These are architectural and engineering drawings for Building 401 at the Mount Weather Emergency Operations Center in Mount Weather, Virginia. The documents comprise Level 1 and Level 2 floor plans, telecom enlarged plans, and rack elevations prepared by FEMA for the facility's telecommunications infrastructure.

The drawings specify telecommunications requirements including conduit routing, cable tray installations, and data center rack configurations across multiple levels. Key requirements include: provision of empty conduit telecom drops for vending machines and DDC (Direct Digital Control) control panels; installation of 4-inch conduits routed in ceiling spaces connecting to ductbanks with continuation to handholes HH6O and HH6P; provision of conduit, junction boxes, and cabling for an Area of Rescue Assistance System supporting 2-way emergency communication; coordination of exact placement with elevator and DDC control panel installers prior to rough-in; and installation of CT4-type cable tray vertically mounted to walls for routing cables between floors and between sleeves and cable tray. Telecom rooms are designated on Level 1 (Room 102) and Level 2 (Room 202) with detailed rack elevations showing voice, data, and CAT6 distribution equipment, fiber optic terminal boxes, UPS systems, and wall-mounted cable trays. All outlets terminate in designated telecom rooms unless otherwise noted. The drawings were issued at 65%, 95%, and final IFC (Issued for Construction) submission stages dated April 17, May 26, and July 28, 2020, respectively.

View the file

Other files

File Type Posted
PP_Questionnaire.docx DOCX document
B401 Base Bldg A2.00 Window Elevations.pdf PDF
101423.001.00 - Interior Signage -SAMPLE-1.pdf PDF
Level-2 Power Plan Existing.pdf PDF
OF 336 70FA5026Q00000002.pdf PDF
265219.001.00 - Emergency and Exit Lighting - SAMPLE SUBMITTAL MWEOC Std..pdf PDF
B401 Base Bldg A1.01 L2 FP - Window Types.pdf PDF
B401 Base Bldg A2.01 Window Elevations.pdf PDF
GFCI Government Furnished Contractor Installed Materials.pdf PDF
Copy of B401 Tenant-6 Bidder Inquiries - 021326 REV-6 FINAL to post.xlsx XLSX spreadsheet
101423.002.00 - Interior Signage -SAMPLE-2.pdf PDF
B401 T6 Bre-Bid Conference Sign in Sheet.pdf PDF
101423 Signage spec from Tenant 1 and 2.pdf PDF
101423.001.00 - Interior Signage.pdf PDF
B401 Base Bldg A6.20 Window Schedule & Details.pdf PDF
B401 Base Bldg A2.02 Window Elevations.pdf PDF
Level-2 Mech Piping Plan Existing.pdf PDF
70FA5026Q00000001 A0002.pdf PDF
70FA5026Q00000002 A0001.pdf PDF
Previous Bidder Inquiries QA Ref Only 12.08.25 REV6.pdf PDF
B401 Tenant6 Dry Cooler IFC Plans - Combined.pdf PDF
B401 T6 IFC FFE Plan Schedules1.pdf PDF
B401 T6 IFC FFE Spec Book.pdf PDF
B401 Tenant 6 Vol I-II IFC Specifications.pdf PDF
B401 Base-Building Subcontractor List.docx DOCX document
B401 Base-Building MECH Dwgs.pdf PDF
283113.003.01 - Digital Addressable Fire-Alarm System - SD - AAN 2nd Floor Buildout.pdf PDF
283113 - Digital Addressable Fire Alarm - Tenant 3 4 - 10-3-23 FEMA APP w comments.pdf PDF
GFCI Government Furnished Contractor Installed Materials.docx DOCX document
70FA5026Q00000002 final.pdf PDF
70FA5026Q00000002 solicitation.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FE-3

F E

-3

FE-4

FE-1 FE-1 FE-1

FE-1

FE-1FE-1

FE-1

FE-1FE-1

F E

-1

FE-1 FE-1

FE-1 FE-1

FE-3

FE-1

FE-3

FE-1

F E

-4

FE-4 FE-4

A B

C

A

D

3 5 8 92 6

C

B

104 71.5 9.5

A.5

C.5

LOBBY

BREAK RM

STAIR106

ELEC

DNS

ELEV 1

TOILET RM104

TOILET RM

ELEC RM

MECH RM

T4.01

TELE RM

HSKPG

BOILER RM

STAIRDNS2

ELEV 2

2 1

LEVEL 1 FUTURE

TENANT

TSA / DHS

W

W

E

E

W W

W

STAIR

4-WAY DUCTBANK FROM

HANDHOLE HH6O. REFER

TO DRAWING ES1.01 FOR

CONTINUATION.

4-WAY DUCTBANK FROM

HANDHOLE HH6P. REFER

TO DRAWING ES1.01 FOR

CONTINUATION.

TOTAL OF (8) 4"

CONDUITS ROUTED IN

CEILING SPACE FROM

DUCTBANK

STUB CONDUITS

INTO ROOM 102

PLAN NORTH

COMPASS

NORTH

4'0 8' 16'

SCALE: 1/8" = 1'-0"

PROJECT NO:

DESIGNED BY:

DRAWN BY:

APPROVED BY:

EPS NO:

SHEET

WORK ORDER NO:

OF

M O

U N

T W

E A

T H

E R

E M

E R

G E

N C

Y O

P E

R A

T

IO

N S

C E

N T

E R

M O

U N

T W

E A

T H

E R

, V

IR

G

IN

IA

-2

SHEET TITLE:

IS

S

U E

B

LO

C K

UNCLASSIFIED / FOR OFFICIAL USE ONLY

UNCLASSIFIED / FOR OFFICIAL USE ONLY

CHECKED BY:

T1.01

LEVEL 1 FLOOR PLAN

Approver

CAC

CAC

353.06

738785

BUILDING 401

B U

IL

D

IN

G

LKK

IFC

SUBMISSION

REFER TO DRAWING T0.01 FOR LEGEND, NOTES &

ABBREVIATIONS.

REFER TO T4.XX SERIES DRAWINGS FOR ENLARGED

PLANS.

REFER TO T5.XX SERIES DRAWINGS FOR DETAILS.

REFER TO T6.XX SERIES DRAWINGS FOR SCHEDULES &

DIAGRAMS.

ALL OUTLETS THIS DRAWING TERMINATE IN ROOM 102

UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE REQUIRED CONDUIT,

JUNCTION BOX AND CABLING FOR AREA OF RESCUE

ASSITANCE SYSTEM (2-WAY EMERGENCY

COMMUNICATION). REFER TO "FA" SERIES DRAWINGS FOR

AREA OF RESCUE ASSISTANCE SYSTEM REQUIREMENTS.

A.

B.

C.

D.

E.

F.

KEYNOTES: #

PROVIDE DATA DROPS FOR DDC CONTROL PANELS.

FIELD COORDINATE EXACT PLACEMENT WITH DDC

CONTROL PANEL INSTALLER PRIOR TO ROUGH-IN.

1.

FIELD COORDINATE EXACT PLACEMENT WITH

ELEVATOR INSTALLER PRIOR TO ROUGH-IN.

2.

PROVIDE (1) 1" CONDUIT WITH PULL STRING FROM

POWER MONITORING SYSTEM LOCATED IN ELEC RM

103 TO CABLE TRAY LOCATED IN TELE RM 102.

3.

SCALE: 1/8" = 1'-0"T1.01T4.01

LEVEL 1 FLOOR PLAN1

GENERAL NOTES:

PROVIDE EMPTY CONDUIT TELECOM DROPS FOR

VENDING MACHINES.

4.

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

7/

S

U B

M

IS

S

IO

N

/2

6/

S

U B

M

IS

S

IO

N

/2

8/

IF

C S

U B

M

IS

S

IO

N

07/28/2020

F E

-1

FE-1

F E

-1

F E

-1

FE-1

FE-1 FE-1

FE-1

A B

C

FE-1

FE-1

TELE RM

T4.01

TOILET RM

TOILET RM

DNS

ELEV 1

DNS2

ELEV 2

ELEC

STAIR

MECH RM

BREAK RM 03

STAIR

HSKPG

LOBBY

W W

W

W

A

D

3 5 8 92 6

C

B

104 71.5 9.5

A.5

C.5

LEVEL 2 FUTURE

TENANT

200A

VEST

W

STAIR

PLAN NORTH

COMPASS

NORTH

4'0 8' 16'

SCALE: 1/8" = 1'-0"

PROJECT NO:

DESIGNED BY:

DRAWN BY:

APPROVED BY:

EPS NO:

SHEET

WORK ORDER NO:

OF

M O

U N

T W

E A

T H

E R

E M

E R

G E

N C

Y O

P E

R A

T

IO

N S

C E

N T

E R

M O

U N

T W

E A

T H

E R

, V

IR

G

IN

IA

-2

SHEET TITLE:

IS

S

U E

B

LO

C K

UNCLASSIFIED / FOR OFFICIAL USE ONLY

UNCLASSIFIED / FOR OFFICIAL USE ONLY

CHECKED BY:

T1.02

LEVEL 2 FLOOR PLAN

Approver

CAC

CAC

353.06

738785

BUILDING 401

B U

IL

D

IN

G

LKK

IFC

SUBMISSION

SCALE: 1/8" = 1'-0"T1.02

LEVEL 2 FLOOR PLAN1

KEYNOTES: #

PROVIDE TELECOM DROPS FOR DDC CONTOL PANELS.

FIELD COORDINATE EXACT PLACEMENT WITH DDC

CONTROL PANEL INSTALLER PRIOR TO ROUGH-IN.

1.

PROVIDE EMPTY CONDUIT TELECOM DROPS FOR

VENDING MACHINES.

2.

GENERAL NOTES:

REFER TO DRAWING T0.01 FOR LEGEND, NOTES &

ABBREVIATIONS.

REFER TO T4.XX SERIES DRAWINGS FOR ENLARGED

PLANS.

REFER TO T5.XX SERIES DRAWINGS FOR DETAILS.

REFER TO T6.XX SERIES DRAWINGS FOR SCHEDULES &

DIAGRAMS.

ALL OUTLETS THIS DRAWING TERMINATE IN ROOM 202

UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE REQUIRED CONDUIT,

JUNCTION BOX AND CABLING FOR AREA OF RESCUE

ASSITANCE SYSTEM (2-WAY EMERGENCY

COMMUNICATION). REFER TO "FA" SERIES DRAWINGS FOR

AREA OF RESCUE ASSISTANCE SYSTEM REQUIREMENTS.

A.

B.

C.

D.

E.

F.

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

7/

S

U B

M

IS

S

IO

N

/2

6/

S

U B

M

IS

S

IO

N

/2

8/

IF

C S

U B

M

IS

S

IO

FE-1

FE-1

FD

FE-1

F

E -1

FE-1

TELE RM

FSR1

FSR1

TGB

TYPICAL OF

ALL WALLS

T4.01

(6) 4" SLEEVES UP

TO LEVEL ABOVE:

(2) VOICE LEVEL 3,4

(2) LAN AND CATV

(1) GROUND

(1) SPARE

(7) 4" SLEEVES DOWN

TO LEVEL BELOW:

(2) VOICE LEVEL 1

(2) LAN AND CAT V

(1) GROUND

(1) SPARE

CT3

CABLE TRAY LOCATED

IN CEILING SPACE

B

1.5

VWM1

FOT

PW01

CT3

FSR1

F144

WM2U

FSR1VWM1

UPS1UPS1

RACK LABEL 202-01 RACK LABEL 202-02

LEVEL 2 TR

(VOICE)

VP24

R110LEVEL 2 TR

(DATA)

PP48

WM2U

UPS1UPS1

WM2U

PP48

LEVEL 2 TR

(CAT6)

F144

FSR1 FSR1 FSR1

UPS1 UPS1 UPS1

R110

WM2U

VWM1 VWM1

CT3

R110

RACK LABEL 102-01 RACK LABEL 102-02 RACK LABEL 102-03

UPS1 UPS1 UPS1

INCOMING FIBER

FROM DUCTBANK

F144

F144

LEVEL 1 TR

(DATA)

LEVEL 2 TR

(DATA)

F144LEVEL 3 TR

(DATA)

F144LEVEL 4 TR

(DATA)

INCOMING COPPER

FROM PRIMARY

PROTECTORS

PP48

WM2U

LEVEL 1 TR

(VOICE)

VP24

WM2U

R110

PP48

WM2U

LEVEL 1 TR

(CAT6)

T4.01

B

1.5

TELE RM

FSR1

FSR1

FSR1

PW01

TMGB

FOT

(TYPICAL OF

ALL WALLS)

VWM1

VWM1

CT3

CT3

(7) 4" SLEEVES UP

TO LEVEL ABOVE:

(2) VOICE LEVEL 1

(2) LAN AND CAT V

(1) GROUND

(1) SPARE

TOTAL OF (8) 4"

CONDUITS ROUTED IN

CEILING SPACE FROM

DUCTBANK STUBBED

INTO RM 102

T4.01

FODN

P100

P100

AMP

TELE RM

ELEC RM

LEVEL

1701' - 4"

P100P100

TMGB

PLAN NORTH

COMPASS

NORTH

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROJECT NO:

DESIGNED BY:

DRAWN BY:

APPROVED BY:

EPS NO:

SHEET

WORK ORDER NO:

OF

M O

U N

T W

E A

T H

E R

E M

E R

G E

N C

Y O

P E

R A

T

IO

N S

C E

N T

E R

M O

U N

T W

E A

T H

E R

, V

IR

G

IN

IA

-2

SHEET TITLE:

IS

S

U E

B

LO

C K

UNCLASSIFIED / FOR OFFICIAL USE ONLY

UNCLASSIFIED / FOR OFFICIAL USE ONLY

CHECKED BY:

T4.01

TELECOM ENLARGED PLANS &

ELEVATIONS

Approver

CAC

CAC

353.06

738785

BUILDING 401

B U

IL

D

IN

G

LKK

IFC

SUBMISSION

SCALE: 1/4" = 1'-0"T4.01T1.02

TELECOM RM 202 ENLARGED PLAN4

SCALE: 1" = 1'-0"T4.01

TELECOM RM 202 RACK ELEVATION5

KEYNOTES:

REFER TO DRAWING T0.01 FOR LEGEND, NOTES &

ABBREVIATIONS.

REFER TO T4.XX SERIES DRAWINGS FOR ENLARGED

PLANS.

REFER TO T5.XX SERIES DRAWINGS FOR DETAILS.

REFER TO T6.XX SERIES DRAWINGS FOR SCHEDULES &

DIAGRAMS.

TERMINATE ALL WORKSTATION DATA OUTLETS IN A GROUP

TOGETHER, WALL TELEPHONE DATA OUTLETS IN A

GROUP TOGETHER AND TV DATA OUTLETS IN A GROUP

TOGTHER ON THE PATCH PANEL.

A.

B.

C.

D.

E.

1. PROVIDE CT4 TYPE CABLE TRAY VERTICALLY MOUNTED TO

THE WALL. ROUTE THE CABLE TRAY FROM FLOOR TO

CEILING SLAB TO PROVIDE APPROPRIATE ROUTING OF

CABLES BETWEEN FLOORS OR BETWEEN SLEEVES AND

CABLE TRAY.

SCALE: 1" = 1'-0"T4.01T4.01

TELECOM RM 102 RACK ELEVATION2

2. PROVIDE CT4 TYPE CABLE TRAY VERTICALLY MOUNTED TO

THE WALL. ROUTE THE CABLE TRAY LOCATED BELOW

RAISED FLOOR TO CABLE TRAY LOCATED IN CEILING

SPACE ABOVE RACKS. REFER TO DETAIL 8 ON DRAWING

T5.01 FOR ADDITIONAL REQUIREMENTS.

GENERAL NOTES:

SCALE: 1/4" = 1'-0"T4.01T1.01

TELECOM RM 102 ENLARGED PLAN1

SCALE: 1" = 1'-0"T4.01T4.01

TELECOM RM 102 WALL ELEVATION3

3. PROVIDE CT4 TYPE CABLE TRAY VERTICALLY MOUNTED TO

THE WALL. ROUTE THE CABLE TRAY IN FLOOR NOTCH

LOCATED BELOW RAISED FLOOR TO CABLE TRAY LOCATED

IN CEILING SPACE ABOVE RACKS. REFER TO DETAIL "S"

DRAWINGS FOR ADDITIONAL NOTCH REQUIREMENTS .

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

7/

S

U B

M

IS

S

IO

N

/2

6/

S

U B

M

IS

S

IO

N

/2

8/

IF

C S

U B

M

IS

S

IO

File details come from the government source that posted it. Updated .