CNMI-450706334_Repair_Approved_Line_Items.pdf
PDF 15 MB Posted
- Attached to
- PHC Housing Repair - Saipan
- Solicitation number
- 70FBR920B00000002
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dewberry
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
Insured: RODNEY ADA Home: (670) 285-8389 Cellular: (670) 234-8011Home: MANGGA ST 4TH HOME ON RIGHT
KAGMAN THREE, HI
Property: MANGGA ST 4TH HOME ON RIGHT
KAGMAN THREE, HI
Claim Rep.: Casey Hoak
Estimator: Casey Hoak
Claim Number: CNMI-450706334 Policy Number: CNMI-450706334 Type of Loss: Hurricane
Date Contacted: 11/26/2019 10:00 PM Date of Loss: 10/24/2018 2:00 PM Date Received: 1/12/2019 12:59 AM
Date Inspected: 2/16/2019 8:00 PM Date Entered: 11/27/2109 1:03 AM
Date Est. Completed: 2/18/2019 10:06 PM
Price List: HIOI8X_JAN19 Restoration/Service/Remodel
Estimate: CNMI-450706334_RA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 2
11/26/2109 CMH:
Site Visits Batch Four Attending: Casey Hoak, DeDe Hubbard, Brunson Taylor, Jorge Rivera PE Home is a 3 bedroom CMU block house with porch and outdoor kitchen. The roof was destroyed during the storm and a temporary roof has been put on. Per the PE Jorge a gable roof with a shed over the back bath is in order. The roof will be turned from its present design and the end walls will now be on the front and rear. A saw cut of the two sides and a bond beam around the EPW will be needed along with 19LF of beam around the porch. It has been determined by the PE that it is more cost effective to build over the porch then to leave it off. On the interior new joists, ceilings, insulation, and molding will be needed. New doors for both the interior and exterior will be added and new framed 2x4 walls in the bedroom 1&2 and the hall with sheathing added back. Damaged windows will be replaced where shown and and the home had shutters on most all windows except the two baths and they will be added to the scope. Paint for all added treated wood both interior and exterior and for all the new doors. A new panel, breaker, mast, and meter base along with a rewire of the home with actual count of plugs, lights, switches , GFI's , smoke alarms and Co. In the kitchen the concrete counter top is damaged and 7 LF of base cabinets and 5 LF of uppers will be needed along with a new 7 LF of counter top. A new set of photos was added to the file showing the house in its present state and all GFM has been utilized where appropriate. No other damages were noted at this time.
INSPECTION SUMMARY
The applicant met at the damaged dwelling and the following was observed.
The dwelling is a 1 story 3 bedroom concrete structure with a tin roof and slab foundation. There are 2 occupants and 2 occupied bedrooms. The tin roof was ripped from dwelling causing the damages. The military installed a temporary roof in order for the Applicant to be able to occupy the dwelling.
The dwelling is deemed to be repairable.
There is 1 structural components damaged which is the Roof.
Reconstruction should take approximately 16 weeks from start of construction.
Total Square Footage of Damaged Dwelling
AGE: The dwelling was built in approximately 2003
DAMAGE AND REPAIR SUMMARY
See attached estimate for exact repair and line items.
LATITUDE: 15.174287
LONGITUDE: 145.781513
A: ROOF: The roof was completely destroyed and will need to be replaced from the framing up.
B: INTERIOR: The exterior walls and some interior walls were concrete which are not damaged and will only need paint once the ceiling and roofing repairs are complete. There are some interior walls that I have included to replace that were damaged.
All windows and doors will need to be replaced and shutters installed. The flooring is vinyl tile which needs to be replaced.
C: STRUCTURAL: The foundation is slab which was not damaged.
D: MECHANICAL/PLUMBING/WATER SYSTEM: No mechanical or plumbing damages.
E: ELECTRICAL: All electrical needs to be replaced.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 3
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 4
CNMI-450706334_RA
ROOF
ROOF
DESCRIPTION QTY
257. 2" x 6" x 8' #2 treated pine (material only) 21.00 EA
275. 2" x 6" x 14' #2 treated pine (material only) 3.00 EA
274. 2" x 6" x 16' #2 treated pine (material only) 2.00 EA
273. 2" x 6" x 18' #2 treated pine (material only) 2.00 EA
266. 2" x 6" x 20' #2 treated pine (material only) 20.00 EA
277. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 27.00 EA
For gable end walls
276. 2" x 10" x 8' #2 treated pine (material only) 6.00 EA
280. 2" x 10" x 16' #2 treated pine (material only) 54.00 EA
285. 2" x 12" x 8' #2 treated pine (material only) 1.00 EA
284. 2" x 12" x 16' #2 treated pine (material only) 4.00 EA
282. 2" x 12" x 18' #2 treated pine (material only) 4.00 EA
281. 2" x 12" x 20' #2 treated pine (material only) 4.00 EA
278. Install Sheathing - plywood - 1/2" - treated 585.16 SF
368. Material Only Sheathing - plywood - 1/2" - treated 585.16 SF
262. Install Sheathing - plywood - 3/4" - treated 1120.00 SF
369. Material Only Sheathing - plywood - 3/4" - treated 1120.00 SF
260. Rafters - 2x6 - Labor only - (using rafter length) 726.86 LF
For gable end walls and collar ties
270. R&R Rafters - 2x10 - Labor only - (using rafter length) 763.03 LF
283. Rafters - 2x12 - Labor only - (using rafter length) 210.94 LF
For ridge beam and fascia
NOTES:
Roof1
(A)F1
(B)F2 Roof2 F3
37' 2"
' 2
' 9
' 2
' 9
' 5
Roof1
1050.35 Surface Area
130.85 Total Perimeter Length
10.50 Number of Squares
37.17 Total Ridge Length
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 5
DESCRIPTION QTY
------------------ ROOFING -----------------
286. Remove Metal roofing - ribbed - 24 gauge - up to 1" 1050.35 SF
288. Install Metal roofing - ribbed - 24 gauge - up to 1" 1050.35 SF
289. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 1050.35 SF
290. Closure strips for metal roofing - inside and/or outside 74.33 LF
291. Flashing tape - self-adhesive 413.46 LF
Seal between the metal roof seams
293. Ridge vent - Metal roofing - floating ventilator 37.17 LF
294. Additional screws for 3/4 plywood sheathing 5039.00 EA
Additional screws for 3/4 plywood sheathing above Xactimate pricing. 6% waste added Labor included
295. Additional screws for 2X4 & 2x6 furring & fascia 1082.00 EA
Additional screws for 2X4 & 2x6 furring & fascia above Xactimate pricing. 6% waste added Labor included
299. Drip edge/gutter apron 74.33 LF
300. Install Gable trim for metal roofing - 26 gauge 56.52 LF
301. Material Only Gable trim for metal roofing - 26 gauge 56.52 LF
302. Ice & water barrier 1050.35 SF
304. Install 2" x 4" lumber - treated (.667 BF per LF) 434.00 LF
Roof purlins
305. Material Only 2" x 4" lumber - treated (.667 BF per LF) 434.00 LF
Roof purlins
306. Install 2" x 6" lumber - treated (1 BF per LF) 205.19 LF
For Picture Frame Purlins
307. Material Only 2" x 6" lumber - treated (1 BF per LF) 205.19 LF
For Picture Frame Purlins
308. Install 2" x 6" lumber - treated (1 BF per LF) 223.00 LF
Rafter Blocking
309. Material Only 2" x 6" lumber - treated (1 BF per LF) 223.00 LF
Rafter Blocking
------------------ SOFFIT -----------------
310. Install Soffit - box framing - 1' overhang 98.86 LF
Calculation set for 16" overhang
312. Material Only Soffit - box framing - 1' overhang 98.86 LF
Calculation set for 16" overhang
313. Install Soffit & fascia - wood - 1' overhang 98.86 LF
Calculation set for 16" overhang
314. Material Only Soffit & fascia - wood - 1' overhang 98.86 LF
Calculation set for 16" overhang
315. Baffle vent - foam 74.33 LF
Cut to fit as needed for vents
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 6
CONTINUED - Roof1
DESCRIPTION QTY
317. Soffit vent - linear 37.17 LF
------------------ PAINT -----------------
318. Prime & paint exterior soffit - wood 98.86 SF
320. Prime & paint exterior fascia - wood, 4"- 6" wide 148.67 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
321. Exterior - paint two coats 292.58 SF
322. Siding - hardboard panel - paint grade 292.58 SF
323. House wrap (air/moisture barrier) 292.58 SF
------------------ STRAPPING -----------------
324. 2x10 Joist hangers for rafters 54.00 EA
2x10 Joist hangers for rafters
325. Joist hangers for 2x6 rafter blocking 156.00 EA
Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans
326. Framing hurricane tie 324.00 EA
For rafter tails and gable wall studs top and bottom
327. Install Framing hurricane tie 16.00 EA
For joist to top plate
328. Material Only Framing hurricane tie 16.00 EA
For joist to top plate
330. Framing strap - 24" long 29.00 EA
331. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 156.00 EA
4 @ each rafter section & 24 at the splice on the ridge
NOTES:
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 7
Roof1
(A)F1
(B)F2
Roof2
F3
5'
7' 10" 7' 9" Roof2
43.87 Surface Area
21.30 Total Perimeter Length
0.44 Number of Squares
DESCRIPTION QTY
------------------ ROOFING -----------------
332. Remove Metal roofing - ribbed - 24 gauge - up to 1" 43.87 SF
333. Install Metal roofing - ribbed - 24 gauge - up to 1" 43.87 SF
334. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 43.87 SF
335. Closure strips for metal roofing - inside and/or outside 5.58 LF
336. Flashing tape - self-adhesive 7.86 LF
Seal between the metal roof seams
337. Additional screws for 3/4 sheathing 265.00 EA
Additional screws for 3/4 sheathing above Xactimate allowance. 6% waste added for screws Includes labor
338. Additional screws for 2x4 & 2x6 furring & fascia 103.00 EA
Additional screws for 2x4 & 2x6 furring & fascia above Xactimate allowance. 6% waste added for screws Includes Labor
342. Drip edge/gutter apron 5.58 LF
343. Install Gable trim for metal roofing - 26 gauge 15.71 LF
344. Material Only Gable trim for metal roofing - 26 gauge 15.71 LF
345. Ice & water barrier 43.87 SF
346. Flashing, 20" wide 5.58 LF
347. Neoprene pipe jack flashing for metal roofing 1.00 EA
348. Install 2" x 4" lumber (.667 BF per LF) 11.17 LF
Roof purlins
349. Material Only 2" x 4" lumber (.667 BF per LF) 11.17 LF
Roof purlins
350. Install 2" x 6" lumber (1 BF per LF) 26.88 LF
For Picture Frame
351. Material Only 2" x 6" lumber (1 BF per LF) 26.88 LF
For Picture Frame
352. Install 2" x 6" lumber (1 BF per LF) 5.58 LF
Rafter Blocking
353. Material Only 2" x 6" lumber (1 BF per LF) 5.58 LF
Blocking For Rafters
------------------ SOFFIT -----------------
354. Install Soffit - box framing - 1' overhang 5.58 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 8
CONTINUED - Roof2
DESCRIPTION QTY
Calculation set for 16" overhang
355. Material Only Soffit - box framing - 1' overhang 5.58 LF
Calculation set for 16" overhang
356. Install Soffit & fascia - wood - 1' overhang 5.58 LF
Calculation set for 16" overhang
357. Material Only Soffit & fascia - wood - 1' overhang 5.58 LF
Calculation set for 16" overhang
358. Soffit vent - linear 5.58 LF
Cut to fit for soffit vent
359. Baffle vent - foam 5.58 LF
------------------ PAINT -----------------
360. Prime & paint exterior soffit - wood 7.43 SF
361. Prime & paint exterior fascia - wood, 4"- 6" wide 11.17 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
------------------ STRAPPING -----------------
365. 2x10 Joist hangers for rafters 5.00 EA
2x10 Joist hangers for rafters
366. 2x6 joist hangers for rafter blocking 6.00 EA
2x6 joist hangers for rafter blocking in the roof.
367. Framing hurricane tie 10.00 EA
Rafter to wall hurricane tie - 2 per rafter per plans. (Not GFM)
NOTES:
Main Level Main Level
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
381. R&R Meter mast for overhead power - 2" conduit 1.00 EA
383. R&R Meter base - 200 amp 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 9
CONTINUED - Main Level
DESCRIPTION QTY
384. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA
385. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA
386. Rewire - average residence - copper wiring 895.08 SF
387. R&R Ground fault interrupter (GFI) outlet 1.00 EA
388. R&R Exterior light fixture 2.00 EA
389. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA
390. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF
------------------ WALL REPAIRS-----------------
391. Concrete cutting - wall (per LF per inch of saw depth) 402.00 LF
To straighten the top of the wall where needed
393. Remove Concrete wall - labor & materials - Reinforced 1.00 CY
394. Concrete - General Laborer - per hour 4.00 HR
4 hours per CY of Concrete Wall
395. Concrete Post & Beam construction - Beams 1.84 CY
To pour a bond beam on top of existing wall - includes rebar
458. Concrete Post & Beam construction - Beams 0.75 CY
To pour the 2 beams over the porch area
396. Concrete anchor bolt - 1/2" x 10" 105.00 EA
399. Install 2" x 6" lumber - treated (1 BF per LF) 480.50 LF
For double sill plate on the perimeter
400. Material Only 2" x 6" lumber - treated (1 BF per LF) 480.50 LF
For double sill plate on the perimeter
401. Sill seal foam - 6" 138.50 LF
------------------ SCAFFOLD -----------------
402. Scaffolding Setup & Take down - per hour 32.00 HR
------------------ GENERAL ITEMS -----------------
404. Clean the floor - Heavy 895.08 SF
406. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 10
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Closet 1 (1)
Bathroom 1
9'
3' 2' 8"
3'
8' 11"
3' 9"
3'
3'
2'
1'
1'
3'
3'
10'
4'
4'
4' 7"
4' 3"
Living Room Height: 8'
386.67 SF Walls
575.14 SF Walls & Ceiling
20.94 SY Flooring
48.33 LF Ceil. Perimeter
188.47 SF Ceiling
188.47 SF Floor
48.33 LF Floor Perimeter
Missing Wall 9' 8" X 8' Opens into KITCHEN
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
562. R&R Switch 2.00 EA
563. R&R Light fixture 1.00 EA
564. R&R Outlet 3.00 EA
------------------ DOORS & WINDOWS -----------------
570. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
571. Door lockset & deadbolt - exterior 1.00 EA
572. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
573. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
------------------ ROUGH FRAMING -----------------
698. Remove Sheathing - plywood - 1/2" - treated 155.20 SF
Living room wall next to bedroom 2
699. Install Sheathing - plywood - 1/2" - treated 155.20 SF
700. Material Only Sheathing - plywood - 1/2" - treated 155.20 SF
701. Seal & paint plywood sheathing 155.20 SF
------------------ INSULATION -----------------
579. Batt insulation - 10" - R30 - paper faced 188.47 SF
------------------ WALLS & CEILINGS -----------------
580. Remove Sheathing - plywood - 1/2" - treated 188.47 SF
581. Install Sheathing - plywood - 1/2" - treated 188.47 SF
582. Material Only Sheathing - plywood - 1/2" - treated 188.47 SF
583. Seal & paint plywood sheathing 188.47 SF
584. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 188.47 SF
585. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 188.47 SF
586. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 188.47 SF
587. Cove molding - 3/4" 48.33 LF
------------------ FLOORING -----------------
593. Floor preparation for resilient flooring 188.47 SF
594. Remove Vinyl floor covering (sheet goods) 188.47 SF
595. Vinyl floor covering (sheet goods) 216.74 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 11
CONTINUED - Living Room
DESCRIPTION QTY
15% added for waste
NOTES:
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Closet 1 (1)
Bathroom 1
3'
6"10
9"7"
9'
3' 1' 3"6' 1"
6' 3"
2'
"1'
2'
7'
7'
4"
3' 3'
3'
4'4'
10' Kitchen Height: 8'
296.44 SF Walls
443.83 SF Walls & Ceiling
16.38 SY Flooring
39.83 LF Ceil. Perimeter
147.39 SF Ceiling
147.39 SF Floor
36.50 LF Floor Perimeter
Missing Wall - Goes to Floor 3' 4" X 6' 8" Opens into HALLWAY
Missing Wall 9' 8" X 8' Opens into LIVING_ROOM
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
407. R&R Switch 2.00 EA
408. R&R Light fixture 1.00 EA
409. R&R Outlet 2.00 EA
410. R&R Ground fault interrupter (GFI) outlet 1.00 EA
------------------ DOORS & WINDOWS -----------------
425. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
427. Door lockset & deadbolt - exterior 1.00 EA
428. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
429. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
430. Storm window - aluminum, 12-24 sf 1.00 EA
------------------ ROUGH FRAMING -----------------
702. Remove Sheathing - plywood - 1/2" - treated 80.00 SF
Living room wall next to bedroom 2
703. Install Sheathing - plywood - 1/2" - treated 80.00 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 12
CONTINUED - Kitchen
DESCRIPTION QTY
704. Material Only Sheathing - plywood - 1/2" - treated 80.00 SF
705. Seal & paint plywood sheathing 80.00 SF
------------------ INSULATION -----------------
435. Batt insulation - 10" - R30 - paper faced 147.39 SF
------------------ WALLS & CEILINGS -----------------
436. Remove Sheathing - plywood - 1/2" - treated 147.39 SF
437. Install Sheathing - plywood - 1/2" - treated 147.39 SF
438. Material Only Sheathing - plywood - 1/2" - treated 147.39 SF
439. Seal & paint plywood sheathing 147.39 SF
440. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 147.39 SF
441. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 147.39 SF
442. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 147.39 SF
443. Cove molding - 3/4" 39.83 LF
------------------ FLOORING -----------------
451. Floor preparation for resilient flooring 147.39 SF
453. Remove Vinyl floor covering (sheet goods) 147.39 SF
454. Vinyl floor covering (sheet goods) 169.50 SF
15% added for waste
------------------ CABINETRY -----------------
706. Cabinetry - lower (base) units 7.00 LF
708. R&R Cabinetry - upper (wall) units 5.00 LF
709. Countertop - flat laid plastic laminate 7.00 LF
710. Remove Countertop - concrete 28.00 SF
Times two to cover the 4 inch concrete counter top
------------------GENERAL ITEMS -----------------
457. 5 lb. ABC fire extinguisher 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 13
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Closet 1 (1)
Bathroom 1
3' 2'
2'
1"
4'
4'
10' 2'
4"2"
4"6"
3' 3'
3'
4" 3'
3'
3'
3' 6"
3' 10"
3' 6"
3' 8" Bedroom 1 Height: 8'
320.00 SF Walls
420.00 SF Walls & Ceiling
11.11 SY Flooring
40.00 LF Ceil. Perimeter
100.00 SF Ceiling
100.00 SF Floor
40.00 LF Floor Perimeter
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Closet 1 (1)
Bathroom 1
6'
2'
1' 10"
3'
3'
3'
4" 3'
4"
3'
2' 2" Subroom: Closet 1 (1) Height: 8'
136.00 SF Walls
148.22 SF Walls & Ceiling
1.36 SY Flooring
17.00 LF Ceil. Perimeter
12.22 SF Ceiling
12.22 SF Floor
17.00 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
664. R&R Switch 1.00 EA
665. R&R Light fixture 1.00 EA
666. R&R Outlet 3.00 EA
668. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
670. R&R Interior door unit 1.00 EA
671. Door knob - interior 1.00 EA
674. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
675. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
676. Storm window - aluminum, 3-11 sf 1.00 EA
------------------ ROUGH FRAMING -----------------
722. Install Stud wall - 2" x 4" - 16" oc 160.00 SF
723. Material Only Stud wall - 2" x 4" - 16" oc 160.00 SF
724. Remove Sheathing - plywood - 1/2" - treated 160.00 SF
725. Install Sheathing - plywood - 1/2" - treated 160.00 SF
726. Material Only Sheathing - plywood - 1/2" - treated 160.00 SF
727. Seal & paint plywood sheathing 160.00 SF
------------------ INSULATION -----------------
681. Batt insulation - 10" - R30 - paper faced 112.22 SF
------------------ WALLS & CEILINGS -----------------
683. Install Sheathing - plywood - 1/2" - treated 112.22 SF
684. Material Only Sheathing - plywood - 1/2" - treated 112.22 SF
685. Seal & paint plywood sheathing 112.22 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 14
CONTINUED - Bedroom 1
DESCRIPTION QTY
686. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 112.22 SF
687. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 112.22 SF
688. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 112.22 SF
689. Cove molding - 3/4" 57.00 LF
------------------ A/C OPENING -----------------
690. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
691. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
692. Install Sheathing - plywood - 3/4" - treated 8.00 SF
693. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF
694. Seal & paint plywood sheathing 8.00 SF
To paint A/C Hole in exterior wall
------------------ FLOORING -----------------
695. Floor preparation for resilient flooring 112.22 SF
696. Remove Vinyl floor covering (sheet goods) 112.22 SF
697. Vinyl floor covering (sheet goods) 129.06 SF
15% added for waste
------------------CABINETS -----------------
728. Remove Cabinetry - full height unit 5.00 LF
NOTES:
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Closet 1 (1)
Bathroom 1
7'
7'
2'
0"
2'
0"
10'2'
2"4"
6"4"
2'
1" 3'
3'
5" 2'
1"
3'
3'
3' 6"
3' 8"
3' 6"
3' 8" Bedroom 2 Height: 8'
320.00 SF Walls
420.00 SF Walls & Ceiling
11.11 SY Flooring
40.00 LF Ceil. Perimeter
100.00 SF Ceiling
100.00 SF Floor
40.00 LF Floor Perimeter
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 15
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Closet 1 (1)
Bathroom 1
6'
2' 3"
2' 1"
2'
1"
3'
3'
5" 2'
1"
4"
3'
2' 5" Subroom: Closet 2 (1) Height: 8'
140.00 SF Walls
153.89 SF Walls & Ceiling
1.54 SY Flooring
17.50 LF Ceil. Perimeter
13.89 SF Ceiling
13.89 SF Floor
17.50 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
596. R&R Switch 1.00 EA
597. R&R Light fixture 1.00 EA
598. R&R Outlet 2.00 EA
600. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
602. R&R Interior door unit 1.00 EA
603. Door knob - interior 1.00 EA
606. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
607. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
608. Storm window - aluminum, 3-11 sf 1.00 EA
------------------ ROUGH FRAMING -----------------
611. Install Stud wall - 2" x 4" - 16" oc 160.00 SF
612. Material Only Stud wall - 2" x 4" - 16" oc 160.00 SF
718. Remove Sheathing - plywood - 1/2" - treated 160.00 SF
719. Install Sheathing - plywood - 1/2" - treated 160.00 SF
720. Material Only Sheathing - plywood - 1/2" - treated 160.00 SF
721. Seal & paint plywood sheathing 160.00 SF
------------------ INSULATION -----------------
613. Batt insulation - 10" - R30 - paper faced 113.89 SF
------------------ WALLS & CEILINGS -----------------
614. Remove Sheathing - plywood - 1/2" - treated 113.89 SF
615. Install Sheathing - plywood - 1/2" - treated 113.89 SF
616. Material Only Sheathing - plywood - 1/2" - treated 113.89 SF
617. Seal & paint plywood sheathing 113.89 SF
618. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 113.89 SF
619. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 113.89 SF
620. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 113.89 SF
621. Cove molding - 3/4" 57.50 LF
------------------ A/C OPENING -----------------
622. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 16
CONTINUED - Bedroom 2
DESCRIPTION QTY
To fill A/C Hole in exterior wall
623. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
624. Install Sheathing - plywood - 3/4" - treated 8.00 SF
625. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF
626. Seal & paint plywood sheathing 8.00 SF
To paint A/C Hole in exterior wall
------------------ FLOORING -----------------
627. Floor preparation for resilient flooring 113.89 SF
628. Remove Vinyl floor covering (sheet goods) 113.89 SF
629. Vinyl floor covering (sheet goods) 130.97 SF
15% added for waste
------------------CABINETS -----------------
717. Remove Cabinetry - full height unit 5.00 LF
NOTES:
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1) Bedroom 1
Closet 1 (1)
Bathroom 1
4' 11"
5' 5"
7'
7'
2' 10" 1'
8"
2'
0" 2'
0"
2'
1'
3'
3'
11' 5"
11' 3"
4' 4'
9'
9'
Bedroom3 Height: 8'
458.67 SF Walls
608.16 SF Walls & Ceiling
16.61 SY Flooring
57.33 LF Ceil. Perimeter
149.49 SF Ceiling
149.49 SF Floor
57.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
494. R&R Switch 1.00 EA
495. R&R Light fixture 1.00 EA
496. R&R Outlet 3.00 EA
498. Smoke detector 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 17
CONTINUED - Bedroom3
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
500. R&R Interior door unit 1.00 EA
501. Door knob - interior 1.00 EA
504. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
505. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
------------------ INSULATION -----------------
511. Batt insulation - 10" - R30 - paper faced 149.49 SF
------------------ WALLS & CEILINGS -----------------
513. Install Sheathing - plywood - 1/2" - treated 149.49 SF
514. Material Only Sheathing - plywood - 1/2" - treated 149.49 SF
515. Seal & paint plywood sheathing 149.49 SF
516. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 149.49 SF
517. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 149.49 SF
518. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 149.49 SF
519. Cove molding - 3/4" 57.33 LF
------------------ A/C OPENING -----------------
520. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
521. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
522. Install Sheathing - plywood - 3/4" - treated 8.00 SF
523. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF
524. Seal & paint plywood sheathing 8.00 SF
To paint A/C Hole in exterior wall
------------------ FLOORING -----------------
525. Floor preparation for resilient flooring 149.49 SF
526. Remove Vinyl floor covering (sheet goods) 149.49 SF
527. Vinyl floor covering (sheet goods) 171.92 SF
15% added for waste
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 18
CONTINUED - Bedroom3
DESCRIPTION QTY
NOTES:
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Closet 1 (1)
Bathroom 1
6' 9"
6' 5"
2'
2"
1'
1'
6' 11"
2' 1'
1'
1'
Bathroom 1 Height: 8'
166.67 SF Walls
192.33 SF Walls & Ceiling
2.85 SY Flooring
20.83 LF Ceil. Perimeter
25.67 SF Ceiling
25.67 SF Floor
20.83 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
459. R&R Switch 1.00 EA
460. R&R Light fixture 1.00 EA
------------------ DOORS & WINDOWS -----------------
466. R&R Interior door unit 1.00 EA
467. Door knob - interior 1.00 EA
470. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
471. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
474. Security/storm shutter 7.50 SF
------------------ INSULATION -----------------
477. Batt insulation - 10" - R30 - paper faced 25.67 SF
------------------ WALLS & CEILINGS -----------------
712. Install Sheathing - plywood - 1/2" - treated 25.67 SF
Rafters will be used as the joists
713. Material Only Sheathing - plywood - 1/2" - treated 25.67 SF
714. Seal & paint plywood sheathing 25.67 SF
485. Cove molding - 3/4" 20.83 LF
------------------ PLUMBING -----------------
736. Plumbing - Labor Minimum 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 19
CONTINUED - Bathroom 1
DESCRIPTION QTY
For Plumbing fixture supply line
NOTES:
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Closet 1 (1)
Bathroom 1
2'
2'
2' 2"
2'
2' 2"
7'
7'
2' 6"2' 10"
1'
8"
7'
Bathroom 2 Height: 8'
208.00 SF Walls
250.00 SF Walls & Ceiling
4.67 SY Flooring
26.00 LF Ceil. Perimeter
42.00 SF Ceiling
42.00 SF Floor
26.00 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
528. R&R Switch 1.00 EA
529. R&R Light fixture 1.00 EA
------------------ DOORS & WINDOWS -----------------
534. R&R Interior door unit 1.00 EA
535. Door knob - interior 1.00 EA
538. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
539. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
542. Security/storm shutter - roll-up type 5.00 SF
------------------ INSULATION -----------------
545. Batt insulation - 10" - R30 - paper faced 42.00 SF
------------------ WALLS & CEILINGS -----------------
547. Install Sheathing - plywood - 1/2" - treated 42.00 SF
548. Material Only Sheathing - plywood - 1/2" - treated 42.00 SF
549. Seal & paint plywood sheathing 42.00 SF
550. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 42.00 SF
551. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 42.00 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 20
CONTINUED - Bathroom 2
DESCRIPTION QTY
552. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 42.00 SF
553. Cove molding - 3/4" 26.00 LF
NOTES:
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Closet 1 (1)
Bathroom 1
4'
4'
4' 7"
4' 3"
4"
3'
6"10
9"7" 2"
4"6" 2'
1' 10"
2' 3"
2' 1"
2'
Hallway Height: 8'
169.78 SF Walls
202.72 SF Walls & Ceiling
3.66 SY Flooring
24.00 LF Ceil. Perimeter
32.94 SF Ceiling
32.94 SF Floor
20.67 LF Floor Perimeter
Missing Wall - Goes to Floor 3' 4" X 6' 8" Opens into KITCHEN
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
630. R&R Switch 1.00 EA
631. R&R Light fixture 1.00 EA
635. Carbon monoxide detector 1.00 EA
------------------ ROUGH FRAMING -----------------
645. Install Stud wall - 2" x 4" - 16" oc 128.00 SF
646. Material Only Stud wall - 2" x 4" - 16" oc 128.00 SF
730. Remove Sheathing - plywood - 1/2" - treated 128.00 SF
731. Install Sheathing - plywood - 1/2" - treated 128.00 SF
732. Material Only Sheathing - plywood - 1/2" - treated 128.00 SF
733. Seal & paint plywood sheathing 128.00 SF
------------------ INSULATION -----------------
647. Batt insulation - 10" - R30 - paper faced 32.94 SF
------------------ WALLS & CEILINGS -----------------
648. Remove Sheathing - plywood - 1/2" - treated 32.94 SF
649. Install Sheathing - plywood - 1/2" - treated 32.94 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 21
CONTINUED - Hallway
DESCRIPTION QTY
650. Material Only Sheathing - plywood - 1/2" - treated 32.94 SF
651. Seal & paint plywood sheathing 32.94 SF
652. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 32.94 SF
653. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 32.94 SF
654. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 32.94 SF
655. Cove molding - 3/4" 24.00 LF
------------------ FLOORING -----------------
661. Floor preparation for resilient flooring 32.94 SF
662. Remove Vinyl floor covering (sheet goods) 32.94 SF
663. Vinyl floor covering (sheet goods) 37.88 SF
15% added for waste
------------------CABINETS -----------------
729. Remove Cabinetry - full height unit 3.00 LF
NOTES:
CNMI DATA
CNMI Data1' 4"
CNMI Data Height: 4"
1.57 SF Walls
2.92 SF Walls & Ceiling
0.15 SY Flooring
4.70 LF Ceil. Perimeter
1.36 SF Ceiling
1.36 SF Floor
4.70 LF Floor Perimeter
DESCRIPTION QTY
210. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO
211. Material Only LATITUDE DAMAGED DWELLING 15.17 DE
15.174287
212. Material Only LONGITUDE DAMAGED DWELLING 145.78 DE
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 22
CONTINUED - CNMI Data
DESCRIPTION QTY
145.781513
213. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO
214. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO
215. Material Only DOES DWELLING HAVE A SEPTIC TANK 1.00 YS
Lat: 15.174265 Long: 145.781664
216. DOES DWELLING HAVE A WELL 0.00 NO
217. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO
218. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 2003.00 YR
219. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO
220. Material Only ENCROACHMENT ISSUES 0.00 NO
221. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO
222. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 EA
223. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 893.00 SF
224. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO
225. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
226. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
ROOF
227. Material Only IS DWELLING DESTROYED 0.00 NO
228. Material Only FOUNDATION TYPE 1.00 UN
SLAB
229. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO
230. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
231. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO
232. Material Only DID THE MILITARY PROVIDE A TENT 0.00 NO
233. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
ROOF
234. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO
235. Material Only LATITUDE OUT BUILDING 0.00 DE
236. Material Only LONGITUDE OUT BUILDING 0.00 DE
237. Material Only LATITUDE POWER POLE 15.17 DE
15.174447
238. Material Only LONGITUDE POWER POLE 145.78 DE
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 23
CONTINUED - CNMI Data
DESCRIPTION QTY
145.781657
239. Material Only LATITUDE WATER METER 15.17 DE
15.174110
240. Material Only LONGITUDE WATER METER 145.78 DE
145.781454
241. Material Only LATITUDE SEPTIC TANK 15.17 DE
15.174265
242. Material Only LONGITUDE SEPTIC TANK 145.78 DE
145.781664
NOTES:
Grand Total Areas:
2,755.12 SF Walls 896.44 SF Ceiling SF Walls and Ceiling3,651.56
896.44 SF Floor 99.60 SY Flooring 347.79 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 354.45 LF Ceil. Perimeter
896.44 Floor Area 975.58 Total Area 2,755.12 Interior Wall Area 1,412.00 Exterior Wall Area 143.20 Exterior Perimeter of
Walls
1,094.21 Surface Area 10.94 Number of Squares 152.15 Total Perimeter Length
37.17 Total Ridge Length 0.00 Total Hip Length
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 24
1 Main Level - 1-Scope Notes
Date Taken: 11/26/2019
Taken By: Darlene Hbbard
2 Main Level - 2-Scope Notes
Date Taken: 11/26/2019
Taken By: Darlene Hbbard
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 25
3 Main Level - 3-Scope Notes
Date Taken: 11/26/2019
Taken By: Darlene Hbbard
4 Main Level - 4-Scope Notes
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 26
5 Main Level - 5-Front Elevation
Date Taken: 11/26/2019
Taken By: Casey Hoak
Site visit with Jorge Rivera, PE which determined to install gable roof but turn from the presently installed roof.
Saw cut 67LF on left and right elevation (see sketch). Pour bond beam EPW X 10" and pour additional concrete beam 1'X1'X19" (see sketch)
6 Main Level - 6-Front Elevation
Taken By: Casey Hoak
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 27
7 Main Level - 7-Front Elevation
Date Taken: 11/26/2019
Taken By: Casey Hoak
8 Main Level - 8-Front Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 28
9 Main Level - 9-Front Elevation
Date Taken: 11/26/2019
Taken By: Casey Hoak
10 Main Level - 10-Front Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 29
11 Main Level - 11-Left Elevation
Date Taken: 11/26/2019
Taken By: Casey Hoak
12 Main Level - 12-Left Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 30
13 Main Level - 13-Back Elevation
Date Taken: 11/26/2019
Taken By: Casey Hoak
14 Main Level - 14-Back Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 31
15 Main Level - 15-Back Elevation
Date Taken: 11/26/2019
Taken By: Casey Hoak
16 Main Level - 16-Right Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 32
17 Main Level - 17-Right Elevation
Date Taken: 11/26/2019
Taken By: Casey Hoak
Back corner looking at covered porch
18 Main Level/Living Room - 18- Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof. Remove ceiling and joists, replace CJM add insulation and paint. Electric=2 switch, 1 lights, 3 outlets. R/R 12LF 2X4 damaged framing and sheathing.
No damage windows and shutters present. R&R damaged exterior door, paint trim and all 6 sides of the door.
R/R FCV.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 33
19 Main Level/Living Room - 19- Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
20 Main Level/Living Room - 20- Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 34
21 Main Level/Living Room - 21- Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
22 Main Level/Living Room - 22- Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 35
23 Main Level/Living Room - 23- Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
24 Main Level/Living Room - 24- Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 36
25 Main Level/Kitchen - 25-Kitchen
Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=Replace 220 amp main panel, 2 switch, 1 lights, 2 outlets, 1GFI. R/R 10LF 2X4 damaged framing and sheathing. R/R 1 4X4 broken window and shutters present. R&R damaged exterior door, paint trim and all 6 sides of the door.
R/R FCV. Remove 7LF concrete counter top with sides. Add 7LF base cabinet, 7LF laminate counter top, add 5LF upper cabinet.
26 Main Level/Kitchen - 26-Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 37
27 Main Level/Kitchen - 27-Kitchen
Date Taken: 11/26/2019
Taken By: Casey Hoak
28 Main Level/Kitchen - 28-Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 38
29 Main Level/Kitchen - 29-Kitchen
Date Taken: 11/26/2019
Taken By: Casey Hoak
30 Main Level/Kitchen - 30-Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 39
31 Main Level/Kitchen - 31-Kitchen
Date Taken: 11/26/2019
Taken By: Casey Hoak
32 Main Level/Bedroom 1 - 32- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights, 3 outlets. Remove 5LF 2X4 damaged framing, add 21LF sheathing.
Enclose A/C opening. R/R 3X3 damaged window and shutters present. R&R damaged interior door, paint trim and all 6 sides of the door.
R/R FCV. Remove 5LF full-height cabinets. Add smoke detector.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 40
33 Main Level/Bedroom 1 - 33- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
34 Main Level/Bedroom 1 - 34- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 41
35 Main Level/Bedroom 1 - 35- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
36 Main Level/Bedroom 1 - 36- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 42
37 Main Level/Bedroom 1 - 37- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
38 Main Level/Bedroom 1 - 38- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 43
39 Main Level/Bedroom 1 - 39- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
40 Main Level/Bedroom 1 - 40- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 44
41 Main Level/Bedroom 1 - 41- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
42 Main Level/Bedroom 2 - 42- Bedroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights, 2 outlets. R/R 21LF sheathing. Enclose A/C opening. R/R 3X3 damaged window and shutters present. R&R damaged interior door, paint trim and all 6 sides of the door. R/R FCV.
Remove 5LF full-height cabinets. Add smoke detector.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 45
43 Main Level/Bedroom 2 - 43- Bedroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
44 Main Level/Bedroom 2 - 44- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 46
45 Main Level/Bedroom 2 - 45- Bedroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
46 Main Level/Bedroom 2 - 46- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 47
47 Main Level/Bedroom 2 - 47- Bedroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
48 Main Level/Bedroom 2 - 48- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 48
49 Main Level/Bedroom 2 - 49- Bedroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
50 Main Level/Bedroom 2 - 50- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 49
51 Main Level/Bedroom 2 - 51- Bedroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
52 Main Level/Bedroom3 - 52- Bedroom 3 Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights, 3 outlets. Enclose A/C opening. No damage to windows and shutters present. R&R damaged interior door, paint trim and all 6 sides of the door.
R/R FCV. Add smoke detector.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 50
53 Main Level/Bedroom3 - 53- Bedroom 3 Date Taken: 11/26/2019
Taken By: Casey Hoak
54 Main Level/Bedroom3 - 54- Bedroom 3
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 51
55 Main Level/Bedroom3 - 55- Bedroom 3 Date Taken: 11/26/2019
Taken By: Casey Hoak
56 Main Level/Bedroom3 - 56- Bedroom 3
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 52
57 Main Level/Bedroom3 - 57- Bedroom 3 Date Taken: 11/26/2019
Taken By: Casey Hoak
58 Main Level/Bedroom3 - 58- Bedroom 3
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 53
59 Main Level/Bedroom3 - 59- Bedroom 3 Date Taken: 11/26/2019
Taken By: Casey Hoak
60 Main Level/Bathroom 1 - 60- Bathroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights.
No damage to window, add 2X2 shutter. R&R damaged interior door, paint trim and all 6 sides of the door.
No damage to toilet or sink, add supply line and P-trap.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 54
61 Main Level/Bathroom 1 - 61- Bathroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
62 Main Level/Bathroom 1 - 62- Bathroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 55
63 Main Level/Bathroom 1 - 63- Bathroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
64 Main Level/Bathroom 1 - 64- Bathroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 56
65 Main Level/Bathroom 1 - 65- Bathroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
66 Main Level/Bathroom 2 - 66- Bathroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
Bathroom 2 never completed.
Damage to ceiling and roof. Remove joists, replace CM add insulation and paint. R/R 1 damaged interior door.
No damage to window, add 18"X18" shutter
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 57
67 Main Level/Bathroom 2 - 67- Bathroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
68 Main Level/Bathroom 2 - 68- Bathroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 58
69 Main Level/Bathroom 2 - 69- Bathroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
70 Main Level/Hallway - 70-Hallway
Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights.
R/R 3LF sheathing. R/R FCV.
Remove 3LF full-height cabinets.
Add C/O
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 59
71 Main Level/Hallway - 71-Hallway
Date Taken: 11/26/2019
Taken By: Casey Hoak
72 Main Level/Hallway - 72-Hallway
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 60
73 Main Level/Hallway - 73-Hallway
Date Taken: 11/26/2019
Taken By: Casey Hoak
74 74-Outdoor Kitchen
Date Taken: 11/26/2019
Taken By: Casey Hoak
Remove existing roof, remove 4LF upper cabinets.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 61
75 75-Outdoor Kitchen
Date Taken: 11/26/2019
Taken By: Casey Hoak
76 76-Outdoor Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 62
77 77-Outdoor Kitchen
Date Taken: 11/26/2019
Taken By: Casey Hoak
78 78-Outdoor Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 63
79 101-Living room
Date Taken: 2/17/2019
Taken By: Darlene Hbbard
Entry door
80 102-Living room
Date Taken: 2/17/2019
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 64
81 103-Living room
Date Taken: 2/17/2019
Taken By: Darlene Hbbard
82 104-Living room
Date Taken: 2/17/2019
Entry door
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 65
83 105-Living room
Date Taken: 2/17/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof temporary repairs made
84 106-Living room
Date Taken: 2/17/2019
Taken By: Darlene Hbbard
Damage to vinyl flooring need to replace
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 66
85 107-Living room
Date Taken: 2/17/2019
Taken By: Darlene Hbbard
Damage to interior wall replace
86 108-Indoor kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 67
87 109-Indoor kitchen
Date Taken: 2/17/2019
Taken By: Darlene Hbbard
88 110-Indoor kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 68
89 111-Indoor kitchen
Date Taken: 2/17/2019
Taken By: Darlene Hbbard
Damaged interior wall, replace
90 112-Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-450706334_RA 12/8/2019 Page: 69
91 113-Kitchen
Date Taken: 2/17/2019
Taken By: Darlene Hbbard
Damage to ceiling and roof
92 114-Kitchen
Date Taken: 2/17/2019
Damage to vinyl tile, replace
CNMI-450706334_RA 12/8/2019 Page: 70
Main Level
Porch
Bedroom3
Bathroom 2
Kitchen Living Room
Bedroom 2
Hallway
Closet 2 (1)
Bedroom 1
Saw Cut & Bond Beam entire wall
Closet 1 (1)
Saw Cut & Bond Beam entire wall
Bathroom 1
Framed 2x4
Bond Beam Only
Main Level
CNMI-450706334_RA 12/8/2019 Page: 71
ROOF
Roof1
(A)F1
(B)F2
Roof2
F3
ROOF
CNMI-450706334_RA 12/8/2019 Page: 72
PLOT
Water Meter (A6)
Septic (A2)
Power Pole (A5)
Damaged Dwelling (A4)
Mangga Street (A3)
Plot (A1)
PLOT
CNMI-450706334_RA 12/8/2019 Page: 73
CNMI DATA
CNMI Data
CNMI DATA
File details come from the government source that posted it. Updated .