CNMI-450706755_Repair_Approved_Scope.pdf
PDF 8 MB Posted
- Attached to
- PHC Housing Repair - Saipan
- Solicitation number
- 70FBR920B00000002
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dewberry
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
Insured: NAYMINIAL ANDON Home: (670) 588-1607 Cellular: (670) 323-0102Home: 005 H 55 ON TEXAS RD (EAST SIDE)
CHALAN KANOA, HI
Property: 005 H 55 ON TEXAS RD (EAST SIDE)
CHALAN KANOA, HI
Claim Rep.: Casey Hoak
Estimator: Casey Hoak
Claim Number: CNMI-450706755 Policy Number: CNMI-450706755 Type of Loss: Hurricane
Date Contacted: 12/8/2019 9:00 PM Date of Loss: 10/25/2018 7:00 AM Date Received: 6/5/2019 5:17 AM
Date Inspected: 6/6/2019 10:00 PM Date Entered: 12/9/2019 5:21 AM
Date Est. Completed: 6/8/2019 12:44 PM
Price List: HIOI8X_JAN19 Restoration/Service/Remodel
Estimate: CNMI-450706755_RA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 2
12/9/2019 DDH:
Site Visits Batch Four Next 20:
Attending: DeDe Hubbard, Brunson Taylor and Jorge Rivera, PE. The main portion of the dwelling has a temporary roof that was installed which is included to remove. No saw cut needed or additional bond beam poured, just level bond beam for new anchor bolts. Additional demo will be added when removing existing roof for detaching surrounding building's roofs that are not part of the qualified scope from the eligible building. Jorge Rivera, PE, has determined to replace the existing roof with a gable roof. All ceilings and joists will be R/R, add insulation, crown molding and paint the ceiling. Only damaged window is the bathroom window which will need to be replaced. All windows include to install shutters. The two front windows and burglar bars which will need to be removed for the shutters. Exterior electric to replace is 2 lights, 1 plug.
A new 200 amp main panel, mast and meter base along with a rewire of only the area under the new roof will be done with the actual plugs, switches, outlets and GFI's, smoke detectors in the bedrooms and C/O added to the living room.
Two exterior doors and three damaged interior doors to be replaced which includes painting of all 6 sides of the door.
Scope includes to replace the damaged sink and vanity that was damaged from disaster.
INSPECTION SUMMARY
The applicant met at the damaged dwelling and the following was observed.
The dwelling is a one story CMU with a metal roof and slab on grade. The home has 8 occupants and 2 bedrooms occupied.
There are 5 other separate living structures on this property. Each have their own electric meter and separate locking exterior doors. The applicant states ownership of all the property and all people living in the homes are family members. The total of all family is 30 people living in the 6 units.
The dwelling is deemed to be repairable . The one structural component damaged is the roof Reconstruction should take approximately 16 weeks from start of construction.
AGE: 1993
DAMAGE AND REPAIR SUMMARY
See attached estimate for exact repair and line items.
LATITUDE: 15.150122
LONGITUDE: 145.705128
A: ROOF: The roof is destroyed and will require replacement from the framing up including soffit.
B: INTERIOR: The interior will require new ceiling joists, wood ceilings, window storm shutters, both exterior and interior doors, and painting for all doors. The floors are concrete and will need cleaning
C: STRUCTURAL: The walls and slab are intact and are not damaged.
D: MECHANICAL/PLUMBING/WATER SYSTEM: Appear OK
E: ELECTRICAL: All electric will need replacing from the masthead in.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 3
CNMI-450706755_RA
ROOF
ROOF
DESCRIPTION QTY
169. 2" x 6" x 8' #2 treated pine (material only) 12.00 EA
164. 2" x 6" x 14' #2 treated pine (material only) 4.00 EA
153. 2" x 6" x 20' #2 treated pine (material only) 13.00 EA
165. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 6.00 EA
168. 2" x 10" x 14' #2 treated pine (material only) 44.00 EA
170. 2" x 12" x 20' #2 treated pine (material only) 4.00 EA
171. 2" x 12" x 12' #2 treated pine (material only) 4.00 EA
173. 2" x 12" x 14' #2 treated pine (material only) 4.00 EA
175. Install Sheathing - OSB - 1/2" 140.02 SF
166. Material Only Sheathing - OSB - 1/2" 140.02 SF
161. Install Sheathing - plywood - 3/4" - treated 864.00 SF
174. Material Only Sheathing - plywood - 3/4" - treated 864.00 SF
167. Labor to frame 2" x 6" non-bearing wall - 16" oc 70.01 SF
159. Rafters - 2x6 - Labor only - (using rafter length) 289.67 LF
For Collar Ties
158. R&R Rafters - 2x10 - Labor only - (using rafter length) 597.16 LF
172. Rafters - 2x12 - Labor only - (using rafter length) 178.95 LF
For Ridge Beam and Fascia
NOTES:
Roof1 (A)F1(B)F2 31 ' 2
13' 7" 13' 2"
13' 7" 13' 2"
26' 4"
Roof1
845.98 Surface Area
116.62 Total Perimeter Length
8.46 Number of Squares
31.17 Total Ridge Length
DESCRIPTION QTY
------------------ ROOFING -----------------
182. Remove Metal roofing - ribbed - 24 gauge - up to 1" 845.98 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 4
CONTINUED - Roof1
DESCRIPTION QTY
184. Install Metal roofing - ribbed - 24 gauge - up to 1" 845.98 SF
185. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 845.98 SF
186. Closure strips for metal roofing - inside and/or outside 62.33 LF
187. Flashing tape - self-adhesive 333.77 LF
Seal between the metal roof seams
189. Ridge vent - Metal roofing - floating ventilator 31.17 LF
190. Additional screws for 3/4 plywood sheathing 2999.00 EA
Additional screws and labor or 3/4 plywood sheathing above Xactimate pricing. 6% waste added
191. Additional screws for 2X4 and 2X6 furring and fascia 1015.00 EA
Additional screws and labor for 2x4 and 2X6 furring and fascia above Xactimate pricing. 6% waste added
195. Drip edge/gutter apron 62.33 LF
196. Install Gable trim for metal roofing - 26 gauge 54.29 LF
197. Material Only Gable trim for metal roofing - 26 gauge 54.29 LF
198. Ice & water barrier 845.98 SF
199. Neoprene pipe jack flashing for metal roofing 1.00 EA
200. Install 2" x 4" lumber - treated (.667 BF per LF) 301.67 LF
Roof purlins
201. Material Only 2" x 4" lumber - treated (.667 BF per LF) 301.67 LF
Roof purlins
202. Install 2" x 6" lumber - treated (1 BF per LF) 178.95 LF
For Picture Frame Purlins
203. Material Only 2" x 6" lumber - treated (1 BF per LF) 178.95 LF
For Picture Frame Purlins
204. Install 2" x 6" lumber - treated (1 BF per LF) 187.00 LF
Rafter Blocking
205. Material Only 2" x 6" lumber - treated (1 BF per LF) 187.00 LF
Rafter Blocking
------------------ SOFFIT -----------------
206. Install Soffit - box framing - 1' overhang 82.90 LF
Calculation set for 16" overhang
208. Material Only Soffit - box framing - 1' overhang 82.90 LF
Calculation set for 16" overhang
209. Install Soffit & fascia - wood - 1' overhang 82.90 LF
Calculation set for 16" overhang
210. Material Only Soffit & fascia - wood - 1' overhang 82.90 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 5
CONTINUED - Roof1
DESCRIPTION QTY
Calculation set for 16" overhang
211. Baffle vent - foam 62.33 LF
Cut to fit as needed for vents
213. Soffit vent - linear 31.17 LF
------------------ PAINT -----------------
214. Prime & paint exterior soffit - wood 82.90 SF
216. Prime & paint exterior fascia - wood, 4"- 6" wide 124.67 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
217. Exterior - paint two coats 70.01 SF
218. Siding - hardboard panel - paint grade 70.01 SF
219. House wrap (air/moisture barrier) 70.01 SF
------------------ STRAPPING -----------------
220. 2x10 Joist hangers for rafters 46.00 EA
2x10 Joist hangers for rafters
221. Joist hangers for 2x6 rafter blocking 144.00 EA
Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans
222. Framing hurricane tie 162.00 EA
For rafter tails and gable wall studs top and bottom
223. Install Framing hurricane tie 50.00 EA
For joist to top plate
224. Material Only Framing hurricane tie 50.00 EA
For joist to top plate
226. Framing strap - 24" long 25.00 EA
227. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 116.00 EA
4 @ each rafter section & 24 at the splice on the ridge
NOTES:
Main Level Main Level
DESCRIPTION QTY
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 6
CONTINUED - Main Level
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
238. R&R Meter mast for overhead power - 2" conduit 1.00 EA
240. R&R Meter base - 200 amp 1.00 EA
241. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA
242. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA
243. Rewire - average residence - copper wiring 686.22 SF
244. R&R Ground fault interrupter (GFI) outlet 1.00 EA
245. R&R Exterior light fixture 1.00 EA
246. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA
247. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF
------------------ WALL REPAIRS-----------------
547. Concrete wall - labor & materials 1.00 CY
1 CY to reach minimum - for leveling only
254. Wedge anchor bolt - 1/2" x 8 1/2" 117.00 EA
For cold joint between top of wall and new bond beam.
255. Epoxy crack and joint filler (per LF of crack) 117.00 LF
256. Install 2" x 6" lumber - treated (1 BF per LF) 310.33 LF
For double sill plate on the perimeter
257. Material Only 2" x 6" lumber - treated (1 BF per LF) 310.33 LF
For double sill plate on the perimeter
258. Sill seal foam - 6" 109.67 LF
------------------ SCAFFOLD -----------------
259. Scaffolding Setup & Take down - per hour 32.00 HR
------------------ DEMOLITION ----------------
546. General Demolition - per hour 15.00 HR
Additional labor for detaching surrounding building's roof that is not a part of the qualified scope from the eligible building. 5 men 3hrs each
------------------ GENERAL ITEMS -----------------
261. Clean the floor - Heavy 686.22 SF
263. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA
For haul off and dump fees
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 7
CONTINUED - Main Level
DESCRIPTION QTY
NOTES:
Living Room
Bathroom
Bedroom 1 Bedroom 2
Kitchen
' 4
3'1' 4" 1' 8"
11' 6"
3' 11"
6' 3"
6' 7"
5' 9"
' 1
0"
' 4
2' 6"
1' 1" 7' 11"2' 6"
2'
Living Room Height: 8'
438.67 SF Walls
736.11 SF Walls & Ceiling
33.05 SY Flooring
54.83 LF Ceil. Perimeter
297.44 SF Ceiling
297.44 SF Floor
54.83 LF Floor Perimeter
Missing Wall 14' 4" X 8' Opens into KITCHEN
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
264. R&R Switch 1.00 EA
265. R&R Light fixture 1.00 EA
266. R&R Outlet 3.00 EA
269. Carbon monoxide detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
282. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
284. Door lockset & deadbolt - exterior 1.00 EA
285. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
286. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
491. Remove Ornamental iron - security grill - window 16.00 SF
289. Security/storm shutter 22.50 SF
------------------ INSULATION -----------------
292. Batt insulation - 10" - R30 - paper faced 297.44 SF
------------------ WALLS & CEILINGS -----------------
293. Remove Sheathing - plywood - 1/2" - treated 297.44 SF
294. Install Sheathing - plywood - 1/2" - treated 297.44 SF
295. Material Only Sheathing - plywood - 1/2" - treated 297.44 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 8
CONTINUED - Living Room
DESCRIPTION QTY
296. Seal & paint plywood sheathing 297.44 SF
297. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 297.44 SF
298. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 297.44 SF
299. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 297.44 SF
300. Cove molding - 3/4" 54.83 LF
------------------ A/C OPENING -----------------
301. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
302. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
303. Install Sheathing - plywood - 3/4" - treated 8.00 SF
304. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF
305. Seal & paint plywood sheathing 8.00 SF
To paint A/C Hole in exterior wall
NOTES:
Living Room
Bathroom
Bedroom 1 Bedroom 2
Kitchen
' 4
3' 11" 1'
2' 8"
3' 3'
3'
8'
8'
3' 7'
1"
8'
3'
3'
" 7' 4"
7' Kitchen Height: 8'
230.67 SF Walls
333.39 SF Walls & Ceiling
11.41 SY Flooring
28.83 LF Ceil. Perimeter
102.72 SF Ceiling
102.72 SF Floor
28.83 LF Floor Perimeter
Missing Wall 14' 4" X 8' Opens into LIVING_ROOM
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
315. R&R Switch 1.00 EA
316. R&R Light fixture 1.00 EA
318. R&R Ground fault interrupter (GFI) outlet 2.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 9
CONTINUED - Kitchen
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
330. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
331. Door lockset & deadbolt - exterior 1.00 EA
332. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
333. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
493. Remove Ornamental iron - security grill - window 16.00 SF
336. Security/storm shutter 36.50 SF
------------------ INSULATION -----------------
339. Batt insulation - 10" - R30 - paper faced 102.72 SF
------------------ WALLS & CEILINGS -----------------
340. Remove Sheathing - plywood - 1/2" - treated 102.72 SF
341. Install Sheathing - plywood - 1/2" - treated 102.72 SF
342. Material Only Sheathing - plywood - 1/2" - treated 102.72 SF
343. Seal & paint plywood sheathing 102.72 SF
344. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 102.72 SF
345. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 102.72 SF
346. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 102.72 SF
347. Cove molding - 3/4" 28.83 LF
------------------GENERAL ITEMS -----------------
545. 5 lb. ABC fire extinguisher 1.00 EA
NOTES:
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 10
Living Room
Bathroom
Bedroom 1 Bedroom 2
Kitchen
3' 11"
3' 1"
3' 5"
4' 5"
4' 7"
' 4
' 1
0"
7'
7' 2" 2' 6"
11" 9"
7"
Bedroom 1 Height: 8'
362.67 SF Walls
491.11 SF Walls & Ceiling
14.27 SY Flooring
45.33 LF Ceil. Perimeter
128.44 SF Ceiling
128.44 SF Floor
45.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
359. R&R Switch 1.00 EA
360. R&R Light fixture 1.00 EA
361. R&R Outlet 2.00 EA
362. R&R 220 volt copper wiring run, box and receptacle 1.00 EA
363. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
372. R&R Interior door unit 1.00 EA
373. Door knob - interior 1.00 EA
376. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
377. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
380. Security/storm shutter 22.50 SF
------------------ INSULATION -----------------
383. Batt insulation - 10" - R30 - paper faced 128.44 SF
------------------ WALLS & CEILINGS -----------------
384. Remove Sheathing - plywood - 1/2" - treated 128.44 SF
385. Install Sheathing - plywood - 1/2" - treated 128.44 SF
386. Material Only Sheathing - plywood - 1/2" - treated 128.44 SF
387. Seal & paint plywood sheathing 128.44 SF
388. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF
389. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF
390. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF
391. Cove molding - 3/4" 45.33 LF
------------------ A/C OPENING -----------------
392. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
393. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
394. Install Sheathing - plywood - 3/4" - treated 8.00 SF
395. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF
396. Seal & paint plywood sheathing 8.00 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 11
CONTINUED - Bedroom 1
DESCRIPTION QTY
To paint A/C Hole in exterior wall
------------------ CABINETS-----------------
494. Remove Cabinetry - full height unit 6.00 LF
NOTES:
Living Room
Bathroom
Bedroom 1 Bedroom 2
Kitchen
' 4
' 1
0"
3' 11"
3' 4"
3' 6"
4' 2"
4' 6"
2' 6"
1' 1"
7' 11"
Bedroom 2 Height: 8'
362.67 SF Walls
491.11 SF Walls & Ceiling
14.27 SY Flooring
45.33 LF Ceil. Perimeter
128.44 SF Ceiling
128.44 SF Floor
45.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
403. R&R Switch 1.00 EA
404. R&R Light fixture 1.00 EA
405. R&R Outlet 2.00 EA
406. R&R 220 volt copper wiring run, box and receptacle 1.00 EA
407. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
416. R&R Interior door unit 1.00 EA
417. Door knob - interior 1.00 EA
420. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
421. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
424. Security/storm shutter 22.50 SF
------------------ INSULATION -----------------
427. Batt insulation - 10" - R30 - paper faced 128.44 SF
------------------ WALLS & CEILINGS -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 12
CONTINUED - Bedroom 2
DESCRIPTION QTY
428. Remove Sheathing - plywood - 1/2" - treated 128.44 SF
429. Install Sheathing - plywood - 1/2" - treated 128.44 SF
430. Material Only Sheathing - plywood - 1/2" - treated 128.44 SF
431. Seal & paint plywood sheathing 128.44 SF
432. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF
433. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF
434. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 128.44 SF
435. Cove molding - 3/4" 45.33 LF
------------------ A/C OPENING -----------------
436. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
437. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
438. Install Sheathing - plywood - 3/4" - treated 8.00 SF
439. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF
440. Seal & paint plywood sheathing 8.00 SF
To paint A/C Hole in exterior wall
NOTES:
Living Room
Bathroom
Bedroom 1 Bedroom 2
Kitchen
7'
7' 2"
1'
1'
1'
1'
0"
7' 4"
2'
9"
1'
Bathroom Height: 8'
178.67 SF Walls
207.83 SF Walls & Ceiling
3.24 SY Flooring
22.33 LF Ceil. Perimeter
29.17 SF Ceiling
29.17 SF Floor
22.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
447. R&R Switch 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 13
CONTINUED - Bathroom
DESCRIPTION QTY
448. R&R Light fixture 1.00 EA
------------------ PLUMBING -----------------
548. Sink - single 1.00 EA
455. Sink faucet - Bathroom 1.00 EA
457. Plumbing fixture supply line 1.00 EA
Only cold water in dwelling
498. P-trap assembly - Acid waste piping (PVDF) 1.00 EA
------------------ DOORS & WINDOWS -----------------
460. R&R Interior door unit 1.00 EA
461. Door knob - interior 1.00 EA
464. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
465. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
466. Storm window - aluminum, 3-11 sf 1.00 EA
467. Add. charge for a retrofit window, 3-11 sf - difficult 1.00 EA
468. Security/storm shutter 7.50 SF
------------------ INSULATION -----------------
471. Batt insulation - 10" - R30 - paper faced 29.17 SF
------------------ WALLS & CEILINGS -----------------
472. Remove Sheathing - plywood - 1/2" - treated 29.17 SF
473. Install Sheathing - plywood - 1/2" - treated 29.17 SF
474. Material Only Sheathing - plywood - 1/2" - treated 29.17 SF
475. Seal & paint plywood sheathing 29.17 SF
476. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 29.17 SF
477. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 29.17 SF
478. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 29.17 SF
479. Cove molding - 3/4" 22.33 LF
------------------ CABINETS -----------------
497. Vanity 3.00 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 14
CNMI DATA
CNMI Data1' 4"
CNMI Data Height: 4"
1.57 SF Walls
2.92 SF Walls & Ceiling
0.15 SY Flooring
4.70 LF Ceil. Perimeter
1.36 SF Ceiling
1.36 SF Floor
4.70 LF Floor Perimeter
DESCRIPTION QTY
104. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO
105. Material Only LATITUDE DAMAGED DWELLING 15.15 DE
15.150122
106. Material Only LONGITUDE DAMAGED DWELLING 145.71 DE
145.705128
107. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO
108. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO
109. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 NO
110. DOES DWELLING HAVE A WELL 1.00 NO
111. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO
112. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1993.00 YR
113. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO
114. Material Only ENCROACHMENT ISSUES 0.00 NO
115. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO
116. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 6.00 EA
There are 5 other separate units in the complex on the property. All have their own Meters for electric and separate locking exterior doors
117. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 628.00 SF
118. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO
119. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
120. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
ROOF
121. Material Only IS DWELLING DESTROYED 0.00 NO
122. Material Only FOUNDATION TYPE 0.00 UN
SLAB
123. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO
124. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
125. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO
126. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 15
CONTINUED - CNMI Data
DESCRIPTION QTY
127. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
ROOF
128. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO
129. Material Only LATITUDE OUT BUILDING 0.00 DE
130. Material Only LONGITUDE OUT BUILDING 0.00 DE
131. Material Only LATITUDE POWER POLE 15.15 DE
15.150439
132. Material Only LONGITUDE POWER POLE 145.71 DE
145.705155
133. Material Only LATITUDE WATER METER 15.15 DE
15.150441
134. Material Only LONGITUDE WATER METER 145.71 DE
145.705160
135. Material Only LATITUDE WATER TANK 0.00 DE
136. Material Only LONGITUDE WATER TANK 0.00 DE
NOTES:
Labor Minimums Applied
DESCRIPTION QTY
271. Plumbing labor minimum 1.00 EA
281. Finish hardware labor minimum 1.00 EA
492. Ornamental iron labor minimum 1.00 EA
495. Cabinetry labor minimum 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 16
Grand Total Areas:
1,574.90 SF Walls 687.58 SF Ceiling SF Walls and Ceiling2,262.48
687.58 SF Floor 76.40 SY Flooring 201.37 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 201.37 LF Ceil. Perimeter
687.58 Floor Area 738.97 Total Area 1,574.90 Interior Wall Area 1,063.28 Exterior Wall Area 114.37 Exterior Perimeter of
Walls
845.98 Surface Area 8.46 Number of Squares 116.62 Total Perimeter Length
31.17 Total Ridge Length 0.00 Total Hip Length
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 17
1 Main Level - Scope
Date Taken: 12/11/2019
Taken By: Darlene Hbbard
2 Main Level - Scope Notes
Date Taken: 12/11/2019
Taken By: Darlene Hbbard
Site visit conducted with DeDe Hubbard, Brunson Taylor and Jorge Rivera, PE. The main portion of the dwelling has a temporary roof that was installed. No saw cut needed, just level bond beam for anchor bolts.
Additional demo will be added when removing existing roof for detaching surrounding building's roofs that are not part of the qualified scope from the eligible building. Jorge Rivera, PE, has determined to replace the existing roof with a gable roof. All ceilings and joists will be R/R, add insulation, crown molding and paint the ceiling. Only damaged window is the bathroom window which will need to be replaced. All windows include to install shutters. The two front windows and burglar bars which will need to be removed for the shutters.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 18
3 Main Level - Scope Notes
Date Taken: 12/11/2019
Taken By: Darlene Hbbard
4 Main Level - Scope Notes
Date Taken: 12/11/2019
Taken By: Darlene Hbbard
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 19
5 Main Level - 1-Front Elevation
Date Taken: 12/9/2019
Taken By: Darlene Hbbard e living room.
6 Main Level - 2-Front Elevation
Date Taken: 12/10/2019
Entry into other living area
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 20
7 Main Level - 3-Front Elevation
Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Walkway between living areas
8 Main Level - 4-Front Elevation
Date Taken: 12/10/2019
Power connections to other units
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 21
9 Main Level - 5-Front Elevation
Date Taken: 12/10/2019
Taken By: Darlene Hbbard
10 Main Level - 6-Front Elevation
Date Taken: 12/10/2019
Taken By: Darlene Hbbard
No access to right elevation, concrete wall attached
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 22
11 Main Level - 7-Left Elevation
Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Other living area
12 Main Level - 8-Left Elevation
Date Taken: 12/10/2019
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 23
13 Main Level - 9-Back Elevation
Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Walkway between other living areas
14 Main Level - 10-Back Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 24
15 Main Level/Living Room - 11- Living Room Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Electric= 1 double switch, 2 lights, 3 outlets, add C/O. No damage windows, remove burglar bars, add 22.5SF shutter.
R&R damaged exterior door, paint trim and all 6 sides of the door. No damage to flooring.
16 Main Level/Living Room - 12- Living Room Date Taken: 12/10/2019
Main panel located behind entry door
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 25
17 Main Level/Living Room - 13- Living Room Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Tile flooring, no damage
18 Main Level/Living Room - 14- Living Room Date Taken: 12/10/2019
Taken By: Darlene Hbbard
No damage to windows, remove burglar bars from front windows and add shutters
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 26
19 Main Level/Living Room - 15- Living Room Date Taken: 12/10/2019
Taken By: Darlene Hbbard
20 Main Level/Living Room - 16- Living Room Date Taken: 12/10/2019
Remove ceiling and joists
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 27
21 Main Level/Living Room - 17- Living Room Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Entry into bedrooms
22 Main Level/Kitchen - 18-Kitchen
Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Electric= 1 switch, 1 lights, 2 GFI outlets. No damage windows, remove burglar bars, add 36.5SF shutter. R&R damaged exterior door, paint trim and all 6 sides of the door. No damage to flooring.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 28
23 Main Level/Kitchen - 19-Kitchen
Date Taken: 12/10/2019
Taken By: Darlene Hbbard
No damage to windows, remove bars from front window, add shutter
24 Main Level/Kitchen - 20-Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 29
25 Main Level/Kitchen - 21-Kitchen
Date Taken: 12/10/2019
Taken By: Darlene Hbbard
No damage to cabinets
26 Main Level/Kitchen - 22-Kitchen
Date Taken: 12/10/2019
No damage to flooring
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 30
27 Main Level/Bedroom 1 - 23- Bedroom 1 Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Enclose AC opening. Electric= 1 switch, 1 lights, 3 outlets, add smoke. Remove 6LF full-height built-in cabinets. No damage windows add 22.5SF shutter.
R&R damaged interior door, paint trim and all 6 sides of the door. No damage to flooring.
28 Main Level/Bedroom 1 - 24- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 31
29 Main Level/Bedroom 1 - 25- Bedroom 1 Date Taken: 12/10/2019
Taken By: Darlene Hbbard
30 Main Level/Bedroom 1 - 26- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 32
31 Main Level/Bedroom 1 - 27- Bedroom 1 Date Taken: 12/10/2019
Taken By: Darlene Hbbard
32 Main Level/Bedroom 1 - 28- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 33
33 Main Level/Bedroom 2 - 29- Bedroom 2 Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Enclose AC opening. Electric= 1 switch, 1 lights, 3 outlets, add smoke. No damage windows add 22.5SF shutter. R&R damaged interior door, paint trim and all 6 sides of the door. No damage to flooring.
34 Main Level/Bedroom 2 - 30- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 34
35 Main Level/Bedroom 2 - 31- Bedroom 2 Date Taken: 12/10/2019
Taken By: Darlene Hbbard
36 Main Level/Bedroom 2 - 32- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 35
37 Main Level/Bedroom 2 - 33- Bedroom 2 Date Taken: 12/10/2019
Taken By: Darlene Hbbard no damage to flooring
38 Main Level/Bedroom 2 - 34- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 36
39 Main Level/Bedroom 2 - 35- Bedroom 2 Date Taken: 12/10/2019
Taken By: Darlene Hbbard
No door to remove, only frame
40 Main Level/Bathroom - 36- Bathroom Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof, temporary roof installed. Remove ceiling and joists, replace CJM add insulation and paint. Electric= 1 switch, 1 lights. Replace 1.9X1.6 damaged window add 7.5SF shutter.
No damage to toilet, replace damage sink and vanity. R&R damaged interior door, paint trim and all 6 sides of the door. No damage to flooring.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 37
41 Main Level/Bathroom - 37- Bathroom Date Taken: 12/10/2019
Taken By: Darlene Hbbard
42 Main Level/Bathroom - 38- Bathroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706755_RA 12/11/2019 Page: 38
43 Main Level/Bathroom - 39- Bathroom Date Taken: 12/10/2019
Taken By: Darlene Hbbard
Damage to vanity and sink from disaster.
44 Main Level/Bathroom - 40- Bathroom
CNMI-450706755_RA 12/11/2019 Page: 39
Main Level
Living Room
Bathroom
Bedroom 1 Bedroom 2
Kitchen
Main Level
CNMI-450706755_RA 12/11/2019 Page: 40
ROOF
Roof1 (A)F1(B)F2
ROOF
CNMI-450706755_RA 12/11/2019 Page: 41
PLOT
PLOT (A1)
Texas Street (A2)
Driveway (A3)
Other Living (A4) Damaged Dwelling (A5) Other Living (A6)
Other Living (A7) Other Living (A8) Other Livin3 (A9)
Water Meter (A10)Power Po;e (A11)
PLOT
CNMI-450706755_RA 12/11/2019 Page: 42
CNMI DATA
CNMI Data
CNMI DATA
File details come from the government source that posted it. Updated .