HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

Insured: NAYMINIAL ANDON Home: (670) 588-1607 Cellular: (670) 323-0102Home: 005 H 55 ON TEXAS RD (EAST SIDE)

CHALAN KANOA, HI

Property: 005 H 55 ON TEXAS RD (EAST SIDE)

CHALAN KANOA, HI

Claim Rep.: Casey Hoak

Estimator: Casey Hoak

Claim Number: CNMI-450706755 Policy Number: CNMI-450706755 Type of Loss: Hurricane

Date Contacted: 12/8/2019 9:00 PM Date of Loss: 10/25/2018 7:00 AM Date Received: 6/5/2019 5:17 AM

Date Inspected: 6/6/2019 10:00 PM Date Entered: 12/9/2019 5:21 AM

Date Est. Completed: 6/8/2019 12:44 PM

Price List: HIOI8X_JAN19 Restoration/Service/Remodel

Estimate: CNMI-450706755_RA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 2

12/9/2019 DDH:

Site Visits Batch Four Next 20:

Attending: DeDe Hubbard, Brunson Taylor and Jorge Rivera, PE. The main portion of the dwelling has a temporary roof that was installed which is included to remove. No saw cut needed or additional bond beam poured, just level bond beam for new anchor bolts. Additional demo will be added when removing existing roof for detaching surrounding building's roofs that are not part of the qualified scope from the eligible building. Jorge Rivera, PE, has determined to replace the existing roof with a gable roof. All ceilings and joists will be R/R, add insulation, crown molding and paint the ceiling. Only damaged window is the bathroom window which will need to be replaced. All windows include to install shutters. The two front windows and burglar bars which will need to be removed for the shutters. Exterior electric to replace is 2 lights, 1 plug.

A new 200 amp main panel, mast and meter base along with a rewire of only the area under the new roof will be done with the actual plugs, switches, outlets and GFI's, smoke detectors in the bedrooms and C/O added to the living room.

Two exterior doors and three damaged interior doors to be replaced which includes painting of all 6 sides of the door.

Scope includes to replace the damaged sink and vanity that was damaged from disaster.

INSPECTION SUMMARY

The applicant met at the damaged dwelling and the following was observed.

The dwelling is a one story CMU with a metal roof and slab on grade. The home has 8 occupants and 2 bedrooms occupied.

There are 5 other separate living structures on this property. Each have their own electric meter and separate locking exterior doors. The applicant states ownership of all the property and all people living in the homes are family members. The total of all family is 30 people living in the 6 units.

The dwelling is deemed to be repairable . The one structural component damaged is the roof Reconstruction should take approximately 16 weeks from start of construction.

AGE: 1993

DAMAGE AND REPAIR SUMMARY

See attached estimate for exact repair and line items.

LATITUDE: 15.150122

LONGITUDE: 145.705128

A: ROOF: The roof is destroyed and will require replacement from the framing up including soffit.

B: INTERIOR: The interior will require new ceiling joists, wood ceilings, window storm shutters, both exterior and interior doors, and painting for all doors. The floors are concrete and will need cleaning

C: STRUCTURAL: The walls and slab are intact and are not damaged.

D: MECHANICAL/PLUMBING/WATER SYSTEM: Appear OK

E: ELECTRICAL: All electric will need replacing from the masthead in.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 3

CNMI-450706755_RA

ROOF

ROOF

DESCRIPTION QTY

169. 2" x 6" x 8' #2 treated pine (material only) 12.00 EA

164. 2" x 6" x 14' #2 treated pine (material only) 4.00 EA

153. 2" x 6" x 20' #2 treated pine (material only) 13.00 EA

165. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 6.00 EA

168. 2" x 10" x 14' #2 treated pine (material only) 44.00 EA

170. 2" x 12" x 20' #2 treated pine (material only) 4.00 EA

171. 2" x 12" x 12' #2 treated pine (material only) 4.00 EA

173. 2" x 12" x 14' #2 treated pine (material only) 4.00 EA

175. Install Sheathing - OSB - 1/2" 140.02 SF

166. Material Only Sheathing - OSB - 1/2" 140.02 SF

161. Install Sheathing - plywood - 3/4" - treated 864.00 SF

174. Material Only Sheathing - plywood - 3/4" - treated 864.00 SF

167. Labor to frame 2" x 6" non-bearing wall - 16" oc 70.01 SF

159. Rafters - 2x6 - Labor only - (using rafter length) 289.67 LF

For Collar Ties

158. R&R Rafters - 2x10 - Labor only - (using rafter length) 597.16 LF

172. Rafters - 2x12 - Labor only - (using rafter length) 178.95 LF

For Ridge Beam and Fascia

NOTES:

Roof1 (A)F1(B)F2 31 ' 2

13' 7" 13' 2"

13' 7" 13' 2"

26' 4"

Roof1

845.98 Surface Area

116.62 Total Perimeter Length

8.46 Number of Squares

31.17 Total Ridge Length

DESCRIPTION QTY

------------------ ROOFING -----------------

182. Remove Metal roofing - ribbed - 24 gauge - up to 1" 845.98 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 4

CONTINUED - Roof1

DESCRIPTION QTY

184. Install Metal roofing - ribbed - 24 gauge - up to 1" 845.98 SF

185. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 845.98 SF

186. Closure strips for metal roofing - inside and/or outside 62.33 LF

187. Flashing tape - self-adhesive 333.77 LF

Seal between the metal roof seams

189. Ridge vent - Metal roofing - floating ventilator 31.17 LF

190. Additional screws for 3/4 plywood sheathing 2999.00 EA

Additional screws and labor or 3/4 plywood sheathing above Xactimate pricing. 6% waste added

191. Additional screws for 2X4 and 2X6 furring and fascia 1015.00 EA

Additional screws and labor for 2x4 and 2X6 furring and fascia above Xactimate pricing. 6% waste added

195. Drip edge/gutter apron 62.33 LF

196. Install Gable trim for metal roofing - 26 gauge 54.29 LF

197. Material Only Gable trim for metal roofing - 26 gauge 54.29 LF

198. Ice & water barrier 845.98 SF

199. Neoprene pipe jack flashing for metal roofing 1.00 EA

200. Install 2" x 4" lumber - treated (.667 BF per LF) 301.67 LF

Roof purlins

201. Material Only 2" x 4" lumber - treated (.667 BF per LF) 301.67 LF

Roof purlins

202. Install 2" x 6" lumber - treated (1 BF per LF) 178.95 LF

For Picture Frame Purlins

203. Material Only 2" x 6" lumber - treated (1 BF per LF) 178.95 LF

For Picture Frame Purlins

204. Install 2" x 6" lumber - treated (1 BF per LF) 187.00 LF

Rafter Blocking

205. Material Only 2" x 6" lumber - treated (1 BF per LF) 187.00 LF

Rafter Blocking

------------------ SOFFIT -----------------

206. Install Soffit - box framing - 1' overhang 82.90 LF

Calculation set for 16" overhang

208. Material Only Soffit - box framing - 1' overhang 82.90 LF

Calculation set for 16" overhang

209. Install Soffit & fascia - wood - 1' overhang 82.90 LF

Calculation set for 16" overhang

210. Material Only Soffit & fascia - wood - 1' overhang 82.90 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 5

CONTINUED - Roof1

DESCRIPTION QTY

Calculation set for 16" overhang

211. Baffle vent - foam 62.33 LF

Cut to fit as needed for vents

213. Soffit vent - linear 31.17 LF

------------------ PAINT -----------------

214. Prime & paint exterior soffit - wood 82.90 SF

216. Prime & paint exterior fascia - wood, 4"- 6" wide 124.67 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

217. Exterior - paint two coats 70.01 SF

218. Siding - hardboard panel - paint grade 70.01 SF

219. House wrap (air/moisture barrier) 70.01 SF

------------------ STRAPPING -----------------

220. 2x10 Joist hangers for rafters 46.00 EA

2x10 Joist hangers for rafters

221. Joist hangers for 2x6 rafter blocking 144.00 EA

Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans

222. Framing hurricane tie 162.00 EA

For rafter tails and gable wall studs top and bottom

223. Install Framing hurricane tie 50.00 EA

For joist to top plate

224. Material Only Framing hurricane tie 50.00 EA

For joist to top plate

226. Framing strap - 24" long 25.00 EA

227. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 116.00 EA

4 @ each rafter section & 24 at the splice on the ridge

NOTES:

Main Level Main Level

DESCRIPTION QTY

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 6

CONTINUED - Main Level

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

238. R&R Meter mast for overhead power - 2" conduit 1.00 EA

240. R&R Meter base - 200 amp 1.00 EA

241. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA

242. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA

243. Rewire - average residence - copper wiring 686.22 SF

244. R&R Ground fault interrupter (GFI) outlet 1.00 EA

245. R&R Exterior light fixture 1.00 EA

246. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA

247. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF

------------------ WALL REPAIRS-----------------

547. Concrete wall - labor & materials 1.00 CY

1 CY to reach minimum - for leveling only

254. Wedge anchor bolt - 1/2" x 8 1/2" 117.00 EA

For cold joint between top of wall and new bond beam.

255. Epoxy crack and joint filler (per LF of crack) 117.00 LF

256. Install 2" x 6" lumber - treated (1 BF per LF) 310.33 LF

For double sill plate on the perimeter

257. Material Only 2" x 6" lumber - treated (1 BF per LF) 310.33 LF

For double sill plate on the perimeter

258. Sill seal foam - 6" 109.67 LF

------------------ SCAFFOLD -----------------

259. Scaffolding Setup & Take down - per hour 32.00 HR

------------------ DEMOLITION ----------------

546. General Demolition - per hour 15.00 HR

Additional labor for detaching surrounding building's roof that is not a part of the qualified scope from the eligible building. 5 men 3hrs each

------------------ GENERAL ITEMS -----------------

261. Clean the floor - Heavy 686.22 SF

263. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA

For haul off and dump fees

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 7

CONTINUED - Main Level

DESCRIPTION QTY

NOTES:

Living Room

Bathroom

Bedroom 1 Bedroom 2

Kitchen

' 4

3'1' 4" 1' 8"

11' 6"

3' 11"

6' 3"

6' 7"

5' 9"

' 1

0"

' 4

2' 6"

1' 1" 7' 11"2' 6"

2'

Living Room Height: 8'

438.67 SF Walls

736.11 SF Walls & Ceiling

33.05 SY Flooring

54.83 LF Ceil. Perimeter

297.44 SF Ceiling

297.44 SF Floor

54.83 LF Floor Perimeter

Missing Wall 14' 4" X 8' Opens into KITCHEN

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

264. R&R Switch 1.00 EA

265. R&R Light fixture 1.00 EA

266. R&R Outlet 3.00 EA

269. Carbon monoxide detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

282. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

284. Door lockset & deadbolt - exterior 1.00 EA

285. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

286. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

491. Remove Ornamental iron - security grill - window 16.00 SF

289. Security/storm shutter 22.50 SF

------------------ INSULATION -----------------

292. Batt insulation - 10" - R30 - paper faced 297.44 SF

------------------ WALLS & CEILINGS -----------------

293. Remove Sheathing - plywood - 1/2" - treated 297.44 SF

294. Install Sheathing - plywood - 1/2" - treated 297.44 SF

295. Material Only Sheathing - plywood - 1/2" - treated 297.44 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 8

CONTINUED - Living Room

DESCRIPTION QTY

296. Seal & paint plywood sheathing 297.44 SF

297. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 297.44 SF

298. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 297.44 SF

299. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 297.44 SF

300. Cove molding - 3/4" 54.83 LF

------------------ A/C OPENING -----------------

301. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

302. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

303. Install Sheathing - plywood - 3/4" - treated 8.00 SF

304. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF

305. Seal & paint plywood sheathing 8.00 SF

To paint A/C Hole in exterior wall

NOTES:

Living Room

Bathroom

Bedroom 1 Bedroom 2

Kitchen

' 4

3' 11" 1'

2' 8"

3' 3'

3'

8'

8'

3' 7'

1"

8'

3'

3'

" 7' 4"

7' Kitchen Height: 8'

230.67 SF Walls

333.39 SF Walls & Ceiling

11.41 SY Flooring

28.83 LF Ceil. Perimeter

102.72 SF Ceiling

102.72 SF Floor

28.83 LF Floor Perimeter

Missing Wall 14' 4" X 8' Opens into LIVING_ROOM

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

315. R&R Switch 1.00 EA

316. R&R Light fixture 1.00 EA

318. R&R Ground fault interrupter (GFI) outlet 2.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 9

CONTINUED - Kitchen

DESCRIPTION QTY

------------------ DOORS & WINDOWS -----------------

330. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

331. Door lockset & deadbolt - exterior 1.00 EA

332. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

333. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

493. Remove Ornamental iron - security grill - window 16.00 SF

336. Security/storm shutter 36.50 SF

------------------ INSULATION -----------------

339. Batt insulation - 10" - R30 - paper faced 102.72 SF

------------------ WALLS & CEILINGS -----------------

340. Remove Sheathing - plywood - 1/2" - treated 102.72 SF

341. Install Sheathing - plywood - 1/2" - treated 102.72 SF

342. Material Only Sheathing - plywood - 1/2" - treated 102.72 SF

343. Seal & paint plywood sheathing 102.72 SF

344. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 102.72 SF

345. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 102.72 SF

346. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 102.72 SF

347. Cove molding - 3/4" 28.83 LF

------------------GENERAL ITEMS -----------------

545. 5 lb. ABC fire extinguisher 1.00 EA

NOTES:

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 10

Living Room

Bathroom

Bedroom 1 Bedroom 2

Kitchen

3' 11"

3' 1"

3' 5"

4' 5"

4' 7"

' 4

' 1

0"

7'

7' 2" 2' 6"

11" 9"

7"

Bedroom 1 Height: 8'

362.67 SF Walls

491.11 SF Walls & Ceiling

14.27 SY Flooring

45.33 LF Ceil. Perimeter

128.44 SF Ceiling

128.44 SF Floor

45.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

359. R&R Switch 1.00 EA

360. R&R Light fixture 1.00 EA

361. R&R Outlet 2.00 EA

362. R&R 220 volt copper wiring run, box and receptacle 1.00 EA

363. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

372. R&R Interior door unit 1.00 EA

373. Door knob - interior 1.00 EA

376. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

377. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

380. Security/storm shutter 22.50 SF

------------------ INSULATION -----------------

383. Batt insulation - 10" - R30 - paper faced 128.44 SF

------------------ WALLS & CEILINGS -----------------

384. Remove Sheathing - plywood - 1/2" - treated 128.44 SF

385. Install Sheathing - plywood - 1/2" - treated 128.44 SF

386. Material Only Sheathing - plywood - 1/2" - treated 128.44 SF

387. Seal & paint plywood sheathing 128.44 SF

388. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF

389. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF

390. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF

391. Cove molding - 3/4" 45.33 LF

------------------ A/C OPENING -----------------

392. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

393. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

394. Install Sheathing - plywood - 3/4" - treated 8.00 SF

395. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF

396. Seal & paint plywood sheathing 8.00 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 11

CONTINUED - Bedroom 1

DESCRIPTION QTY

To paint A/C Hole in exterior wall

------------------ CABINETS-----------------

494. Remove Cabinetry - full height unit 6.00 LF

NOTES:

Living Room

Bathroom

Bedroom 1 Bedroom 2

Kitchen

' 4

' 1

0"

3' 11"

3' 4"

3' 6"

4' 2"

4' 6"

2' 6"

1' 1"

7' 11"

Bedroom 2 Height: 8'

362.67 SF Walls

491.11 SF Walls & Ceiling

14.27 SY Flooring

45.33 LF Ceil. Perimeter

128.44 SF Ceiling

128.44 SF Floor

45.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

403. R&R Switch 1.00 EA

404. R&R Light fixture 1.00 EA

405. R&R Outlet 2.00 EA

406. R&R 220 volt copper wiring run, box and receptacle 1.00 EA

407. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

416. R&R Interior door unit 1.00 EA

417. Door knob - interior 1.00 EA

420. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

421. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

424. Security/storm shutter 22.50 SF

------------------ INSULATION -----------------

427. Batt insulation - 10" - R30 - paper faced 128.44 SF

------------------ WALLS & CEILINGS -----------------

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 12

CONTINUED - Bedroom 2

DESCRIPTION QTY

428. Remove Sheathing - plywood - 1/2" - treated 128.44 SF

429. Install Sheathing - plywood - 1/2" - treated 128.44 SF

430. Material Only Sheathing - plywood - 1/2" - treated 128.44 SF

431. Seal & paint plywood sheathing 128.44 SF

432. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF

433. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF

434. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF

435. Cove molding - 3/4" 45.33 LF

------------------ A/C OPENING -----------------

436. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

437. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

438. Install Sheathing - plywood - 3/4" - treated 8.00 SF

439. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF

440. Seal & paint plywood sheathing 8.00 SF

To paint A/C Hole in exterior wall

NOTES:

Living Room

Bathroom

Bedroom 1 Bedroom 2

Kitchen

7'

7' 2"

1'

1'

1'

1'

0"

7' 4"

2'

9"

1'

Bathroom Height: 8'

178.67 SF Walls

207.83 SF Walls & Ceiling

3.24 SY Flooring

22.33 LF Ceil. Perimeter

29.17 SF Ceiling

29.17 SF Floor

22.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

447. R&R Switch 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 13

CONTINUED - Bathroom

DESCRIPTION QTY

448. R&R Light fixture 1.00 EA

------------------ PLUMBING -----------------

548. Sink - single 1.00 EA

455. Sink faucet - Bathroom 1.00 EA

457. Plumbing fixture supply line 1.00 EA

Only cold water in dwelling

498. P-trap assembly - Acid waste piping (PVDF) 1.00 EA

------------------ DOORS & WINDOWS -----------------

460. R&R Interior door unit 1.00 EA

461. Door knob - interior 1.00 EA

464. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

465. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

466. Storm window - aluminum, 3-11 sf 1.00 EA

467. Add. charge for a retrofit window, 3-11 sf - difficult 1.00 EA

468. Security/storm shutter 7.50 SF

------------------ INSULATION -----------------

471. Batt insulation - 10" - R30 - paper faced 29.17 SF

------------------ WALLS & CEILINGS -----------------

472. Remove Sheathing - plywood - 1/2" - treated 29.17 SF

473. Install Sheathing - plywood - 1/2" - treated 29.17 SF

474. Material Only Sheathing - plywood - 1/2" - treated 29.17 SF

475. Seal & paint plywood sheathing 29.17 SF

476. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 29.17 SF

477. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 29.17 SF

478. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 29.17 SF

479. Cove molding - 3/4" 22.33 LF

------------------ CABINETS -----------------

497. Vanity 3.00 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 14

CNMI DATA

CNMI Data1' 4"

CNMI Data Height: 4"

1.57 SF Walls

2.92 SF Walls & Ceiling

0.15 SY Flooring

4.70 LF Ceil. Perimeter

1.36 SF Ceiling

1.36 SF Floor

4.70 LF Floor Perimeter

DESCRIPTION QTY

104. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO

105. Material Only LATITUDE DAMAGED DWELLING 15.15 DE

15.150122

106. Material Only LONGITUDE DAMAGED DWELLING 145.71 DE

145.705128

107. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO

108. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO

109. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 NO

110. DOES DWELLING HAVE A WELL 1.00 NO

111. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO

112. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1993.00 YR

113. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO

114. Material Only ENCROACHMENT ISSUES 0.00 NO

115. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO

116. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 6.00 EA

There are 5 other separate units in the complex on the property. All have their own Meters for electric and separate locking exterior doors

117. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 628.00 SF

118. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO

119. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

120. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

ROOF

121. Material Only IS DWELLING DESTROYED 0.00 NO

122. Material Only FOUNDATION TYPE 0.00 UN

SLAB

123. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO

124. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

125. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO

126. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 15

CONTINUED - CNMI Data

DESCRIPTION QTY

127. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

ROOF

128. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO

129. Material Only LATITUDE OUT BUILDING 0.00 DE

130. Material Only LONGITUDE OUT BUILDING 0.00 DE

131. Material Only LATITUDE POWER POLE 15.15 DE

15.150439

132. Material Only LONGITUDE POWER POLE 145.71 DE

145.705155

133. Material Only LATITUDE WATER METER 15.15 DE

15.150441

134. Material Only LONGITUDE WATER METER 145.71 DE

145.705160

135. Material Only LATITUDE WATER TANK 0.00 DE

136. Material Only LONGITUDE WATER TANK 0.00 DE

NOTES:

Labor Minimums Applied

DESCRIPTION QTY

271. Plumbing labor minimum 1.00 EA

281. Finish hardware labor minimum 1.00 EA

492. Ornamental iron labor minimum 1.00 EA

495. Cabinetry labor minimum 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 16

Grand Total Areas:

1,574.90 SF Walls 687.58 SF Ceiling SF Walls and Ceiling2,262.48

687.58 SF Floor 76.40 SY Flooring 201.37 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 201.37 LF Ceil. Perimeter

687.58 Floor Area 738.97 Total Area 1,574.90 Interior Wall Area 1,063.28 Exterior Wall Area 114.37 Exterior Perimeter of

Walls

845.98 Surface Area 8.46 Number of Squares 116.62 Total Perimeter Length

31.17 Total Ridge Length 0.00 Total Hip Length

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 17

1 Main Level - Scope

Date Taken: 12/11/2019

Taken By: Darlene Hbbard

2 Main Level - Scope Notes

Date Taken: 12/11/2019

Taken By: Darlene Hbbard

Site visit conducted with DeDe Hubbard, Brunson Taylor and Jorge Rivera, PE. The main portion of the dwelling has a temporary roof that was installed. No saw cut needed, just level bond beam for anchor bolts.

Additional demo will be added when removing existing roof for detaching surrounding building's roofs that are not part of the qualified scope from the eligible building. Jorge Rivera, PE, has determined to replace the existing roof with a gable roof. All ceilings and joists will be R/R, add insulation, crown molding and paint the ceiling. Only damaged window is the bathroom window which will need to be replaced. All windows include to install shutters. The two front windows and burglar bars which will need to be removed for the shutters.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 18

3 Main Level - Scope Notes

Date Taken: 12/11/2019

Taken By: Darlene Hbbard

4 Main Level - Scope Notes

Date Taken: 12/11/2019

Taken By: Darlene Hbbard

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 19

5 Main Level - 1-Front Elevation

Date Taken: 12/9/2019

Taken By: Darlene Hbbard e living room.

6 Main Level - 2-Front Elevation

Date Taken: 12/10/2019

Entry into other living area

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 20

7 Main Level - 3-Front Elevation

Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Walkway between living areas

8 Main Level - 4-Front Elevation

Date Taken: 12/10/2019

Power connections to other units

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 21

9 Main Level - 5-Front Elevation

Date Taken: 12/10/2019

Taken By: Darlene Hbbard

10 Main Level - 6-Front Elevation

Date Taken: 12/10/2019

Taken By: Darlene Hbbard

No access to right elevation, concrete wall attached

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 22

11 Main Level - 7-Left Elevation

Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Other living area

12 Main Level - 8-Left Elevation

Date Taken: 12/10/2019

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 23

13 Main Level - 9-Back Elevation

Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Walkway between other living areas

14 Main Level - 10-Back Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 24

15 Main Level/Living Room - 11- Living Room Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Electric= 1 double switch, 2 lights, 3 outlets, add C/O. No damage windows, remove burglar bars, add 22.5SF shutter.

R&R damaged exterior door, paint trim and all 6 sides of the door. No damage to flooring.

16 Main Level/Living Room - 12- Living Room Date Taken: 12/10/2019

Main panel located behind entry door

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 25

17 Main Level/Living Room - 13- Living Room Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Tile flooring, no damage

18 Main Level/Living Room - 14- Living Room Date Taken: 12/10/2019

Taken By: Darlene Hbbard

No damage to windows, remove burglar bars from front windows and add shutters

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 26

19 Main Level/Living Room - 15- Living Room Date Taken: 12/10/2019

Taken By: Darlene Hbbard

20 Main Level/Living Room - 16- Living Room Date Taken: 12/10/2019

Remove ceiling and joists

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 27

21 Main Level/Living Room - 17- Living Room Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Entry into bedrooms

22 Main Level/Kitchen - 18-Kitchen

Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Electric= 1 switch, 1 lights, 2 GFI outlets. No damage windows, remove burglar bars, add 36.5SF shutter. R&R damaged exterior door, paint trim and all 6 sides of the door. No damage to flooring.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 28

23 Main Level/Kitchen - 19-Kitchen

Date Taken: 12/10/2019

Taken By: Darlene Hbbard

No damage to windows, remove bars from front window, add shutter

24 Main Level/Kitchen - 20-Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 29

25 Main Level/Kitchen - 21-Kitchen

Date Taken: 12/10/2019

Taken By: Darlene Hbbard

No damage to cabinets

26 Main Level/Kitchen - 22-Kitchen

Date Taken: 12/10/2019

No damage to flooring

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 30

27 Main Level/Bedroom 1 - 23- Bedroom 1 Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Enclose AC opening. Electric= 1 switch, 1 lights, 3 outlets, add smoke. Remove 6LF full-height built-in cabinets. No damage windows add 22.5SF shutter.

R&R damaged interior door, paint trim and all 6 sides of the door. No damage to flooring.

28 Main Level/Bedroom 1 - 24- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 31

29 Main Level/Bedroom 1 - 25- Bedroom 1 Date Taken: 12/10/2019

Taken By: Darlene Hbbard

30 Main Level/Bedroom 1 - 26- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 32

31 Main Level/Bedroom 1 - 27- Bedroom 1 Date Taken: 12/10/2019

Taken By: Darlene Hbbard

32 Main Level/Bedroom 1 - 28- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 33

33 Main Level/Bedroom 2 - 29- Bedroom 2 Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Enclose AC opening. Electric= 1 switch, 1 lights, 3 outlets, add smoke. No damage windows add 22.5SF shutter. R&R damaged interior door, paint trim and all 6 sides of the door. No damage to flooring.

34 Main Level/Bedroom 2 - 30- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 34

35 Main Level/Bedroom 2 - 31- Bedroom 2 Date Taken: 12/10/2019

Taken By: Darlene Hbbard

36 Main Level/Bedroom 2 - 32- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 35

37 Main Level/Bedroom 2 - 33- Bedroom 2 Date Taken: 12/10/2019

Taken By: Darlene Hbbard no damage to flooring

38 Main Level/Bedroom 2 - 34- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 36

39 Main Level/Bedroom 2 - 35- Bedroom 2 Date Taken: 12/10/2019

Taken By: Darlene Hbbard

No door to remove, only frame

40 Main Level/Bathroom - 36- Bathroom Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Electric= 1 switch, 1 lights. Replace 1.9X1.6 damaged window add 7.5SF shutter.

No damage to toilet, replace damage sink and vanity. R&R damaged interior door, paint trim and all 6 sides of the door. No damage to flooring.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 37

41 Main Level/Bathroom - 37- Bathroom Date Taken: 12/10/2019

Taken By: Darlene Hbbard

42 Main Level/Bathroom - 38- Bathroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706755_RA 12/11/2019 Page: 38

43 Main Level/Bathroom - 39- Bathroom Date Taken: 12/10/2019

Taken By: Darlene Hbbard

Damage to vanity and sink from disaster.

44 Main Level/Bathroom - 40- Bathroom

CNMI-450706755_RA 12/11/2019 Page: 39

Main Level

Living Room

Bathroom

Bedroom 1 Bedroom 2

Kitchen

Main Level

CNMI-450706755_RA 12/11/2019 Page: 40

ROOF

Roof1 (A)F1(B)F2

ROOF

CNMI-450706755_RA 12/11/2019 Page: 41

PLOT

PLOT (A1)

Texas Street (A2)

Driveway (A3)

Other Living (A4) Damaged Dwelling (A5) Other Living (A6)

Other Living (A7) Other Living (A8) Other Livin3 (A9)

Water Meter (A10)Power Po;e (A11)

PLOT

CNMI-450706755_RA 12/11/2019 Page: 42

CNMI DATA

CNMI Data

CNMI DATA