Dewberry

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

Insured: JOEY CRUZ Home: (670) 256-4374 Cellular: (670) 287-4611Business: 1111 bh ftghi, DC 98790 Home: SANTA LOURDES DR LOT TR22768-R2 NEW

AS TEO, HI 96701

Property: SANTA LOURDES DR LOT TR22768-R2 NEW

AS TEO, HI 96701

Claim Rep.: Casey Hoak

Estimator: Casey Hoak

Claim Number: CNMI-412600472 Policy Number: CNMI-412600472 Type of Loss: Hurricane

Date Contacted: 8/22/2019 10:00 AM Date of Loss: 10/25/2018 12:00 AM Date Received: 1/11/2019 8:32 PM

Date Inspected: 2/11/2019 3:00 PM Date Entered: 8/24/2019 8:36 PM

Date Est. Completed: 2/12/2019 2:26 AM

Price List: HIOI8X_JAN19 Restoration/Service/Remodel

Estimate: CNMI-412600472_RA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 2

11/25/2019 CMH

Site visits batch of 4 next 20 Attending /Casey Hoak, Jorge Rivera PE This home was visited on a joint site visit back in August for the initial set of 40. The home has not suffered any new damage since that scope was written. Changes were made only to the gable end wall to make them 2x6 instead of 2x4.

Scaffold labor and a dumpster for hauling the debris off have also been added per FEMA Guidance. All other items listed remain the same. The roof design that was written has been reviewed by PE Jorge Rivera and he is in agreement with the design of the roof. A new set of photos has been added to the file to document the present condition of the home as of today.

JOINT SCOPING SUMMARY 8/22/2019:CMH

Attendees: FEMA : Chuck Thompson, Chris Craft. Dewberry: Marvin Davis, Darlene Hubbard.

Roof designed and agreed to at the joint site visit: 2 story dwelling with a portion of 2nd story roof concrete. Only replacing damaged portion with gable roof that is present. No need to replace existing bond beam, drill and epoxy anchor bolts.

Foundation appears in good condition and should not need any work.

Windows are only being replaced that were damaged which is in bedroom 3 and all windows getting storm shutters including those located on 1st floor under concrete roof per FEMA guidance.

No damage to any ceramic tile flooring.

1 damaged slider door located in Dining Room on 2nd floor will be replaced with retrofit exterior door and painted trim and all 6 sides.

Electrical will be to rewire affected rooms on 2nd floor only with actual count for plugs, lights and switches, including adding smoke detectors and C/O to all bedrooms and living room on 2nd floor.

A sub100 amp panel on 2nd floor will be replaced with a 125 amp panel. The main panel on the first floor is undamaged and FEMA guidance has been to replace only the sub panel in these cases.

All available GFM (Government Supplied Material was identified). All changes were agreed upon by all parties and are made a part of this revised report.

INSPECTION SUMMARY

The applicant met at the damaged dwelling and the following was observed.

The dwelling is a 2 story 4 bedroom structure. The dwelling is deemed to be repairable. The roof was torn off and has a temporary tin roof, paid for by the applicant.

Reconstruction should take approximately 16 weeks from start of construction.

AGE

The home was built in 1989

DAMAGE AND REPAIR SUMMARY

See attached estimate for exact repair and line items.

Square Footage of Damaged Dwelling

LAT 15.196211

LONG 145.765284

A; ROOF

Roof including roof and framing was destroyed.

B: INTERIOR

Some interior items damaged

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 3

C: STRUCTURAL

Foundation is a slab. Slab appears to be intact.

D: MECHANICAL/PLUMBING/WATER SYSTEM

Mechanical/Plumbing ok

E: ELECTRICAL

Some electrical needs replacement

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 4

CNMI-412600472_RA

ROOF

ROOF

DESCRIPTION QTY

1. 2" x 6" x 10' #2 treated pine (material only) 12.00 EA

2. 2" x 10" x 18' #2 treated pine (material only) 46.00 EA

3. 2" x 12" x 20' #2 treated pine (material only) 4.00 EA

4. 2" x 12" x 14' #2 treated pine (material only) 4.00 EA

5. 2" x 12" x 18' #2 treated pine (material only) 4.00 EA

6. R&R Rafters - 2x10 - Labor only - (using rafter length) 825.82 LF

7. R&R Rafters - 2x6 - Labor only - (using rafter length) 233.84 LF

For gable end walls and collar ties

8. R&R Rafters - 2x12 - Labor only - (using rafter length) 200.81 LF

For the ridge beam and fascia

10. 2" x 6" x 20' #2 treated pine (material only) 2.00 EA

11. 2" x 6" x 14' #2 treated pine (material only) 2.00 EA

12. 2" x 6" x 18' #2 treated pine (material only) 4.00 EA

13. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 11.00 EA

For gable end walls

14. Install Sheathing - plywood - 1/2" - treated 258.68 SF

15. Material Only Sheathing - plywood - 1/2" - treated 258.68 SF

16. Install Sheathing - plywood - 3/4" - treated 1152.00 SF

17. Material Only Sheathing - plywood - 3/4" - treated 1152.00 SF

182. Siding - hardboard panel - paint grade 129.34 SF

183. House wrap (air/moisture barrier) 129.34 SF

------------------ ROOFING -----------------

18. Remove Metal roofing - ribbed - 24 gauge - up to 1" 1151.96 SF

19. Install Metal roofing - ribbed - 24 gauge - up to 1" 1151.96 SF

20. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 1151.96 SF

21. Closure strips for metal roofing - inside and/or outside 64.17 LF

22. Flashing tape - self-adhesive 423.22 LF

Seal between the metal roof seams

23. Ridge vent - Metal roofing - floating ventilator 32.08 LF

24. Additional screws for 3/4 plywood sheathing 3891.00 EA

Additional screws for 3/4 plywood sheathing above Xactimate allowance 6% waste is added

25. Additional screws for 2x4 furring 800.00 EA

Additional screws for 2X4 furring above Xactimate allowance 6% waste is added

26. Additional screws for 2x6 furring 326.00 EA

Additional screws for 2x6 furring above Xactimate allowance 6% waste is added

27. Additional screws for fascia 106.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 5

CONTINUED - ROOF

DESCRIPTION QTY

Additional screws for fascia above Xactimate allowance 6% waste is added

29. Drip edge/gutter apron 64.17 LF

30. Gable trim for metal roofing - 26 gauge 71.81 LF

31. Ice & water barrier 1151.96 SF

32. Neoprene pipe jack flashing for metal roofing 1.00 EA

33. Install 2" x 4" lumber - treated (.667 BF per LF) 435.17 LF

Roof purlins

34. Material Only 2" x 4" lumber - treated (.667 BF per LF) 435.17 LF

Roof purlins

35. Install 2" x 6" lumber - treated (1 BF per LF) 200.14 LF

For Picture Frame Purlins

36. Material Only 2" x 6" lumber - treated (1 BF per LF) 200.14 LF

For Picture Frame Purlins

37. Install 2" x 6" lumber - treated (1 BF per LF) 256.67 LF

Rafter Blocking

38. Material Only 2" x 6" lumber - treated (1 BF per LF) 256.67 LF

Rafter Blocking

------------------ SOFFIT -----------------

39. Install Soffit - box framing - 1' overhang 85.34 LF

Calculation set for 16" overhang

40. Material Only Soffit - box framing - 1' overhang 85.34 LF

Calculation set for 16" overhang

41. Install Soffit & fascia - wood - 1' overhang 85.34 LF

Calculation set for 16" overhang

42. Material Only Soffit & fascia - wood - 1' overhang 85.34 LF

Calculation set for 16" overhang

43. Baffle vent - foam 64.17 LF

Cut to fit as needed for vents

44. Soffit vent - linear 32.08 LF

------------------ PAINT -----------------

45. Exterior - paint two coats 129.34 SF

46. Prime & paint exterior soffit - wood 85.34 SF

47. Prime & paint exterior fascia - wood, 4"- 6" wide 128.33 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

------------------ STRAPPING -----------------

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 6

CONTINUED - ROOF

DESCRIPTION QTY

48. 2x10 Joist hangers for rafters 48.00 EA

2x10 Joist hangers for rafters

49. Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans 200.00 EA

Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans

50. Framing hurricane tie 208.00 EA

For rafter tails and gable wall studs top and bottom

51. Install Framing hurricane tie 52.00 EA

For joist to top plate

52. Material Only Framing hurricane tie 52.00 EA

For joist to top plate

54. Framing strap - 24" long 26.00 EA

55. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 120.00 EA

4 @ each rafter section & 24 at the splice on the ridge

NOTES:

DOCUMENT1

Main Level Main Level

DESCRIPTION QTY

------------------ GENERAL ITEMS -----------------

56. Clean the floor - Heavy 976.67 SF

NOTES:

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 7

Bedroom 2

Bathroom 1

Bedroom 1

Hallway

Kitchen 1

Living Room 1

Stairs

3' 5"

9"

1' 13' 8"

' 1

0"

2' 6" 13'

13' 6"

2' 4"

2' 7"

3' 4' 4"

4' 10"

10' 6"

10' 9"

' 7

Kitchen 1 Height: 8'

435.89 SF Walls

629.08 SF Walls & Ceiling

21.47 SY Flooring

57.33 LF Ceil. Perimeter

193.19 SF Ceiling

193.19 SF Floor

53.92 LF Floor Perimeter

Missing Wall - Goes to Floor 3' 5" X 6' 8" Opens into LIVING_ROOM_

DESCRIPTION QTY

------------------ DOORS & WINDOWS -----------------

57. Security/storm shutter 14.00 SF

NOTES:

Bedroom 2

Bathroom 1

Bedroom 1

Hallway

Kitchen 1

Living Room 1

Stairs

' 7

2' 6"

4' 2"

4' 5"

5' 10"

6' 4"

4'

' 4

' 1

0"

3'

3'

4'

3'

0"

' 4

' 7

3' 5"

9"

1' 13' 8"

7'

0"

4' 10"

5' 4"

Living Room 1 Height: 8'

471.89 SF Walls

759.50 SF Walls & Ceiling

31.96 SY Flooring

61.83 LF Ceil. Perimeter

287.61 SF Ceiling

287.61 SF Floor

58.42 LF Floor Perimeter

Missing Wall - Goes to Floor 3' 5" X 6' 8" Opens into KITCHEN_1

Missing Wall 7' 10" X 8' Opens into HALLWAY

Missing Wall 5' 4" X 8' Opens into ROOM7

DESCRIPTION QTY

------------------ DOORS & WINDOWS -----------------

58. Security/storm shutter 45.00 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 8

Bedroom 2

Bathroom 1

Bedroom 1

Hallway

Kitchen 1

Living Room 1

Stairs

7'

0" 2' 6" 2'

2' 6"

1' 7"

2'

2'

2'

2' 6"

1' 4" 2' 3"

2' 6"

Hallway Height: 8'

162.00 SF Walls

207.69 SF Walls & Ceiling

5.08 SY Flooring

20.25 LF Ceil. Perimeter

45.69 SF Ceiling

45.69 SF Floor

20.25 LF Floor Perimeter

Missing Wall 7' 10" X 8' Opens into LIVING_ROOM_

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

59. Smoke detector 1.00 EA

60. Carbon monoxide detector 1.00 EA

NOTES:

Bedroom 2

Bathroom 1

Bedroom 1

Hallway

Kitchen 1

Living Room 1

Stairs

5' 2'

3'

3'

3'

5' 6' 10"

7' 1"

3'

3' 6"

' 1

0"

2' 6"

1' 4" 2' 3"

2' 6"8' 6"

8' 9"

Bedroom 1 Height: 8'

410.67 SF Walls

571.36 SF Walls & Ceiling

17.85 SY Flooring

51.33 LF Ceil. Perimeter

160.69 SF Ceiling

160.69 SF Floor

51.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ DOORS & WINDOWS -----------------

61. Security/storm shutter 35.00 SF

------------------ ELECTRICAL -----------------

62. Smoke detector 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 9

Bedroom 2

Bathroom 1

Bedroom 1

Hallway

Kitchen 1

Living Room 1

Stairs3' 4'

4'

4'

4'

8' 9"

8' 6"

2' 6" 2'

2' 6"

1' 7"

1' 4"

' 4

' 1

0"

3'

5' 2"

5' 8"

6' 8"

6' 11" Bedroom 2 Height: 8'

418.67 SF Walls

586.78 SF Walls & Ceiling

18.68 SY Flooring

52.33 LF Ceil. Perimeter

168.11 SF Ceiling

168.11 SF Floor

52.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ DOORS & WINDOWS -----------------

63. Security/storm shutter 53.00 SF

------------------ ELECTRICAL -----------------

64. Smoke detector 1.00 EA

NOTES:

Bedroom 2

Bathroom 1

Bedroom 1

Hallway

Kitchen 1

Living Room 1

Stairs

2'

2'

2'

8' 9"

8' 6"

2' 3'

3'

2'

0"

3'

Bathroom 1 Height: 8'

261.33 SF Walls

327.92 SF Walls & Ceiling

7.40 SY Flooring

32.67 LF Ceil. Perimeter

66.58 SF Ceiling

66.58 SF Floor

32.67 LF Floor Perimeter

DESCRIPTION QTY

------------------ DOORS & WINDOWS -----------------

65. Security/storm shutter 7.50 SF

CNMI DATA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 10

CNMI Data1' 4"

CNMI Data Height: 4"

1.57 SF Walls

2.92 SF Walls & Ceiling

0.15 SY Flooring

4.70 LF Ceil. Perimeter

1.36 SF Ceiling

1.36 SF Floor

4.70 LF Floor Perimeter

DESCRIPTION QTY

135. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO

136. Material Only LATITUDE DAMAGED DWELLING 15.20 DE

15.196211

137. Material Only LONGITUDE DAMAGED DWELLING 145.77 DE

145.765284

138. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO

139. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO

140. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 NO

141. DOES DWELLING HAVE A WELL 1.00 NO

142. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO

143. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1989.00 YR

144. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO

145. Material Only ENCROACHMENT ISSUES 0.00 NO

146. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO

147. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 NO

148. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 2516.00 SF

149. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO

150. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

151. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

ROOF

152. Material Only IS DWELLING DESTROYED 0.00 NO

153. Material Only FOUNDATION TYPE 0.00 UN

Slab

154. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO

155. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

156. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO

157. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS

158. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

ROOF

159. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 11

CONTINUED - CNMI Data

DESCRIPTION QTY

160. Material Only LATITUDE OUT BUILDING 15.20 DE

15.196989

161. Material Only LONGITUDE OUT BUILDING 145.77 DE

145.765120

162. Material Only LATITUDE POWER POLE 15.20 DE

15.196605

163. Material Only LONGITUDE POWER POLE 145.76 DE

145.764949

164. Material Only LATITUDE WATER METER 15.20 DE

15.196209

165. Material Only LONGITUDE WATER METER 145.77 DE

145.765173

166. Material Only LATITUDE WATER TANK 15.20 DE

15.196160

167. Material Only LONGITUDE WATER TANK 145.77 DE

15.141423

NOTES:

Level 2 Level 2

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

66. Rewire - average residence - copper wiring 930.00 SF

Only rewiring portion that was affected by removal of the roof. Remainder of electrical under concrete roof and not affected.

67. R&R Breaker panel - 125 amp w/arc fault breakers 1.00 EA

260590101220 Rewiring electrical under portion of roof affected and separate panel for 2nd floor.

68. Remove Circuit breaker - main disconnect - 125 amp 1.00 EA

------------------ WALL REPAIRS-----------------

69. Wedge anchor bolt - 1/2" x 8 1/2" 205.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 12

CONTINUED - Level 2

DESCRIPTION QTY

For cold joint between top of wall and new bond beam.

70. Epoxy crack and joint filler (per LF of crack) 205.00 EA

71. Install 2" x 6" lumber - treated (1 BF per LF) 544.50 LF

For double sill plate on the perimeter

72. Material Only 2" x 6" lumber - treated (1 BF per LF) 544.50 LF

For double sill plate on the perimeter

73. Sill seal foam - 6" 159.00 LF

NOTES:

Bedroom 4

Kitchen 2

Living Room 2

Dining Room

Bath2

Stairwell

Bedroom 3

Bath3

5'

0"

5'

2'

3'

2'

2'

3' 6' 6"

6' 9"

9' 4"

9' 7"

2'

8'

3'

2' 6" 7' 9"

7' 6"

3' 9"5' 1" Kitchen 2 Height: 8'

538.67 SF Walls

818.03 SF Walls & Ceiling

31.04 SY Flooring

67.33 LF Ceil. Perimeter

279.36 SF Ceiling

279.36 SF Floor

67.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

74. R&R Switch 4.00 EA

75. R&R Light fixture 1.00 EA

76. R&R Outlet 2.00 EA

77. R&R Ground fault interrupter (GFI) outlet 3.00 EA

78. 220 volt copper wiring run, box and receptacle 1.00 EA

79. Detach & Reset Range hood 1.00 EA

Detach and Reset

------------------ DOORS & WINDOWS -----------------

80. Security/storm shutter 14.00 SF

------------------ INSULATION -----------------

81. Batt insulation - 10" - R30 - paper faced 279.36 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 13

CONTINUED - Kitchen 2

DESCRIPTION QTY

------------------ WALLS & CEILINGS -----------------

82. Remove Sheathing - plywood - 1/2" - treated 279.36 SF

83. Install Sheathing - plywood - 1/2" - treated 279.36 SF

84. Material Only Sheathing - plywood - 1/2" CDX 279.36 SF

85. Seal & paint plywood sheathing 279.36 SF

86. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 279.36 SF

87. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 279.36 SF

88. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 279.36 SF

89. Cove molding - 3/4" 67.33 LF

------------------CABINETRY -----------------

90. Detach & Reset Cabinetry - upper (wall) units 19.00 LF

Detach and Reset

------------------GENERAL ITEMS -----------------

91. 5 lb. ABC fire extinguisher 1.00 EA

NOTES:

Bedroom 4

Kitchen 2

Living Room 2

Dining Room

Bath2

Stairwell

Bedroom 3

Bath3

' 1

0"

7' 9"

7' 6"

3' 9" 11' 11"

11' 8"

4'

' 1

0"

' 4

1'

1'

4'

4'

2"

' 8

' 1

1"

3'

21' 9"

1' 8"3'

5' 6"

3' 10' 3"

12' 8"

13' 2"

3'5' 1"

17' 10"

18' 4"

Living Room 2 Height: 8'

541.33 SF Walls

947.72 SF Walls & Ceiling

45.15 SY Flooring

67.67 LF Ceil. Perimeter

406.39 SF Ceiling

406.39 SF Floor

67.67 LF Floor Perimeter

Missing Wall 15' 10" X 8' Opens into STAIRWELL

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

92. R&R Switch 3.00 EA

93. R&R Light fixture 1.00 EA

94. R&R Outlet 4.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 14

CONTINUED - Living Room 2

DESCRIPTION QTY

95. Smoke detector 1.00 EA

96. Carbon monoxide detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

97. Security/storm shutter 141.70 SF

------------------ INSULATION -----------------

98. Batt insulation - 10" - R30 - paper faced 406.39 SF

------------------ WALLS & CEILINGS -----------------

99. Remove Sheathing - plywood - 1/2" - treated 406.39 SF

100. Install Sheathing - plywood - 1/2" - treated 406.39 SF

101. Material Only Sheathing - plywood - 1/2" CDX 406.39 SF

102. Seal & paint plywood sheathing 406.39 SF

103. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 406.39 SF

104. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 406.39 SF

105. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 406.39 SF

106. Cove molding - 3/4" 67.67 LF

NOTES:

Bedroom 4

Kitchen 2

Living Room 2

Dining Room

Bath2

Stairwell

Bedroom 3

Bath3

2'

8'

3'

3'

5' 9"

6' 3"

2' 11"

3' 2"

3' 2' 5"

2' 11"

6' 3"

6' 6"

3'

' 8

' 1

1" 1'

5'

5" 8"

9'

9'

1"

3'

7'

7'

5'

11' 11"

11' 8" Dining Room Height: 8'

424.00 SF Walls

597.06 SF Walls & Ceiling

19.23 SY Flooring

53.00 LF Ceil. Perimeter

173.06 SF Ceiling

173.06 SF Floor

53.00 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

107. R&R Switch 3.00 EA

108. R&R Light fixture 1.00 EA

109. R&R Outlet 3.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 15

CONTINUED - Dining Room

DESCRIPTION QTY

------------------ DOORS & WINDOWS -----------------

110. Remove 5-0 6-8 vinyl sliding patio door 1.00 EA

111. Additional charge for a retrofit exterior door 1.00 EA

112. Exterior door - metal - insulated - flush or panel style 1.00 EA

113. Door lockset & deadbolt - exterior 1.00 EA

114. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

115. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

116. Security/storm shutter 84.00 SF

------------------ INSULATION -----------------

117. Batt insulation - 10" - R30 - paper faced 173.06 SF

------------------ WALLS & CEILINGS -----------------

118. Remove Sheathing - plywood - 1/2" - treated 173.06 SF

119. Install Sheathing - plywood - 1/2" - treated 173.06 SF

120. Material Only Sheathing - plywood - 1/2" CDX 173.06 SF

121. Seal & paint plywood sheathing 173.06 SF

122. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 173.06 SF

123. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 173.06 SF

124. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 173.06 SF

125. Cove molding - 3/4" 53.00 LF

NOTES:

Bedroom 4

Kitchen 2

Living Room 2

Dining Room

Bath2

Stairwell

Bedroom 3

Bath3

2' 6"

1' 8"

2' 8' 5"

8' 8"

2'

3'

2'

2'

3' 6' 11"

7' 2"

4' 11"

5' 5"

3' 2'

1"

3'

2'

1"

3'

Bedroom 3 Height: 8'

377.33 SF Walls

507.13 SF Walls & Ceiling

14.42 SY Flooring

47.17 LF Ceil. Perimeter

129.79 SF Ceiling

129.79 SF Floor

47.17 LF Floor Perimeter

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 16

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

126. R&R Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

127. R&R Storm window - aluminum, 12-24 sf 1.00 EA

Replace broken window

128. Security/storm shutter 35.00 SF

NOTES:

Bedroom 4

Kitchen 2

Living Room 2

Dining Room

Bath2

Stairwell

Bedroom 3

Bath3

3' 4'

4'

0"

8'

8'

6' 2"

5' 11"

2' 6" 3'3' 2"

2' 11"

' 1

0" 2'

3'

3' 10"

4' 4"

8'

8' 3" 3'

7' 1"

7' 7"

4' 9"

5' Bedroom 4 Height: 8'

490.67 SF Walls

725.53 SF Walls & Ceiling

26.10 SY Flooring

61.33 LF Ceil. Perimeter

234.86 SF Ceiling

234.86 SF Floor

61.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

129. R&R Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

130. Security/storm shutter 52.50 SF

NOTES:

Bedroom 4

Kitchen 2

Living Room 2

Dining Room

Bath2

Stairwell

Bedroom 3

Bath3

5'

2' 6" 1' 5"

1' 8"

2'

2' 2'

2'

1'

1'

0"

6' 2"

5' 11"

Bath2 Height: 8'

184.00 SF Walls

217.03 SF Walls & Ceiling

3.67 SY Flooring

23.00 LF Ceil. Perimeter

33.03 SF Ceiling

33.03 SF Floor

23.00 LF Floor Perimeter

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 17

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

131. R&R Switch 1.00 EA

132. R&R Light fixture 1.00 EA

133. R&R Ground fault interrupter (GFI) outlet 1.00 EA

------------------ DOORS & WINDOWS -----------------

184. Security/storm shutter 7.50 SF

NOTES:

Labor Minimums Applied

DESCRIPTION QTY

168. Finish hardware labor minimum 1.00 EA

NOTES:

Grand Total Areas:

5,376.01 SF Walls 2,358.04 SF Ceiling SF Walls and Ceiling7,734.05 2,358.04 SF Floor 262.00 SY Flooring 675.37 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 682.20 LF Ceil. Perimeter

2,358.04 Floor Area 2,617.25 Total Area 5,376.01 Interior Wall Area 2,757.61 Exterior Wall Area 296.04 Exterior Perimeter of

Walls

1,151.96 Surface Area 11.52 Number of Squares 135.98 Total Perimeter Length

32.08 Total Ridge Length 0.00 Total Hip Length

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 18

1 DOCUMENT1/Main Level - 1- Scope Notes Date Taken: 8/22/2019

Taken By: Darlene Hubbard

No damages to 1st floor, no broken windows. Add shutters to all windows. Portion of 2nd story roof made of concrete, no damages to ceilings in that portion. Agreement by all parties at joint site visit 8/22/19 to replace with gable roof, no bond beam necessary, drill and epoxy anchor bolts.

2 DOCUMENT1/Main Level - 2- Scope Notes Date Taken: 8/22/2019

Taken By: Darlene Hubbard

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 19

3 DOCUMENT1/Main Level - 3- Scope Notes Date Taken: 8/22/2019

Taken By: Darlene Hubbard

4 DOCUMENT1/Main Level - 4- Scope Notes

Taken By: Darlene Hubbard

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 20

5 DOCUMENT1/Main Level - Front Elevation Date Taken: 11/25/2019

Taken By: Casey Hoak

6 DOCUMENT1/Main Level - Front Elevation Date Taken: 11/25/2019

Taken By: Casey Hoak

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 21

7 DOCUMENT1/Main Level - Front Elevation Date Taken: 11/25/2019

Taken By: Casey Hoak

8 DOCUMENT1/Main Level - Front Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 22

9 DOCUMENT1/Main Level - Front Elevation Date Taken: 11/25/2019

Taken By: Casey Hoak

10 DOCUMENT1/Main Level - Right Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 23

11 DOCUMENT1/Main Level - Back Elevation Date Taken: 11/25/2019

Taken By: Casey Hoak

12 DOCUMENT1/Main Level - Left Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 24

13 DOCUMENT1/Main Level - Left Elevation Date Taken: 11/25/2019

Taken By: Casey Hoak

14 DOCUMENT1/Main Level - Left Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 25

15 DOCUMENT1/Main Level - Left Elevation Date Taken: 11/25/2019

Taken By: Casey Hoak

16 DOCUMENT1/Main Level - Left Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 26

17 DOCUMENT1/Main Level - Left Elevation Date Taken: 11/25/2019

Taken By: Casey Hoak

18 DOCUMENT1/Main Level/Kitchen 1 - Kitchen 1 Date Taken: 11/25/2019

Taken By: Casey Hoak

No damages to kitchen, only addressing 14SF shutters for window.

No damage to exterior door.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 27

19 DOCUMENT1/Main Level/Kitchen 1 - Kitchen 1 Date Taken: 11/25/2019

Taken By: Casey Hoak

20 DOCUMENT1/Main Level/Kitchen 1 - Kitchen 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 28

21 DOCUMENT1/Main Level/Living Room 1 - Living Room Date Taken: 11/25/2019

Taken By: Casey Hoak

No damages to 1st floor interior, windows or doors. Only addressing 28SF shutters for windows.

22 DOCUMENT1/Main Level/Living Room 1 - Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 29

23 DOCUMENT1/Main Level/Hallway - Hallway Date Taken: 11/25/2019

Taken By: Casey Hoak

No damages to 1st floor interior, windows or doors. Add smoke detector

24 DOCUMENT1/Main Level/Hallway - Hallway

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 30

25 DOCUMENT1/Main Level/Hallway - Hallway Date Taken: 11/25/2019

Taken By: Casey Hoak

26 DOCUMENT1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/25/2019

Taken By: Casey Hoak

No damages to 1st floor interior, windows or doors. Only addressing 28SF shutters for windows. Add smoke detector.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 31

27 DOCUMENT1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/25/2019

Taken By: Casey Hoak

28 DOCUMENT1/Main Level/Bedroom 1 - Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 32

29 DOCUMENT1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/25/2019

Taken By: Casey Hoak

30 DOCUMENT1/Main Level/Bedroom 2 - Bedroom 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

No damages to 1st floor interior, windows or doors. Only addressing 52SF shutters for windows. Add smoke detector

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 33

31 DOCUMENT1/Main Level/Bedroom 2 - Bedroom 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

32 DOCUMENT1/Main Level/Bedroom 2 - Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 34

33 DOCUMENT1/Main Level/Bathroom 1 - Bathroom 1 Date Taken: 11/25/2019

Taken By: Casey Hoak

No damages to Bathroom 1, only addressing to 7.5 shutter window.

Damages to ceiling not disaster related, caused by plumbing issues from bathroom above.

34 DOCUMENT1/Main Level/Stairs - Stairs Date Taken: 11/25/2019

Taken By: Casey Hoak

No damages, only addressing shutter for window

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 35

35 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

Ceiling and roof damage to this portion of dwelling, half of the roof is concrete. No damage to gable end walls. Replace CJM, add insulation and paint. R&R 1 light, 4 switches, 3 GFI, 2 plugs, (1) 220 volt outlet. No damage to cabinets or flooring. R&R Rangehood, adding 14SF shutters.

Add fire extinguisher.

36 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 36

37 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

38 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 37

39 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

40 DOCUMENT1/Level 2/Living Room 2 - Living Room 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

Ceiling and roof damage to this portion of dwelling, half of the roof is concrete. No damage to gable end walls. Replace CJM, add insulation and paint. R&R 1 light, 3 switches, 2 plugs. No damage to windows or flooring. Adding 141.7 SF shutters.

Add smoke detector and C/O.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 38

41 DOCUMENT1/Level 2/Living Room 2 - Living Room 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

42 DOCUMENT1/Level 2/Living Room 2 - Living Room 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 39

43 DOCUMENT1/Level 2/Living Room 2 - Living Room 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

44 DOCUMENT1/Level 2/Living Room 2 - Living Room 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 40

45 DOCUMENT1/Level 2/Dining Room - Dining Room Date Taken: 11/25/2019

Taken By: Casey Hoak

Ceiling and roof damage to this portion of dwelling, half of the roof on 2nd floor is concrete. No damage to gable end walls. Replace CJM, add insulation and paint. R&R 1 light, 3 switches, 3 plugs, replace 125 amp panel. Replace broken slider with 3' retrofit door. No damage to windows or flooring. Adding 84 SF shutters.

46 DOCUMENT1/Level 2/Dining Room - Dining Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 41

47 DOCUMENT1/Level 2/Dining Room - Dining Room Date Taken: 11/25/2019

Taken By: Casey Hoak

48 DOCUMENT1/Level 2/Dining Room - Dining Room Date Taken: 11/25/2019

Broken slider

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 42

49 DOCUMENT1/Level 2/Dining Room - Dining Room Date Taken: 8/22/2019

Taken By: Darlene Hbbard

Replacing with 100 amp panel

50 DOCUMENT1/Level 2/Bedroom 3 - Bedroom 3 Date Taken: 11/25/2019

Taken By: Casey Hoak

No damage to ceiling or roof as it is concrete. Addressing 1 broken 3X4 window and adding 35SF shutter. No damage to flooring or door. Replace smoke detector.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 43

51 DOCUMENT1/Level 2/Bedroom 3 - Bedroom 3 Date Taken: 11/25/2019

Taken By: Casey Hoak

52 DOCUMENT1/Level 2/Bedroom 3 - Bedroom 3

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 44

53 DOCUMENT1/Level 2/Bedroom 3 - Bedroom 3 Date Taken: 11/25/2019

Taken By: Casey Hoak

54 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4 Date Taken: 11/25/2019

Taken By: Casey Hoak

No damage to ceiling or roof as it is concrete. No broken windows and adding 52.5 SF shutter. No damage to flooring or door. R/R smoke detector.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 45

55 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4 Date Taken: 11/25/2019

Taken By: Casey Hoak

56 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 46

57 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4 Date Taken: 11/25/2019

Taken By: Casey Hoak

58 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 47

59 DOCUMENT1/Level 2/Bath2 - Bathroom 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

No damage to ceiling or concrete roof. No damage to fixtures and no window in bathroom. 1 light replace

60 DOCUMENT1/Level 2/Bath2 - Bathroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 48

61 DOCUMENT1/Level 2/Bath2 - Bathroom 2 Date Taken: 11/25/2019

Taken By: Casey Hoak

62 DOCUMENT1/Level 2/Bath3 - Bathroom 3 Date Taken: 11/25/2019

Taken By: Casey Hoak

No damage to ceiling or concrete roof. Only adding 7.5 shutter. No damages to fixtures or floor.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 49

63 DOCUMENT1/Level 2/Bath3 - Bathroom 3 Date Taken: 11/25/2019

Taken By: Casey Hoak

64 DOCUMENT1/Level 2/Bath3 - Bathroom 3

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 50

65 DOCUMENT1/Level 2/Bath3 - Bathroom 3 Date Taken: 11/25/2019

Taken By: Casey Hoak

66 DOCUMENT1/Level 2/Bath3 - Bathroom 3

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 51

67 DOCUMENT1/Level 2/Stairwell - 98-Stairs Date Taken: 8/22/2019

Taken By: Darlene Hbbard

No damages

68 23-Living Room

Taken By: Darlene Hbbard

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 52

69 22-Living Room

Date Taken: 8/22/2019

Taken By: Darlene Hbbard

70 21-Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 53

71 20-Living Room

Date Taken: 8/22/2019

Taken By: Darlene Hbbard

72 19-Living Room

Date Taken: 8/22/2019

No damages to 1st floor interior, windows or doors. Only addressing 28SF shutters for windows.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 54

73 28-Bedroom 1

Date Taken: 8/22/2019

Taken By: Darlene Hbbard

No damages to 1st floor interior, windows or doors. Only addressing 28SF shutters for windows. Add smoke detector.

74 29-Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 55

75 30-Bedroom 1

Date Taken: 8/22/2019

Taken By: Darlene Hbbard

76 31-Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412600472_RA 12/7/2019 Page: 56

77 32-Bedroom 1

Date Taken: 8/22/2019

Taken By: Darlene Hbbard

78 33-Bedroom 1

CNMI-412600472_RA 12/7/2019 Page: 57

Main Level

Bedroom 2

Bathroom 1

Bedroom 1

Hallway

Kitchen 1

Living Room 1

Stairs

Main Level

CNMI-412600472_RA 12/7/2019 Page: 58

Level 2

Bedroom 4

Kitchen 2

Living Room 2

Dining Room

Bath2

Stairwell

Bedroom 3

Bath3

Level 2

CNMI-412600472_RA 12/7/2019 Page: 59

ROOF

Roof1

(A)F1

(B)F2

ROOF

CNMI-412600472_RA 12/7/2019 Page: 60

PLOT

Damaged Dwelling (A1)

Power Pole (A4)

Driveway (A5)

Water Meter (A6)

Water Tank (A8)

Lot (A9)

Santa Lourdes Drive (A2)

Out Building (A3)

PLOT