water Meter (A4)

Damaged Dwelling (A5)

PLOT

CNMI-412635492_RA 12/8/2019 Page: 62