Dewberry
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
Insured: JOEY CRUZ Home: (670) 256-4374 Cellular: (670) 287-4611Business: 1111 bh ftghi, DC 98790 Home: SANTA LOURDES DR LOT TR22768-R2 NEW
AS TEO, HI 96701
Property: SANTA LOURDES DR LOT TR22768-R2 NEW
AS TEO, HI 96701
Claim Rep.: Casey Hoak
Estimator: Casey Hoak
Claim Number: CNMI-412600472 Policy Number: CNMI-412600472 Type of Loss: Hurricane
Date Contacted: 8/22/2019 10:00 AM Date of Loss: 10/25/2018 12:00 AM Date Received: 1/11/2019 8:32 PM
Date Inspected: 2/11/2019 3:00 PM Date Entered: 8/24/2019 8:36 PM
Date Est. Completed: 2/12/2019 2:26 AM
Price List: HIOI8X_JAN19 Restoration/Service/Remodel
Estimate: CNMI-412600472_RA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 2
11/25/2019 CMH
Site visits batch of 4 next 20 Attending /Casey Hoak, Jorge Rivera PE This home was visited on a joint site visit back in August for the initial set of 40. The home has not suffered any new damage since that scope was written. Changes were made only to the gable end wall to make them 2x6 instead of 2x4.
Scaffold labor and a dumpster for hauling the debris off have also been added per FEMA Guidance. All other items listed remain the same. The roof design that was written has been reviewed by PE Jorge Rivera and he is in agreement with the design of the roof. A new set of photos has been added to the file to document the present condition of the home as of today.
JOINT SCOPING SUMMARY 8/22/2019:CMH
Attendees: FEMA : Chuck Thompson, Chris Craft. Dewberry: Marvin Davis, Darlene Hubbard.
Roof designed and agreed to at the joint site visit: 2 story dwelling with a portion of 2nd story roof concrete. Only replacing damaged portion with gable roof that is present. No need to replace existing bond beam, drill and epoxy anchor bolts.
Foundation appears in good condition and should not need any work.
Windows are only being replaced that were damaged which is in bedroom 3 and all windows getting storm shutters including those located on 1st floor under concrete roof per FEMA guidance.
No damage to any ceramic tile flooring.
1 damaged slider door located in Dining Room on 2nd floor will be replaced with retrofit exterior door and painted trim and all 6 sides.
Electrical will be to rewire affected rooms on 2nd floor only with actual count for plugs, lights and switches, including adding smoke detectors and C/O to all bedrooms and living room on 2nd floor.
A sub100 amp panel on 2nd floor will be replaced with a 125 amp panel. The main panel on the first floor is undamaged and FEMA guidance has been to replace only the sub panel in these cases.
All available GFM (Government Supplied Material was identified). All changes were agreed upon by all parties and are made a part of this revised report.
INSPECTION SUMMARY
The applicant met at the damaged dwelling and the following was observed.
The dwelling is a 2 story 4 bedroom structure. The dwelling is deemed to be repairable. The roof was torn off and has a temporary tin roof, paid for by the applicant.
Reconstruction should take approximately 16 weeks from start of construction.
AGE
The home was built in 1989
DAMAGE AND REPAIR SUMMARY
See attached estimate for exact repair and line items.
Square Footage of Damaged Dwelling
LAT 15.196211
LONG 145.765284
A; ROOF
Roof including roof and framing was destroyed.
B: INTERIOR
Some interior items damaged
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 3
C: STRUCTURAL
Foundation is a slab. Slab appears to be intact.
D: MECHANICAL/PLUMBING/WATER SYSTEM
Mechanical/Plumbing ok
E: ELECTRICAL
Some electrical needs replacement
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 4
CNMI-412600472_RA
ROOF
ROOF
DESCRIPTION QTY
1. 2" x 6" x 10' #2 treated pine (material only) 12.00 EA
2. 2" x 10" x 18' #2 treated pine (material only) 46.00 EA
3. 2" x 12" x 20' #2 treated pine (material only) 4.00 EA
4. 2" x 12" x 14' #2 treated pine (material only) 4.00 EA
5. 2" x 12" x 18' #2 treated pine (material only) 4.00 EA
6. R&R Rafters - 2x10 - Labor only - (using rafter length) 825.82 LF
7. R&R Rafters - 2x6 - Labor only - (using rafter length) 233.84 LF
For gable end walls and collar ties
8. R&R Rafters - 2x12 - Labor only - (using rafter length) 200.81 LF
For the ridge beam and fascia
10. 2" x 6" x 20' #2 treated pine (material only) 2.00 EA
11. 2" x 6" x 14' #2 treated pine (material only) 2.00 EA
12. 2" x 6" x 18' #2 treated pine (material only) 4.00 EA
13. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 11.00 EA
For gable end walls
14. Install Sheathing - plywood - 1/2" - treated 258.68 SF
15. Material Only Sheathing - plywood - 1/2" - treated 258.68 SF
16. Install Sheathing - plywood - 3/4" - treated 1152.00 SF
17. Material Only Sheathing - plywood - 3/4" - treated 1152.00 SF
182. Siding - hardboard panel - paint grade 129.34 SF
183. House wrap (air/moisture barrier) 129.34 SF
------------------ ROOFING -----------------
18. Remove Metal roofing - ribbed - 24 gauge - up to 1" 1151.96 SF
19. Install Metal roofing - ribbed - 24 gauge - up to 1" 1151.96 SF
20. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 1151.96 SF
21. Closure strips for metal roofing - inside and/or outside 64.17 LF
22. Flashing tape - self-adhesive 423.22 LF
Seal between the metal roof seams
23. Ridge vent - Metal roofing - floating ventilator 32.08 LF
24. Additional screws for 3/4 plywood sheathing 3891.00 EA
Additional screws for 3/4 plywood sheathing above Xactimate allowance 6% waste is added
25. Additional screws for 2x4 furring 800.00 EA
Additional screws for 2X4 furring above Xactimate allowance 6% waste is added
26. Additional screws for 2x6 furring 326.00 EA
Additional screws for 2x6 furring above Xactimate allowance 6% waste is added
27. Additional screws for fascia 106.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 5
CONTINUED - ROOF
DESCRIPTION QTY
Additional screws for fascia above Xactimate allowance 6% waste is added
29. Drip edge/gutter apron 64.17 LF
30. Gable trim for metal roofing - 26 gauge 71.81 LF
31. Ice & water barrier 1151.96 SF
32. Neoprene pipe jack flashing for metal roofing 1.00 EA
33. Install 2" x 4" lumber - treated (.667 BF per LF) 435.17 LF
Roof purlins
34. Material Only 2" x 4" lumber - treated (.667 BF per LF) 435.17 LF
Roof purlins
35. Install 2" x 6" lumber - treated (1 BF per LF) 200.14 LF
For Picture Frame Purlins
36. Material Only 2" x 6" lumber - treated (1 BF per LF) 200.14 LF
For Picture Frame Purlins
37. Install 2" x 6" lumber - treated (1 BF per LF) 256.67 LF
Rafter Blocking
38. Material Only 2" x 6" lumber - treated (1 BF per LF) 256.67 LF
Rafter Blocking
------------------ SOFFIT -----------------
39. Install Soffit - box framing - 1' overhang 85.34 LF
Calculation set for 16" overhang
40. Material Only Soffit - box framing - 1' overhang 85.34 LF
Calculation set for 16" overhang
41. Install Soffit & fascia - wood - 1' overhang 85.34 LF
Calculation set for 16" overhang
42. Material Only Soffit & fascia - wood - 1' overhang 85.34 LF
Calculation set for 16" overhang
43. Baffle vent - foam 64.17 LF
Cut to fit as needed for vents
44. Soffit vent - linear 32.08 LF
------------------ PAINT -----------------
45. Exterior - paint two coats 129.34 SF
46. Prime & paint exterior soffit - wood 85.34 SF
47. Prime & paint exterior fascia - wood, 4"- 6" wide 128.33 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
------------------ STRAPPING -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 6
CONTINUED - ROOF
DESCRIPTION QTY
48. 2x10 Joist hangers for rafters 48.00 EA
2x10 Joist hangers for rafters
49. Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans 200.00 EA
Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans
50. Framing hurricane tie 208.00 EA
For rafter tails and gable wall studs top and bottom
51. Install Framing hurricane tie 52.00 EA
For joist to top plate
52. Material Only Framing hurricane tie 52.00 EA
For joist to top plate
54. Framing strap - 24" long 26.00 EA
55. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 120.00 EA
4 @ each rafter section & 24 at the splice on the ridge
NOTES:
DOCUMENT1
Main Level Main Level
DESCRIPTION QTY
------------------ GENERAL ITEMS -----------------
56. Clean the floor - Heavy 976.67 SF
NOTES:
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 7
Bedroom 2
Bathroom 1
Bedroom 1
Hallway
Kitchen 1
Living Room 1
Stairs
3' 5"
9"
1' 13' 8"
' 1
0"
2' 6" 13'
13' 6"
2' 4"
2' 7"
3' 4' 4"
4' 10"
10' 6"
10' 9"
' 7
Kitchen 1 Height: 8'
435.89 SF Walls
629.08 SF Walls & Ceiling
21.47 SY Flooring
57.33 LF Ceil. Perimeter
193.19 SF Ceiling
193.19 SF Floor
53.92 LF Floor Perimeter
Missing Wall - Goes to Floor 3' 5" X 6' 8" Opens into LIVING_ROOM_
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
57. Security/storm shutter 14.00 SF
NOTES:
Bedroom 2
Bathroom 1
Bedroom 1
Hallway
Kitchen 1
Living Room 1
Stairs
' 7
2' 6"
4' 2"
4' 5"
5' 10"
6' 4"
4'
' 4
' 1
0"
3'
3'
4'
3'
0"
' 4
' 7
3' 5"
9"
1' 13' 8"
7'
0"
4' 10"
5' 4"
Living Room 1 Height: 8'
471.89 SF Walls
759.50 SF Walls & Ceiling
31.96 SY Flooring
61.83 LF Ceil. Perimeter
287.61 SF Ceiling
287.61 SF Floor
58.42 LF Floor Perimeter
Missing Wall - Goes to Floor 3' 5" X 6' 8" Opens into KITCHEN_1
Missing Wall 7' 10" X 8' Opens into HALLWAY
Missing Wall 5' 4" X 8' Opens into ROOM7
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
58. Security/storm shutter 45.00 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 8
Bedroom 2
Bathroom 1
Bedroom 1
Hallway
Kitchen 1
Living Room 1
Stairs
7'
0" 2' 6" 2'
2' 6"
1' 7"
2'
2'
2'
2' 6"
1' 4" 2' 3"
2' 6"
Hallway Height: 8'
162.00 SF Walls
207.69 SF Walls & Ceiling
5.08 SY Flooring
20.25 LF Ceil. Perimeter
45.69 SF Ceiling
45.69 SF Floor
20.25 LF Floor Perimeter
Missing Wall 7' 10" X 8' Opens into LIVING_ROOM_
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
59. Smoke detector 1.00 EA
60. Carbon monoxide detector 1.00 EA
NOTES:
Bedroom 2
Bathroom 1
Bedroom 1
Hallway
Kitchen 1
Living Room 1
Stairs
5' 2'
3'
3'
3'
5' 6' 10"
7' 1"
3'
3' 6"
' 1
0"
2' 6"
1' 4" 2' 3"
2' 6"8' 6"
8' 9"
Bedroom 1 Height: 8'
410.67 SF Walls
571.36 SF Walls & Ceiling
17.85 SY Flooring
51.33 LF Ceil. Perimeter
160.69 SF Ceiling
160.69 SF Floor
51.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
61. Security/storm shutter 35.00 SF
------------------ ELECTRICAL -----------------
62. Smoke detector 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 9
Bedroom 2
Bathroom 1
Bedroom 1
Hallway
Kitchen 1
Living Room 1
Stairs3' 4'
4'
4'
4'
8' 9"
8' 6"
2' 6" 2'
2' 6"
1' 7"
1' 4"
' 4
' 1
0"
3'
5' 2"
5' 8"
6' 8"
6' 11" Bedroom 2 Height: 8'
418.67 SF Walls
586.78 SF Walls & Ceiling
18.68 SY Flooring
52.33 LF Ceil. Perimeter
168.11 SF Ceiling
168.11 SF Floor
52.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
63. Security/storm shutter 53.00 SF
------------------ ELECTRICAL -----------------
64. Smoke detector 1.00 EA
NOTES:
Bedroom 2
Bathroom 1
Bedroom 1
Hallway
Kitchen 1
Living Room 1
Stairs
2'
2'
2'
8' 9"
8' 6"
2' 3'
3'
2'
0"
3'
Bathroom 1 Height: 8'
261.33 SF Walls
327.92 SF Walls & Ceiling
7.40 SY Flooring
32.67 LF Ceil. Perimeter
66.58 SF Ceiling
66.58 SF Floor
32.67 LF Floor Perimeter
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
65. Security/storm shutter 7.50 SF
CNMI DATA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 10
CNMI Data1' 4"
CNMI Data Height: 4"
1.57 SF Walls
2.92 SF Walls & Ceiling
0.15 SY Flooring
4.70 LF Ceil. Perimeter
1.36 SF Ceiling
1.36 SF Floor
4.70 LF Floor Perimeter
DESCRIPTION QTY
135. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO
136. Material Only LATITUDE DAMAGED DWELLING 15.20 DE
15.196211
137. Material Only LONGITUDE DAMAGED DWELLING 145.77 DE
145.765284
138. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO
139. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO
140. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 NO
141. DOES DWELLING HAVE A WELL 1.00 NO
142. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO
143. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1989.00 YR
144. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO
145. Material Only ENCROACHMENT ISSUES 0.00 NO
146. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO
147. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 NO
148. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 2516.00 SF
149. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO
150. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
151. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
ROOF
152. Material Only IS DWELLING DESTROYED 0.00 NO
153. Material Only FOUNDATION TYPE 0.00 UN
Slab
154. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO
155. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
156. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO
157. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS
158. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
ROOF
159. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 11
CONTINUED - CNMI Data
DESCRIPTION QTY
160. Material Only LATITUDE OUT BUILDING 15.20 DE
15.196989
161. Material Only LONGITUDE OUT BUILDING 145.77 DE
145.765120
162. Material Only LATITUDE POWER POLE 15.20 DE
15.196605
163. Material Only LONGITUDE POWER POLE 145.76 DE
145.764949
164. Material Only LATITUDE WATER METER 15.20 DE
15.196209
165. Material Only LONGITUDE WATER METER 145.77 DE
145.765173
166. Material Only LATITUDE WATER TANK 15.20 DE
15.196160
167. Material Only LONGITUDE WATER TANK 145.77 DE
15.141423
NOTES:
Level 2 Level 2
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
66. Rewire - average residence - copper wiring 930.00 SF
Only rewiring portion that was affected by removal of the roof. Remainder of electrical under concrete roof and not affected.
67. R&R Breaker panel - 125 amp w/arc fault breakers 1.00 EA
260590101220 Rewiring electrical under portion of roof affected and separate panel for 2nd floor.
68. Remove Circuit breaker - main disconnect - 125 amp 1.00 EA
------------------ WALL REPAIRS-----------------
69. Wedge anchor bolt - 1/2" x 8 1/2" 205.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 12
CONTINUED - Level 2
DESCRIPTION QTY
For cold joint between top of wall and new bond beam.
70. Epoxy crack and joint filler (per LF of crack) 205.00 EA
71. Install 2" x 6" lumber - treated (1 BF per LF) 544.50 LF
For double sill plate on the perimeter
72. Material Only 2" x 6" lumber - treated (1 BF per LF) 544.50 LF
For double sill plate on the perimeter
73. Sill seal foam - 6" 159.00 LF
NOTES:
Bedroom 4
Kitchen 2
Living Room 2
Dining Room
Bath2
Stairwell
Bedroom 3
Bath3
5'
0"
5'
2'
3'
2'
2'
3' 6' 6"
6' 9"
9' 4"
9' 7"
2'
8'
3'
2' 6" 7' 9"
7' 6"
3' 9"5' 1" Kitchen 2 Height: 8'
538.67 SF Walls
818.03 SF Walls & Ceiling
31.04 SY Flooring
67.33 LF Ceil. Perimeter
279.36 SF Ceiling
279.36 SF Floor
67.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
74. R&R Switch 4.00 EA
75. R&R Light fixture 1.00 EA
76. R&R Outlet 2.00 EA
77. R&R Ground fault interrupter (GFI) outlet 3.00 EA
78. 220 volt copper wiring run, box and receptacle 1.00 EA
79. Detach & Reset Range hood 1.00 EA
Detach and Reset
------------------ DOORS & WINDOWS -----------------
80. Security/storm shutter 14.00 SF
------------------ INSULATION -----------------
81. Batt insulation - 10" - R30 - paper faced 279.36 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 13
CONTINUED - Kitchen 2
DESCRIPTION QTY
------------------ WALLS & CEILINGS -----------------
82. Remove Sheathing - plywood - 1/2" - treated 279.36 SF
83. Install Sheathing - plywood - 1/2" - treated 279.36 SF
84. Material Only Sheathing - plywood - 1/2" CDX 279.36 SF
85. Seal & paint plywood sheathing 279.36 SF
86. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 279.36 SF
87. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 279.36 SF
88. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 279.36 SF
89. Cove molding - 3/4" 67.33 LF
------------------CABINETRY -----------------
90. Detach & Reset Cabinetry - upper (wall) units 19.00 LF
Detach and Reset
------------------GENERAL ITEMS -----------------
91. 5 lb. ABC fire extinguisher 1.00 EA
NOTES:
Bedroom 4
Kitchen 2
Living Room 2
Dining Room
Bath2
Stairwell
Bedroom 3
Bath3
' 1
0"
7' 9"
7' 6"
3' 9" 11' 11"
11' 8"
4'
' 1
0"
' 4
1'
1'
4'
4'
2"
' 8
' 1
1"
3'
21' 9"
1' 8"3'
5' 6"
3' 10' 3"
12' 8"
13' 2"
3'5' 1"
17' 10"
18' 4"
Living Room 2 Height: 8'
541.33 SF Walls
947.72 SF Walls & Ceiling
45.15 SY Flooring
67.67 LF Ceil. Perimeter
406.39 SF Ceiling
406.39 SF Floor
67.67 LF Floor Perimeter
Missing Wall 15' 10" X 8' Opens into STAIRWELL
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
92. R&R Switch 3.00 EA
93. R&R Light fixture 1.00 EA
94. R&R Outlet 4.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 14
CONTINUED - Living Room 2
DESCRIPTION QTY
95. Smoke detector 1.00 EA
96. Carbon monoxide detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
97. Security/storm shutter 141.70 SF
------------------ INSULATION -----------------
98. Batt insulation - 10" - R30 - paper faced 406.39 SF
------------------ WALLS & CEILINGS -----------------
99. Remove Sheathing - plywood - 1/2" - treated 406.39 SF
100. Install Sheathing - plywood - 1/2" - treated 406.39 SF
101. Material Only Sheathing - plywood - 1/2" CDX 406.39 SF
102. Seal & paint plywood sheathing 406.39 SF
103. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 406.39 SF
104. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 406.39 SF
105. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 406.39 SF
106. Cove molding - 3/4" 67.67 LF
NOTES:
Bedroom 4
Kitchen 2
Living Room 2
Dining Room
Bath2
Stairwell
Bedroom 3
Bath3
2'
8'
3'
3'
5' 9"
6' 3"
2' 11"
3' 2"
3' 2' 5"
2' 11"
6' 3"
6' 6"
3'
' 8
' 1
1" 1'
5'
5" 8"
9'
9'
1"
3'
7'
7'
5'
11' 11"
11' 8" Dining Room Height: 8'
424.00 SF Walls
597.06 SF Walls & Ceiling
19.23 SY Flooring
53.00 LF Ceil. Perimeter
173.06 SF Ceiling
173.06 SF Floor
53.00 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
107. R&R Switch 3.00 EA
108. R&R Light fixture 1.00 EA
109. R&R Outlet 3.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 15
CONTINUED - Dining Room
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
110. Remove 5-0 6-8 vinyl sliding patio door 1.00 EA
111. Additional charge for a retrofit exterior door 1.00 EA
112. Exterior door - metal - insulated - flush or panel style 1.00 EA
113. Door lockset & deadbolt - exterior 1.00 EA
114. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
115. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
116. Security/storm shutter 84.00 SF
------------------ INSULATION -----------------
117. Batt insulation - 10" - R30 - paper faced 173.06 SF
------------------ WALLS & CEILINGS -----------------
118. Remove Sheathing - plywood - 1/2" - treated 173.06 SF
119. Install Sheathing - plywood - 1/2" - treated 173.06 SF
120. Material Only Sheathing - plywood - 1/2" CDX 173.06 SF
121. Seal & paint plywood sheathing 173.06 SF
122. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 173.06 SF
123. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 173.06 SF
124. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 173.06 SF
125. Cove molding - 3/4" 53.00 LF
NOTES:
Bedroom 4
Kitchen 2
Living Room 2
Dining Room
Bath2
Stairwell
Bedroom 3
Bath3
2' 6"
1' 8"
2' 8' 5"
8' 8"
2'
3'
2'
2'
3' 6' 11"
7' 2"
4' 11"
5' 5"
3' 2'
1"
3'
2'
1"
3'
Bedroom 3 Height: 8'
377.33 SF Walls
507.13 SF Walls & Ceiling
14.42 SY Flooring
47.17 LF Ceil. Perimeter
129.79 SF Ceiling
129.79 SF Floor
47.17 LF Floor Perimeter
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 16
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
126. R&R Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
127. R&R Storm window - aluminum, 12-24 sf 1.00 EA
Replace broken window
128. Security/storm shutter 35.00 SF
NOTES:
Bedroom 4
Kitchen 2
Living Room 2
Dining Room
Bath2
Stairwell
Bedroom 3
Bath3
3' 4'
4'
0"
8'
8'
6' 2"
5' 11"
2' 6" 3'3' 2"
2' 11"
' 1
0" 2'
3'
3' 10"
4' 4"
8'
8' 3" 3'
7' 1"
7' 7"
4' 9"
5' Bedroom 4 Height: 8'
490.67 SF Walls
725.53 SF Walls & Ceiling
26.10 SY Flooring
61.33 LF Ceil. Perimeter
234.86 SF Ceiling
234.86 SF Floor
61.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
129. R&R Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
130. Security/storm shutter 52.50 SF
NOTES:
Bedroom 4
Kitchen 2
Living Room 2
Dining Room
Bath2
Stairwell
Bedroom 3
Bath3
5'
2' 6" 1' 5"
1' 8"
2'
2' 2'
2'
1'
1'
0"
6' 2"
5' 11"
Bath2 Height: 8'
184.00 SF Walls
217.03 SF Walls & Ceiling
3.67 SY Flooring
23.00 LF Ceil. Perimeter
33.03 SF Ceiling
33.03 SF Floor
23.00 LF Floor Perimeter
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 17
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
131. R&R Switch 1.00 EA
132. R&R Light fixture 1.00 EA
133. R&R Ground fault interrupter (GFI) outlet 1.00 EA
------------------ DOORS & WINDOWS -----------------
184. Security/storm shutter 7.50 SF
NOTES:
Labor Minimums Applied
DESCRIPTION QTY
168. Finish hardware labor minimum 1.00 EA
NOTES:
Grand Total Areas:
5,376.01 SF Walls 2,358.04 SF Ceiling SF Walls and Ceiling7,734.05 2,358.04 SF Floor 262.00 SY Flooring 675.37 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 682.20 LF Ceil. Perimeter
2,358.04 Floor Area 2,617.25 Total Area 5,376.01 Interior Wall Area 2,757.61 Exterior Wall Area 296.04 Exterior Perimeter of
Walls
1,151.96 Surface Area 11.52 Number of Squares 135.98 Total Perimeter Length
32.08 Total Ridge Length 0.00 Total Hip Length
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 18
1 DOCUMENT1/Main Level - 1- Scope Notes Date Taken: 8/22/2019
Taken By: Darlene Hubbard
No damages to 1st floor, no broken windows. Add shutters to all windows. Portion of 2nd story roof made of concrete, no damages to ceilings in that portion. Agreement by all parties at joint site visit 8/22/19 to replace with gable roof, no bond beam necessary, drill and epoxy anchor bolts.
2 DOCUMENT1/Main Level - 2- Scope Notes Date Taken: 8/22/2019
Taken By: Darlene Hubbard
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 19
3 DOCUMENT1/Main Level - 3- Scope Notes Date Taken: 8/22/2019
Taken By: Darlene Hubbard
4 DOCUMENT1/Main Level - 4- Scope Notes
Taken By: Darlene Hubbard
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 20
5 DOCUMENT1/Main Level - Front Elevation Date Taken: 11/25/2019
Taken By: Casey Hoak
6 DOCUMENT1/Main Level - Front Elevation Date Taken: 11/25/2019
Taken By: Casey Hoak
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 21
7 DOCUMENT1/Main Level - Front Elevation Date Taken: 11/25/2019
Taken By: Casey Hoak
8 DOCUMENT1/Main Level - Front Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 22
9 DOCUMENT1/Main Level - Front Elevation Date Taken: 11/25/2019
Taken By: Casey Hoak
10 DOCUMENT1/Main Level - Right Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 23
11 DOCUMENT1/Main Level - Back Elevation Date Taken: 11/25/2019
Taken By: Casey Hoak
12 DOCUMENT1/Main Level - Left Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 24
13 DOCUMENT1/Main Level - Left Elevation Date Taken: 11/25/2019
Taken By: Casey Hoak
14 DOCUMENT1/Main Level - Left Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 25
15 DOCUMENT1/Main Level - Left Elevation Date Taken: 11/25/2019
Taken By: Casey Hoak
16 DOCUMENT1/Main Level - Left Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 26
17 DOCUMENT1/Main Level - Left Elevation Date Taken: 11/25/2019
Taken By: Casey Hoak
18 DOCUMENT1/Main Level/Kitchen 1 - Kitchen 1 Date Taken: 11/25/2019
Taken By: Casey Hoak
No damages to kitchen, only addressing 14SF shutters for window.
No damage to exterior door.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 27
19 DOCUMENT1/Main Level/Kitchen 1 - Kitchen 1 Date Taken: 11/25/2019
Taken By: Casey Hoak
20 DOCUMENT1/Main Level/Kitchen 1 - Kitchen 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 28
21 DOCUMENT1/Main Level/Living Room 1 - Living Room Date Taken: 11/25/2019
Taken By: Casey Hoak
No damages to 1st floor interior, windows or doors. Only addressing 28SF shutters for windows.
22 DOCUMENT1/Main Level/Living Room 1 - Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 29
23 DOCUMENT1/Main Level/Hallway - Hallway Date Taken: 11/25/2019
Taken By: Casey Hoak
No damages to 1st floor interior, windows or doors. Add smoke detector
24 DOCUMENT1/Main Level/Hallway - Hallway
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 30
25 DOCUMENT1/Main Level/Hallway - Hallway Date Taken: 11/25/2019
Taken By: Casey Hoak
26 DOCUMENT1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/25/2019
Taken By: Casey Hoak
No damages to 1st floor interior, windows or doors. Only addressing 28SF shutters for windows. Add smoke detector.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 31
27 DOCUMENT1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/25/2019
Taken By: Casey Hoak
28 DOCUMENT1/Main Level/Bedroom 1 - Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 32
29 DOCUMENT1/Main Level/Bedroom 1 - Bedroom 1 Date Taken: 11/25/2019
Taken By: Casey Hoak
30 DOCUMENT1/Main Level/Bedroom 2 - Bedroom 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
No damages to 1st floor interior, windows or doors. Only addressing 52SF shutters for windows. Add smoke detector
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 33
31 DOCUMENT1/Main Level/Bedroom 2 - Bedroom 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
32 DOCUMENT1/Main Level/Bedroom 2 - Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 34
33 DOCUMENT1/Main Level/Bathroom 1 - Bathroom 1 Date Taken: 11/25/2019
Taken By: Casey Hoak
No damages to Bathroom 1, only addressing to 7.5 shutter window.
Damages to ceiling not disaster related, caused by plumbing issues from bathroom above.
34 DOCUMENT1/Main Level/Stairs - Stairs Date Taken: 11/25/2019
Taken By: Casey Hoak
No damages, only addressing shutter for window
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 35
35 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
Ceiling and roof damage to this portion of dwelling, half of the roof is concrete. No damage to gable end walls. Replace CJM, add insulation and paint. R&R 1 light, 4 switches, 3 GFI, 2 plugs, (1) 220 volt outlet. No damage to cabinets or flooring. R&R Rangehood, adding 14SF shutters.
Add fire extinguisher.
36 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 36
37 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
38 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 37
39 DOCUMENT1/Level 2/Kitchen 2 - Kitchen 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
40 DOCUMENT1/Level 2/Living Room 2 - Living Room 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
Ceiling and roof damage to this portion of dwelling, half of the roof is concrete. No damage to gable end walls. Replace CJM, add insulation and paint. R&R 1 light, 3 switches, 2 plugs. No damage to windows or flooring. Adding 141.7 SF shutters.
Add smoke detector and C/O.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 38
41 DOCUMENT1/Level 2/Living Room 2 - Living Room 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
42 DOCUMENT1/Level 2/Living Room 2 - Living Room 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 39
43 DOCUMENT1/Level 2/Living Room 2 - Living Room 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
44 DOCUMENT1/Level 2/Living Room 2 - Living Room 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 40
45 DOCUMENT1/Level 2/Dining Room - Dining Room Date Taken: 11/25/2019
Taken By: Casey Hoak
Ceiling and roof damage to this portion of dwelling, half of the roof on 2nd floor is concrete. No damage to gable end walls. Replace CJM, add insulation and paint. R&R 1 light, 3 switches, 3 plugs, replace 125 amp panel. Replace broken slider with 3' retrofit door. No damage to windows or flooring. Adding 84 SF shutters.
46 DOCUMENT1/Level 2/Dining Room - Dining Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 41
47 DOCUMENT1/Level 2/Dining Room - Dining Room Date Taken: 11/25/2019
Taken By: Casey Hoak
48 DOCUMENT1/Level 2/Dining Room - Dining Room Date Taken: 11/25/2019
Broken slider
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 42
49 DOCUMENT1/Level 2/Dining Room - Dining Room Date Taken: 8/22/2019
Taken By: Darlene Hbbard
Replacing with 100 amp panel
50 DOCUMENT1/Level 2/Bedroom 3 - Bedroom 3 Date Taken: 11/25/2019
Taken By: Casey Hoak
No damage to ceiling or roof as it is concrete. Addressing 1 broken 3X4 window and adding 35SF shutter. No damage to flooring or door. Replace smoke detector.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 43
51 DOCUMENT1/Level 2/Bedroom 3 - Bedroom 3 Date Taken: 11/25/2019
Taken By: Casey Hoak
52 DOCUMENT1/Level 2/Bedroom 3 - Bedroom 3
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 44
53 DOCUMENT1/Level 2/Bedroom 3 - Bedroom 3 Date Taken: 11/25/2019
Taken By: Casey Hoak
54 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4 Date Taken: 11/25/2019
Taken By: Casey Hoak
No damage to ceiling or roof as it is concrete. No broken windows and adding 52.5 SF shutter. No damage to flooring or door. R/R smoke detector.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 45
55 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4 Date Taken: 11/25/2019
Taken By: Casey Hoak
56 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 46
57 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4 Date Taken: 11/25/2019
Taken By: Casey Hoak
58 DOCUMENT1/Level 2/Bedroom 4 - Bedroom 4
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 47
59 DOCUMENT1/Level 2/Bath2 - Bathroom 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
No damage to ceiling or concrete roof. No damage to fixtures and no window in bathroom. 1 light replace
60 DOCUMENT1/Level 2/Bath2 - Bathroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 48
61 DOCUMENT1/Level 2/Bath2 - Bathroom 2 Date Taken: 11/25/2019
Taken By: Casey Hoak
62 DOCUMENT1/Level 2/Bath3 - Bathroom 3 Date Taken: 11/25/2019
Taken By: Casey Hoak
No damage to ceiling or concrete roof. Only adding 7.5 shutter. No damages to fixtures or floor.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 49
63 DOCUMENT1/Level 2/Bath3 - Bathroom 3 Date Taken: 11/25/2019
Taken By: Casey Hoak
64 DOCUMENT1/Level 2/Bath3 - Bathroom 3
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 50
65 DOCUMENT1/Level 2/Bath3 - Bathroom 3 Date Taken: 11/25/2019
Taken By: Casey Hoak
66 DOCUMENT1/Level 2/Bath3 - Bathroom 3
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 51
67 DOCUMENT1/Level 2/Stairwell - 98-Stairs Date Taken: 8/22/2019
Taken By: Darlene Hbbard
No damages
68 23-Living Room
Taken By: Darlene Hbbard
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 52
69 22-Living Room
Date Taken: 8/22/2019
Taken By: Darlene Hbbard
70 21-Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 53
71 20-Living Room
Date Taken: 8/22/2019
Taken By: Darlene Hbbard
72 19-Living Room
Date Taken: 8/22/2019
No damages to 1st floor interior, windows or doors. Only addressing 28SF shutters for windows.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 54
73 28-Bedroom 1
Date Taken: 8/22/2019
Taken By: Darlene Hbbard
No damages to 1st floor interior, windows or doors. Only addressing 28SF shutters for windows. Add smoke detector.
74 29-Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 55
75 30-Bedroom 1
Date Taken: 8/22/2019
Taken By: Darlene Hbbard
76 31-Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412600472_RA 12/7/2019 Page: 56
77 32-Bedroom 1
Date Taken: 8/22/2019
Taken By: Darlene Hbbard
78 33-Bedroom 1
CNMI-412600472_RA 12/7/2019 Page: 57
Main Level
Bedroom 2
Bathroom 1
Bedroom 1
Hallway
Kitchen 1
Living Room 1
Stairs
Main Level
CNMI-412600472_RA 12/7/2019 Page: 58
Level 2
Bedroom 4
Kitchen 2
Living Room 2
Dining Room
Bath2
Stairwell
Bedroom 3
Bath3
Level 2
CNMI-412600472_RA 12/7/2019 Page: 59
ROOF
Roof1
(A)F1
(B)F2
ROOF
CNMI-412600472_RA 12/7/2019 Page: 60
PLOT
Damaged Dwelling (A1)
Power Pole (A4)
Driveway (A5)
Water Meter (A6)
Water Tank (A8)
Lot (A9)
Santa Lourdes Drive (A2)
Out Building (A3)
PLOT
CNMI-412600472_RA 12/7/2019 Page: 61