Dewberry

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

Insured: SHALINI KATTA Home: (670) 788-8554 Cellular: (670) 789-4452Home: ROUTE 37 TR 22549 NEW-R1 TANU LANE

ASLITO, HI 96701

Property: ROUTE 37 TR 22549 NEW-R1 TANU LANE

ASLITO, HI

Claim Rep.: Casey Hoak

Estimator: Casey Hoak

Claim Number: CNMI-412601742 Policy Number: CNMI-412601742 Type of Loss: Hurricane

Date Contacted: 11/25/2019 12:30 AM Date of Loss: 10/25/2018 5:00 AM Date Received: 6/4/2019 9:23 AM

Date Inspected: 6/5/2019 8:00 PM Date Entered: 11/24/2019 9:44 AM

Date Est. Completed: 6/6/2019 2:25 PM

Price List: HIOI8X_JAN19 Restoration/Service/Remodel

Estimate: CNMI-412601742_RA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 2

11/24/2019 CMH

Site visits batch of 4 next 20 Attending Casey Hoak, DeDe Hubbard, Brunson Taylor, Jorge Rivera PE This home was visited on a joint site visit back in August for the initial set of 40. The home has not suffered any new damage since that scope was written. Changes were made only to the gable end wall to make them 2x6 instead of 2x4.

Scaffold labor and a dumpster for hauling the debris off have also been added per FEMA Guidance. All other items listed remain the same. The roof design that was written has been reviewed by PE Jorge Rivera and he is in agreement with the design of the roof. A new set of photos has been added to the file to document the present condition of the home as of today.

JOINT SCOPING SUMMARY 8/23/2019:CMH

Attendees: FEMA : Robert Strayhorn, Chris Craft. Dewberry: Casey Hoak, Marvin Davis, DeDe Hubbard.

Roof design agreed to at joint site visit: Gable roof with Shed over Kitchen portion. Saw cut 2 gable end walls level and Pour 10" Bond Beam on the exterior perimeter wall.

Framing damaged 2x4 walls in the living room and laundry room. Framing a 2x6 exterior wall on the kitchen per FEMA to replace the damaged one present.

All other exterior walls are concrete. Installing sheathing to replace damaged sheathing in bedroom 2 where old door was covered up.

Foundation appears in good condition and should not need any work.

Windows are being replaced that were damaged with all windows getting storm shutters.

No damage to any ceramic tile floor.

All damaged doors to be replaced, paint trim and all 6 sides of the door will be added The electrical of the home will include replacement of the mast head, meter base, and 200 amp panel.

The actual count of plugs, switches and lights that were present at the time of the storm are to be replaced.

Bathrooms and Kitchens that have existing electrical outlets within 6 feet of a sink are to be protected by a GFIC per code and per FEMA Guidance. Per FEMA guidance all exterior plugs are to be replaced with a GFI.

When no plugs existed prior in these rooms or the exterior none will be added to the estimate.

Rewiring of the entire home done by the floor's square footage will be done without conduit unless needed and approved by

FEMA.

All available GFM (Government Supplied Material was identified).

All changes were agreed upon by all parties and are made a part of this revised report.

INSPECTION SUMMARY

The applicants Mother Sankita Katta met at the damaged dwelling and the following was observed.

The dwelling is a one story CMU with a metal roof and slab on grade. The home has four occupants and 2 bedrooms occupied.

The dwelling is deemed to be repairable . The one structural component damaged is the roof Reconstruction should take approximately 16 weeks from start of construction.

AGE: 2002

DAMAGE AND REPAIR SUMMARY

See attached estimate for exact repair and line items.

LATITUDE: 15.133895

LONGITUDE: 145.718454

A: ROOF: The roof is destroyed and will require replacement from the framing up. The garage portion will not be included in the replacement of the roof. A gable roof will be put over the main dwelling with a shed roof installed over the kitchen.

B: INTERIOR: The interior will require new ceiling joists, wood ceilings, window shutters, both exterior and interior doors, and painting for all doors. In the kitchen lower & upper cabinets removed and replaced with

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 3

8 LF bottom and 8LF upper with counter top. Concrete counter top will be removed and laminate replaced. There is damage to the interior walls in the Kitchen Living and Laundry Rooms.

C: STRUCTURAL: The slab is intact and are not damaged.

D: MECHANICAL OK, PLUMBING: Replace sink and faucet, WATER SYSTEM: OK

E: ELECTRICAL: All electric will need replacing from the masthead in to include plugs switches lights meter and panel.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 4

CNMI-412601742_RA

Roof Roof

DESCRIPTION QTY

1. Material Only 2" x 6" x 20' #2 treated pine (material only) 4.00 EA

2. Material Only 2" x 6" x 18' #2 treated pine (material only) 8.00 EA

3. Material Only 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 32.00 EA

For gable end walls

5. Material Only 2" x 6" x 14' #2 treated pine (material only) 4.00 EA

6. Material Only 2" x 6" x 10' #2 treated pine (material only) 4.00 EA

7. Material Only 2" x 6" x 8' #2 treated pine (material only) 23.00 EA

8. Material Only 2" x 10" x 18' #2 treated pine (material only) 12.00 EA

9. Material Only 2" x 10" x 16' #2 treated pine (material only) 52.00 EA

10. Material Only 2" x 12" x 18' #2 treated pine (material only) 5.00 EA

11. Material Only 2" x 12" x 20' #2 treated pine (material only) 4.00 EA

12. Material Only 2" x 12" x 16' #2 treated pine (material only) 8.00 EA

14. Rafters - 2x6 - Labor only - (using rafter length) 475.68 LF

For gable end walls and collar ties

15. Rafters - 2x10 - Labor only - (using rafter length) 942.60 LF

16. Rafters - 2x12 - Labor only - (using rafter length) 285.19 LF

For Ridge beam and fascia

17. Install Sheathing - plywood - 1/2" - treated 386.30 SF

18. Material Only Sheathing - plywood - 1/2" - treated 386.30 SF

19. Install Sheathing - plywood - 3/4" - treated 1312.00 SF

20. Material Only Sheathing - plywood - 3/4" - treated 1312.00 SF

251. Siding - hardboard panel - paint grade 193.20 SF

252. Remove House wrap (air/moisture barrier) 193.20 SF

------------------ ROOFING -----------------

21. Install Metal roofing - ribbed - 24 gauge - up to 1" 1306.31 SF

22. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 1306.31 SF

23. Closure strips for metal roofing - inside and/or outside 71.62 LF

24. Flashing tape - self-adhesive 480.38 LF

Seal between the metal roof seams

25. Ridge vent - Metal roofing - floating ventilator 35.81 LF

26. Additional screws for 3/4 plywood sheathing 4413.00 EA

Additional screws for 3/4 plywood sheathing above Xactimate allowance 6 % waste added

27. Additional screws for 2X4 furring 1011.00 EA

Additional screws for 2X4 furring above Xactimate allowance 6 % waste added

28. Additional screws for 2x6 furring 434.00 EA

Additional screws for 2x6 furring above Xactimate allowance 6 % waste added

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 5

CONTINUED - Roof

DESCRIPTION QTY

29. Additional screws for fascia 115.00 EA

Additional screws for fascia above Xactimate allowance 6 % waste added

31. Drip edge/gutter apron 71.62 LF

32. Install Gable trim for metal roofing - 26 gauge 90.96 LF

33. Material Only Gable trim for metal roofing - 26 gauge 90.56 LF

34. Ice & water barrier 1306.31 SF

35. Neoprene pipe jack flashing for metal roofing 1.00 EA

36. Install 2" x 4" lumber - treated (.667 BF per LF) 536.71 LF

Roof purlins

37. Material Only 2" x 4" lumber - treated (.667 BF per LF) 536.71 LF

Roof purlins

38. Install 2" x 6" lumber - treated (1 BF per LF) 285.46 LF

For Picture Frame Purlins

39. Material Only 2" x 6" lumber - treated (1 BF per LF) 285.46 LF

For Picture Frame Purlins

40. Install 2" x 6" lumber - treated (1 BF per LF) 282.85 LF

Rafter Blocking

41. Material Only 2" x 6" lumber - treated (1 BF per LF) 282.85 LF

Rafter Blocking

------------------ SOFFIT -----------------

42. Install Soffit - box framing - 1' overhang 89.64 LF

Calculation set for 16" overhang

43. Material Only Soffit - box framing - 1' overhang 89.64 LF

Calculation set for 16" overhang

44. Install Soffit & fascia - wood - 1' overhang 89.64 LF

Calculation set for 16" overhang

45. Material Only Soffit & fascia - wood - 1' overhang 89.64 LF

Calculation set for 16" overhang

46. Baffle vent - foam 71.62 LF

Cut to fit as needed for vents

47. Soffit vent - linear 44.31 LF

------------------ PAINT -----------------

48. Exterior - paint two coats 386.30 SF

To paint end walls

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 6

CONTINUED - Roof

DESCRIPTION QTY

49. Prime & paint exterior soffit - wood 95.25 SF

50. Prime & paint exterior fascia - wood, 4"- 6" wide 143.24 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

------------------ STRAPPING -----------------

51. 2x10 Joist hangers for rafters 52.00 EA

2x10 Joist hangers for rafters

52. Joist hangers for 2x6 rafter blocking 218.00 EA

Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans

53. Framing hurricane tie 188.00 EA

For rafter tails and gable wall studs top and bottom

54. Install Framing hurricane tie 82.00 EA

For joist to top plate

55. Material Only Framing hurricane tie 82.00 EA

For joist to top plate

57. Framing strap - 24" long 28.00 EA

58. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 128.00 EA

4 @ each rafter section & 24 at the splice on the ridge

NOTES:

Document 1

Main Level Main Level

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

59. R&R Meter mast for overhead power - 2" conduit 1.00 EA

60. R&R Meter base - 200 amp 1.00 EA

61. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA

62. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA

63. Rewire - average residence - copper wiring 1111.59 SF

64. R&R Ground fault interrupter (GFI) outlet 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 7

CONTINUED - Main Level

DESCRIPTION QTY

65. R&R Exterior light fixture 1.00 EA

66. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA

67. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF

------------------ WALL REPAIRS-----------------

68. Concrete cutting - wall (per LF per inch of saw depth) 336.00 LF

To straighten the top of the wall where needed

69. Remove Concrete wall - labor & materials - Reinforced 1.00 CY

70. Concrete - General Laborer - per hour 4.00 HR

4 hours per CY of Concrete Wall

71. Concrete Post & Beam construction - Beams 2.36 CY

To pour a bond beam on top of existing wall - includes rebar

72. Concrete anchor bolt - 1/2" x 10" 116.00 EA

73. Install 2" x 6" lumber - treated (1 BF per LF) 484.02 LF

For double sill plate on the perimeter

74. Material Only 2" x 6" lumber - treated (1 BF per LF) 484.02 LF

For double sill plate on the perimeter

75. Sill seal foam - 6" 153.78 LF

------------------ SCAFFOLD -----------------

277. Scaffolding Setup & Take down - per hour 32.00 HR

------------------ GENERAL ITEMS -----------------

76. Clean the floor - Heavy 1111.59 SF

279. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA

NOTES:

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 8

KitchenG

FC

I

Laundry Room Bedroom 2

Living Room Bedroom 1

Bathroom 3'

8'

8'

4'

4'

3'

' 4

' 8

6"4"

3' 8' 7"

8' 9"

2' 3" 3' 1' 9"

1' 11"

9' 1"

2'

8'

13' 6"

3' 8" 6" Living Room Height: 8'

546.67 SF Walls

825.67 SF Walls & Ceiling

31.00 SY Flooring

68.33 LF Ceil. Perimeter

279.00 SF Ceiling

279.00 SF Floor

68.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

77. R&R Switch 6.00 EA

78. R&R Light fixture 1.00 EA

79. R&R Outlet 4.00 EA

80. Smoke detector 1.00 EA

81. Carbon monoxide detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

82. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

83. Door lockset & deadbolt - exterior 1.00 EA

84. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

85. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

86. Security/storm shutter 70.00 SF

------------------ ROUGH FRAMING -----------------

87. Remove Stud wall - 2" x 4" - 16" oc 88.00 SF

To replace damaged interior wall, including framing, sheathing and paint.

88. Install Stud wall - 2" x 4" - 16" oc 88.00 SF

89. Material Only Stud wall - 2" x 4" - 16" oc 88.00 SF

90. Remove Sheathing - plywood - 1/2" - treated 88.00 SF

91. Install Sheathing - plywood - 1/2" - treated 88.00 SF

92. Material Only Sheathing - plywood - 1/2" CDX 88.00 SF

93. Seal & paint plywood sheathing 88.00 SF

------------------ INSULATION -----------------

94. Batt insulation - 10" - R30 - paper faced 279.00 SF

------------------ WALLS & CEILINGS -----------------

95. Install Sheathing - plywood - 1/2" - treated 279.00 SF

96. Material Only Sheathing - plywood - 1/2" CDX 279.00 SF

97. Seal & paint plywood sheathing 279.00 SF

98. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 279.00 SF

99. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 279.00 SF

100. Cove molding - 3/4" 68.33 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 9

CONTINUED - Living Room

DESCRIPTION QTY

NOTES:

KitchenG

FC

I

Laundry Room Bedroom 2

Living Room Bedroom 1

Bathroom

3'

' 9

' 1

1'

2'

3' 6'6' 10"

7' 2"

3' 1'

1'

6'

2'

0" 2'

3'

11' 11"

12' 3"

11" 1' 1"2'5' 5"

8' 9"

8' 11" Kitchen Height: 8'

517.33 SF Walls

778.58 SF Walls & Ceiling

29.03 SY Flooring

64.67 LF Ceil. Perimeter

261.25 SF Ceiling

261.25 SF Floor

64.67 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

101. R&R Switch 1.00 EA

102. R&R Light fixture 1.00 EA

103. R&R Outlet 1.00 EA

104. R&R Ground fault interrupter (GFI) outlet 2.00 EA

------------------ DOORS & WINDOWS -----------------

105. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

106. Door lockset & deadbolt - exterior 1.00 EA

107. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

108. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

253. Add. charge for a retrofit window, 3-11 sf - difficult 2.00 EA

109. Storm window - aluminum, 3-11 sf 2.00 EA

110. Security/storm shutter 24.00 SF

------------------ ROUGH FRAMING -----------------

111. Install Stud wall - 2" x 6" - 16" oc 152.00 SF

Exterior wall replace per FEMA request. Sheathing and seal & paint both sides

112. Material Only Stud wall - 2" x 6" - 16" oc 152.00 SF

113. Remove Sheathing - plywood - 1/2" - treated 304.00 SF

114. Install Sheathing - plywood - 1/2" - treated 304.00 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 10

CONTINUED - Kitchen

DESCRIPTION QTY

115. Material Only Sheathing - plywood - 1/2" CDX 304.00 SF

116. Seal & paint plywood sheathing 304.00 SF

------------------ INSULATION -----------------

117. Batt insulation - 10" - R30 - paper faced 261.25 SF

------------------ WALLS & CEILINGS -----------------

118. Remove Sheathing - plywood - 1/2" - treated 261.25 SF

119. Install Sheathing - plywood - 1/2" - treated 261.25 SF

120. Material Only Sheathing - plywood - 1/2" CDX 261.25 SF

121. Seal & paint plywood sheathing 261.25 SF

122. Cove molding - 3/4" 64.67 LF

------------------ CABINETRY -----------------

123. Remove Cabinetry - lower (base) units 14.00 LF

124. Cabinetry - lower (base) units 8.00 LF

125. R&R Cabinetry - upper (wall) units 8.00 LF

126. Remove Countertop - concrete 28.00 SF

127. Countertop - flat laid plastic laminate 8.00 LF

------------------ PLUMBING -----------------

128. Sink - single 1.00 EA

129. Sink faucet - Kitchen 1.00 EA

------------------GENERAL ITEMS -----------------

130. 5 lb. ABC fire extinguisher 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 11

KitchenG

FC

I

Laundry Room Bedroom 2

Living Room Bedroom 1

Bathroom

2' 7' 11" 8' 3"

3' 2" 3' 4"

2'

4'

4'

1"

' 1 1"

' 3

2' 6" 5' 10"4' 9"

2'

8'

Bedroom 1 Height: 8'

540.00 SF Walls

810.39 SF Walls & Ceiling

30.04 SY Flooring

67.50 LF Ceil. Perimeter

270.39 SF Ceiling

270.39 SF Floor

67.50 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

131. R&R Switch 1.00 EA

132. R&R Light fixture 1.00 EA

133. R&R Outlet 4.00 EA

134. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

135. R&R Interior door unit 2.00 EA

136. Door knob - interior 2.00 EA

137. Paint door slab only - 2 coats (per side) 4.00 EA

Painting all 6 sides of door

138. Paint door/window trim & jamb - 2 coats (per side) 4.00 EA

139. Security/storm shutter 35.00 SF

------------------ INSULATION -----------------

140. Batt insulation - 10" - R30 - paper faced 270.39 SF

------------------ WALLS & CEILINGS -----------------

141. Install Sheathing - plywood - 1/2" - treated 270.39 SF

142. Material Only Sheathing - plywood - 1/2" CDX 270.39 SF

143. Seal & paint plywood sheathing 270.39 SF

144. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 270.39 SF

145. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 270.39 SF

146. Cove molding - 3/4" 67.50 LF

------------------ HVAC -----------------

147. Comb and straighten a/c condenser fins - w/out trip charge 1.00 EA

To clean & sanitize split unit

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 12

KitchenG

FC

I

Laundry Room Bedroom 2

Living Room Bedroom 1

Bathroom

3'

3'

3'

4'

0"

5'

4' 7"

4' 2"

4' 4"

4' 3"

4' 7"

5'

5'

2'

2'

2'

1"

2' 6" 5' 10"4' 9"

Bedroom 2 Height: 8'

392.94 SF Walls

543.08 SF Walls & Ceiling

16.68 SY Flooring

49.12 LF Ceil. Perimeter

150.14 SF Ceiling

150.14 SF Floor

49.12 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

148. R&R Switch 2.00 EA

149. R&R Light fixture 1.00 EA

150. R&R Outlet 2.00 EA

151. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

152. R&R Interior door unit 1.00 EA

153. Door knob - interior 1.00 EA

154. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

155. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

156. Security/storm shutter 24.50 SF

------------------ INSULATION -----------------

157. Batt insulation - 10" - R30 - paper faced 150.14 SF

------------------ WALLS & CEILINGS -----------------

158. Install Sheathing - plywood - 1/2" - treated 150.14 SF

159. Material Only Sheathing - plywood - 1/2" CDX 150.14 SF

160. Seal & paint plywood sheathing 150.14 SF

161. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 150.14 SF

162. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 150.14 SF

163. Cove molding - 3/4" 49.12 LF

------------------ ROUGH FRAMING -----------------

164. Remove Sheathing - plywood - 1/2" - treated 21.00 SF

Replacing damaged sheathing were old door was.

165. Install Sheathing - plywood - 1/2" - treated 21.00 SF

166. Material Only Sheathing - plywood - 1/2" CDX 21.00 SF

167. Seal & paint plywood sheathing 21.00 SF

------------------ CABINETRY -----------------

168. Remove Cabinetry - full height unit 5.00 LF

Removal of full height built ins no replace per FEMA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 13

CONTINUED - Bedroom 2

DESCRIPTION QTY

NOTES:

KitchenG

FC

I

Laundry Room Bedroom 2

Living Room Bedroom 1

Bathroom

2' 6"

1' 2"

10" 3' 8"

5'

" 5'

2'

2' 4"

2' 6"

2' 8"

2' 10"

5'

Bathroom Height: 8'

192.00 SF Walls

227.00 SF Walls & Ceiling

3.89 SY Flooring

24.00 LF Ceil. Perimeter

35.00 SF Ceiling

35.00 SF Floor

24.00 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

169. R&R Switch 1.00 EA

170. R&R Light fixture 1.00 EA

------------------ DOORS & WINDOWS -----------------

171. R&R Interior door unit 1.00 EA

172. Door knob - interior 1.00 EA

173. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

174. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

175. Security/storm shutter 7.50 SF

------------------ INSULATION -----------------

176. Batt insulation - 10" - R30 - paper faced 35.00 SF

------------------ WALLS & CEILINGS -----------------

177. Remove Sheathing - plywood - 1/2" - treated 35.00 SF

178. Install Sheathing - plywood - 1/2" - treated 35.00 SF

179. Material Only Sheathing - plywood - 1/2" CDX 35.00 SF

180. Seal & paint plywood sheathing 35.00 SF

181. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 35.00 SF

182. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 35.00 SF

183. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 35.00 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 14

CONTINUED - Bathroom

DESCRIPTION QTY

184. Cove molding - 3/4" 24.00 LF

NOTES:

KitchenG

FC

I

Laundry Room Bedroom 2

Living Room Bedroom 1

Bathroom

2'

2'

2'

1"

2' 6"

1' 2"

3' 8"

5'

5'

6' 2"

6' 6"

2'

6'

2'

0"

2'

13' 6"

Laundry Room Height: 8'

399.61 SF Walls

515.42 SF Walls & Ceiling

12.87 SY Flooring

49.95 LF Ceil. Perimeter

115.81 SF Ceiling

115.81 SF Floor

49.95 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

185. R&R Switch 1.00 EA

186. R&R Light fixture 1.00 EA

187. R&R Outlet 2.00 EA

------------------ DOORS & WINDOWS -----------------

188. R&R Interior door unit 1.00 EA

189. Door knob - interior 1.00 EA

190. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

191. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

------------------ ROUGH FRAMING -----------------

192. Remove Sheathing - plywood - 1/2" - treated 88.00 SF

Replacing damaged interior adjoining wall with living room.

193. Install Sheathing - plywood - 1/2" - treated 88.00 SF

194. Material Only Sheathing - plywood - 1/2" CDX 88.00 SF

195. Seal & paint plywood sheathing 88.00 SF

------------------ INSULATION -----------------

196. Batt insulation - 10" - R30 - paper faced 115.81 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 15

CONTINUED - Laundry Room

DESCRIPTION QTY

------------------ WALLS & CEILINGS -----------------

197. Install Sheathing - plywood - 1/2" - treated 115.81 SF

198. Material Only Sheathing - plywood - 1/2" CDX 115.81 SF

199. Seal & paint plywood sheathing 115.81 SF

200. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 115.81 SF

201. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 115.81 SF

202. Cove molding - 3/4" 49.95 LF

------------------DEMOLITION--------------

203. General Demolition - per hour 1.00 HR

Additional labor to remove damaged cabinets in laundry room. No replacement

NOTES:

CNMI DATA

CNMI Data1' 4"

CNMI Data Height: 4"

1.57 SF Walls

2.92 SF Walls & Ceiling

0.15 SY Flooring

4.70 LF Ceil. Perimeter

1.36 SF Ceiling

1.36 SF Floor

4.70 LF Floor Perimeter

DESCRIPTION QTY

204. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO

205. Material Only LATITUDE DAMAGED DWELLING 15.13 DE

15.133895

206. Material Only LONGITUDE DAMAGED DWELLING 145.72 DE

145.718454

207. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO

208. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 16

CONTINUED - CNMI Data

DESCRIPTION QTY

209. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 YS

210. DOES DWELLING HAVE A WELL 1.00 NO

211. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO

212. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 2002.00 YR

213. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO

214. Material Only ENCROACHMENT ISSUES 0.00 NO

215. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO

216. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 EA

217. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 1112.00 SF

218. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO

219. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

220. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

ROOF

221. Material Only IS DWELLING DESTROYED 0.00 NO

222. Material Only FOUNDATION TYPE 0.00 UN

Slab on Grade

223. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO

224. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

225. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO

226. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS

227. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

ROOF

228. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO

229. Material Only LATITUDE OUT BUILDING 0.00 DE

230. Material Only LONGITUDE OUT BUILDING 0.00 DE

231. Material Only LATITUDE POWER POLE 15.13 DE

15.134052

232. Material Only LONGITUDE POWER POLE 145.72 DE

145.718495

233. Material Only LATITUDE WATER METER 15.13 DE

15.133998

234. Material Only LONGITUDE WATER METER 145.72 DE

145.718571

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 17

CONTINUED - CNMI Data

DESCRIPTION QTY

235. Material Only LATITUDE SEPTIC 15.13 DE

15.133830

236. Material Only LONGITUDE SEPTIC 145.72 DE

145.718550

NOTES:

Labor Minimums Applied

DESCRIPTION QTY

237. Finish hardware labor minimum 1.00 EA

238. Plumbing labor minimum 1.00 EA

NOTES:

Grand Total Areas:

2,590.12 SF Walls 1,112.95 SF Ceiling SF Walls and Ceiling3,703.07 1,112.95 SF Floor 123.66 SY Flooring 328.27 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 328.27 LF Ceil. Perimeter

1,112.95 Floor Area 1,193.06 Total Area 2,590.12 Interior Wall Area 1,776.64 Exterior Wall Area 158.49 Exterior Perimeter of

Walls

1,306.31 Surface Area 13.06 Number of Squares 179.58 Total Perimeter Length

35.81 Total Ridge Length 0.00 Total Hip Length

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 18

1 Document 1/Main Level - 1-Scope

Date Taken: 8/30/2019

Taken By: Casey Hoak

2 Document 1/Main Level - 2-Scope

Date Taken: 8/30/2019

Taken By: Casey Hoak

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 19

3 Document 1/Main Level - 3-Scope

Date Taken: 8/30/2019

Taken By: Casey Hoak

4 Document 1/Main Level - 4-Scope

Date Taken: 8/30/2019

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 20

5 Document 1/Main Level - Front Elevation Date Taken: 11/24/2019

Taken By: Casey Hoak

6 Document 1/Main Level - Front Elevation Date Taken: 11/24/2019

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 21

7 Document 1/Main Level - Front Elevation Date Taken: 11/24/2019

Taken By: Casey Hoak

Covered carport and entry

8 Document 1/Main Level - Front Elevation Date Taken: 11/24/2019

Front Entry

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 22

9 Document 1/Main Level - Front Elevation Date Taken: 11/24/2019

Taken By: Casey Hoak

10 Document 1/Main Level - Front Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 23

11 Document 1/Main Level - Back Elevation Date Taken: 11/24/2019

Taken By: Casey Hoak

12 Document 1/Main Level - Right Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 24

13 Document 1/Main Level - Left Elevation Date Taken: 11/24/2019

Taken By: Casey Hoak

14 Document 1/Main Level - Left Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 25

15 Document 1/Main Level - Left Elevation Date Taken: 11/24/2019

Taken By: Casey Hoak

16 Document 1/Main Level - Right Elevation Date Taken: 11/24/2019

Damage to exterior wall

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 26

17 Document 1/Main Level - Right Elevation Date Taken: 11/24/2019

Taken By: Casey Hoak

18 Document 1/Main Level/Living Room - Living Room Date Taken: 11/24/2019

Taken By: Casey Hoak

Roof and ceiling damage. No roof remaining, replace CJM add insulation and paint. R/R 2x4 damaged wall @ 88 sq. ft. R/R 88 sf damaged sheathing. Electric=Replace main panel, 1 light, 6 switch, 4 plugs, add smoke and C/O. No broken jealousy panes, add total of 70sf shutters for (4) 3X4 windows.

Ceramic tile floor ok.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 27

19 Document 1/Main Level/Living Room - Living Room Date Taken: 11/24/2019

Taken By: Casey Hoak

20 Document 1/Main Level/Living Room - Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 28

21 Document 1/Main Level/Living Room - Living Room Date Taken: 11/24/2019

Taken By: Casey Hoak

22 Document 1/Main Level/Living Room - Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 29

23 Document 1/Main Level/Kitchen - Kitchen Date Taken: 11/24/2019

Taken By: Casey Hoak

Damage to roof and ceiling. Remove joist, replace CJM add insulation and paint. Electric=1 light, 1 switch, 1 plug, 1 GFI. Reframe 2x6 exterior wall, paint. R/R 1 3X3 & 1 2x3 windows to replace damaged jealousy windows, add 24SF shutter. R/R 8LF upper cabinets and 14 LF of lower.

Replace 8 LF lower cabinets per FEMA and add new laminate counter top to replace damaged concrete counter top. Add fire extinguisher.

24 Document 1/Main Level/Kitchen - Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 30

25 Document 1/Main Level/Kitchen - Kitchen Date Taken: 11/24/2019

Taken By: Casey Hoak

26 Document 1/Main Level/Kitchen - Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 31

27 Document 1/Main Level/Kitchen - Kitchen Date Taken: 11/24/2019

Taken By: Casey Hoak

28 Document 1/Main Level/Kitchen - Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 32

29 Document 1/Main Level/Kitchen - Kitchen Date Taken: 11/24/2019

Taken By: Casey Hoak

30 Document 1/Main Level/Kitchen - Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 33

31 Document 1/Main Level/Kitchen - Kitchen Date Taken: 11/24/2019

Taken By: Casey Hoak

32 Document 1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/24/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Replace CJM add insulation and paint.

Electric=1 light, 1 plugs, 4 outlets, add smoke. R/R 1 interior door. No broken windows, add 35sf shutters

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 34

33 Document 1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/24/2019

Taken By: Casey Hoak

34 Document 1/Main Level/Bedroom 1 - Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 35

35 Document 1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/24/2019

Taken By: Casey Hoak

36 Document 1/Main Level/Bedroom 1 - Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 36

37 Document 1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/24/2019

Taken By: Casey Hoak

38 Document 1/Main Level/Bedroom 1 - Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 37

39 Document 1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/24/2019

Taken By: Casey Hoak

40 Document 1/Main Level/Bedroom 2 - Bedroom 2 Date Taken: 11/24/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Replace CJM add insulation and paint. R/R damged sheathing 21 sq ft where old door used to be and seal & paint.

Electric=1 light, 2 plugs, 2 outlets, add smoke. Remove 5LF full height cabinets. No broken windows, add 24sf shutters

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 38

41 Document 1/Main Level/Bedroom 2 - Bedroom 2 Date Taken: 11/24/2019

Taken By: Casey Hoak

42 Document 1/Main Level/Bedroom 2 - Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 39

43 Document 1/Main Level/Bedroom 2 - Bedroom 2 Date Taken: 11/24/2019

Taken By: Casey Hoak

44 Document 1/Main Level/Bathroom

- 57-Bathroom Date Taken: 11/24/2019

Taken By: Casey Hoak

(Could not get door open at site visit 11/24, used photos from previous site visit) Damage to ceiling and roof.

R/R CJM add insulation and paint.

Electric=1 light, 1 switch. No damage to window add 7.5sf shutter. No damage to floor. No damage to fixtures

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 40

45 Document 1/Main Level/Bathroom

- 58-Bathroom Date Taken: 11/24/2019

Taken By: Casey Hoak

No window damage

46 Document 1/Main Level/Bathroom

- 59-Bathroom Date Taken: 11/24/2019

No damage to fixtures

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 41

47 Document 1/Main Level/Bathroom

- 60-Bathroom Date Taken: 11/24/2019

Taken By: Casey Hoak

48 Document 1/Main Level/Bathroom

- 61-Bathroom Date Taken: 11/24/2019

Damaged ceiling and electric

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 42

49 Document 1/Main Level/Bathroom

- 62-Bathroom Date Taken: 11/24/2019

Taken By: Casey Hoak

50 Document 1/Main Level/Laundry Room - Laundry Room Date Taken: 11/24/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Replace CJM add insulation and paint. R/R 88sf damaged sheathing on wall.

Replace interior door, paint trim and all 6 sides of the door. No windows, no damage to floor. Adding 1hr debris disposal to remove damaged shelving

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 43

51 Document 1/Main Level/Laundry Room - Laundry Room Date Taken: 11/24/2019

Taken By: Casey Hoak

52 69-Carport

Date Taken: 8/23/2019

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412601742_RA 12/8/2019 Page: 44

53 70-Carport

Date Taken: 8/23/2019

Taken By: Casey Hoak

54 71-Carport

Date Taken: 8/23/2019

CNMI-412601742_RA 12/8/2019 Page: 45

Main Level

KitchenG

FC

I

Laundry Room Bedroom 2

Living Room Bedroom 1

Bathroom

Main Level

CNMI-412601742_RA 12/8/2019 Page: 46

Roof

Roof1 (A)F1(B)F2

Roof2

F3

Roof

CNMI-412601742_RA 12/8/2019 Page: 47

CNMI DATA

CNMI Data

CNMI DATA

CNMI-412601742_RA 12/8/2019 Page: 48

PLOT

Plot (A1)

Tanu Lane (A2)

DD (A3)

Other Home (A4)

Other Home (A5)

Power Pole (A6)

Water Meter (A7)

MSGR. Martinez Rd (A8)

Septic (A9)

PLOT