Dewberry
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
Insured: URSULA JOSEPH Home: (670) 785-0191 Cellular: (670) 286-7575Home: 6TH HOUSE LEFT MAGICIENNE BAY AVE
RED RD BUMP FRT
DANDAN, HI 96701
Property: 6TH HOUSE LEFT MAGICIENNE BAY AVE
RED RD BUMP FRT
DANDAN, HI
Claim Rep.: Casey Hoak
Estimator: Casey Hoak
Claim Number: CNMI-412603412 Policy Number: CNMI-412603412 Type of Loss: Hurricane
Date Contacted: 11/26/2019 8:00 PM Date of Loss: 10/24/2018 2:00 PM Date Received: 1/12/2019 4:26 AM
Date Inspected: 1/29/2019 8:00 PM Date Entered: 11/27/2109 7:12 AM
Date Est. Completed: 2/13/2019 1:21 AM
Price List: HIOI8X_JAN19 Restoration/Service/Remodel
Estimate: CNMI-412603412_RA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 2
12/5/2019 CMF:
Per FEMA this dwelling does not have an existing septic tank. It also does not have access to a manciple sewer system.
Since the existing bathroom was not completed at the time of the disaster, and the applicants were previously using an outhouse the program will provide the applicant back with an outhouse that is ADA accessible. Removed the bathroom upgrades and placed ADA outhouse into it's own folder, placed exterior ADA access items into the Main folder of the dwelling. See estimate for details.
11/26/2019 CMH:
Site Visits Batch Four next 20.
Attending: Casey Hoak, DeDe Hubbard, Brunson Taylor, Jorge Rivera PE.
This the fifth site visit for the property and the last was done in August. There has been no knew damage to the property and we we are still waiting on an answer from FEMA IA on the bathroom issue. There is a partially built bathroom in the home that needs to be finished or they can rebuild the outhouse and add a handicap ramp to get from the house to it. Both scopes are in this estimate for FEMA review. A new set of photos detailing the homes present condition has been added to the file.
JOINT SCOPING SUMMARY 8/14/2019:CMH
Attendees: FEMA : Robert Strayhorn, Chris Craft. Dewberry, Casey Hoak, Marvin Davis, Darlene Hubbard.
Roof design agreed to at site visit: Saw cut level with front and back the two gable ends off. Pour Bond Beam on on perimeter wall and center wall and stick built gable roof.
ADA ramp will need to be built with 5ft landing at beginning and end of ramp with 12ft run including railing.
Foundation appears in good condition and should not need any work.
Windows are being replaced that were damaged with all windows getting storm shutters.
Vinyl sheet floor to be installed in all rooms except the bathroom.
All damaged doors to replaced and paint to all 6 sides will be added Electrical will be a rewire of the home with the actual count for plugs, lights and switches.
Waiting for determination from FEMA on whether the indoor bathroom that the Applicant was installing due to the outhouse being destroyed during the storm will be completed or build a new outhouse.
No sewer lines or septic are in place. I have presented both options for FEMA to review.
Also waiting for determination from FEMA - there is a 1ft step down to the kitchen and bedroom 3, how will this be addressed per ADA guidelines.
All available GFM (Government Supplied Material) was identified. All changes were agreed upon by all parties and are made a part of this revised report.
INSPECTION SUMMARY
The applicant met at the damaged dwelling and the following was observed.
The dwelling is a 1 story 3 bedroom structure. The main house has 4 adults and 2 children occupying 3 bedrooms.
The dwelling is deemed to be repairable. There was one structural components damaged the Roof Reconstruction should take approximately 16 weeks from start of construction.
AGE
The home was built approx. 1994
DAMAGE AND REPAIR SUMMARY:
See attached estimate for exact repair and line items.
LAT: 15.132918
LONG: 145.738031
Square Foot of Dwelling: 951
A; ROOF
Roof including roof and framing was destroyed. DOD has replaced at time of inspection
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 3
B: INTERIOR
Wind and water damaged the the ceiling and joists in all rooms. 1/2 plywood for all ceilings. All doors and windows will be replaced and walls, ceilings, door frames and slabs painted. Cabinets are OK. The vinyl floor in the Kitchen will be replaced and the carpet in all rooms replaced. The Outhouse was destroyed and the applicant is in the process of renovating to put the bathroom inside the DD. Window units only in the dwelling.
C: STRUCTURAL
Foundation is a slab.
Slab appears to be intact and will not need to be replaced.
D: MECHANICAL/PLUMBING/WATER SYSTEM
Mechanical/Plumbing do not need to be replaced and all fixtures are OK
E: ELECTRICAL: Replace form the masthead in
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 4
CNMI-412603412_RA
SKETCH1
ROOF
ROOF
DESCRIPTION QTY
1. 2" x 6" x 20' #2 treated pine (material only) 16.00 EA
2. 2" x 6" x 8' #2 treated pine (material only) 27.00 EA
3. 2" x 6" x 12' #2 treated pine (material only) 4.00 EA
4. 2" x 6" x 18' #2 treated pine (material only) 2.00 EA
5. 2" x 6" x 16' #2 treated pine (material only) 1.00 EA
6. 2" x 6" x 10' #2 treated pine (material only) 2.00 EA
7. 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) 19.00 EA
For gable end walls
8. 2" x 8" x 8' #2 treated pine (material only) 4.00 EA
9. 2" x 10" x 8' #2 treated pine (material only) 1.00 EA
10. 2" x 10" x 20' #2 treated pine (material only) 5.00 EA
11. 2" x 10" x 18' #2 treated pine (material only) 43.00 EA
12. 2" x 12" x 20' #2 treated pine (material only) 3.00 EA
13. 2" x 12" x 14' #2 treated pine (material only) 3.00 EA
14. 2" x 12" x 18' #2 treated pine (material only) 4.00 EA
15. 2" x 12" x 16' #2 treated pine (material only) 1.00 EA
16. 2" x 12" x 12' #2 treated pine (material only) 1.00 EA
17. 2" x 12" x 8' #2 treated pine (material only) 2.00 EA
18. Install Sheathing - plywood - 1/2" - treated 336.04 SF
19. Material Only Sheathing - plywood - 1/2" - treated 336.04 SF
20. Install Sheathing - plywood - 3/4" - treated 1248.00 SF
21. Material Only Sheathing - plywood - 3/4" - treated 1248.00 SF
22. Rafters - 2x6 - Labor only - (using rafter length) 560.37 LF
For gable end walls and collar ties
23. R&R Rafters - 2x8 - Labor only - (using rafter length) 25.87 LF
24. R&R Rafters - 2x10 - Labor only - (using rafter length) 866.37 LF
25. Rafters - 2x12 - Labor only - (using rafter length) 207.61 LF
For ridge beam and fascia
26. Siding - hardboard panel - paint grade 168.02 SF
27. House wrap (air/moisture barrier) 168.02 SF
------------------ ROOFING -----------------
28. Remove Metal roofing - ribbed - 24 gauge - up to 1" 1225.89 SF
29. Install Metal roofing - ribbed - 24 gauge - up to 1" 1225.89 SF
30. Material Only Metal roofing - ribbed - 24 gauge - up to 1" 1225.89 SF
31. Closure strips for metal roofing - inside and/or outside 72.84 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 5
CONTINUED - ROOF
DESCRIPTION QTY
32. Drip edge/gutter apron 7.17 LF
33. Flashing tape - self-adhesive 447.05 LF
Seal between the metal roof seams
34. Ridge vent - Metal roofing - floating ventilator 32.83 LF
35. Additional screws for 3/4 plywood sheathing 4001.00 EA
Additional screws for 3/4 plywood sheathing above Xactimate allowance
36. Additional screws for 2X4 furring 900.00 EA
Additional screws for 2X4 furring above Xactimate allowance
37. Additional screws for 2x6 furring 334.00 EA
Additional screws for 2x6 furring above Xactimate allowance
38. Additional screws for fascia 106.00 EA
Additional screws for fascia above Xactimate allowance
39. Drip edge/gutter apron 65.67 LF
40. Gable trim for metal roofing - 26 gauge 76.28 LF
41. Ice & water barrier 1184.54 SF
42. Install 2" x 4" lumber - treated (.667 BF per LF) 509.33 LF
Roof purlins
43. Material Only 2" x 4" lumber - treated (.667 BF per LF) 509.33 LF
Roof purlins
44. Install 2" x 6" lumber - treated (1 BF per LF) 207.61 LF
For Picture Frame Purlins
45. Material Only 2" x 6" lumber - treated (1 BF per LF) 207.61 LF
For Picture Frame Purlins
46. Install 2" x 6" lumber - treated (1 BF per LF) 269.84 LF
Rafter Blocking
47. Material Only 2" x 6" lumber - treated (1 BF per LF) 269.84 LF
Rafter Blocking
------------------ SOFFIT -----------------
48. Install Soffit - box framing - 1' overhang 87.34 LF
Calculation set for 16" overhang
49. Material Only Soffit - box framing - 1' overhang 87.34 LF
Calculation set for 16" overhang
50. Install Soffit & fascia - wood - 1' overhang 87.34 LF
Calculation set for 16" overhang
51. Material Only Soffit & fascia - wood - 1' overhang 87.34 LF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 6
CONTINUED - ROOF
DESCRIPTION QTY
Calculation set for 16" overhang
52. Baffle vent - foam 65.67 LF
Cut to fit as needed for vents
53. Soffit vent - linear 32.83 LF
------------------ PAINT -----------------
54. Exterior - paint two coats 168.02 SF
55. Prime & paint exterior soffit - wood 87.34 SF
56. Prime & paint exterior fascia - wood, 4"- 6" wide 131.33 LF
Doubling the amount as the Fascia is 2x12 and XM8 line item covers only 6 inch fascia wood.
------------------ STRAPPING -----------------
57. 2x10 Joist hangers for rafters 54.00 EA
2x10 Joist hangers for rafters
58. Joist hangers for 2x6 rafter blocking 207.00 EA
Joist hangers for 2x6 rafter blocking
59. Framing hurricane tie 220.00 EA
For rafter tails and gable wall studs top and bottom
60. Install Framing hurricane tie 52.00 EA
For joist to top plate
61. Material Only Framing hurricane tie 52.00 EA
For joist to top plate
62. Framing hurricane tie 14.00 EA
For Gable End walls mounted to top plate HGA10KT
63. Framing strap - 24" long 26.00 EA
64. Lag bolt - 1/2" x 5" - hex lag screw - zinc plated 120.00 EA
4 @ each rafter section & 24 at the splice on the ridge
NOTES:
Main Level Main Level
DESCRIPTION QTY
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 7
CONTINUED - Main Level
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
65. R&R Meter mast for overhead power - 2" conduit 1.00 EA
66. R&R Meter base - 200 amp 1.00 EA
67. R&R Breaker panel - 200 amp w/arc fault breakers 1.00 EA
68. Circuit breaker - main disconnect - 150 to 200 amp 1.00 EA
69. Rewire - average residence - copper wiring 980.81 SF
70. R&R Exterior light fixture 3.00 EA
71. R&R Grounding rod - copper clad with clamp, 8' 2.00 EA
72. R&R Trunk cable - aluminum - 4 wire 2/0 5.00 LF
------------------ WALL REPAIRS-----------------
73. Concrete cutting - wall (per LF per inch of saw depth) 192.00 LF
To straighten the top of the wall where needed
74. Remove Concrete wall - labor & materials - Reinforced 0.50 CY
75. Concrete - General Laborer - per hour 2.00 HR
4 hours per CY of Concrete Wall
76. Concrete Post & Beam construction - Beams 2.99 CY
To pour a bond beam on top of existing wall - includes rebar
77. Concrete anchor bolt - 1/2" x 10" 189.00 EA
For cold joint between top of wall and new bond beam.
78. Install 2" x 6" lumber - treated (1 BF per LF) 502.17 LF
For double sill plate on the perimeter
79. Material Only 2" x 6" lumber - treated (1 BF per LF) 502.17 LF
For double sill plate on the perimeter
80. Sill seal foam - 6" 162.17 LF
------------------ GENERAL ITEMS -----------------
81. Clean the floor - Heavy 980.81 SF
82. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA
------------------ ADA ITEMS -----------------
83. R&R Concrete ramp slab on grade 87.00 SF
Area includes two 5x5 landings at the top and bottom and a 12 LF ramp at a 1 to 12 slope per ADA code Metal hand rail listed below. I have allowed the remove charge for the concrete in lieu of the backhoe for 4 hours that was agreed on site. The price is the same and the line includes the jack hammer and the prep work to regrade the ground for the ramp and landings
84. Chain link fence w/posts & top rail - 3' high 28.00 LF
Metal posts, top rail, concrete and labor to build 14 Lf per side for the ramp
------------------ ADA ITEMS TO OUTHOUSE -----------------
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 8
CONTINUED - Main Level
DESCRIPTION QTY
85. Concrete ramp slab on grade 225.00 SF
If you put the outhouse in you may need to build a concrete walkway with railing roughly 75 linear feet and 150 linear feet of railing as well for the access to it.
86. Chain link fence w/posts & top rail - 3' high 150.00 LF
Metal posts, top rail, concrete and labor to build 14 Lf per side for the ramp
NOTES:
Bedroom 2
Bedroom 1
Bedroom 3Kitchen
Bathroom
Living Room
Shower room
Outhouse
4' 8'
0"
9'
6'
0"
7'
3' 9"
1'
16' 2"
16' 8"
4'
14'
14' 3"
1' 11"
2' 5"
4'
5' 6"
5' 9"
10' 5"
4'
3'
1" 7'
2'
4' 5"
5' 6"
5' 3"
2' 2"
2' 5"2' 6"4'
1' 4" Living Room Height: 8'
603.89 SF Walls
995.58 SF Walls & Ceiling
43.52 SY Flooring
79.17 LF Ceil. Perimeter
391.69 SF Ceiling
391.69 SF Floor
74.75 LF Floor Perimeter
Missing Wall - Goes to Floor 4' 5" X 6' 8" Opens into KITCHEN
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
87. R&R Switch 2.00 EA
88. R&R Light fixture 1.00 EA
89. R&R Outlet 3.00 EA
90. Smoke detector 1.00 EA
91. Carbon monoxide detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
92. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
93. Door lockset & deadbolt - exterior 1.00 EA
94. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
95. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
96. Security/storm shutter 67.50 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 9
CONTINUED - Living Room
DESCRIPTION QTY
------------------ INSULATION -----------------
97. Batt insulation - 10" - R30 - paper faced 391.69 SF
------------------ WALLS & CEILINGS -----------------
98. Install Sheathing - plywood - 1/2" - treated 391.69 SF
99. Material Only Sheathing - plywood - 1/2" CDX 391.69 SF
100. Seal & paint plywood sheathing 391.69 SF
101. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 391.69 SF
102. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 391.69 SF
103. Cove molding - 3/4" 79.17 LF
------------------ FLOORING -----------------
104. Floor preparation for resilient flooring 391.69 SF
105. Vinyl floor covering (sheet goods) 450.45 SF
15% added for waste
NOTES:
Bedroom 2
Bedroom 1
Bedroom 3Kitchen
Bathroom
Living Room
Shower room
Outhouse2' 10"4' 5"
5' 6"
5' 3"
2' 2"
2' 5"
2' 6"
2'
2' 3"
1' 4"
2'
2'
3'2' 7" 1' 4"
2'
3' 2"
2' 11"
2'
7'
Kitchen Height: 8'
422.56 SF Walls
599.88 SF Walls & Ceiling
19.70 SY Flooring
56.50 LF Ceil. Perimeter
177.33 SF Ceiling
177.33 SF Floor
52.08 LF Floor Perimeter
Missing Wall - Goes to Floor 4' 5" X 6' 8" Opens into LIVING_ROOM
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
106. R&R Switch 2.00 EA
107. R&R Light fixture 1.00 EA
108. R&R Outlet 3.00 EA
109. R&R Ground fault interrupter (GFI) outlet 1.00 EA
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 10
CONTINUED - Kitchen
DESCRIPTION QTY
------------------ DOORS & WINDOWS -----------------
110. R&R Exterior door - metal - insulated - flush or panel style 1.00 EA
111. Door lockset & deadbolt - exterior 1.00 EA
112. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
113. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
114. Security/storm shutter 14.00 SF
------------------ INSULATION -----------------
115. Batt insulation - 10" - R30 - paper faced 177.33 SF
------------------ WALLS & CEILINGS -----------------
116. Install Sheathing - plywood - 1/2" - treated 177.33 SF
117. Material Only Sheathing - plywood - 1/2" CDX 177.33 SF
118. Seal & paint plywood sheathing 177.33 SF
119. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 177.33 SF
120. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 177.33 SF
121. Cove molding - 3/4" 56.50 LF
------------------ FLOORING -----------------
122. Floor preparation for resilient flooring 177.33 SF
123. Vinyl floor covering (sheet goods) 203.93 SF
15% added for waste
------------------GENERAL ITEMS -----------------
124. 5 lb. ABC fire extinguisher 1.00 EA
NOTES:
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 11
Bedroom 2
Bedroom 1
Bedroom 3Kitchen
Bathroom
Living Room
Shower room
Outhouse
4'
5'
5'
4'
4'
0"
10' 8"
2'
4'
3'
1" 7'
4' 2' 2"
2' 8"
4' 6"
4' 9"
Bedroom 1 Height: 8'
386.67 SF Walls
530.67 SF Walls & Ceiling
16.00 SY Flooring
48.33 LF Ceil. Perimeter
144.00 SF Ceiling
144.00 SF Floor
48.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
125. R&R Switch 1.00 EA
126. R&R Light fixture 1.00 EA
127. R&R Outlet 2.00 EA
128. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
129. R&R Interior door unit 1.00 EA
130. Door knob - interior 1.00 EA
131. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
132. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
133. Security/storm shutter 45.00 SF
------------------ INSULATION -----------------
134. Batt insulation - 10" - R30 - paper faced 144.00 SF
------------------ WALLS & CEILINGS -----------------
135. Install Sheathing - plywood - 1/2" - treated 144.00 SF
136. Material Only Sheathing - plywood - 1/2" CDX 144.00 SF
137. Seal & paint plywood sheathing 144.00 SF
138. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 144.00 SF
139. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 144.00 SF
140. Cove molding - 3/4" 48.33 LF
------------------ FLOORING -----------------
141. Floor preparation for resilient flooring 144.00 SF
142. Vinyl floor covering (sheet goods) 165.60 SF
15% added for waste
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 12
Bedroom 2
Bedroom 1
Bedroom 3Kitchen
Bathroom
Living Room
Shower room
Outhouse
3'1' 7"
1' 8"
1' 5"
' 6
2' 6"4'
Bedroom 2 Height: 8'
297.33 SF Walls
380.75 SF Walls & Ceiling
9.27 SY Flooring
37.17 LF Ceil. Perimeter
83.42 SF Ceiling
83.42 SF Floor
37.17 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
143. R&R Switch 1.00 EA
144. R&R Light fixture 1.00 EA
145. R&R Outlet 1.00 EA
146. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
147. R&R Interior door unit 1.00 EA
148. Door knob - interior 1.00 EA
149. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
150. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
151. Security/storm shutter 14.00 SF
------------------ INSULATION -----------------
152. Batt insulation - 10" - R30 - paper faced 83.42 SF
------------------ WALLS & CEILINGS -----------------
153. Remove Sheathing - plywood - 1/2" - treated 83.42 SF
154. Install Sheathing - plywood - 1/2" - treated 83.42 SF
155. Material Only Sheathing - plywood - 1/2" CDX 83.42 SF
156. Seal & paint plywood sheathing 83.42 SF
157. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 83.42 SF
158. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 83.42 SF
159. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 83.42 SF
160. Cove molding - 3/4" 37.17 LF
------------------ FLOORING -----------------
161. Floor preparation for resilient flooring 83.42 SF
162. Vinyl floor covering (sheet goods) 95.93 SF
15% added for waste
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 13
Bedroom 2
Bedroom 1
Bedroom 3Kitchen
Bathroom
Living Room
Shower room
Outhouse
2'
1'
7'
7' 7"
8' 4"
3'
2'
0"
3'
5'
5'
2'
4'
3' 9" 1' 10"
Bedroom 3 Height: 8'
294.67 SF Walls
376.82 SF Walls & Ceiling
9.13 SY Flooring
36.83 LF Ceil. Perimeter
82.15 SF Ceiling
82.15 SF Floor
36.83 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
163. R&R Switch 1.00 EA
164. R&R Light fixture 1.00 EA
165. R&R Outlet 1.00 EA
166. Smoke detector 1.00 EA
------------------ DOORS & WINDOWS -----------------
167. R&R Interior door unit 1.00 EA
168. Door knob - interior 1.00 EA
169. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
170. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
171. Security/storm shutter 10.50 SF
------------------ INSULATION -----------------
172. Batt insulation - 10" - R30 - paper faced 82.15 SF
------------------ WALLS & CEILINGS -----------------
173. Install Sheathing - plywood - 1/2" - treated 82.15 SF
174. Material Only Sheathing - plywood - 1/2" CDX 82.15 SF
175. Seal & paint plywood sheathing 82.15 SF
176. Install Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 82.15 SF
177. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 82.15 SF
178. Cove molding - 3/4" 36.83 LF
------------------ A/C OPENING -----------------
179. Install 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
180. Material Only 2" x 4" lumber - treated (.667 BF per LF) 10.00 LF
To fill A/C Hole in exterior wall
To fill A/C Hole in exterior wall
To fill A/C Hole in exterior wall
181. R&R Sheathing - plywood - 3/4" - treated 82.15 SF
182. R&R Sheathing - plywood - 3/4" - treated 82.15 SF
183. Seal & paint plywood sheathing 8.00 SF
To paint A/C Hole in exterior wall
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 14
CONTINUED - Bedroom 3
DESCRIPTION QTY
------------------ FLOORING -----------------
184. Floor preparation for resilient flooring 82.15 SF
185. Vinyl floor covering (sheet goods) 94.48 SF
15% added for waste
NOTES:
Bedroom 2
Bedroom 1
Bedroom 3Kitchen
Bathroom
Living Room
Shower room
Outhouse2'
4'
3' 9" 1' 10"
2' 10"
2' 10"
2'
8" 10' 8"
2'
3'
3'
6" 9"
Bathroom Height: 8'
261.33 SF Walls
321.78 SF Walls & Ceiling
6.72 SY Flooring
32.67 LF Ceil. Perimeter
60.44 SF Ceiling
60.44 SF Floor
32.67 LF Floor Perimeter
DESCRIPTION QTY
------------------ ELECTRICAL -----------------
186. R&R Switch 1.00 EA
187. R&R Light fixture 1.00 EA
188. R&R Ground fault interrupter (GFI) outlet 1.00 EA
------------------ DOORS & WINDOWS -----------------
189. R&R Interior door unit 1.00 EA
190. Door knob - interior 1.00 EA
191. Paint door slab only - 2 coats (per side) 2.00 EA
Painting all 6 sides of door
192. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
193. Security/storm shutter 14.00 SF
------------------ INSULATION -----------------
194. Batt insulation - 10" - R30 - paper faced 60.44 SF
------------------ WALLS & CEILINGS -----------------
195. Install Sheathing - plywood - 1/2" - treated 60.44 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 15
CONTINUED - Bathroom
DESCRIPTION QTY
196. Material Only Sheathing - plywood - 1/2" CDX 60.44 SF
197. Seal & paint plywood sheathing 60.44 SF
198. Remove Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 60.44 SF
199. Material Only Joist - floor or ceiling - 2x6 - w/blocking - 16" oc 60.44 SF
200. Cove molding - 3/4" 32.67 LF
NOTES:
Bedroom 2
Bedroom 1
Bedroom 3Kitchen
Bathroom
Living Room
Shower room
Outhouse
5'
6'
3' 4"
4' Outhouse Height: 8'
138.67 SF Walls
156.44 SF Walls & Ceiling
1.98 SY Flooring
17.33 LF Ceil. Perimeter
17.78 SF Ceiling
17.78 SF Floor
17.33 LF Floor Perimeter
DESCRIPTION QTY
------------------ OUTHOUSE COST -----------------
201. 4" x 4" square wood post (1.33 BF per LF) 40.00 LF
202. Sheathing - plywood - 1/2" - treated 192.00 SF
203. Material Only Sheathing - plywood - 1/2" - treated 192.00 SF
204. Install Sheathing - plywood - 3/4" - treated 72.00 SF
205. Material Only Sheathing - plywood - 3/4" - treated 72.00 SF
206. Material Only 2" x 4" lumber (.667 BF per LF) 116.00 LF
Rafters and purlins
207. R&R Rafters - 2x4 - Labor only - (using rafter length) 48.00 LF
208. Install Metal roofing - corrugated - 24 gauge 48.00 SF
209. Material Only Metal roofing - corrugated - 24 gauge 48.00 SF
210. Exterior door - metal - insulated - flush or panel style 1.00 EA
211. Door lockset & deadbolt - exterior 1.00 EA
212. Exterior - paint two coats 192.00 SF
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 16
CONTINUED - Outhouse
DESCRIPTION QTY
213. Paint door/window trim & jamb - 2 coats (per side) 2.00 EA
214. Paint door slab only - 2 coats (per side) 2.00 EA
215. Toilet seat 1.00 EA
264. Sewage filtration/septic tank - 1000 gl. 1.00 EA
NOTES:
CNMI DATA
CNMI Data1' 4"
CNMI Data Height: 4"
1.57 SF Walls
2.92 SF Walls & Ceiling
0.15 SY Flooring
4.70 LF Ceil. Perimeter
1.36 SF Ceiling
1.36 SF Floor
4.70 LF Floor Perimeter
DESCRIPTION QTY
216. Install ANY REMAINS THAT REQUIRE REINTERMENT 0.00 NO
217. Material Only LATITUDE DAMAGED DWELLING 15.13 DE
15.132918
218. Material Only LONGITUDE DAMAGED DWELLING 145.74 DE
145.738031
219. Material Only 55 GAL DRUMS VISIBLE LEAKING 0.00 NO
220. Material Only PETROLEUM ABOVE GROUND TANKS 0.00 NO
221. Material Only DOES DWELLING HAVE A SEPTIC TANK 0.00 NO
222. DOES DWELLING HAVE A WELL 0.00 NO
223. Material Only UNDERGROUND STORAGE TANKS/OR VENTS 0.00 NO
224. Material Only APPROXIMATELY WHAT YEAR WAS THE DWELLING BUILT 1994.00 YR
225. Material Only ANY SPECIAL NEEDS OR HANDICAPPED NEEDS 0.00 YS
226. Material Only ENCROACHMENT ISSUES 0.00 NO
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 17
CONTINUED - CNMI Data
DESCRIPTION QTY
227. Material Only IS DEWLLING SAFE, SANITARY AND FUNCTIONAL 0.00 NO
228. Material Only DOES DWELLING HAVE MORE THAN 1 LIVING UNIT 0.00 EA
229. Material Only TOTAL SQUARE FOOTAGE OF DWELLING 951.00 SF
230. Material Only UNUNUSAL SITE CONDITIONS 0.00 NO
231. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
232. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
233. Material Only IS DWELLING DESTROYED 0.00 NO
234. Material Only FOUNDATION TYPE 0.00 UN
Slab
235. Material Only DOES DWELLING HAVE POTENTIAL LEAD ISSUE 0.00 NO
236. Material Only DOES DWELLING HAVE CENTRAL HVAC SYSTEM 0.00 NO
237. Material Only DID THE MILITAY PROVIDE THE ROOFING 0.00 YS
238. Material Only DID THE MILITARY PROVIDE A TENT 0.00 YS
239. Material Only HOW MANY MAJOR CONSTRUCTION COMPONENTS DAMAGED 1.00 EA
Roof
240. Material Only DOES DWELLING HAVE POTENTIAL ASBESTOS ISSUE 0.00 NO
241. Material Only LATITUDE OUT BUILDING 0.00 DE
242. Material Only LONGITUDE OUT BUILDING 0.00 DE
243. Material Only LATITUDE POWER POLE 15.13 DE
15.132790
244. Material Only LONGITUDE POWER POLE 145.74 DE
145.738372
245. Material Only LATITUDE WATER METER 15.13 DE
15.132794
246. Material Only LONGITUDE WATER METER 145.74 DE
145.738367
247. Material Only LATITUDE WATER TANK 15.13 DE
15.132851
248. Material Only LONGITUDE WATER TANK 145.74 DE
145.737928
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 18
CONTINUED - CNMI Data
DESCRIPTION QTY
NOTES:
Grand Total Areas:
2,566.68 SF Walls 982.17 SF Ceiling SF Walls and Ceiling3,548.85
982.17 SF Floor 109.13 SY Flooring 323.87 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 332.70 LF Ceil. Perimeter
982.17 Floor Area 1,103.10 Total Area 2,566.68 Interior Wall Area 1,699.01 Exterior Wall Area 166.87 Exterior Perimeter of
Walls
1,225.89 Surface Area 12.26 Number of Squares 160.65 Total Perimeter Length
32.83 Total Ridge Length 0.00 Total Hip Length
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 19
1 SKETCH1/Main Level - Image177
Date Taken: 11/26/2019
Taken By: Darlene Hbbard
2 SKETCH1/Main Level - Front Elevation Date Taken: 11/26/2019
Taken By: Casey Hoak
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 20
3 SKETCH1/Main Level - Front Elevation Date Taken: 11/26/2019
Taken By: Casey Hoak
Left corner
4 SKETCH1/Main Level - Left Elevation Date Taken: 11/26/2019
Meter base
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 21
5 SKETCH1/Main Level - Left Elevation Date Taken: 11/26/2019
Taken By: Casey Hoak
6 SKETCH1/Main Level - Left Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 22
7 SKETCH1/Main Level - Left Elevation Date Taken: 11/26/2019
Taken By: Casey Hoak
Meter base
8 SKETCH1/Main Level - Back Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 23
9 SKETCH1/Main Level - Back Elevation Date Taken: 11/26/2019
Taken By: Casey Hoak
Tin shower room
10 SKETCH1/Main Level - Back Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 24
11 SKETCH1/Main Level - Back Elevation Date Taken: 11/26/2019
Taken By: Casey Hoak
12 SKETCH1/Main Level - Back Elevation Date Taken: 11/26/2019
Exterior entrance
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 25
13 SKETCH1/Main Level - Back Elevation Date Taken: 11/26/2019
Taken By: Casey Hoak
Left corner
14 SKETCH1/Main Level - Back Elevation
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 26
15 SKETCH1/Main Level - Right Elevation Date Taken: 11/26/2019
Taken By: Casey Hoak
Back corner
16 SKETCH1/Main Level - Right Elevation Date Taken: 11/26/2019
Front corner
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 27
17 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof, Temporary repairs made. Replace CJM add insulation. No broken windows in dwelling, adding shutters to all windows. Replace exterior door and paint all 6 sides. Add 67.SF shutter. Electric=R&R 2 switch 1 light, 3 outlets, add 1 smoke and 1 C/O. Flooring was previously carpet that was removed, adding FCV
18 SKETCH1/Main Level/Living Room - Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 28
19 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
20 SKETCH1/Main Level/Living Room - Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 29
21 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
22 SKETCH1/Main Level/Living Room - Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 30
23 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
24 SKETCH1/Main Level/Living Room - Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 31
25 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
26 SKETCH1/Main Level/Living Room - Living Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 32
27 SKETCH1/Main Level/Living Room - Living Room Date Taken: 11/26/2019
Taken By: Casey Hoak
28 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019
Taken By: Casey Hoak
Ceiling and roof damage. Replace CJM add insulation, paint. There is a 1 foot drop from kitchen and bedroom 2, no answer on ADA requirement from FEMA. Add exterior door and paint all 6 sides. Electric=R&R 1 light, 2 switch and 3 outlets. Replace FCV. Add fire extinguisher. No broken windows, add 14SF shutter
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 33
29 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019
Taken By: Casey Hoak
30 SKETCH1/Main Level/Kitchen - Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 34
31 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019
Taken By: Casey Hoak
32 SKETCH1/Main Level/Kitchen - Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 35
33 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019
Taken By: Casey Hoak
34 SKETCH1/Main Level/Kitchen - Kitchen
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 36
35 SKETCH1/Main Level/Kitchen - Kitchen Date Taken: 11/26/2019
Taken By: Casey Hoak
36 SKETCH1/Main Level/Bedroom 1
- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof. Replace CJM add insulation and paint.
Replace interior door and paint all 6 sides. Electric=R&R 1 switch, 1 light, 2 outlets, add 1 smoke. Replace FCV. No broken windows, add 45SF shutter.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 37
37 SKETCH1/Main Level/Bedroom 1
- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
38 SKETCH1/Main Level/Bedroom 1
- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 38
39 SKETCH1/Main Level/Bedroom 1
- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
40 SKETCH1/Main Level/Bedroom 1
- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 39
41 SKETCH1/Main Level/Bedroom 1
- Bedroom 1 Date Taken: 11/26/2019
Taken By: Casey Hoak
42 SKETCH1/Main Level/Bedroom 1
- Bedroom 1
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 40
43 SKETCH1/Main Level/Bedroom 2
- Bedroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof.
Temporary roof installed. Replace CJM add insulation and paint.
Electric=R&R 1 switch, 1 light, 1 outlet, add 1 smoke. R&R interior door and paint all 6 sides of the door.
Bedroom has a 1 foot step down, ADA requirement not addressed by FEMA at this time. Replace FCV.
44 SKETCH1/Main Level/Bedroom 2
- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 41
45 SKETCH1/Main Level/Bedroom 2
- Bedroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
46 SKETCH1/Main Level/Bedroom 2
- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 42
47 SKETCH1/Main Level/Bedroom 2
- Bedroom 2 Date Taken: 11/26/2019
Taken By: Casey Hoak
48 SKETCH1/Main Level/Bedroom 2
- Bedroom 2
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 43
49 SKETCH1/Main Level/Bedroom 3
- Bedroom 3 Date Taken: 11/26/2019
Taken By: Casey Hoak
Damage to ceiling and roof.
Temporary roof installed. Replace CJM add insulation and paint.
Enclose AC opening. Electric=R&R 1 switch, 1 light, 1 outlet add 1 smoke. R&R interior door and paint all 6 sides and trim. No broken windows, add 10.5SF shutter.
50 SKETCH1/Main Level/Bedroom 3
- Bedroom 3
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 44
51 SKETCH1/Main Level/Bedroom 3
- Bedroom 3 Date Taken: 11/26/2019
Taken By: Casey Hoak
52 SKETCH1/Main Level/Bedroom 3
- Bedroom 3
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 45
53 SKETCH1/Main Level/Bedroom 3
- Bedroom 3 Date Taken: 11/26/2019
Taken By: Casey Hoak
54 SKETCH1/Main Level/Bathroom - Bathroom Date Taken: 11/26/2019
Taken By: Casey Hoak
Applicants out house was destroyed he is putting in a new bathroom in the dwelling. Comparison written to complete interior bathroom vs building a new outhouse. Damage to ceiling and roof. Remove joists, replace CJM add insulation and paint.
Waiting for FEMA to determine what repairs will be made to interior bathroom. New fixtures will need to be installed and septic line installed.
Interior door to be installed and paint trim and all 6 sides.
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 46
55 SKETCH1/Main Level/Bathroom - Bathroom Date Taken: 11/26/2019
Taken By: Casey Hoak
56 SKETCH1/Main Level/Bathroom - Bathroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 47
57 SKETCH1/Main Level/Bathroom - Bathroom Date Taken: 11/26/2019
Taken By: Casey Hoak
58 SKETCH1/Main Level/Bathroom - Bathroom
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 48
59 SKETCH1/Main Level/Shower room - Shower Room Date Taken: 11/26/2019
Taken By: Casey Hoak
Shed roof will be added over shower room. Final determination pending on whether completing bathroom inside for ADA. No septic, sewer line available. No fixtures inside.
60 SKETCH1/Main Level/Shower room - Shower Room
HOUSING ASSESSMENT in SUPPORT of Typhoon Yutu DR-4404-MP
CNMI-412603412_RA 12/8/2019 Page: 49
61 SKETCH1/Main Level/Shower room - Shower Room Date Taken: 11/26/2019
Taken By: Casey Hoak
62 SKETCH1/Main Level/Shower room - Shower Room
CNMI-412603412_RA 12/8/2019 Page: 50
Main Level
Bedroom 2
Bedroom 1
Bedroom 3Kitchen
Bathroom
Living Room
Shower room
Outhouse
Main Level
CNMI-412603412_RA 12/8/2019 Page: 51
ROOF
Roof1
(A)F1
(B)F2
Roof3
F4
ROOF
CNMI-412603412_RA 12/8/2019 Page: 52
PLOT
Water Tank (A1)
Water Meter (A2)
DD Footprint (A3) Destroyed Outhouse (A4)
Power Pole (A5)
Street'. (A6)
LOT (A7)
PLOT
CNMI-412603412_RA 12/8/2019 Page: 53
CNMI DATA
CNMI Data
CNMI DATA
File details come from the government source that posted it. Updated .