Dewberry
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
Insured: MUNA, FABIAN SAN NICOLAS Home: (670) 789-1931 Home: LOT 011 G 1103 PAHOMG STREET BLUE
HOUSE ON RIGHT
KAGMAN THREE, HI
Property: LOT 011 G 1103 PAHOMG STREET BLUE
HOUSE ON RIGHT
KAGMAN THREE, HI
Claim Rep.: Darlene Hubbard
Estimator: Darlene Hubbard
Claim Number: CNMI-412603557 Policy Number: CNMI-412603557 Type of Loss: Hurricane
Date Contacted: 11/29/2019 7:00 PM Date of Loss: 10/25/2018 5:00 AM Date Received: 1/11/2019 7:24 AM
Date Inspected: 2/7/2019 11:00 PM Date Entered: 12/1/2019 7:32 AM
Date Est. Completed: 2/16/2019 6:00 PM
Price List: HIOI8X_JAN19 Restoration/Service/Remodel
Estimate: CNMI-412603557_RA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 2
12/1/2019 DDH:
Site Visit Batch for next 20:
Attending: DeDe Hubbard, Brunson Taylor, Jorge Rivera, PE.
The home is a 3 bedroom CMU block structure with a metal roof. It was determined by Jorge Rivera, PE to replace the metal roof with a gable roof with shed over the far right portion of the dwelling and a non-code compliant shed roof over outdoor kitchen. The top portion of the gable ends will need to be removed down 2 levels of CMU block on the front and back elevation. A new bond beam will need to be poured EPW to level. The far right elevation will need additional concrete poured to raise the elevation from 5'11" to 7'6". The estimate include to replace the existing main panel with a 200 amp panel, located in the dining room. The estimate also includes to replace the breaker, mast and meter base along with a rewire of the entire dwelling with the actual plugs, switches, outlets and GFI's that were present at the time of the disaster and not add any additional plugs, outlets or switches. The estimate also includes to add smoke detectors in the bedrooms and a CO in the hall. The roof that will be installed over the outdoor kitchen is a non-code compliant shed roof due to the area not having windows or doors at the time of the disaster. The window openings in the outdoor kitchen are not addressed and shutters are not included in the estimate. The ceiling and insulation is not included as they were not present at the time of the disaster. The screen door will remain leading into the outdoor kitchen from the porch as it is not damaged. The estimate includes to R/R the door entering the hall with an exterior door and paint all 6 sides. All exterior walls are constructed of concrete and are not damaged. There is one interior wall between the living room and bedroom 2 that was destroyed which is to be reframed with 2X4 and have sheathing included on both sides and painted.
The estimate includes to remove the ceilings that are present and replace ceiling, joists, add insulation and molding.
Under the shed roof, the rafters will act as joists. The dwelling had carpet at the time of the disaster which has been removed, Vinyl floor covering is included to replace carpet. All GFM has been utilized in the appropriate areas and new photos of the home detailing the status to date were added to the file.
INSPECTION SUMMARY
The applicant met at the damaged dwelling and the following was observed.
The dwelling is a 1 story 2 bedroom structure. FEMA has this file listed as 3 bedrooms occupied.
The dwelling is deemed to be repairable. There is 1 structural components damaged = Roof.
The applicant put a temporary roof on and has made some temporary repairs.
The project should take 16 weeks from the start of repairs.
AGE
The home was built in 1994.
DAMAGE AND REPAIR SUMMARY
See attached estimate for exact repair and line items.
SQUARE FOOTAGE:
LAT 15.170723
LONG 145.779371
A: ROOF
The roof was destroyed by the storm and a temporary roof has been installed.
B: INTERIOR
Some interior items were destroyed. One framed wall will need to be replace.
C: STRUCTURAL
The slab foundation appears to be intact and will not need to be removed.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 3
D: MECHANICAL/PLUMBING/WATER SYSTEM
Mechanical/Plumbing do not need to be replaced.
The water system appears to be intact.
E: ELECTRICAL
All electrical will need to be replaced as it was damaged when the roof was destroyed.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 4
CNMI-412603557_RA
SKETCH1
Roof Roof
DESCRIPTION QTY
1,014. 2" x 12" x 20' #2 & better Fir / Larch (material only) 6.00 EA
1,015. 2" x 6" x 8' #2 & better Fir / Larch (material only) 13.00 EA
1,016. R&R Rafters - 2x12 - Labor only - (using rafter length) 529.06 LF
1,017. R&R Rafters - 2x6 - Labor only - (using rafter length) 337.18 LF
1,018. Install Sheathing - plywood - 3/4" - treated 1108.00 SF
1,019. Material Only Sheathing - plywood - 3/4" - treated 1108.00 SF
1,020. 2" x 6" x 8' #2 & better Fir / Larch (material only) 5.00 EA
1,021. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 9.00 EA
1,022. Install Sheathing - plywood - 1/2" - treated 126.99 SF
1,023. Material Only Sheathing - plywood - 1/2" - treated 126.99 SF
1,024. R&R Labor to frame 2" x 6" non-bearing wall - 16" oc 126.99 SF
1,025. 2" x 6" x 16' #2 & better Fir / Larch (material only) 4.00 EA
1,026. 2" x 12" x 18' #2 & better Fir / Larch (material only) 19.00 EA
1,027. 2" x 12" x 8' #2 & better Fir / Larch (material only) 1.00 EA
1,028. 2" x 12" x 12' #2 & better Fir / Larch (material only) 4.00 EA
1,029. 2" x 10" x 14' #2 & better Fir / Larch (material only) 44.00 EA
1,030. 2" x 12" x 14' #2 & better Fir / Larch (material only) 4.00 EA
1,031. 2" x 6" x 20' #2 & better Fir / Larch (material only) 11.00 EA
1,032. R&R Rafters - 2x10 - Labor only - (using rafter length) 592.89 LF
1,033. 2" x 6" x 20' #2 & better Fir / Larch (material only) 1.00 EA
1,034. 2" x 6" x 18' #2 & better Fir / Larch (material only) 1.00 EA
1,035. 2" x 6" x 14' #2 & better Fir / Larch (material only) 3.00 EA
1,036. 2" x 8" x 8' #2 & better Fir / Larch (material only) 12.00 EA
1,037. 2" x 6" x 18' #2 & better Fir / Larch (material only) 2.00 EA
1,038. R&R Rafters - 2x8 - Labor only - (using rafter length) 85.60 LF
1,039. Install Sheathing - plywood - 1/2" - treated 128.00 SF
1,040. Material Only Sheathing - plywood - 1/2" - treated 128.00 SF
NOTES:
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 5
Roof1
(A)F1
(B)F2
Roof2 F3
Roof3 F4
30' 5"
' 6
' 1
' 6
' 1
' 2
Roof1
819.75 Surface Area
114.73 Total Perimeter Length
8.20 Number of Squares
30.42 Total Ridge Length
DESCRIPTION QTY
------------------ ROOFING -----------------
79. Remove Metal roofing - ribbed - 24 gauge - up to 1" 819.75 SF
81. Install Metal roofing - ribbed - 24 gauge - up to 1" 819.75 SF
82. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 819.75 SF
83. Closure strips for metal roofing - inside and/or outside 60.84 LF
84. Flashing tape - self-adhesive 330.33 LF
Seal between the metal roof seams
86. Ridge vent - Metal roofing - floating ventilator 30.42 LF
87. Additional screws for 3/4 plywood sheathing 4035.00 EA
Additional screws for 3/4 plywood sheathing above Xactimate pricing. 6% waste added Labor Included
88. Additional screws for 2X4 & 2x6 furring & fascia 1206.00 EA
Additional screws for 2X4 & 2x6 furring & fascia above Xactimate pricing. 6% waste added Labor Included
92. Drip edge/gutter apron 60.84 LF
93. Install Gable trim for metal roofing - 26 gauge 53.90 LF
94. Material Only Gable trim for metal roofing - 26 gauge 53.90 LF
95. Ice & water barrier 819.75 SF
96. Neoprene pipe jack flashing for metal roofing 1.00 EA
97. Install 2" x 4" lumber - treated (.667 BF per LF) 294.18 LF
Roof purlins
98. Material Only 2" x 4" lumber - treated (.667 BF per LF) 294.18 LF
Roof purlins
99. Install 2" x 6" lumber - treated (1 BF per LF) 175.57 LF
For Picture Frame Purlins
100. Material Only 2" x 6" lumber - treated (1 BF per LF) 175.57 LF
For Picture Frame Purlins
101. Install 2" x 6" lumber - treated (1 BF per LF) 182.51 LF
Rafter Blocking
102. Material Only 2" x 6" lumber - treated (1 BF per LF) 182.51 LF
Rafter Blocking
------------------ SOFFIT -----------------
103. Install Soffit - box framing - 1' overhang 80.91 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 6
CONTINUED - Roof1
DESCRIPTION QTY
Calculation set for 16" overhang
105. Material Only Soffit - box framing - 1' overhang 80.91 LF
Calculation set for 16" overhang
106. Install Soffit & fascia - wood - 1' overhang 80.91 LF
Calculation set for 16" overhang
107. Material Only Soffit & fascia - wood - 1' overhang 80.91 LF
Calculation set for 16" overhang
108. Baffle vent - foam 60.84 LF
Cut to fit as needed for vents
110. Soffit vent - linear 30.42 LF
------------------ PAINT -----------------
111. Prime & paint exterior soffit - wood 80.91 SF
113. Prime & paint exterior fascia - wood, 4"- 6" wide 121.67 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
114. Exterior - paint two coats 88.91 SF
115. Siding - hardboard panel - paint grade 88.91 SF
116. House wrap (air/moisture barrier) 88.91 SF
------------------ STRAPPING -----------------
117. 2x10 Joist hangers for rafters 44.00 EA
2x10 Joist hangers for rafters
118. Joist hangers for 2x6 rafter blocking 138.00 EA
Joist hangers for 2x6 rafter blocking, Typical one side of blocking per plans
119. Framing hurricane tie 291.00 EA
For rafter tails and gable wall studs top and bottom
120. Install Framing hurricane tie 24.00 EA
For joist to top plate
121. Material Only Framing hurricane tie 24.00 EA
For joist to top plate
123. Framing strap - 24" long 24.00 EA
124. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 112.00 EA
4 @ each rafter section & 24 at the splice on the ridge
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 7
CONTINUED - Roof1
DESCRIPTION QTY
NOTES:
Roof1
(A)F1
(B)F2
Roof2 F3
Roof3 F4
' 6
15' 8" 15' 5"
Roof2
366.88 Surface Area
54.73 Total Perimeter Length
3.67 Number of Squares
DESCRIPTION QTY
------------------ ROOFING -----------------
125. Remove Metal roofing - ribbed - 24 gauge - up to 1" 366.88 SF
126. Install Metal roofing - ribbed - 24 gauge - up to 1" 366.88 SF
127. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 366.88 SF
128. Closure strips for metal roofing - inside and/or outside 23.48 LF
129. Flashing tape - self-adhesive 132.86 LF
Seal between the metal roof seams
130. Additional screws for 3/4 sheathing 1906.00 EA
Additional screws and labor for 3/4 sheathing above Xactimate allowance. 6% waste added for screws
131. Additional screws for 2x4 & 2x6 furring & fascia 603.00 EA
Additional screws and labor for 2x4 & 2x6 furring & fascia above Xactimate allowance. 6% waste added for screws Labor included
135. Drip edge/gutter apron 23.48 LF
136. Install Gable trim for metal roofing - 26 gauge 31.25 LF
137. Material Only Gable trim for metal roofing - 26 gauge 31.25 LF
138. Ice & water barrier 366.88 SF
139. Flashing, 20" wide 23.48 LF
141. Install 2" x 4" lumber (.667 BF per LF) 140.87 LF
Roof purlins
142. Material Only 2" x 4" lumber (.667 BF per LF) 140.87 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 8
CONTINUED - Roof2
DESCRIPTION QTY
Roof purlins
143. Install 2" x 6" lumber (1 BF per LF) 78.21 LF
For Picture Frame
144. Material Only 2" x 6" lumber (1 BF per LF) 78.21 LF
For Picture Frame
145. Install 2" x 6" lumber (1 BF per LF) 70.44 LF
Rafter Blocking
146. Material Only 2" x 6" lumber (1 BF per LF) 70.44 LF
Blocking For Rafters
------------------ SOFFIT -----------------
147. Install Soffit - box framing - 1' overhang 23.48 LF
Calculation set for 16" overhang
148. Material Only Soffit - box framing - 1' overhang 23.48 LF
Calculation set for 16" overhang
149. Install Soffit & fascia - wood - 1' overhang 23.48 LF
Calculation set for 16" overhang
150. Material Only Soffit & fascia - wood - 1' overhang 23.48 LF
Calculation set for 16" overhang
151. Soffit vent - linear 11.74 LF
Cut to fit for soffit vent
152. Baffle vent - foam 23.48 LF
------------------ PAINT -----------------
153. Prime & paint exterior soffit - wood 31.23 SF
154. Prime & paint exterior fascia - wood, 4"- 6" wide 46.96 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
------------------ STRAPPING -----------------
158. 2x10 Joist hangers for rafters 19.00 EA
2x10 Joist hangers for rafters
159. 2x6 joist hangers for rafter blocking 57.00 EA
2x6 joist hangers for rafter blocking in the roof.
1,042. Install Framing hurricane tie 7.00 EA
Joist to wall hurricane tie - (GFM)
1,041. Material Only Framing hurricane tie 7.00 EA
Joist to wall hurricane tie - (GFM)
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 9
CONTINUED - Roof2
DESCRIPTION QTY
160. Framing hurricane tie 38.00 EA
Rafter to wall hurricane tie - 2 per rafter per plans. (Not GFM)
NOTES:
Roof1
(A)F1
(B)F2
Roof2 F3
Roof3 F4 17
' 8
7' 8" 7' 7"
Roof3
135.46 Surface Area
33.00 Total Perimeter Length
1.35 Number of Squares
DESCRIPTION QTY
------------------ ROOFING -----------------
913. Remove Metal roofing - ribbed - 24 gauge - up to 1" 135.46 SF
914. Install Metal roofing - ribbed - 24 gauge - up to 1" 135.46 SF
915. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 135.46 SF
917. Flashing tape - self-adhesive 38.36 LF
Seal between the metal roof seams
920. Drip edge/gutter apron 17.66 LF
924. Flashing, 20" wide 17.66 LF
926. Install 2" x 4" lumber - treated (.667 BF per LF) 35.32 LF
Roof purlins
927. Material Only 2" x 4" lumber - treated (.667 BF per LF) 35.32 LF
Roof purlins
------------------ PAINT -----------------
938. Prime & paint exterior soffit - wood 23.49 SF
939. Prime & paint exterior fascia - wood, 4"- 6" wide 35.32 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
------------------ STRAPPING -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 10
CONTINUED - Roof3
DESCRIPTION QTY
940. 2x10 Joist hangers for rafters 14.00 EA
2x10 Joist hangers for rafters
942. Framing hurricane tie 28.00 EA
Rafter to wall hurricane tie - 2 per rafter per plans. (Not GFM)
NOTES:
Main Level Main Level
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
161. R&R Meter mast for overhead power - 2" conduit 1.00 EA
163. R&R Meter base - 200 amp 1.00 EA
164. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA
165. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA
166. Rewire - average residence - copper wiring 1140.45 SF
168. R&R Exterior light fixture 1.00 EA
169. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA
170. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF
------------------ WALL REPAIRS-----------------
653. Concrete cutting - wall (per LF per inch of saw depth) 1111.24 LF
To straighten the top of the wall where needed
727. Remove Block - 6" x 8" x 16" - in place - reinforced 260.00 SF to remove top two layers of block around the perimeter of the dwelling and the column on the front left corner.
655. Concrete - General Laborer - per hour 19.25 HR
4 hours per CY of Concrete Wall
943. Concrete wall - labor & materials - Reinforced 2.50 CY
Used for all exterior walls to make level for bond beam.
49. Concrete Post & Beam construction - Beams 2.64 CY
For Exterior Wall Perimeter plus interior walls for ceiling joist...Does not include Outdoor Kitchen
657. Concrete anchor bolt - 1/2" x 10" 195.39 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 11
CONTINUED - Main Level
DESCRIPTION QTY
WLF minus Kitchen and Bed Room at 16" oc
658. Wedge anchor bolt - 1/2" x 8 1/2" 14.00 EA
For Outdoor Kitchen
659. Epoxy crack and joint filler (ea) 14.00 EA
For Outdoor Kitchen
660. Install 2" x 6" lumber - treated (1 BF per LF) 621.90 LF
For double sill plate on the perimeter
661. Material Only 2" x 6" lumber - treated (1 BF per LF) 621.90 LF
For double sill plate on the perimeter
662. Sill seal foam - 6" 185.21 LF
------------------ SCAFFOLD -----------------
181. Scaffolding Setup & Take down - per hour 32.00 HR
------------------ GENERAL ITEMS -----------------
183. Clean the floor - Heavy 1140.45 SF
185. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA
For haul off and dump fees
NOTES:
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room Living Room 2
Bedroom 3
Bathroom
2'
3'
3'
3'
7' 7'
1'
1'
2' 6"6' 9"
' 1
' 4
7' 4"
7' 7"
1' 7"
1' 10"
4' 7"
5' 7"
5' 10"
1' 6"
2' 5"
7' 9"
Living Room Height: 8'
374.81 SF Walls
524.16 SF Walls & Ceiling
16.59 SY Flooring
49.00 LF Ceil. Perimeter
149.35 SF Ceiling
149.35 SF Floor
46.42 LF Floor Perimeter
Missing Wall - Goes to Floor 2' 6 7/8" X 6' 8" Opens into DINING_ROOM
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
305. R&R Switch 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 12
CONTINUED - Living Room
DESCRIPTION QTY
306. R&R Light fixture 1.00 EA
307. R&R Outlet 2.00 EA
------------------ DOORS & WINDOWS -----------------
320. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
321. Door lockset & deadbolt - exterior 1.00 EA
322. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
323. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
326. Security/storm shutter 16.00 SF
------------------ ROUGH FRAMING -----------------
327. Install Stud wall - 2" x 4" - 16" oc 73.00 SF
328. Material Only Stud wall - 2" x 4" - 16" oc 73.00 SF
------------------ INSULATION -----------------
329. Batt insulation - 10" - R30 - paper faced 149.35 SF
------------------ WALLS & CEILINGS -----------------
331. Install Sheathing - plywood - 1/2" - treated 222.35 SF
Additional quantity of labor and material to replace 2X4 framed wall destroyed by typhoon.
332. Material Only Sheathing - plywood - 1/2" - treated 222.35 SF
333. Seal & paint plywood sheathing 222.35 SF
334. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 149.35 SF
335. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 149.35 SF
336. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 149.35 SF
337. Cove molding - 3/4" 49.00 LF
------------------ FLOORING -----------------
730. Floor preparation for resilient flooring 149.35 SF
346. Vinyl floor covering (sheet goods) 171.75 SF
15% added for waste.
Vinyl flooring to replace damaged carpet removed after disaster
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 13
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room Living Room 2
Bedroom 3
Bathroom
7'
3'
3'
2'
3'
9' 6"
9'
9'
8'
2' 8" 2' 11"
7" 10"
8'
1"
' 1 " 22
' 6
2' 6" 10' 3"
10' 9"
2' 8" 2' 8"
4' 1"
8' 11"
9' 2"
Living Room 2 Height: 7' 6"
564.68 SF Walls
819.66 SF Walls & Ceiling
28.33 SY Flooring
75.29 LF Ceil. Perimeter
254.98 SF Ceiling
254.98 SF Floor
75.29 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
349. R&R Switch 2.00 EA
350. R&R Light fixture 1.00 EA
351. R&R Outlet 2.00 EA
------------------ DOORS & WINDOWS -----------------
364. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
614. Exterior door - metal - insulated - flush or panel style 1.00 EA
365. Door lockset & deadbolt - exterior 2.00 EA
366. Paint door slab only - 2 coats (per side) 4.00 EA
Painting all 6 sides of door
367. Paint door/window trim & jamb - 2 coats (per side) 4.00 EA
615. Security/storm shutter 24.00 SF
------------------ INSULATION -----------------
373. Batt insulation - 10" - R30 - paper faced 254.98 SF
------------------ WALLS & CEILINGS -----------------
375. Install Sheathing - plywood - 1/2" - treated 254.98 SF
376. Material Only Sheathing - plywood - 1/2" - treated 254.98 SF
377. Seal & paint plywood sheathing 254.98 SF
381. Cove molding - 3/4" 75.29 LF
------------------ FLOORING -----------------
735. Floor preparation for resilient flooring 254.98 SF
390. Vinyl floor covering (sheet goods) 293.23 SF
15% added for waste
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 14
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room Living Room 2
Bedroom 3
Bathroom
2' 6"
1' 10" 2' 1"
4' 1'
1'
' 4
' 1
0"
6' 5"
3" 3" 2'
"1'
' 2
' 1
1" Kitchen Height: 8'
371.96 SF Walls
479.94 SF Walls & Ceiling
12.00 SY Flooring
46.50 LF Ceil. Perimeter
107.98 SF Ceiling
107.98 SF Floor
46.50 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
186. R&R Switch 2.00 EA
187. R&R Light fixture 1.00 EA
188. R&R Outlet 4.00 EA
------------------GENERAL ITEMS -----------------
236. 5 lb. ABC fire extinguisher 1.00 EA
NOTES:
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room Living Room 2
Bedroom 3
Bathroom
5'
6'
4'
1"
2' 6" 2' 9"5' 7"
2'
3'
3'
5'
3'
7' 7'
1'
2' 7" 4' 8"
4' 11"
3' 4"
3' 7"
Dining Room Height: 8' 4"
303.23 SF Walls
420.30 SF Walls & Ceiling
13.01 SY Flooring
38.64 LF Ceil. Perimeter
117.07 SF Ceiling
117.07 SF Floor
36.06 LF Floor Perimeter
Missing Wall 4' 10 13/16" X 8' 3 1/2" Opens into HALLWAY
Missing Wall - Goes to Floor 2' 6 7/8" X 6' 8" Opens into LIVING_ROOM2
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
393. R&R Switch 1.00 EA
394. R&R Light fixture 1.00 EA
395. R&R Outlet 2.00 EA
------------------ DOORS & WINDOWS -----------------
617. Remove Ornamental iron - security grill - window 10.00 SF
414. Security/storm shutter 16.00 SF
------------------ INSULATION -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 15
CONTINUED - Dining Room
DESCRIPTION QTY
417. Batt insulation - 10" - R30 - paper faced 117.07 SF
------------------ WALLS & CEILINGS -----------------
418. Remove Sheathing - plywood - 1/2" - treated 117.07 SF
419. Install Sheathing - plywood - 1/2" - treated 117.07 SF
420. Material Only Sheathing - plywood - 1/2" - treated 117.07 SF
421. Seal & paint plywood sheathing 117.07 SF
423. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 117.07 SF
424. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 117.07 SF
425. Cove molding - 3/4" 38.64 LF
------------------ FLOORING -----------------
733. Floor preparation for resilient flooring 117.07 SF
434. Vinyl floor covering (sheet goods) 134.63 SF
15% added for waste.
Vinyl flooring to replace damaged carpet removed after disaster
NOTES:
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room Living Room 2
Bedroom 3
Bathroom
1'
1'
9'
8'
1"
3'
2' 2"
2' 5"
11' 9"
12' 3'
8' 2"
8' 5"
5' 9"
6'
' 2
' 1
1"
6' 1" 2' 6"5' 7"
Bedroom 1 Height: 8' 4"
461.59 SF Walls
646.26 SF Walls & Ceiling
20.52 SY Flooring
55.67 LF Ceil. Perimeter
184.67 SF Ceiling
184.67 SF Floor
55.67 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
237. R&R Switch 1.00 EA
238. R&R Light fixture 1.00 EA
239. R&R Outlet 2.00 EA
241. Smoke detector 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 16
CONTINUED - Bedroom 1
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
250. R&R Interior door unit 1.00 EA
251. Door knob - interior 1.00 EA
254. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
255. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
619. Remove Ornamental iron - security grill - window 12.00 SF
258. Security/storm shutter 17.50 SF
------------------ INSULATION -----------------
261. Batt insulation - 10" - R30 - paper faced 184.67 SF
------------------ WALLS & CEILINGS -----------------
262. Remove Sheathing - plywood - 1/2" - treated 184.67 SF
263. Install Sheathing - plywood - 1/2" - treated 184.67 SF
264. Material Only Sheathing - plywood - 1/2" - treated 184.67 SF
265. Seal & paint plywood sheathing 184.67 SF
267. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 184.67 SF
268. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 184.67 SF
269. Cove molding - 3/4" 55.67 LF
------------------ A/C OPENING -----------------
270. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
271. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
272. Install Sheathing - plywood - 3/4" - treated 8.00 SF
273. Material Only Sheathing - plywood - 3/4" - treated 8.00 SF
274. Seal & paint plywood sheathing 8.00 SF
To paint A/C Hole in exterior wall
------------------ FLOORING -----------------
731. Floor preparation for resilient flooring 184.67 SF
278. Vinyl floor covering (sheet goods) 212.37 SF
15% added for waste
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 17
CONTINUED - Bedroom 1
DESCRIPTION QTY
NOTES:
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room Living Room 2
Bedroom 3
Bathroom
8'
1"
9'
2' 7"
4' 9"
5'
4' 1"
4' 4"
2' 6" 2' 2"6' 9"
Bedroom 2 Height: 8'
325.02 SF Walls
426.59 SF Walls & Ceiling
11.29 SY Flooring
40.63 LF Ceil. Perimeter
101.57 SF Ceiling
101.57 SF Floor
40.63 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
437. R&R Switch 1.00 EA
438. R&R Light fixture 1.00 EA
439. R&R Outlet 1.00 EA
441. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
450. Interior door unit 1.00 EA
451. Door knob - interior 1.00 EA
454. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
455. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
620. Remove Ornamental iron - security grill - window 5.00 SF
458. Security/storm shutter 9.00 SF
------------------ INSULATION -----------------
461. Batt insulation - 10" - R30 - paper faced 101.57 SF
------------------ WALLS & CEILINGS -----------------
463. Install Sheathing - plywood - 1/2" - treated 174.57 SF
Additional quantity for labor and material to apply 1/2" plywood sheathing to interior wall that was reframed.
464. Material Only Sheathing - plywood - 1/2" - treated 174.57 SF
465. Seal & paint plywood sheathing 174.57 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 18
CONTINUED - Bedroom 2
DESCRIPTION QTY
Additional quantity for labor and material to paint the 1/2" plywood sheathing to interior wall that was reframed.
467. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 101.57 SF
468. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 101.57 SF
469. Cove molding - 3/4" 40.63 LF
------------------ FLOORING -----------------
734. Floor preparation for resilient flooring 101.57 SF
478. Vinyl floor covering (sheet goods) 116.81 SF
15% added for waste.
Vinyl flooring to replace damaged carpet removed after disaster
NOTES:
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room Living Room 2
Bedroom 3
Bathroom
9' 6"
9'
9'
8'
1' 7"
2' 10"
3' 1"
4' 7"
5' 1"
5'
1'
" 2'
1'
0"
2'
Bedroom 3 Height: 7' 6"
263.18 SF Walls
340.10 SF Walls & Ceiling
8.55 SY Flooring
35.09 LF Ceil. Perimeter
76.92 SF Ceiling
76.92 SF Floor
35.09 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
481. R&R Switch 1.00 EA
482. R&R Light fixture 1.00 EA
483. R&R Outlet 1.00 EA
485. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
494. R&R Interior door unit 1.00 EA
495. Door knob - interior 1.00 EA
498. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 19
CONTINUED - Bedroom 3
DESCRIPTION QTY
499. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
621. Security/storm shutter 22.50 SF
------------------ INSULATION -----------------
505. Batt insulation - 10" - R30 - paper faced 76.92 SF
------------------ WALLS & CEILINGS -----------------
507. Install Sheathing - plywood - 1/2" - treated 76.92 SF
508. Material Only Sheathing - plywood - 1/2" - treated 76.92 SF
509. Seal & paint plywood sheathing 76.92 SF
513. Cove molding - 3/4" 35.09 LF
------------------ FLOORING -----------------
736. Floor preparation for resilient flooring 76.92 SF
522. Vinyl floor covering (sheet goods) 88.46 SF
15% added for waste Vinyl flooring to replace damaged carpet removed after disaster
NOTES:
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room
Living Room 2
Bedroom 3
Bathroom
5'
5'
3" 3"
6' 4"
5' 10"
5'
6'
6' 4"
Storage Height: 8' 4"
190.60 SF Walls
223.62 SF Walls & Ceiling
3.67 SY Flooring
22.99 LF Ceil. Perimeter
33.02 SF Ceiling
33.02 SF Floor
22.99 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
525. R&R Switch 2.00 EA
526. R&R Light fixture 1.00 EA
------------------ DOORS & WINDOWS -----------------
538. R&R Interior door unit 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 20
CONTINUED - Storage
DESCRIPTION QTY
539. Door knob - interior 1.00 EA
542. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
543. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
------------------ INSULATION -----------------
549. Batt insulation - 10" - R30 - paper faced 33.02 SF
------------------ WALLS & CEILINGS -----------------
551. Install Sheathing - plywood - 1/2" - treated 33.02 SF
552. Material Only Sheathing - plywood - 1/2" - treated 33.02 SF
553. Seal & paint plywood sheathing 33.02 SF
555. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 33.02 SF
556. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 33.02 SF
557. Cove molding - 3/4" 22.99 LF
NOTES:
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room
Living Room 2
Bedroom 3
Bathroom
6' 4"
5' 10"
4'
1"
6' 1"
2'
1'
1'
1'
1'
Hallway Height: 8' 4"
143.61 SF Walls
172.20 SF Walls & Ceiling
3.18 SY Flooring
17.32 LF Ceil. Perimeter
28.59 SF Ceiling
28.59 SF Floor
17.32 LF Floor Perimeter
Missing Wall 4' 10 13/16" X 8' 3 1/2" Opens into DINING_ROOM
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
569. R&R Switch 1.00 EA
570. R&R Light fixture 1.00 EA
574. Carbon monoxide detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 21
CONTINUED - Hallway
DESCRIPTION QTY
944. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
945. Door lockset & deadbolt - exterior 1.00 EA
586. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
587. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
------------------ INSULATION -----------------
593. Batt insulation - 10" - R30 - paper faced 28.59 SF
------------------ WALLS & CEILINGS -----------------
594. Remove Sheathing - plywood - 1/2" - treated 28.59 SF
595. Install Sheathing - plywood - 1/2" - treated 28.59 SF
596. Material Only Sheathing - plywood - 1/2" - treated 28.59 SF
597. Seal & paint plywood sheathing 28.59 SF
599. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 28.59 SF
600. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 28.59 SF
601. Cove molding - 3/4" 17.32 LF
------------------ FLOORING -----------------
732. Floor preparation for resilient flooring 28.59 SF
610. Vinyl floor covering (sheet goods) 32.88 SF
15% added for waste Vinyl flooring to replace damaged carpet removed after disaster
CNMI DATA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 22
CNMI Data1' 4"
CNMI Data Height: 4"
1.57 SF Walls
2.92 SF Walls & Ceiling
0.15 SY Flooring
4.70 LF Ceil. Perimeter
1.36 SF Ceiling
1.36 SF Floor
4.70 LF Floor Perimeter
DESCRIPTION QTY
1. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO
2. Material Only LATITUDE DAMAGED DWELLING 15.17 DE
15.170723
3. Material Only LONGITUDE DAMAGED DWELLING 145.78 DE
145.779371
4. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO
5. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO
6. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 NO
7. DOES DWELLING HAVE A WELL 0.00 NO
8. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO
9. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1994.00 YR
10. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 NO
11. Material Only ENCROACHMENT ISSUES 0.00 NO
12. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO
13. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 YS
14. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 1446.78 SF
1446.78
15. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO
16. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
17. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
Roof
18. Material Only IS DWELLING DESTROYED 0.00 NO
19. Material Only FOUNDATION TYPE 0.00 UN
Slab
20. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO
21. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 NO
22. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS
23. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO
24. Material Only LATITUDE OUT BUILDING 0.00 NO
25. Material Only LONGITUDE OUT BUILDING 0.00 NO
26. Material Only LATITUDE POWER POLE 15.17 DE
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 23
CONTINUED - CNMI Data
DESCRIPTION QTY
15.170572
27. Material Only LONGITUDE POWER POLE 145.78 DE
145.779413
28. Material Only LATITUDE WATER METER 15.17 DE
15.170680
29. Material Only LONGITUDE WATER METER 145.78 DE
145.779279
30. Material Only LATITUDE WATER TANK 0.00 NO
31. Material Only LONGITUDE WATER TANK 0.00 NO
NOTES:
Labor Minimums Applied
DESCRIPTION QTY
618. Ornamental iron labor minimum 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 24
Grand Total Areas:
3,357.47 SF Walls 1,141.80 SF Ceiling SF Walls and Ceiling4,499.27 1,141.80 SF Floor 126.87 SY Flooring 424.83 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 432.87 LF Ceil. Perimeter
1,141.80 Floor Area 1,301.14 Total Area 3,357.47 Interior Wall Area 1,703.55 Exterior Wall Area 189.91 Exterior Perimeter of
Walls
1,322.09 Surface Area 13.22 Number of Squares 202.47 Total Perimeter Length
30.42 Total Ridge Length 0.00 Total Hip Length
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 25
1 SKETCH1/Main Level - Scope Notes Date Taken: 12/1/2019
Taken By: Darlene Hbbard
. It was determined by Jorge Rivera, PE to replace the metal roof with a gable roof with shed over the far right portion of the dwelling. The top portion of the gable ends will need to be removed down 2 levels of CMU block on the front and back elevation.
A new bond beam will need to be poured EPW to level bond beam. The far right elevation will need additional poured to raise the elevation from 5'11" to 7'6". A new 200amp panel, located in the dining room will need to be replaced. The breaker, mast and meter base along with a rewire of the entire dwelling with the actual plugs, switches, outlets and GFI's.
2 SKETCH1/Main Level - Scope Notes Date Taken: 12/1/2019
Taken By: Darlene Hbbard
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 26
3 SKETCH1/Main Level - Scope Notes Date Taken: 12/1/2019
Taken By: Darlene Hbbard
4 SKETCH1/Main Level - Scope Notes Date Taken: 12/1/2019
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 27
5 SKETCH1/Main Level - Front Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Enters into living room
6 SKETCH1/Main Level - Front Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Shows where the roof slopes down which will need to be built up and shed roof will attach to a gable roof as detemined by Jorge Rivera, PE.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 28
7 SKETCH1/Main Level - Front Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Front, right corner looking left. Shed roof will be built on this portion and attached to gable.
8 SKETCH1/Main Level - Front Elevation Date Taken: 11/29/2019
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 29
9 SKETCH1/Main Level - Left Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
No windows were in kitchen at the time of the disaster and are not included to replace. No shutters needed or ceiling.
10 SKETCH1/Main Level - Left Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 30
11 SKETCH1/Main Level - Back Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
12 SKETCH1/Main Level - Back Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 31
13 SKETCH1/Main Level - Back Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
14 SKETCH1/Main Level - Back Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Bathroom is detached and has a concrete roof that was not damaged.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 32
15 SKETCH1/Main Level - Back Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
16 SKETCH1/Main Level - Back Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 33
17 SKETCH1/Main Level - Back Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
18 SKETCH1/Main Level - Back Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 34
19 SKETCH1/Main Level - Back Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
20 SKETCH1/Main Level - Right Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 35
21 SKETCH1/Main Level - Right Elevation Date Taken: 11/29/2019
Taken By: Darlene Hbbard
22 SKETCH1/Main Level - Right Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 36
23 SKETCH1/Main Level/Porch - Porch Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Front left elevation corner. Enter into kitchen. Damage to roof. This area to be included in the total roof replacement due to being the supporting wall for the gable end.
Remove joists, replace joists but no ceiling or insulation. Electric=1 lights.
24 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Damage to roof. Replace CJM, add insulation and paint. Electric=1 switch, 1 lights, 2 outlets. Replacing sheathing for 2X4 frame being replaced for bedroom 2. No broken windows, add 16SF shutter. R/R 1 exterior door, paint trim and all 6 sides of the door. Replace FCV for carpet that was previously removed after disaster.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 37
25 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/29/2019
Taken By: Darlene Hbbard
26 SKETCH1/Main Level/Living Room - Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 38
27 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Arrow indicates where 2X4 framed wall was destroyed. Estimate includes reframe and adding sheathing and paint.
28 SKETCH1/Main Level/Living Room - Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 39
29 SKETCH1/Main Level/Living Room 2 - Living Room 2 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Damage to roof. Replace ceiling, add insulation and paint. Roof is to be shed roof, rafters will act as ceiling joists. Electric=2 switch, 1 lights, 2 outlets. No broken windows, add 16SF shutter. R/R 1 exterior door and replace only additional exterior door on front elevation, paint trim and all 6 sides of the door. Replace FCV for carpet that was previously removed after disaster.
30 SKETCH1/Main Level/Living Room 2 - Living Room 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 40
31 SKETCH1/Main Level/Living Room 2 - Living Room 2 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
32 SKETCH1/Main Level/Living Room 2 - Living Room 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 41
33 SKETCH1/Main Level/Living Room 2 - Living Room 2 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
34 SKETCH1/Main Level/Living Room 2 - Living Room 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 42
35 SKETCH1/Main Level/Living Room 2 - Living Room 2 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
36 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Damage to roof. Replace joists only, no ceiling, insulation, paint or molding to be included. Electric=2 switch, 1 lights, 4 outlets. No windows addressed as none were present at time of the disaster. R/R 1 exterior door and replace only 2nd exterior door on back elevation and paint all 6 sides of the door.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 43
37 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/29/2019
Taken By: Darlene Hbbard
38 SKETCH1/Main Level/Kitchen - Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 44
39 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/29/2019
Taken By: Darlene Hbbard
40 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/29/2019
Door enters into dining room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 45
41 SKETCH1/Main Level/Dining Room - Dining Room Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Damage to roof. Remove present ceiling. Replace CJM, add insulation and paint. R/R 200 amp main panel.
Electric=1 switch, 1 lights, 2 outlets.
No broken windows, remove burglar bars and add 17.5SF shutter. Replace FCV for carpet that was previously removed after disaster.
42 SKETCH1/Main Level/Dining Room - Dining Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 46
43 SKETCH1/Main Level/Dining Room - Dining Room Date Taken: 11/29/2019
Taken By: Darlene Hbbard
44 SKETCH1/Main Level/Dining Room - Dining Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 47
45 SKETCH1/Main Level/Bedroom 1
- Bedroom 1 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Damage to roof. Remove ceiling, replace CJM, add insulation and paint.
Electric=1 switch, 1 lights, 2 outlets, add smoke detector. Adding to enclose AC opening in 2nd window of room, presently top portion of window is framed in with AC installed in bottom portion. No broken windows, remove burglar bars and add 17.5SF shutter. R/R 1 interior door, paint trim and all 6 sides of the door. Replace FCV for carpet that was previously removed after disaster.
46 SKETCH1/Main Level/Bedroom 1
- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 48
47 SKETCH1/Main Level/Bedroom 1
- Bedroom 1 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
48 SKETCH1/Main Level/Bedroom 1
- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 49
49 SKETCH1/Main Level/Bedroom 1
- Bedroom 1 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
50 SKETCH1/Main Level/Bedroom 1
- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 50
51 SKETCH1/Main Level/Bedroom 2
- Bedroom 2 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Damage to roof. Replace CJM, add insulation and paint. Electric=1 switch, 1 lights, 1 outlets, add smoke detector. Including to add 2X4 framing and sheathing and paint for destroyed wall separating bedroom 2 and living room. 1 interior door will need to be added, paint trim and all 6 sides of the door.. No broken windows, remove burglar bars and add 9SF shutter. Replace FCV for carpet that was previously removed after disaster.
52 SKETCH1/Main Level/Bedroom 2
- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 51
53 SKETCH1/Main Level/Bedroom 2
- Bedroom 2 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
54 SKETCH1/Main Level/Bedroom 2
- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 52
55 SKETCH1/Main Level/Bedroom 2
- Bedroom 2 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
56 SKETCH1/Main Level/Bedroom 3
- Bedroom 3 Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Damage to roof. Replace ceiling, add insulation, molding and paint. Roof is to be shed roof, rafters will act as ceiling joists. Electric=1 switch, 1 lights, 1 outlets, add smoke detector.
No broken windows, remove burglar bars and add 24SF shutter. R/R 1 interior door, paint trim and all 6 sides of the door. Replace FCV for carpet that was previously removed after disaster.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 53
57 SKETCH1/Main Level/Storage - Storage Room Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Damage to roof. Replace CJM, add insulation and paint. Electric=2 switch, 1 lights. No windows.
Replace 1 interior door, paint trim and all 6 sides of the door. No flooring.
58 SKETCH1/Main Level/Storage - Storage Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 54
59 SKETCH1/Main Level/Storage - Storage Room Date Taken: 11/29/2019
Taken By: Darlene Hbbard
60 SKETCH1/Main Level/Storage - Storage Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 55
61 SKETCH1/Main Level/Storage - Storage Room Date Taken: 11/29/2019
Taken By: Darlene Hbbard
62 SKETCH1/Main Level/Bathroom - Bathroom Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Bathroom is detached and has a concrete roof that was not damaged.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 56
63 SKETCH1/Main Level/Bathroom - Bathroom Date Taken: 11/29/2019
Taken By: Darlene Hbbard
64 SKETCH1/Main Level/Bathroom - Bathroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 57
65 SKETCH1/Main Level/Bathroom - Bathroom Date Taken: 11/29/2019
Taken By: Darlene Hbbard
66 SKETCH1/Main Level/Bathroom - Bathroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603557_RA 12/8/2019 Page: 58
67 SKETCH1/Main Level/Hallway - Hallway Date Taken: 11/29/2019
Taken By: Darlene Hbbard
Damage to roof. Remove ceiling, replace CJM, add insulation and paint.
Electric=add C/O detector. No windows, R/R 1 interior door, paint trim and all 6 sides of the door.
Replace FCV for carpet that was previously removed after disaster.
CNMI-412603557_RA 12/8/2019 Page: 59
Main Level
Kitchen
Porch
Bedroom 1
Hallway
Storage
Dining Room
Bedroom 2
Living Room Living Room 2
Bedroom 3
Bathroom
Main Level
CNMI-412603557_RA 12/8/2019 Page: 60
Roof
Roof1
(A)F1
(B)F2
Roof2
F3
Roof3
F4
Roof
CNMI-412603557_RA 12/8/2019 Page: 61
PLOT
Damaged Dwelling (A1)
Pahong (A9)
Lot (A2)
Power Pole (A4)
Driveway (A3)
Water Meter (A6)
PLOT
CNMI-412603557_RA 12/8/2019 Page: 62
CNMI DATA
CNMI Data
CNMI DATA