HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

Insured: RODNEY ADA Home: (670) 285-8389 Cellular: (670) 234-8011Home: MANGGA ST 4TH HOME ON RIGHT

KAGMAN THREE, HI

Property: MANGGA ST 4TH HOME ON RIGHT

KAGMAN THREE, HI

Claim Rep.: Casey Hoak

Estimator: Casey Hoak

Claim Number: CNMI-450706334 Policy Number: CNMI-450706334 Type of Loss: Hurricane

Date Contacted: 11/26/2019 10:00 PM Date of Loss: 10/24/2018 2:00 PM Date Received: 1/12/2019 12:59 AM

Date Inspected: 2/16/2019 8:00 PM Date Entered: 11/27/2109 1:03 AM

Date Est. Completed: 2/18/2019 10:06 PM

Price List: HIOI8X_JAN19 Restoration/Service/Remodel

Estimate: CNMI-450706334_RA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 2

11/26/2109 CMH:

Site Visits Batch Four Attending: Casey Hoak, DeDe Hubbard, Brunson Taylor, Jorge Rivera PE Home is a 3 bedroom CMU block house with porch and outdoor kitchen. The roof was destroyed during the storm and a temporary roof has been put on. Per the PE Jorge a gable roof with a shed over the back bath is in order. The roof will be turned from its present design and the end walls will now be on the front and rear. A saw cut of the two sides and a bond beam around the EPW will be needed along with 19LF of beam around the porch. It has been determined by the PE that it is more cost effective to build over the porch then to leave it off. On the interior new joists, ceilings, insulation, and molding will be needed. New doors for both the interior and exterior will be added and new framed 2x4 walls in the bedroom 1&2 and the hall with sheathing added back. Damaged windows will be replaced where shown and and the home had shutters on most all windows except the two baths and they will be added to the scope. Paint for all added treated wood both interior and exterior and for all the new doors. A new panel, breaker, mast, and meter base along with a rewire of the home with actual count of plugs, lights, switches , GFI's , smoke alarms and Co. In the kitchen the concrete counter top is damaged and 7 LF of base cabinets and 5 LF of uppers will be needed along with a new 7 LF of counter top. A new set of photos was added to the file showing the house in its present state and all GFM has been utilized where appropriate. No other damages were noted at this time.

INSPECTION SUMMARY

The applicant met at the damaged dwelling and the following was observed.

The dwelling is a 1 story 3 bedroom concrete structure with a tin roof and slab foundation. There are 2 occupants and 2 occupied bedrooms. The tin roof was ripped from dwelling causing the damages. The military installed a temporary roof in order for the Applicant to be able to occupy the dwelling.

The dwelling is deemed to be repairable.

There is 1 structural components damaged which is the Roof.

Reconstruction should take approximately 16 weeks from start of construction.

Total Square Footage of Damaged Dwelling

AGE: The dwelling was built in approximately 2003

DAMAGE AND REPAIR SUMMARY

See attached estimate for exact repair and line items.

LATITUDE: 15.174287

LONGITUDE: 145.781513

A: ROOF: The roof was completely destroyed and will need to be replaced from the framing up.

B: INTERIOR: The exterior walls and some interior walls were concrete which are not damaged and will only need paint once the ceiling and roofing repairs are complete. There are some interior walls that I have included to replace that were damaged.

All windows and doors will need to be replaced and shutters installed. The flooring is vinyl tile which needs to be replaced.

C: STRUCTURAL: The foundation is slab which was not damaged.

D: MECHANICAL/PLUMBING/WATER SYSTEM: No mechanical or plumbing damages.

E: ELECTRICAL: All electrical needs to be replaced.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 3

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 4

CNMI-450706334_RA

ROOF

ROOF

DESCRIPTION QTY

257. 2" x 6" x 8' #2 treated pine (material only) 21.00 EA

275. 2" x 6" x 14' #2 treated pine (material only) 3.00 EA

274. 2" x 6" x 16' #2 treated pine (material only) 2.00 EA

273. 2" x 6" x 18' #2 treated pine (material only) 2.00 EA

266. 2" x 6" x 20' #2 treated pine (material only) 20.00 EA

277. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 27.00 EA

For gable end walls

276. 2" x 10" x 8' #2 treated pine (material only) 6.00 EA

280. 2" x 10" x 16' #2 treated pine (material only) 54.00 EA

285. 2" x 12" x 8' #2 treated pine (material only) 1.00 EA

284. 2" x 12" x 16' #2 treated pine (material only) 4.00 EA

282. 2" x 12" x 18' #2 treated pine (material only) 4.00 EA

281. 2" x 12" x 20' #2 treated pine (material only) 4.00 EA

278. Install Sheathing - plywood - 1/2" - treated 585.16 SF

368. Material Only Sheathing - plywood - 1/2" - treated 585.16 SF

262. Install Sheathing - plywood - 3/4" - treated 1120.00 SF

369. Material Only Sheathing - plywood - 3/4" - treated 1120.00 SF

260. Rafters - 2x6 - Labor only - (using rafter length) 726.86 LF

For gable end walls and collar ties

270. R&R Rafters - 2x10 - Labor only - (using rafter length) 763.03 LF

283. Rafters - 2x12 - Labor only - (using rafter length) 210.94 LF

For ridge beam and fascia

NOTES:

Roof1

(A)F1

(B)F2 Roof2 F3

37' 2"

' 2

' 9

' 2

' 9

' 5

Roof1

1050.35 Surface Area

130.85 Total Perimeter Length

10.50 Number of Squares

37.17 Total Ridge Length

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 5

DESCRIPTION QTY

------------------ ROOFING -----------------

286. Remove Metal roofing - ribbed - 24 gauge - up to 1" 1050.35 SF

288. Install Metal roofing - ribbed - 24 gauge - up to 1" 1050.35 SF

289. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 1050.35 SF

290. Closure strips for metal roofing - inside and/or outside 74.33 LF

291. Flashing tape - self-adhesive 413.46 LF

Seal between the metal roof seams

293. Ridge vent - Metal roofing - floating ventilator 37.17 LF

294. Additional screws for 3/4 plywood sheathing 5039.00 EA

Additional screws for 3/4 plywood sheathing above Xactimate pricing. 6% waste added Labor included

295. Additional screws for 2X4 & 2x6 furring & fascia 1082.00 EA

Additional screws for 2X4 & 2x6 furring & fascia above Xactimate pricing. 6% waste added Labor included

299. Drip edge/gutter apron 74.33 LF

300. Install Gable trim for metal roofing - 26 gauge 56.52 LF

301. Material Only Gable trim for metal roofing - 26 gauge 56.52 LF

302. Ice & water barrier 1050.35 SF

304. Install 2" x 4" lumber - treated (.667 BF per LF) 434.00 LF

Roof purlins

305. Material Only 2" x 4" lumber - treated (.667 BF per LF) 434.00 LF

Roof purlins

306. Install 2" x 6" lumber - treated (1 BF per LF) 205.19 LF

For Picture Frame Purlins

307. Material Only 2" x 6" lumber - treated (1 BF per LF) 205.19 LF

For Picture Frame Purlins

308. Install 2" x 6" lumber - treated (1 BF per LF) 223.00 LF

Rafter Blocking

309. Material Only 2" x 6" lumber - treated (1 BF per LF) 223.00 LF

Rafter Blocking

------------------ SOFFIT -----------------

310. Install Soffit - box framing - 1' overhang 98.86 LF

Calculation set for 16" overhang

312. Material Only Soffit - box framing - 1' overhang 98.86 LF

Calculation set for 16" overhang

313. Install Soffit & fascia - wood - 1' overhang 98.86 LF

Calculation set for 16" overhang

314. Material Only Soffit & fascia - wood - 1' overhang 98.86 LF

Calculation set for 16" overhang

315. Baffle vent - foam 74.33 LF

Cut to fit as needed for vents

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 6

CONTINUED - Roof1

DESCRIPTION QTY

317. Soffit vent - linear 37.17 LF

------------------ PAINT -----------------

318. Prime & paint exterior soffit - wood 98.86 SF

320. Prime & paint exterior fascia - wood, 4"- 6" wide 148.67 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

321. Exterior - paint two coats 292.58 SF

322. Siding - hardboard panel - paint grade 292.58 SF

323. House wrap (air/moisture barrier) 292.58 SF

------------------ STRAPPING -----------------

324. 2x10 Joist hangers for rafters 54.00 EA

2x10 Joist hangers for rafters

325. Joist hangers for 2x6 rafter blocking 156.00 EA

Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans

326. Framing hurricane tie 324.00 EA

For rafter tails and gable wall studs top and bottom

327. Install Framing hurricane tie 16.00 EA

For joist to top plate

328. Material Only Framing hurricane tie 16.00 EA

For joist to top plate

330. Framing strap - 24" long 29.00 EA

331. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 156.00 EA

4 @ each rafter section & 24 at the splice on the ridge

NOTES:

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 7

Roof1

(A)F1

(B)F2

Roof2

F3

5'

7' 10" 7' 9" Roof2

43.87 Surface Area

21.30 Total Perimeter Length

0.44 Number of Squares

DESCRIPTION QTY

------------------ ROOFING -----------------

332. Remove Metal roofing - ribbed - 24 gauge - up to 1" 43.87 SF

333. Install Metal roofing - ribbed - 24 gauge - up to 1" 43.87 SF

334. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 43.87 SF

335. Closure strips for metal roofing - inside and/or outside 5.58 LF

336. Flashing tape - self-adhesive 7.86 LF

Seal between the metal roof seams

337. Additional screws for 3/4 sheathing 265.00 EA

Additional screws for 3/4 sheathing above Xactimate allowance. 6% waste added for screws Includes labor

338. Additional screws for 2x4 & 2x6 furring & fascia 103.00 EA

Additional screws for 2x4 & 2x6 furring & fascia above Xactimate allowance. 6% waste added for screws Includes Labor

342. Drip edge/gutter apron 5.58 LF

343. Install Gable trim for metal roofing - 26 gauge 15.71 LF

344. Material Only Gable trim for metal roofing - 26 gauge 15.71 LF

345. Ice & water barrier 43.87 SF

346. Flashing, 20" wide 5.58 LF

347. Neoprene pipe jack flashing for metal roofing 1.00 EA

348. Install 2" x 4" lumber (.667 BF per LF) 11.17 LF

Roof purlins

349. Material Only 2" x 4" lumber (.667 BF per LF) 11.17 LF

Roof purlins

350. Install 2" x 6" lumber (1 BF per LF) 26.88 LF

For Picture Frame

351. Material Only 2" x 6" lumber (1 BF per LF) 26.88 LF

For Picture Frame

352. Install 2" x 6" lumber (1 BF per LF) 5.58 LF

Rafter Blocking

353. Material Only 2" x 6" lumber (1 BF per LF) 5.58 LF

Blocking For Rafters

------------------ SOFFIT -----------------

354. Install Soffit - box framing - 1' overhang 5.58 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 8

CONTINUED - Roof2

DESCRIPTION QTY

Calculation set for 16" overhang

355. Material Only Soffit - box framing - 1' overhang 5.58 LF

Calculation set for 16" overhang

356. Install Soffit & fascia - wood - 1' overhang 5.58 LF

Calculation set for 16" overhang

357. Material Only Soffit & fascia - wood - 1' overhang 5.58 LF

Calculation set for 16" overhang

358. Soffit vent - linear 5.58 LF

Cut to fit for soffit vent

359. Baffle vent - foam 5.58 LF

------------------ PAINT -----------------

360. Prime & paint exterior soffit - wood 7.43 SF

361. Prime & paint exterior fascia - wood, 4"- 6" wide 11.17 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

------------------ STRAPPING -----------------

365. 2x10 Joist hangers for rafters 5.00 EA

2x10 Joist hangers for rafters

366. 2x6 joist hangers for rafter blocking 6.00 EA

2x6 joist hangers for rafter blocking in the roof.

367. Framing hurricane tie 10.00 EA

Rafter to wall hurricane tie - 2 per rafter per plans. (Not GFM)

NOTES:

Main Level Main Level

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

381. R&R Meter mast for overhead power - 2" conduit 1.00 EA

383. R&R Meter base - 200 amp 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 9

CONTINUED - Main Level

DESCRIPTION QTY

384. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA

385. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA

386. Rewire - average residence - copper wiring 895.08 SF

387. R&R Ground fault interrupter (GFI) outlet 1.00 EA

388. R&R Exterior light fixture 2.00 EA

389. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA

390. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF

------------------ WALL REPAIRS-----------------

391. Concrete cutting - wall (per LF per inch of saw depth) 402.00 LF

To straighten the top of the wall where needed

393. Remove Concrete wall - labor & materials - Reinforced 1.00 CY

394. Concrete - General Laborer - per hour 4.00 HR

4 hours per CY of Concrete Wall

395. Concrete Post & Beam construction - Beams 1.84 CY

To pour a bond beam on top of existing wall - includes rebar

458. Concrete Post & Beam construction - Beams 0.75 CY

To pour the 2 beams over the porch area

396. Concrete anchor bolt - 1/2" x 10" 105.00 EA

399. Install 2" x 6" lumber - treated (1 BF per LF) 480.50 LF

For double sill plate on the perimeter

400. Material Only 2" x 6" lumber - treated (1 BF per LF) 480.50 LF

For double sill plate on the perimeter

401. Sill seal foam - 6" 138.50 LF

------------------ SCAFFOLD -----------------

402. Scaffolding Setup & Take down - per hour 32.00 HR

------------------ GENERAL ITEMS -----------------

404. Clean the floor - Heavy 895.08 SF

406. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 10

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Closet 1 (1)

Bathroom 1

9'

3' 2' 8"

3'

8' 11"

3' 9"

3'

3'

2'

1'

1'

3'

3'

10'

4'

4'

4' 7"

4' 3"

Living Room Height: 8'

386.67 SF Walls

575.14 SF Walls & Ceiling

20.94 SY Flooring

48.33 LF Ceil. Perimeter

188.47 SF Ceiling

188.47 SF Floor

48.33 LF Floor Perimeter

Missing Wall 9' 8" X 8' Opens into KITCHEN

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

562. R&R Switch 2.00 EA

563. R&R Light fixture 1.00 EA

564. R&R Outlet 3.00 EA

------------------ DOORS & WINDOWS -----------------

570. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

571. Door lockset & deadbolt - exterior 1.00 EA

572. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

573. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

------------------ ROUGH FRAMING -----------------

698. Remove Sheathing - plywood - 1/2" - treated 155.20 SF

Living room wall next to bedroom 2

699. Install Sheathing - plywood - 1/2" - treated 155.20 SF

700. Material Only Sheathing - plywood - 1/2" - treated 155.20 SF

701. Seal & paint plywood sheathing 155.20 SF

------------------ INSULATION -----------------

579. Batt insulation - 10" - R30 - paper faced 188.47 SF

------------------ WALLS & CEILINGS -----------------

580. Remove Sheathing - plywood - 1/2" - treated 188.47 SF

581. Install Sheathing - plywood - 1/2" - treated 188.47 SF

582. Material Only Sheathing - plywood - 1/2" - treated 188.47 SF

583. Seal & paint plywood sheathing 188.47 SF

584. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 188.47 SF

585. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 188.47 SF

586. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 188.47 SF

587. Cove molding - 3/4" 48.33 LF

------------------ FLOORING -----------------

593. Floor preparation for resilient flooring 188.47 SF

594. Remove Vinyl floor covering (sheet goods) 188.47 SF

595. Vinyl floor covering (sheet goods) 216.74 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 11

CONTINUED - Living Room

DESCRIPTION QTY

15% added for waste

NOTES:

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Closet 1 (1)

Bathroom 1

3'

6"10

9"7"

9'

3' 1' 3"6' 1"

6' 3"

2'

"1'

2'

7'

7'

4"

3' 3'

3'

4'4'

10' Kitchen Height: 8'

296.44 SF Walls

443.83 SF Walls & Ceiling

16.38 SY Flooring

39.83 LF Ceil. Perimeter

147.39 SF Ceiling

147.39 SF Floor

36.50 LF Floor Perimeter

Missing Wall - Goes to Floor 3' 4" X 6' 8" Opens into HALLWAY

Missing Wall 9' 8" X 8' Opens into LIVING_ROOM

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

407. R&R Switch 2.00 EA

408. R&R Light fixture 1.00 EA

409. R&R Outlet 2.00 EA

410. R&R Ground fault interrupter (GFI) outlet 1.00 EA

------------------ DOORS & WINDOWS -----------------

425. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

427. Door lockset & deadbolt - exterior 1.00 EA

428. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

429. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

430. Storm window - aluminum, 12-24 sf 1.00 EA

------------------ ROUGH FRAMING -----------------

702. Remove Sheathing - plywood - 1/2" - treated 80.00 SF

Living room wall next to bedroom 2

703. Install Sheathing - plywood - 1/2" - treated 80.00 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 12

CONTINUED - Kitchen

DESCRIPTION QTY

704. Material Only Sheathing - plywood - 1/2" - treated 80.00 SF

705. Seal & paint plywood sheathing 80.00 SF

------------------ INSULATION -----------------

435. Batt insulation - 10" - R30 - paper faced 147.39 SF

------------------ WALLS & CEILINGS -----------------

436. Remove Sheathing - plywood - 1/2" - treated 147.39 SF

437. Install Sheathing - plywood - 1/2" - treated 147.39 SF

438. Material Only Sheathing - plywood - 1/2" - treated 147.39 SF

439. Seal & paint plywood sheathing 147.39 SF

440. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 147.39 SF

441. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 147.39 SF

442. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 147.39 SF

443. Cove molding - 3/4" 39.83 LF

------------------ FLOORING -----------------

451. Floor preparation for resilient flooring 147.39 SF

453. Remove Vinyl floor covering (sheet goods) 147.39 SF

454. Vinyl floor covering (sheet goods) 169.50 SF

15% added for waste

------------------ CABINETRY -----------------

706. Cabinetry - lower (base) units 7.00 LF

708. R&R Cabinetry - upper (wall) units 5.00 LF

709. Countertop - flat laid plastic laminate 7.00 LF

710. Remove Countertop - concrete 28.00 SF

Times two to cover the 4 inch concrete counter top

------------------GENERAL ITEMS -----------------

457. 5 lb. ABC fire extinguisher 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 13

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Closet 1 (1)

Bathroom 1

3' 2'

2'

1"

4'

4'

10' 2'

4"2"

4"6"

3' 3'

3'

4" 3'

3'

3'

3' 6"

3' 10"

3' 6"

3' 8" Bedroom 1 Height: 8'

320.00 SF Walls

420.00 SF Walls & Ceiling

11.11 SY Flooring

40.00 LF Ceil. Perimeter

100.00 SF Ceiling

100.00 SF Floor

40.00 LF Floor Perimeter

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Closet 1 (1)

Bathroom 1

6'

2'

1' 10"

3'

3'

3'

4" 3'

4"

3'

2' 2" Subroom: Closet 1 (1) Height: 8'

136.00 SF Walls

148.22 SF Walls & Ceiling

1.36 SY Flooring

17.00 LF Ceil. Perimeter

12.22 SF Ceiling

12.22 SF Floor

17.00 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

664. R&R Switch 1.00 EA

665. R&R Light fixture 1.00 EA

666. R&R Outlet 3.00 EA

668. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

670. R&R Interior door unit 1.00 EA

671. Door knob - interior 1.00 EA

674. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

675. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

676. Storm window - aluminum, 3-11 sf 1.00 EA

------------------ ROUGH FRAMING -----------------

722. Install Stud wall - 2" x 4" - 16" oc 160.00 SF

723. Material Only Stud wall - 2" x 4" - 16" oc 160.00 SF

724. Remove Sheathing - plywood - 1/2" - treated 160.00 SF

725. Install Sheathing - plywood - 1/2" - treated 160.00 SF

726. Material Only Sheathing - plywood - 1/2" - treated 160.00 SF

727. Seal & paint plywood sheathing 160.00 SF

------------------ INSULATION -----------------

681. Batt insulation - 10" - R30 - paper faced 112.22 SF

------------------ WALLS & CEILINGS -----------------

683. Install Sheathing - plywood - 1/2" - treated 112.22 SF

684. Material Only Sheathing - plywood - 1/2" - treated 112.22 SF

685. Seal & paint plywood sheathing 112.22 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 14

CONTINUED - Bedroom 1

DESCRIPTION QTY

686. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 112.22 SF

687. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 112.22 SF

688. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 112.22 SF

689. Cove molding - 3/4" 57.00 LF

------------------ A/C OPENING -----------------

690. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

691. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

692. Install Sheathing - plywood - 3/4" - treated 8.00 SF

693. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF

694. Seal & paint plywood sheathing 8.00 SF

To paint A/C Hole in exterior wall

------------------ FLOORING -----------------

695. Floor preparation for resilient flooring 112.22 SF

696. Remove Vinyl floor covering (sheet goods) 112.22 SF

697. Vinyl floor covering (sheet goods) 129.06 SF

15% added for waste

------------------CABINETS -----------------

728. Remove Cabinetry - full height unit 5.00 LF

NOTES:

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Closet 1 (1)

Bathroom 1

7'

7'

2'

0"

2'

0"

10'2'

2"4"

6"4"

2'

1" 3'

3'

5" 2'

1"

3'

3'

3' 6"

3' 8"

3' 6"

3' 8" Bedroom 2 Height: 8'

320.00 SF Walls

420.00 SF Walls & Ceiling

11.11 SY Flooring

40.00 LF Ceil. Perimeter

100.00 SF Ceiling

100.00 SF Floor

40.00 LF Floor Perimeter

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 15

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Closet 1 (1)

Bathroom 1

6'

2' 3"

2' 1"

2'

1"

3'

3'

5" 2'

1"

4"

3'

2' 5" Subroom: Closet 2 (1) Height: 8'

140.00 SF Walls

153.89 SF Walls & Ceiling

1.54 SY Flooring

17.50 LF Ceil. Perimeter

13.89 SF Ceiling

13.89 SF Floor

17.50 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

596. R&R Switch 1.00 EA

597. R&R Light fixture 1.00 EA

598. R&R Outlet 2.00 EA

600. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

602. R&R Interior door unit 1.00 EA

603. Door knob - interior 1.00 EA

606. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

607. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

608. Storm window - aluminum, 3-11 sf 1.00 EA

------------------ ROUGH FRAMING -----------------

611. Install Stud wall - 2" x 4" - 16" oc 160.00 SF

612. Material Only Stud wall - 2" x 4" - 16" oc 160.00 SF

718. Remove Sheathing - plywood - 1/2" - treated 160.00 SF

719. Install Sheathing - plywood - 1/2" - treated 160.00 SF

720. Material Only Sheathing - plywood - 1/2" - treated 160.00 SF

721. Seal & paint plywood sheathing 160.00 SF

------------------ INSULATION -----------------

613. Batt insulation - 10" - R30 - paper faced 113.89 SF

------------------ WALLS & CEILINGS -----------------

614. Remove Sheathing - plywood - 1/2" - treated 113.89 SF

615. Install Sheathing - plywood - 1/2" - treated 113.89 SF

616. Material Only Sheathing - plywood - 1/2" - treated 113.89 SF

617. Seal & paint plywood sheathing 113.89 SF

618. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 113.89 SF

619. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 113.89 SF

620. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 113.89 SF

621. Cove molding - 3/4" 57.50 LF

------------------ A/C OPENING -----------------

622. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 16

CONTINUED - Bedroom 2

DESCRIPTION QTY

To fill A/C Hole in exterior wall

623. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

624. Install Sheathing - plywood - 3/4" - treated 8.00 SF

625. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF

626. Seal & paint plywood sheathing 8.00 SF

To paint A/C Hole in exterior wall

------------------ FLOORING -----------------

627. Floor preparation for resilient flooring 113.89 SF

628. Remove Vinyl floor covering (sheet goods) 113.89 SF

629. Vinyl floor covering (sheet goods) 130.97 SF

15% added for waste

------------------CABINETS -----------------

717. Remove Cabinetry - full height unit 5.00 LF

NOTES:

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1) Bedroom 1

Closet 1 (1)

Bathroom 1

4' 11"

5' 5"

7'

7'

2' 10" 1'

8"

2'

0" 2'

0"

2'

1'

3'

3'

11' 5"

11' 3"

4' 4'

9'

9'

Bedroom3 Height: 8'

458.67 SF Walls

608.16 SF Walls & Ceiling

16.61 SY Flooring

57.33 LF Ceil. Perimeter

149.49 SF Ceiling

149.49 SF Floor

57.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

494. R&R Switch 1.00 EA

495. R&R Light fixture 1.00 EA

496. R&R Outlet 3.00 EA

498. Smoke detector 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 17

CONTINUED - Bedroom3

DESCRIPTION QTY

------------------ DOORS & WINDOWS -----------------

500. R&R Interior door unit 1.00 EA

501. Door knob - interior 1.00 EA

504. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

505. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

------------------ INSULATION -----------------

511. Batt insulation - 10" - R30 - paper faced 149.49 SF

------------------ WALLS & CEILINGS -----------------

513. Install Sheathing - plywood - 1/2" - treated 149.49 SF

514. Material Only Sheathing - plywood - 1/2" - treated 149.49 SF

515. Seal & paint plywood sheathing 149.49 SF

516. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 149.49 SF

517. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 149.49 SF

518. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 149.49 SF

519. Cove molding - 3/4" 57.33 LF

------------------ A/C OPENING -----------------

520. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

521. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

522. Install Sheathing - plywood - 3/4" - treated 8.00 SF

523. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF

524. Seal & paint plywood sheathing 8.00 SF

To paint A/C Hole in exterior wall

------------------ FLOORING -----------------

525. Floor preparation for resilient flooring 149.49 SF

526. Remove Vinyl floor covering (sheet goods) 149.49 SF

527. Vinyl floor covering (sheet goods) 171.92 SF

15% added for waste

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 18

CONTINUED - Bedroom3

DESCRIPTION QTY

NOTES:

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Closet 1 (1)

Bathroom 1

6' 9"

6' 5"

2'

2"

1'

1'

6' 11"

2' 1'

1'

1'

Bathroom 1 Height: 8'

166.67 SF Walls

192.33 SF Walls & Ceiling

2.85 SY Flooring

20.83 LF Ceil. Perimeter

25.67 SF Ceiling

25.67 SF Floor

20.83 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

459. R&R Switch 1.00 EA

460. R&R Light fixture 1.00 EA

------------------ DOORS & WINDOWS -----------------

466. R&R Interior door unit 1.00 EA

467. Door knob - interior 1.00 EA

470. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

471. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

474. Security/storm shutter 7.50 SF

------------------ INSULATION -----------------

477. Batt insulation - 10" - R30 - paper faced 25.67 SF

------------------ WALLS & CEILINGS -----------------

712. Install Sheathing - plywood - 1/2" - treated 25.67 SF

Rafters will be used as the joists

713. Material Only Sheathing - plywood - 1/2" - treated 25.67 SF

714. Seal & paint plywood sheathing 25.67 SF

485. Cove molding - 3/4" 20.83 LF

------------------ PLUMBING -----------------

736. Plumbing - Labor Minimum 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 19

CONTINUED - Bathroom 1

DESCRIPTION QTY

For Plumbing fixture supply line

NOTES:

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Closet 1 (1)

Bathroom 1

2'

2'

2' 2"

2'

2' 2"

7'

7'

2' 6"2' 10"

1'

8"

7'

Bathroom 2 Height: 8'

208.00 SF Walls

250.00 SF Walls & Ceiling

4.67 SY Flooring

26.00 LF Ceil. Perimeter

42.00 SF Ceiling

42.00 SF Floor

26.00 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

528. R&R Switch 1.00 EA

529. R&R Light fixture 1.00 EA

------------------ DOORS & WINDOWS -----------------

534. R&R Interior door unit 1.00 EA

535. Door knob - interior 1.00 EA

538. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

539. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

542. Security/storm shutter - roll-up type 5.00 SF

------------------ INSULATION -----------------

545. Batt insulation - 10" - R30 - paper faced 42.00 SF

------------------ WALLS & CEILINGS -----------------

547. Install Sheathing - plywood - 1/2" - treated 42.00 SF

548. Material Only Sheathing - plywood - 1/2" - treated 42.00 SF

549. Seal & paint plywood sheathing 42.00 SF

550. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 42.00 SF

551. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 42.00 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 20

CONTINUED - Bathroom 2

DESCRIPTION QTY

552. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 42.00 SF

553. Cove molding - 3/4" 26.00 LF

NOTES:

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Closet 1 (1)

Bathroom 1

4'

4'

4' 7"

4' 3"

4"

3'

6"10

9"7" 2"

4"6" 2'

1' 10"

2' 3"

2' 1"

2'

Hallway Height: 8'

169.78 SF Walls

202.72 SF Walls & Ceiling

3.66 SY Flooring

24.00 LF Ceil. Perimeter

32.94 SF Ceiling

32.94 SF Floor

20.67 LF Floor Perimeter

Missing Wall - Goes to Floor 3' 4" X 6' 8" Opens into KITCHEN

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

630. R&R Switch 1.00 EA

631. R&R Light fixture 1.00 EA

635. Carbon monoxide detector 1.00 EA

------------------ ROUGH FRAMING -----------------

645. Install Stud wall - 2" x 4" - 16" oc 128.00 SF

646. Material Only Stud wall - 2" x 4" - 16" oc 128.00 SF

730. Remove Sheathing - plywood - 1/2" - treated 128.00 SF

731. Install Sheathing - plywood - 1/2" - treated 128.00 SF

732. Material Only Sheathing - plywood - 1/2" - treated 128.00 SF

733. Seal & paint plywood sheathing 128.00 SF

------------------ INSULATION -----------------

647. Batt insulation - 10" - R30 - paper faced 32.94 SF

------------------ WALLS & CEILINGS -----------------

648. Remove Sheathing - plywood - 1/2" - treated 32.94 SF

649. Install Sheathing - plywood - 1/2" - treated 32.94 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 21

CONTINUED - Hallway

DESCRIPTION QTY

650. Material Only Sheathing - plywood - 1/2" - treated 32.94 SF

651. Seal & paint plywood sheathing 32.94 SF

652. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 32.94 SF

653. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 32.94 SF

654. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 32.94 SF

655. Cove molding - 3/4" 24.00 LF

------------------ FLOORING -----------------

661. Floor preparation for resilient flooring 32.94 SF

662. Remove Vinyl floor covering (sheet goods) 32.94 SF

663. Vinyl floor covering (sheet goods) 37.88 SF

15% added for waste

------------------CABINETS -----------------

729. Remove Cabinetry - full height unit 3.00 LF

NOTES:

CNMI DATA

CNMI Data1' 4"

CNMI Data Height: 4"

1.57 SF Walls

2.92 SF Walls & Ceiling

0.15 SY Flooring

4.70 LF Ceil. Perimeter

1.36 SF Ceiling

1.36 SF Floor

4.70 LF Floor Perimeter

DESCRIPTION QTY

210. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO

211. Material Only LATITUDE DAMAGED DWELLING 15.17 DE

15.174287

212. Material Only LONGITUDE DAMAGED DWELLING 145.78 DE

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 22

CONTINUED - CNMI Data

DESCRIPTION QTY

145.781513

213. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO

214. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO

215. Material Only DOES DWELLING HAVE A SEPTIC TANK 1.00 YS

Lat: 15.174265 Long: 145.781664

216. DOES DWELLING HAVE A WELL 0.00 NO

217. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO

218. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 2003.00 YR

219. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO

220. Material Only ENCROACHMENT ISSUES 0.00 NO

221. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO

222. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 EA

223. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 893.00 SF

224. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO

225. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

226. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

ROOF

227. Material Only IS DWELLING DESTROYED 0.00 NO

228. Material Only FOUNDATION TYPE 1.00 UN

SLAB

229. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO

230. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

231. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO

232. Material Only DID THE MILITARY PROVIDE A TENT 0.00 NO

233. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

ROOF

234. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO

235. Material Only LATITUDE OUT BUILDING 0.00 DE

236. Material Only LONGITUDE OUT BUILDING 0.00 DE

237. Material Only LATITUDE POWER POLE 15.17 DE

15.174447

238. Material Only LONGITUDE POWER POLE 145.78 DE

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 23

CONTINUED - CNMI Data

DESCRIPTION QTY

145.781657

239. Material Only LATITUDE WATER METER 15.17 DE

15.174110

240. Material Only LONGITUDE WATER METER 145.78 DE

145.781454

241. Material Only LATITUDE SEPTIC TANK 15.17 DE

15.174265

242. Material Only LONGITUDE SEPTIC TANK 145.78 DE

145.781664

NOTES:

Grand Total Areas:

2,755.12 SF Walls 896.44 SF Ceiling SF Walls and Ceiling3,651.56

896.44 SF Floor 99.60 SY Flooring 347.79 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 354.45 LF Ceil. Perimeter

896.44 Floor Area 975.58 Total Area 2,755.12 Interior Wall Area 1,412.00 Exterior Wall Area 143.20 Exterior Perimeter of

Walls

1,094.21 Surface Area 10.94 Number of Squares 152.15 Total Perimeter Length

37.17 Total Ridge Length 0.00 Total Hip Length

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 24

1 Main Level - 1-Scope Notes

Date Taken: 11/26/2019

Taken By: Darlene Hbbard

2 Main Level - 2-Scope Notes

Date Taken: 11/26/2019

Taken By: Darlene Hbbard

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 25

3 Main Level - 3-Scope Notes

Date Taken: 11/26/2019

Taken By: Darlene Hbbard

4 Main Level - 4-Scope Notes

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 26

5 Main Level - 5-Front Elevation

Date Taken: 11/26/2019

Taken By: Casey Hoak

Site visit with Jorge Rivera, PE which determined to install gable roof but turn from the presently installed roof.

Saw cut 67LF on left and right elevation (see sketch). Pour bond beam EPW X 10" and pour additional concrete beam 1'X1'X19" (see sketch)

6 Main Level - 6-Front Elevation

Taken By: Casey Hoak

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 27

7 Main Level - 7-Front Elevation

Date Taken: 11/26/2019

Taken By: Casey Hoak

8 Main Level - 8-Front Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 28

9 Main Level - 9-Front Elevation

Date Taken: 11/26/2019

Taken By: Casey Hoak

10 Main Level - 10-Front Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 29

11 Main Level - 11-Left Elevation

Date Taken: 11/26/2019

Taken By: Casey Hoak

12 Main Level - 12-Left Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 30

13 Main Level - 13-Back Elevation

Date Taken: 11/26/2019

Taken By: Casey Hoak

14 Main Level - 14-Back Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 31

15 Main Level - 15-Back Elevation

Date Taken: 11/26/2019

Taken By: Casey Hoak

16 Main Level - 16-Right Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 32

17 Main Level - 17-Right Elevation

Date Taken: 11/26/2019

Taken By: Casey Hoak

Back corner looking at covered porch

18 Main Level/Living Room - 18- Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Remove ceiling and joists, replace CJM add insulation and paint. Electric=2 switch, 1 lights, 3 outlets. R/R 12LF 2X4 damaged framing and sheathing.

No damage windows and shutters present. R&R damaged exterior door, paint trim and all 6 sides of the door.

R/R FCV.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 33

19 Main Level/Living Room - 19- Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

20 Main Level/Living Room - 20- Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 34

21 Main Level/Living Room - 21- Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

22 Main Level/Living Room - 22- Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 35

23 Main Level/Living Room - 23- Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

24 Main Level/Living Room - 24- Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 36

25 Main Level/Kitchen - 25-Kitchen

Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=Replace 220 amp main panel, 2 switch, 1 lights, 2 outlets, 1GFI. R/R 10LF 2X4 damaged framing and sheathing. R/R 1 4X4 broken window and shutters present. R&R damaged exterior door, paint trim and all 6 sides of the door.

R/R FCV. Remove 7LF concrete counter top with sides. Add 7LF base cabinet, 7LF laminate counter top, add 5LF upper cabinet.

26 Main Level/Kitchen - 26-Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 37

27 Main Level/Kitchen - 27-Kitchen

Date Taken: 11/26/2019

Taken By: Casey Hoak

28 Main Level/Kitchen - 28-Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 38

29 Main Level/Kitchen - 29-Kitchen

Date Taken: 11/26/2019

Taken By: Casey Hoak

30 Main Level/Kitchen - 30-Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 39

31 Main Level/Kitchen - 31-Kitchen

Date Taken: 11/26/2019

Taken By: Casey Hoak

32 Main Level/Bedroom 1 - 32- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights, 3 outlets. Remove 5LF 2X4 damaged framing, add 21LF sheathing.

Enclose A/C opening. R/R 3X3 damaged window and shutters present. R&R damaged interior door, paint trim and all 6 sides of the door.

R/R FCV. Remove 5LF full-height cabinets. Add smoke detector.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 40

33 Main Level/Bedroom 1 - 33- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

34 Main Level/Bedroom 1 - 34- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 41

35 Main Level/Bedroom 1 - 35- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

36 Main Level/Bedroom 1 - 36- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 42

37 Main Level/Bedroom 1 - 37- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

38 Main Level/Bedroom 1 - 38- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 43

39 Main Level/Bedroom 1 - 39- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

40 Main Level/Bedroom 1 - 40- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 44

41 Main Level/Bedroom 1 - 41- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

42 Main Level/Bedroom 2 - 42- Bedroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights, 2 outlets. R/R 21LF sheathing. Enclose A/C opening. R/R 3X3 damaged window and shutters present. R&R damaged interior door, paint trim and all 6 sides of the door. R/R FCV.

Remove 5LF full-height cabinets. Add smoke detector.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 45

43 Main Level/Bedroom 2 - 43- Bedroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

44 Main Level/Bedroom 2 - 44- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 46

45 Main Level/Bedroom 2 - 45- Bedroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

46 Main Level/Bedroom 2 - 46- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 47

47 Main Level/Bedroom 2 - 47- Bedroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

48 Main Level/Bedroom 2 - 48- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 48

49 Main Level/Bedroom 2 - 49- Bedroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

50 Main Level/Bedroom 2 - 50- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 49

51 Main Level/Bedroom 2 - 51- Bedroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

52 Main Level/Bedroom3 - 52- Bedroom 3 Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights, 3 outlets. Enclose A/C opening. No damage to windows and shutters present. R&R damaged interior door, paint trim and all 6 sides of the door.

R/R FCV. Add smoke detector.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 50

53 Main Level/Bedroom3 - 53- Bedroom 3 Date Taken: 11/26/2019

Taken By: Casey Hoak

54 Main Level/Bedroom3 - 54- Bedroom 3

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 51

55 Main Level/Bedroom3 - 55- Bedroom 3 Date Taken: 11/26/2019

Taken By: Casey Hoak

56 Main Level/Bedroom3 - 56- Bedroom 3

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 52

57 Main Level/Bedroom3 - 57- Bedroom 3 Date Taken: 11/26/2019

Taken By: Casey Hoak

58 Main Level/Bedroom3 - 58- Bedroom 3

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 53

59 Main Level/Bedroom3 - 59- Bedroom 3 Date Taken: 11/26/2019

Taken By: Casey Hoak

60 Main Level/Bathroom 1 - 60- Bathroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights.

No damage to window, add 2X2 shutter. R&R damaged interior door, paint trim and all 6 sides of the door.

No damage to toilet or sink, add supply line and P-trap.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 54

61 Main Level/Bathroom 1 - 61- Bathroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

62 Main Level/Bathroom 1 - 62- Bathroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 55

63 Main Level/Bathroom 1 - 63- Bathroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

64 Main Level/Bathroom 1 - 64- Bathroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 56

65 Main Level/Bathroom 1 - 65- Bathroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

66 Main Level/Bathroom 2 - 66- Bathroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

Bathroom 2 never completed.

Damage to ceiling and roof. Remove joists, replace CM add insulation and paint. R/R 1 damaged interior door.

No damage to window, add 18"X18" shutter

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 57

67 Main Level/Bathroom 2 - 67- Bathroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

68 Main Level/Bathroom 2 - 68- Bathroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 58

69 Main Level/Bathroom 2 - 69- Bathroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

70 Main Level/Hallway - 70-Hallway

Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint. Electric=1 switch, 1 lights.

R/R 3LF sheathing. R/R FCV.

Remove 3LF full-height cabinets.

Add C/O

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 59

71 Main Level/Hallway - 71-Hallway

Date Taken: 11/26/2019

Taken By: Casey Hoak

72 Main Level/Hallway - 72-Hallway

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 60

73 Main Level/Hallway - 73-Hallway

Date Taken: 11/26/2019

Taken By: Casey Hoak

74 74-Outdoor Kitchen

Date Taken: 11/26/2019

Taken By: Casey Hoak

Remove existing roof, remove 4LF upper cabinets.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 61

75 75-Outdoor Kitchen

Date Taken: 11/26/2019

Taken By: Casey Hoak

76 76-Outdoor Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 62

77 77-Outdoor Kitchen

Date Taken: 11/26/2019

Taken By: Casey Hoak

78 78-Outdoor Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 63

79 101-Living room

Date Taken: 2/17/2019

Taken By: Darlene Hbbard

Entry door

80 102-Living room

Date Taken: 2/17/2019

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 64

81 103-Living room

Date Taken: 2/17/2019

Taken By: Darlene Hbbard

82 104-Living room

Date Taken: 2/17/2019

Entry door

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 65

83 105-Living room

Date Taken: 2/17/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof temporary repairs made

84 106-Living room

Date Taken: 2/17/2019

Taken By: Darlene Hbbard

Damage to vinyl flooring need to replace

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 66

85 107-Living room

Date Taken: 2/17/2019

Taken By: Darlene Hbbard

Damage to interior wall replace

86 108-Indoor kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 67

87 109-Indoor kitchen

Date Taken: 2/17/2019

Taken By: Darlene Hbbard

88 110-Indoor kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 68

89 111-Indoor kitchen

Date Taken: 2/17/2019

Taken By: Darlene Hbbard

Damaged interior wall, replace

90 112-Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-450706334_RA 12/8/2019 Page: 69

91 113-Kitchen

Date Taken: 2/17/2019

Taken By: Darlene Hbbard

Damage to ceiling and roof

92 114-Kitchen

Date Taken: 2/17/2019

Damage to vinyl tile, replace

CNMI-450706334_RA 12/8/2019 Page: 70

Main Level

Porch

Bedroom3

Bathroom 2

Kitchen Living Room

Bedroom 2

Hallway

Closet 2 (1)

Bedroom 1

Saw Cut & Bond Beam entire wall

Closet 1 (1)

Saw Cut & Bond Beam entire wall

Bathroom 1

Framed 2x4

Bond Beam Only

Main Level

CNMI-450706334_RA 12/8/2019 Page: 71

ROOF

Roof1

(A)F1

(B)F2

Roof2

F3

ROOF

CNMI-450706334_RA 12/8/2019 Page: 72

PLOT

Water Meter (A6)

Septic (A2)

Power Pole (A5)

Damaged Dwelling (A4)

Mangga Street (A3)

Plot (A1)

PLOT

CNMI-450706334_RA 12/8/2019 Page: 73

CNMI DATA

CNMI Data

CNMI DATA

File details come from the government source that posted it. Updated .