HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

Insured: URSULA JOSEPH Home: (670) 785-0191 Cellular: (670) 286-7575Home: 6TH HOUSE LEFT MAGICIENNE BAY AVE

RED RD BUMP FRT

DANDAN, HI 96701

Property: 6TH HOUSE LEFT MAGICIENNE BAY AVE

RED RD BUMP FRT

DANDAN, HI

Claim Rep.: Casey Hoak

Estimator: Casey Hoak

Claim Number: CNMI-412603412 Policy Number: CNMI-412603412 Type of Loss: Hurricane

Date Contacted: 11/26/2019 8:00 PM Date of Loss: 10/24/2018 2:00 PM Date Received: 1/12/2019 4:26 AM

Date Inspected: 1/29/2019 8:00 PM Date Entered: 11/27/2109 7:12 AM

Date Est. Completed: 2/13/2019 1:21 AM

Price List: HIOI8X_JAN19 Restoration/Service/Remodel

Estimate: CNMI-412603412_RA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 2

12/5/2019 CMF:

Per FEMA this dwelling does not have an existing septic tank. It also does not have access to a manciple sewer system.

Since the existing bathroom was not completed at the time of the disaster, and the applicants were previously using an outhouse the program will provide the applicant back with an outhouse that is ADA accessible. Removed the bathroom upgrades and placed ADA outhouse into it's own folder, placed exterior ADA access items into the Main folder of the dwelling. See estimate for details.

11/26/2019 CMH:

Site Visits Batch Four next 20.

Attending: Casey Hoak, DeDe Hubbard, Brunson Taylor, Jorge Rivera PE.

This the fifth site visit for the property and the last was done in August. There has been no knew damage to the property and we we are still waiting on an answer from FEMA IA on the bathroom issue. There is a partially built bathroom in the home that needs to be finished or they can rebuild the outhouse and add a handicap ramp to get from the house to it. Both scopes are in this estimate for FEMA review. A new set of photos detailing the homes present condition has been added to the file.

JOINT SCOPING SUMMARY 8/14/2019:CMH

Attendees: FEMA : Robert Strayhorn, Chris Craft. Dewberry, Casey Hoak, Marvin Davis, Darlene Hubbard.

Roof design agreed to at site visit: Saw cut level with front and back the two gable ends off. Pour Bond Beam on on perimeter wall and center wall and stick built gable roof.

ADA ramp will need to be built with 5ft landing at beginning and end of ramp with 12ft run including railing.

Foundation appears in good condition and should not need any work.

Windows are being replaced that were damaged with all windows getting storm shutters.

Vinyl sheet floor to be installed in all rooms except the bathroom.

All damaged doors to replaced and paint to all 6 sides will be added Electrical will be a rewire of the home with the actual count for plugs, lights and switches.

Waiting for determination from FEMA on whether the indoor bathroom that the Applicant was installing due to the outhouse being destroyed during the storm will be completed or build a new outhouse.

No sewer lines or septic are in place. I have presented both options for FEMA to review.

Also waiting for determination from FEMA - there is a 1ft step down to the kitchen and bedroom 3, how will this be addressed per ADA guidelines.

All available GFM (Government Supplied Material) was identified. All changes were agreed upon by all parties and are made a part of this revised report.

INSPECTION SUMMARY

The applicant met at the damaged dwelling and the following was observed.

The dwelling is a 1 story 3 bedroom structure. The main house has 4 adults and 2 children occupying 3 bedrooms.

The dwelling is deemed to be repairable. There was one structural components damaged the Roof Reconstruction should take approximately 16 weeks from start of construction.

AGE

The home was built approx. 1994

DAMAGE AND REPAIR SUMMARY:

See attached estimate for exact repair and line items.

LAT: 15.132918

LONG: 145.738031

Square Foot of Dwelling: 951

A; ROOF

Roof including roof and framing was destroyed. DOD has replaced at time of inspection

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 3

B: INTERIOR

Wind and water damaged the the ceiling and joists in all rooms. 1/2 plywood for all ceilings. All doors and windows will be replaced and walls, ceilings, door frames and slabs painted. Cabinets are OK. The vinyl floor in the Kitchen will be replaced and the carpet in all rooms replaced. The Outhouse was destroyed and the applicant is in the process of renovating to put the bathroom inside the DD. Window units only in the dwelling.

C: STRUCTURAL

Foundation is a slab.

Slab appears to be intact and will not need to be replaced.

D: MECHANICAL/PLUMBING/WATER SYSTEM

Mechanical/Plumbing do not need to be replaced and all fixtures are OK

E: ELECTRICAL: Replace form the masthead in

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 4

CNMI-412603412_RA

SKETCH1

ROOF

ROOF

DESCRIPTION QTY

1. 2" x 6" x 20' #2 treated pine (material only) 16.00 EA

2. 2" x 6" x 8' #2 treated pine (material only) 27.00 EA

3. 2" x 6" x 12' #2 treated pine (material only) 4.00 EA

4. 2" x 6" x 18' #2 treated pine (material only) 2.00 EA

5. 2" x 6" x 16' #2 treated pine (material only) 1.00 EA

6. 2" x 6" x 10' #2 treated pine (material only) 2.00 EA

7. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 19.00 EA

For gable end walls

8. 2" x 8" x 8' #2 treated pine (material only) 4.00 EA

9. 2" x 10" x 8' #2 treated pine (material only) 1.00 EA

10. 2" x 10" x 20' #2 treated pine (material only) 5.00 EA

11. 2" x 10" x 18' #2 treated pine (material only) 43.00 EA

12. 2" x 12" x 20' #2 treated pine (material only) 3.00 EA

13. 2" x 12" x 14' #2 treated pine (material only) 3.00 EA

14. 2" x 12" x 18' #2 treated pine (material only) 4.00 EA

15. 2" x 12" x 16' #2 treated pine (material only) 1.00 EA

16. 2" x 12" x 12' #2 treated pine (material only) 1.00 EA

17. 2" x 12" x 8' #2 treated pine (material only) 2.00 EA

18. Install Sheathing - plywood - 1/2" - treated 336.04 SF

19. Material Only Sheathing - plywood - 1/2" - treated 336.04 SF

20. Install Sheathing - plywood - 3/4" - treated 1248.00 SF

21. Material Only Sheathing - plywood - 3/4" - treated 1248.00 SF

22. Rafters - 2x6 - Labor only - (using rafter length) 560.37 LF

For gable end walls and collar ties

23. R&R Rafters - 2x8 - Labor only - (using rafter length) 25.87 LF

24. R&R Rafters - 2x10 - Labor only - (using rafter length) 866.37 LF

25. Rafters - 2x12 - Labor only - (using rafter length) 207.61 LF

For ridge beam and fascia

26. Siding - hardboard panel - paint grade 168.02 SF

27. House wrap (air/moisture barrier) 168.02 SF

------------------ ROOFING -----------------

28. Remove Metal roofing - ribbed - 24 gauge - up to 1" 1225.89 SF

29. Install Metal roofing - ribbed - 24 gauge - up to 1" 1225.89 SF

30. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 1225.89 SF

31. Closure strips for metal roofing - inside and/or outside 72.84 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 5

CONTINUED - ROOF

DESCRIPTION QTY

32. Drip edge/gutter apron 7.17 LF

33. Flashing tape - self-adhesive 447.05 LF

Seal between the metal roof seams

34. Ridge vent - Metal roofing - floating ventilator 32.83 LF

35. Additional screws for 3/4 plywood sheathing 4001.00 EA

Additional screws for 3/4 plywood sheathing above Xactimate allowance

36. Additional screws for 2X4 furring 900.00 EA

Additional screws for 2X4 furring above Xactimate allowance

37. Additional screws for 2x6 furring 334.00 EA

Additional screws for 2x6 furring above Xactimate allowance

38. Additional screws for fascia 106.00 EA

Additional screws for fascia above Xactimate allowance

39. Drip edge/gutter apron 65.67 LF

40. Gable trim for metal roofing - 26 gauge 76.28 LF

41. Ice & water barrier 1184.54 SF

42. Install 2" x 4" lumber - treated (.667 BF per LF) 509.33 LF

Roof purlins

43. Material Only 2" x 4" lumber - treated (.667 BF per LF) 509.33 LF

Roof purlins

44. Install 2" x 6" lumber - treated (1 BF per LF) 207.61 LF

For Picture Frame Purlins

45. Material Only 2" x 6" lumber - treated (1 BF per LF) 207.61 LF

For Picture Frame Purlins

46. Install 2" x 6" lumber - treated (1 BF per LF) 269.84 LF

Rafter Blocking

47. Material Only 2" x 6" lumber - treated (1 BF per LF) 269.84 LF

Rafter Blocking

------------------ SOFFIT -----------------

48. Install Soffit - box framing - 1' overhang 87.34 LF

Calculation set for 16" overhang

49. Material Only Soffit - box framing - 1' overhang 87.34 LF

Calculation set for 16" overhang

50. Install Soffit & fascia - wood - 1' overhang 87.34 LF

Calculation set for 16" overhang

51. Material Only Soffit & fascia - wood - 1' overhang 87.34 LF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 6

CONTINUED - ROOF

DESCRIPTION QTY

Calculation set for 16" overhang

52. Baffle vent - foam 65.67 LF

Cut to fit as needed for vents

53. Soffit vent - linear 32.83 LF

------------------ PAINT -----------------

54. Exterior - paint two coats 168.02 SF

55. Prime & paint exterior soffit - wood 87.34 SF

56. Prime & paint exterior fascia - wood, 4"- 6" wide 131.33 LF

Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.

------------------ STRAPPING -----------------

57. 2x10 Joist hangers for rafters 54.00 EA

2x10 Joist hangers for rafters

58. Joist hangers for 2x6 rafter blocking 207.00 EA

Joist hangers for 2x6 rafter blocking

59. Framing hurricane tie 220.00 EA

For rafter tails and gable wall studs top and bottom

60. Install Framing hurricane tie 52.00 EA

For joist to top plate

61. Material Only Framing hurricane tie 52.00 EA

For joist to top plate

62. Framing hurricane tie 14.00 EA

For Gable End walls mounted to top plate HGA10KT

63. Framing strap - 24" long 26.00 EA

64. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 120.00 EA

4 @ each rafter section & 24 at the splice on the ridge

NOTES:

Main Level Main Level

DESCRIPTION QTY

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 7

CONTINUED - Main Level

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

65. R&R Meter mast for overhead power - 2" conduit 1.00 EA

66. R&R Meter base - 200 amp 1.00 EA

67. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA

68. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA

69. Rewire - average residence - copper wiring 980.81 SF

70. R&R Exterior light fixture 3.00 EA

71. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA

72. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF

------------------ WALL REPAIRS-----------------

73. Concrete cutting - wall (per LF per inch of saw depth) 192.00 LF

To straighten the top of the wall where needed

74. Remove Concrete wall - labor & materials - Reinforced 0.50 CY

75. Concrete - General Laborer - per hour 2.00 HR

4 hours per CY of Concrete Wall

76. Concrete Post & Beam construction - Beams 2.99 CY

To pour a bond beam on top of existing wall - includes rebar

77. Concrete anchor bolt - 1/2" x 10" 189.00 EA

For cold joint between top of wall and new bond beam.

78. Install 2" x 6" lumber - treated (1 BF per LF) 502.17 LF

For double sill plate on the perimeter

79. Material Only 2" x 6" lumber - treated (1 BF per LF) 502.17 LF

For double sill plate on the perimeter

80. Sill seal foam - 6" 162.17 LF

------------------ GENERAL ITEMS -----------------

81. Clean the floor - Heavy 980.81 SF

82. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA

------------------ ADA ITEMS -----------------

83. R&R Concrete ramp slab on grade 87.00 SF

Area includes two 5x5 landings at the top and bottom and a 12 LF ramp at a 1 to 12 slope per ADA code Metal hand rail listed below. I have allowed the remove charge for the concrete in lieu of the backhoe for 4 hours that was agreed on site. The price is the same and the line includes the jack hammer and the prep work to regrade the ground for the ramp and landings

84. Chain link fence w/posts & top rail - 3' high 28.00 LF

Metal posts, top rail, concrete and labor to build 14 Lf per side for the ramp

------------------ ADA ITEMS TO OUTHOUSE -----------------

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 8

CONTINUED - Main Level

DESCRIPTION QTY

85. Concrete ramp slab on grade 225.00 SF

If you put the outhouse in you may need to build a concrete walkway with railing roughly 75 linear feet and 150 linear feet of railing as well for the access to it.

86. Chain link fence w/posts & top rail - 3' high 150.00 LF

Metal posts, top rail, concrete and labor to build 14 Lf per side for the ramp

NOTES:

Bedroom 2

Bedroom 1

Bedroom 3Kitchen

Bathroom

Living Room

Shower room

Outhouse

4' 8'

0"

9'

6'

0"

7'

3' 9"

1'

16' 2"

16' 8"

4'

14'

14' 3"

1' 11"

2' 5"

4'

5' 6"

5' 9"

10' 5"

4'

3'

1" 7'

2'

4' 5"

5' 6"

5' 3"

2' 2"

2' 5"2' 6"4'

1' 4" Living Room Height: 8'

603.89 SF Walls

995.58 SF Walls & Ceiling

43.52 SY Flooring

79.17 LF Ceil. Perimeter

391.69 SF Ceiling

391.69 SF Floor

74.75 LF Floor Perimeter

Missing Wall - Goes to Floor 4' 5" X 6' 8" Opens into KITCHEN

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

87. R&R Switch 2.00 EA

88. R&R Light fixture 1.00 EA

89. R&R Outlet 3.00 EA

90. Smoke detector 1.00 EA

91. Carbon monoxide detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

92. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

93. Door lockset & deadbolt - exterior 1.00 EA

94. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

95. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

96. Security/storm shutter 67.50 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 9

CONTINUED - Living Room

DESCRIPTION QTY

------------------ INSULATION -----------------

97. Batt insulation - 10" - R30 - paper faced 391.69 SF

------------------ WALLS & CEILINGS -----------------

98. Install Sheathing - plywood - 1/2" - treated 391.69 SF

99. Material Only Sheathing - plywood - 1/2" CDX 391.69 SF

100. Seal & paint plywood sheathing 391.69 SF

101. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 391.69 SF

102. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 391.69 SF

103. Cove molding - 3/4" 79.17 LF

------------------ FLOORING -----------------

104. Floor preparation for resilient flooring 391.69 SF

105. Vinyl floor covering (sheet goods) 450.45 SF

15% added for waste

NOTES:

Bedroom 2

Bedroom 1

Bedroom 3Kitchen

Bathroom

Living Room

Shower room

Outhouse2' 10"4' 5"

5' 6"

5' 3"

2' 2"

2' 5"

2' 6"

2'

2' 3"

1' 4"

2'

2'

3'2' 7" 1' 4"

2'

3' 2"

2' 11"

2'

7'

Kitchen Height: 8'

422.56 SF Walls

599.88 SF Walls & Ceiling

19.70 SY Flooring

56.50 LF Ceil. Perimeter

177.33 SF Ceiling

177.33 SF Floor

52.08 LF Floor Perimeter

Missing Wall - Goes to Floor 4' 5" X 6' 8" Opens into LIVING_ROOM

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

106. R&R Switch 2.00 EA

107. R&R Light fixture 1.00 EA

108. R&R Outlet 3.00 EA

109. R&R Ground fault interrupter (GFI) outlet 1.00 EA

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 10

CONTINUED - Kitchen

DESCRIPTION QTY

------------------ DOORS & WINDOWS -----------------

110. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA

111. Door lockset & deadbolt - exterior 1.00 EA

112. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

113. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

114. Security/storm shutter 14.00 SF

------------------ INSULATION -----------------

115. Batt insulation - 10" - R30 - paper faced 177.33 SF

------------------ WALLS & CEILINGS -----------------

116. Install Sheathing - plywood - 1/2" - treated 177.33 SF

117. Material Only Sheathing - plywood - 1/2" CDX 177.33 SF

118. Seal & paint plywood sheathing 177.33 SF

119. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 177.33 SF

120. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 177.33 SF

121. Cove molding - 3/4" 56.50 LF

------------------ FLOORING -----------------

122. Floor preparation for resilient flooring 177.33 SF

123. Vinyl floor covering (sheet goods) 203.93 SF

15% added for waste

------------------GENERAL ITEMS -----------------

124. 5 lb. ABC fire extinguisher 1.00 EA

NOTES:

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 11

Bedroom 2

Bedroom 1

Bedroom 3Kitchen

Bathroom

Living Room

Shower room

Outhouse

4'

5'

5'

4'

4'

0"

10' 8"

2'

4'

3'

1" 7'

4' 2' 2"

2' 8"

4' 6"

4' 9"

Bedroom 1 Height: 8'

386.67 SF Walls

530.67 SF Walls & Ceiling

16.00 SY Flooring

48.33 LF Ceil. Perimeter

144.00 SF Ceiling

144.00 SF Floor

48.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

125. R&R Switch 1.00 EA

126. R&R Light fixture 1.00 EA

127. R&R Outlet 2.00 EA

128. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

129. R&R Interior door unit 1.00 EA

130. Door knob - interior 1.00 EA

131. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

132. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

133. Security/storm shutter 45.00 SF

------------------ INSULATION -----------------

134. Batt insulation - 10" - R30 - paper faced 144.00 SF

------------------ WALLS & CEILINGS -----------------

135. Install Sheathing - plywood - 1/2" - treated 144.00 SF

136. Material Only Sheathing - plywood - 1/2" CDX 144.00 SF

137. Seal & paint plywood sheathing 144.00 SF

138. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 144.00 SF

139. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 144.00 SF

140. Cove molding - 3/4" 48.33 LF

------------------ FLOORING -----------------

141. Floor preparation for resilient flooring 144.00 SF

142. Vinyl floor covering (sheet goods) 165.60 SF

15% added for waste

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 12

Bedroom 2

Bedroom 1

Bedroom 3Kitchen

Bathroom

Living Room

Shower room

Outhouse

3'1' 7"

1' 8"

1' 5"

' 6

2' 6"4'

Bedroom 2 Height: 8'

297.33 SF Walls

380.75 SF Walls & Ceiling

9.27 SY Flooring

37.17 LF Ceil. Perimeter

83.42 SF Ceiling

83.42 SF Floor

37.17 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

143. R&R Switch 1.00 EA

144. R&R Light fixture 1.00 EA

145. R&R Outlet 1.00 EA

146. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

147. R&R Interior door unit 1.00 EA

148. Door knob - interior 1.00 EA

149. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

150. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

151. Security/storm shutter 14.00 SF

------------------ INSULATION -----------------

152. Batt insulation - 10" - R30 - paper faced 83.42 SF

------------------ WALLS & CEILINGS -----------------

153. Remove Sheathing - plywood - 1/2" - treated 83.42 SF

154. Install Sheathing - plywood - 1/2" - treated 83.42 SF

155. Material Only Sheathing - plywood - 1/2" CDX 83.42 SF

156. Seal & paint plywood sheathing 83.42 SF

157. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 83.42 SF

158. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 83.42 SF

159. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 83.42 SF

160. Cove molding - 3/4" 37.17 LF

------------------ FLOORING -----------------

161. Floor preparation for resilient flooring 83.42 SF

162. Vinyl floor covering (sheet goods) 95.93 SF

15% added for waste

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 13

Bedroom 2

Bedroom 1

Bedroom 3Kitchen

Bathroom

Living Room

Shower room

Outhouse

2'

1'

7'

7' 7"

8' 4"

3'

2'

0"

3'

5'

5'

2'

4'

3' 9" 1' 10"

Bedroom 3 Height: 8'

294.67 SF Walls

376.82 SF Walls & Ceiling

9.13 SY Flooring

36.83 LF Ceil. Perimeter

82.15 SF Ceiling

82.15 SF Floor

36.83 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

163. R&R Switch 1.00 EA

164. R&R Light fixture 1.00 EA

165. R&R Outlet 1.00 EA

166. Smoke detector 1.00 EA

------------------ DOORS & WINDOWS -----------------

167. R&R Interior door unit 1.00 EA

168. Door knob - interior 1.00 EA

169. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

170. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

171. Security/storm shutter 10.50 SF

------------------ INSULATION -----------------

172. Batt insulation - 10" - R30 - paper faced 82.15 SF

------------------ WALLS & CEILINGS -----------------

173. Install Sheathing - plywood - 1/2" - treated 82.15 SF

174. Material Only Sheathing - plywood - 1/2" CDX 82.15 SF

175. Seal & paint plywood sheathing 82.15 SF

176. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 82.15 SF

177. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 82.15 SF

178. Cove molding - 3/4" 36.83 LF

------------------ A/C OPENING -----------------

179. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

180. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF

To fill A/C Hole in exterior wall

To fill A/C Hole in exterior wall

To fill A/C Hole in exterior wall

181. R&R Sheathing - plywood - 3/4" - treated 82.15 SF

182. R&R Sheathing - plywood - 3/4" - treated 82.15 SF

183. Seal & paint plywood sheathing 8.00 SF

To paint A/C Hole in exterior wall

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 14

CONTINUED - Bedroom 3

DESCRIPTION QTY

------------------ FLOORING -----------------

184. Floor preparation for resilient flooring 82.15 SF

185. Vinyl floor covering (sheet goods) 94.48 SF

15% added for waste

NOTES:

Bedroom 2

Bedroom 1

Bedroom 3Kitchen

Bathroom

Living Room

Shower room

Outhouse2'

4'

3' 9" 1' 10"

2' 10"

2' 10"

2'

8" 10' 8"

2'

3'

3'

6" 9"

Bathroom Height: 8'

261.33 SF Walls

321.78 SF Walls & Ceiling

6.72 SY Flooring

32.67 LF Ceil. Perimeter

60.44 SF Ceiling

60.44 SF Floor

32.67 LF Floor Perimeter

DESCRIPTION QTY

------------------ ELECTRICAL -----------------

186. R&R Switch 1.00 EA

187. R&R Light fixture 1.00 EA

188. R&R Ground fault interrupter (GFI) outlet 1.00 EA

------------------ DOORS & WINDOWS -----------------

189. R&R Interior door unit 1.00 EA

190. Door knob - interior 1.00 EA

191. Paint door slab only - 2 coats (per side) 2.00 EA

Painting all 6 sides of door

192. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

193. Security/storm shutter 14.00 SF

------------------ INSULATION -----------------

194. Batt insulation - 10" - R30 - paper faced 60.44 SF

------------------ WALLS & CEILINGS -----------------

195. Install Sheathing - plywood - 1/2" - treated 60.44 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 15

CONTINUED - Bathroom

DESCRIPTION QTY

196. Material Only Sheathing - plywood - 1/2" CDX 60.44 SF

197. Seal & paint plywood sheathing 60.44 SF

198. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 60.44 SF

199. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 60.44 SF

200. Cove molding - 3/4" 32.67 LF

NOTES:

Bedroom 2

Bedroom 1

Bedroom 3Kitchen

Bathroom

Living Room

Shower room

Outhouse

5'

6'

3' 4"

4' Outhouse Height: 8'

138.67 SF Walls

156.44 SF Walls & Ceiling

1.98 SY Flooring

17.33 LF Ceil. Perimeter

17.78 SF Ceiling

17.78 SF Floor

17.33 LF Floor Perimeter

DESCRIPTION QTY

------------------ OUTHOUSE COST -----------------

201. 4" x 4" square wood post (1.33 BF per LF) 40.00 LF

202. Sheathing - plywood - 1/2" - treated 192.00 SF

203. Material Only Sheathing - plywood - 1/2" - treated 192.00 SF

204. Install Sheathing - plywood - 3/4" - treated 72.00 SF

205. Material Only Sheathing - plywood - 3/4" - treated 72.00 SF

206. Material Only 2" x 4" lumber (.667 BF per LF) 116.00 LF

Rafters and purlins

207. R&R Rafters - 2x4 - Labor only - (using rafter length) 48.00 LF

208. Install Metal roofing - corrugated - 24 gauge 48.00 SF

209. Material Only Metal roofing - corrugated - 24 gauge 48.00 SF

210. Exterior door - metal - insulated - flush or panel style 1.00 EA

211. Door lockset & deadbolt - exterior 1.00 EA

212. Exterior - paint two coats 192.00 SF

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 16

CONTINUED - Outhouse

DESCRIPTION QTY

213. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA

214. Paint door slab only - 2 coats (per side) 2.00 EA

215. Toilet seat 1.00 EA

264. Sewage filtration/septic tank - 1000 gl. 1.00 EA

NOTES:

CNMI DATA

CNMI Data1' 4"

CNMI Data Height: 4"

1.57 SF Walls

2.92 SF Walls & Ceiling

0.15 SY Flooring

4.70 LF Ceil. Perimeter

1.36 SF Ceiling

1.36 SF Floor

4.70 LF Floor Perimeter

DESCRIPTION QTY

216. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO

217. Material Only LATITUDE DAMAGED DWELLING 15.13 DE

15.132918

218. Material Only LONGITUDE DAMAGED DWELLING 145.74 DE

145.738031

219. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO

220. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO

221. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 NO

222. DOES DWELLING HAVE A WELL 0.00 NO

223. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO

224. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1994.00 YR

225. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 YS

226. Material Only ENCROACHMENT ISSUES 0.00 NO

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 17

CONTINUED - CNMI Data

DESCRIPTION QTY

227. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO

228. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 EA

229. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 951.00 SF

230. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO

231. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

232. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

233. Material Only IS DWELLING DESTROYED 0.00 NO

234. Material Only FOUNDATION TYPE 0.00 UN

Slab

235. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO

236. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO

237. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 YS

238. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS

239. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA

Roof

240. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO

241. Material Only LATITUDE OUT BUILDING 0.00 DE

242. Material Only LONGITUDE OUT BUILDING 0.00 DE

243. Material Only LATITUDE POWER POLE 15.13 DE

15.132790

244. Material Only LONGITUDE POWER POLE 145.74 DE

145.738372

245. Material Only LATITUDE WATER METER 15.13 DE

15.132794

246. Material Only LONGITUDE WATER METER 145.74 DE

145.738367

247. Material Only LATITUDE WATER TANK 15.13 DE

15.132851

248. Material Only LONGITUDE WATER TANK 145.74 DE

145.737928

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 18

CONTINUED - CNMI Data

DESCRIPTION QTY

NOTES:

Grand Total Areas:

2,566.68 SF Walls 982.17 SF Ceiling SF Walls and Ceiling3,548.85

982.17 SF Floor 109.13 SY Flooring 323.87 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 332.70 LF Ceil. Perimeter

982.17 Floor Area 1,103.10 Total Area 2,566.68 Interior Wall Area 1,699.01 Exterior Wall Area 166.87 Exterior Perimeter of

Walls

1,225.89 Surface Area 12.26 Number of Squares 160.65 Total Perimeter Length

32.83 Total Ridge Length 0.00 Total Hip Length

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 19

1 SKETCH1/Main Level - Image177

Date Taken: 11/26/2019

Taken By: Darlene Hbbard

2 SKETCH1/Main Level - Front Elevation Date Taken: 11/26/2019

Taken By: Casey Hoak

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 20

3 SKETCH1/Main Level - Front Elevation Date Taken: 11/26/2019

Taken By: Casey Hoak

Left corner

4 SKETCH1/Main Level - Left Elevation Date Taken: 11/26/2019

Meter base

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 21

5 SKETCH1/Main Level - Left Elevation Date Taken: 11/26/2019

Taken By: Casey Hoak

6 SKETCH1/Main Level - Left Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 22

7 SKETCH1/Main Level - Left Elevation Date Taken: 11/26/2019

Taken By: Casey Hoak

Meter base

8 SKETCH1/Main Level - Back Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 23

9 SKETCH1/Main Level - Back Elevation Date Taken: 11/26/2019

Taken By: Casey Hoak

Tin shower room

10 SKETCH1/Main Level - Back Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 24

11 SKETCH1/Main Level - Back Elevation Date Taken: 11/26/2019

Taken By: Casey Hoak

12 SKETCH1/Main Level - Back Elevation Date Taken: 11/26/2019

Exterior entrance

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 25

13 SKETCH1/Main Level - Back Elevation Date Taken: 11/26/2019

Taken By: Casey Hoak

Left corner

14 SKETCH1/Main Level - Back Elevation

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 26

15 SKETCH1/Main Level - Right Elevation Date Taken: 11/26/2019

Taken By: Casey Hoak

Back corner

16 SKETCH1/Main Level - Right Elevation Date Taken: 11/26/2019

Front corner

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 27

17 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof, Temporary repairs made. Replace CJM add insulation. No broken windows in dwelling, adding shutters to all windows. Replace exterior door and paint all 6 sides. Add 67.SF shutter. Electric=R&R 2 switch 1 light, 3 outlets, add 1 smoke and 1 C/O. Flooring was previously carpet that was removed, adding FCV

18 SKETCH1/Main Level/Living Room - Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 28

19 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

20 SKETCH1/Main Level/Living Room - Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 29

21 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

22 SKETCH1/Main Level/Living Room - Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 30

23 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

24 SKETCH1/Main Level/Living Room - Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 31

25 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

26 SKETCH1/Main Level/Living Room - Living Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 32

27 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019

Taken By: Casey Hoak

28 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019

Taken By: Casey Hoak

Ceiling and roof damage. Replace CJM add insulation, paint. There is a 1 foot drop from kitchen and bedroom 2, no answer on ADA requirement from FEMA. Add exterior door and paint all 6 sides. Electric=R&R 1 light, 2 switch and 3 outlets. Replace FCV. Add fire extinguisher. No broken windows, add 14SF shutter

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 33

29 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019

Taken By: Casey Hoak

30 SKETCH1/Main Level/Kitchen - Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 34

31 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019

Taken By: Casey Hoak

32 SKETCH1/Main Level/Kitchen - Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 35

33 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019

Taken By: Casey Hoak

34 SKETCH1/Main Level/Kitchen - Kitchen

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 36

35 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019

Taken By: Casey Hoak

36 SKETCH1/Main Level/Bedroom 1

- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof. Replace CJM add insulation and paint.

Replace interior door and paint all 6 sides. Electric=R&R 1 switch, 1 light, 2 outlets, add 1 smoke. Replace FCV. No broken windows, add 45SF shutter.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 37

37 SKETCH1/Main Level/Bedroom 1

- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

38 SKETCH1/Main Level/Bedroom 1

- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 38

39 SKETCH1/Main Level/Bedroom 1

- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

40 SKETCH1/Main Level/Bedroom 1

- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 39

41 SKETCH1/Main Level/Bedroom 1

- Bedroom 1 Date Taken: 11/26/2019

Taken By: Casey Hoak

42 SKETCH1/Main Level/Bedroom 1

- Bedroom 1

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 40

43 SKETCH1/Main Level/Bedroom 2

- Bedroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof.

Temporary roof installed. Replace CJM add insulation and paint.

Electric=R&R 1 switch, 1 light, 1 outlet, add 1 smoke. R&R interior door and paint all 6 sides of the door.

Bedroom has a 1 foot step down, ADA requirement not addressed by FEMA at this time. Replace FCV.

44 SKETCH1/Main Level/Bedroom 2

- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 41

45 SKETCH1/Main Level/Bedroom 2

- Bedroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

46 SKETCH1/Main Level/Bedroom 2

- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 42

47 SKETCH1/Main Level/Bedroom 2

- Bedroom 2 Date Taken: 11/26/2019

Taken By: Casey Hoak

48 SKETCH1/Main Level/Bedroom 2

- Bedroom 2

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 43

49 SKETCH1/Main Level/Bedroom 3

- Bedroom 3 Date Taken: 11/26/2019

Taken By: Casey Hoak

Damage to ceiling and roof.

Temporary roof installed. Replace CJM add insulation and paint.

Enclose AC opening. Electric=R&R 1 switch, 1 light, 1 outlet add 1 smoke. R&R interior door and paint all 6 sides and trim. No broken windows, add 10.5SF shutter.

50 SKETCH1/Main Level/Bedroom 3

- Bedroom 3

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 44

51 SKETCH1/Main Level/Bedroom 3

- Bedroom 3 Date Taken: 11/26/2019

Taken By: Casey Hoak

52 SKETCH1/Main Level/Bedroom 3

- Bedroom 3

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 45

53 SKETCH1/Main Level/Bedroom 3

- Bedroom 3 Date Taken: 11/26/2019

Taken By: Casey Hoak

54 SKETCH1/Main Level/Bathroom - Bathroom Date Taken: 11/26/2019

Taken By: Casey Hoak

Applicants out house was destroyed he is putting in a new bathroom in the dwelling. Comparison written to complete interior bathroom vs building a new outhouse. Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint.

Waiting for FEMA to determine what repairs will be made to interior bathroom. New fixtures will need to be installed and septic line installed.

Interior door to be installed and paint trim and all 6 sides.

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 46

55 SKETCH1/Main Level/Bathroom - Bathroom Date Taken: 11/26/2019

Taken By: Casey Hoak

56 SKETCH1/Main Level/Bathroom - Bathroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 47

57 SKETCH1/Main Level/Bathroom - Bathroom Date Taken: 11/26/2019

Taken By: Casey Hoak

58 SKETCH1/Main Level/Bathroom - Bathroom

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 48

59 SKETCH1/Main Level/Shower room - Shower Room Date Taken: 11/26/2019

Taken By: Casey Hoak

Shed roof will be added over shower room. Final determination pending on whether completing bathroom inside for ADA. No septic, sewer line available. No fixtures inside.

60 SKETCH1/Main Level/Shower room - Shower Room

HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP

CNMI-412603412_RA 12/8/2019 Page: 49

61 SKETCH1/Main Level/Shower room - Shower Room Date Taken: 11/26/2019

Taken By: Casey Hoak

62 SKETCH1/Main Level/Shower room - Shower Room

CNMI-412603412_RA 12/8/2019 Page: 50

Main Level

Bedroom 2

Bedroom 1

Bedroom 3Kitchen

Bathroom

Living Room

Shower room

Outhouse

Main Level

CNMI-412603412_RA 12/8/2019 Page: 51

ROOF

Roof1

(A)F1

(B)F2

Roof3

F4

ROOF

CNMI-412603412_RA 12/8/2019 Page: 52

PLOT

Water Tank (A1)

Water Meter (A2)

DD Footprint (A3) Destroyed Outhouse (A4)

Power Pole (A5)

Street'. (A6)

LOT (A7)

PLOT

CNMI-412603412_RA 12/8/2019 Page: 53

CNMI DATA

CNMI Data

CNMI DATA