This document is an Asbestos Abatement Specification for the Mount Weather Emergency Operations Center Demolition Project, detailing comprehensive requirements for asbestos removal across multiple buildings. The specification covers the removal of various asbestos-containing materials from six buildings (310, 315, 320/320A, 400, 408/408A, and 410/410A), including floor tiles, mastics, drywall joint compound, pipe insulation, cork insulation, and exhaust fan caulking. Each material type is categorized by its asbestos content and requires specific removal procedures, such as negative pressure containment, glove bag removal, or intact removal, with estimated quantities ranging from 50 to 1,600 square feet.
The specification provides detailed technical requirements for asbestos abatement, including worker protection protocols, air monitoring procedures, disposal methods, and laboratory testing. The contractor is responsible for obtaining necessary permits, performing exploratory demolition, and removing all identified asbestos-containing materials as a lump sum. The document also includes provisions for additional unit pricing for potentially concealed materials like thermal system insulation, waterproofing membranes, and electrical components. The abatement must be performed by a licensed asbestos contractor following strict federal and state regulations, with comprehensive air sampling, visual inspections, and final clearance monitoring to ensure complete and safe removal.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Mount Weather Emergency Operations Center
(MWEOC)
Facility Infrastructure Improvements
• Volume 2: FM Maintenance 300-400
Technical Specifications
Project Specifications Issued for Construction
Solicitation No. 70FA5023F00000131
Department of Homeland Security
Federal Emergency Management Agency
P.O. Box 129, Berryville, Virginia 22611
March 5, 2025
FM Maintenance 300-400 Demolition
EPS NO. 9630
Issued for Construction
8 December 2023
TABLE OF CONTENTS
VOLUME 2
FM Maintenance 300-400 Demolition Technical Specifications
SECTION TITLE PAGES
Division 02 Existing Conditions
02 41 16 Structure Demolition 7
02 41 19 Selective Demolition 6
02 41 19 Utility and Life Safety System Outages Directive 5
Division 07 Thermal and Moisture Protection
07 25 00 Sheathing Weather Barrier 5
07 46 46 Fiber Cement Siding 2
07 62 00 Sheet Metal Flashing and Trim 9
07 92 00 Joint Sealants 10
Division 8 Openings
08 52 00 Wood Windows 6
Division 23 Heating, Ventilating, and Air Conditioning
23 23 00 Refrigerant Piping 14
23 31 13 Metal Ducts 12
Division 26 Electrical
26 05 00 Common Work Results for Electrical 4
26 05 19 Low Voltage Electrical Power Conductors and Cables 5
26 05 26 Grounding and Bonding for Electrical Systems 8
26 05 29 Hangers and Supports for Electrical Systems 5
26 05 33 Raceways and Boxes for Electrical Systems 8
26 05 43 Underground Ducts and Raceways for Electrical Systems11
26 05 53 Identification for Electrical Systems 12
26 81 16 Enclosed Switches and Circuit Breakers 7
Division 31 Earthwork
31 10 00 Site Clearing 7
31 20 00 Earth Moving 17
31 50 00 Excavation Support and Protection 6
FM Maintenance 300-400 Demolition
EPS NO. 9630
Issued for Construction
8 December 2023
Division 32 Exterior Improvements
32 12 16 Asphalt Paving 9
32 17 23 Pavement Markings 4
32 91 13 Soil Preparation 9
32 92 00 Turf and Grasses 11
Division 33 Utilities
33 05 00 Common Work Results for Utilities 10
33 42 00 Stormwater Conveyance 6
APPENDIX A: ECS ASBESTOS ABATEMENT SPECIFICATIONS
APPENDIX B: ECS HAZARDOUS MATERIALS SURVEY
100% Employee-Owned
MOUNT WEATHER EMERGENCY OPERATIONS CENTER
DEMOLITION &
REHABILITATION
SPECIFICATIONS
FM MAINTENANCE 300-400 DEMOLITION
EPS NO.: 9630
CONTRACT NO: HSFE50-17-D-0003
ORDER NO: 70FA5019F00000148
IFC SUBMISSION
8 DECEMBER 2023
VOLUME 1 OF 1
12/08/2023
STRUCTURE DEMOLITION 024116 - 1
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
SECTION 024116 - STRUCTURE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of buildings and site improvements.
2. Removing below-grade construction.
3. Disconnecting, capping or sealing, and abandoning in-place or removing site utilities.
B. Related Requirements:
1. Section 011000 "Summary" for use of the premises and phasing requirements.
2. Section 013200 "Construction Progress Documentation" for preconstruction photographs taken before building demolition.
3. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade site improvements not part of building demolition.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
C. Fire Alarm and Information Technology Components. Select fire alarm and information technology equipment within each building shall be recovered by the owner prior to demolition of the structure. Any remaining items are to be demolished by the Contractor. The contractor shall provide 2 weeks of advance demolition notice to the COR for coordinated removal of this equipment.
1.4 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be demolished.
STRUCTURE DEMOLITION 024116 - 2
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
2. Review structural load limitations of existing structures.
3. Review and finalize building demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review and finalize protection requirements.
5. Review procedures for noise control and dust control.
6. Review procedures for protection of adjacent buildings.
7. Review items to be salvaged and returned to Owner.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For refrigerant recovery technician.
B. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
1. Adjacent Buildings: Detail special measures proposed to protect adjacent buildings to remain including means of egress from those buildings.
C. Schedule of Building Demolition Activities: Indicate the following:
1. Detailed sequence of demolition work, with starting and ending dates for each activity.
2. Temporary interruption of utility services.
3. Shutoff and capping or re-routing of utility services.
D. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.7 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program.
1.8 FIELD CONDITIONS
A. Buildings to be demolished will be vacated and their use discontinued before start of the Work.
B. Buildings immediately adjacent to demolition area will be occupied. Conduct building demolition so operations of occupied buildings will not be disrupted.
1. Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.
STRUCTURE DEMOLITION 024116 - 3
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.
a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from authorities having jurisdiction.
C. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
1. Before building demolition, each building will be decommissioned by the Mount Weather Fire Department
2. Before building demolition, Owner will remove the following items:
a. Fire Alarm Control Panels (FACP), GRAPHIC ANNUNCIATORS, POWER
SUPPLY CABINETS, NET RELAYS AND ETHERNET SWITCHES.
3. Before building demolition, each building utility shall be decommissioned by Mount
Weather. These utilities include water, power, fuel oil, and communications.
D. Hazardous Materials: Present in buildings and structures to be demolished. A report on the presence of hazardous materials is included as an appendix to the specifications. Examine report to become aware of locations where hazardous materials are present.
1. Hazardous material remediation is specified elsewhere in the Contract Documents.
2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.
E. On-site storage or sale of removed items or materials is not permitted.
1.9 COORDINATION
A. Arrange demolition schedule so as not to interfere with Owner's on-site operations or operations of adjacent occupied buildings.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
2.2 SOIL MATERIALS
A. Satisfactory Soils: Comply with requirements in Section 312000 "Earth Moving."
STRUCTURE DEMOLITION 024116 - 4
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Verify that hazardous materials have been remediated before proceeding with general building demolition operations.
D. Inventory and record the condition of items to be removed and salvaged.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.
B. Salvaged Items: Comply with the following:
1. Clean salvaged items of dirt and demolition debris.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to storage area designated by Owner.
5. Protect items from damage during transport and storage.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Utilities to Be Disconnected: Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished.
1. Owner will arrange to shut off utilities when requested by Contractor.
2. Contractor must follow requirements of MW DIR 04-001-1 Mount Weather Emergency Operations Center Utility and Life Safety System Outages Directive. Additionally, complete and submit Attachment A Utility Outage Request for each proposed outage.
3. If removal, relocation, or abandonment of utility services will affect adjacent occupied buildings, then provide temporary utilities that bypass buildings and structures to be demolished and that maintain continuity of service to other buildings and structures.
4. Unless otherwise specifically stated, utility services shall not be abandoned in place.
They shall be completely removed back to the main. Electrical services shall be removed to the transformer. Water services shall be removed to the main. Additionally, main water system piping is to be replaced where the tap or branch tee is located. Sanitary laterals shall be removed to the identified manhole, grouted closed, and sealed.
STRUCTURE DEMOLITION 024116 - 5
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
Communication raceway systems shall be removed back to the identified manhole, patched, and sealed. Reference plans for additional information.
5. Do not start demolition work until utility disconnecting and sealing have been completed and verified in writing.
3.4 PROTECTION
A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.
B. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent unexpected movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of demolition.
C. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolition operations.
1. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction.
2. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and authorities having jurisdiction.
a. Provide at least 72 hours' notice to occupants of affected buildings if shutdown of service is required during changeover.
D. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction and as indicated.
Comply with requirements in Section 015000 "Temporary Facilities and Controls."
1. Protect adjacent buildings and facilities from damage due to demolition activities.
2. Protect existing site improvements, appurtenances, and landscaping to remain.
3. Erect a plainly visible fence around drip line of individual trees or around perimeter drip line of groups of trees to remain.
4. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
5. Provide protection to ensure safe passage of people around building demolition area and to and from occupied portions of adjacent buildings and structures.
6. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to building demolition operations.
7. Erect and maintain dustproof partitions and temporary enclosures to limit dust, noise, and dirt migration to occupied portions of adjacent buildings.
E. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or other hazardous conditions remain, leave temporary barriers and protections in place.
STRUCTURE DEMOLITION 024116 - 6
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
3.5 DEMOLITION, GENERAL
A. General: Demolish indicated buildings and site improvements completely. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.
2. Maintain fire watch during and for at least 24 hours after flame-cutting operations.
3. Maintain adequate ventilation when using cutting torches.
4. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.
2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.
C. Explosives: Use of explosives is not permitted.
3.6 DEMOLITION BY MECHANICAL MEANS
A. Proceed with demolition of structural framing members systematically, from higher to lower level. Complete building demolition operations above each floor or tier before disturbing supporting members on the next lower level.
B. Remove debris from elevated portions of the building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
1. Remove structural framing members and lower to ground by method suitable to minimize ground impact and dust generation.
C. Below-Grade Construction: Demolish foundation walls and other below-grade construction.
1. Remove below-grade construction, including basements, foundation walls, and footings, completely.
D. Existing Utilities: Demolish and remove existing utilities and below-grade utility structures as indicated on drawings.
STRUCTURE DEMOLITION 024116 - 7
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
3.7 SITE RESTORATION
A. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades as indicated on drawings.
3.8 REPAIRS
A. Promptly repair damage to adjacent buildings caused by demolition operations.
3.9 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction. and recycle or dispose of them according to Section 017419 "Construction Waste Management and Disposal."
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Do not burn demolished materials.
3.10 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began.
1. Clean roadways of debris caused by debris transport.
END OF SECTION 024116
SELECTIVE DEMOLITION 024119 - 1
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. The Work of this Section Includes:
1. Demolition and removal of selected portions of exterior or interior of building or structure and site elements.
2. Removal and salvage of existing items for delivery to Owner and removal of existing items for reinstallation.
B. Related Requirements:
1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.
2. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade improvements not part of selective demolition.
3. Section 330500 "Common Work Results for Utilities" for removal of site utility systems piping, equipment, and components.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.3 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1.4 INFORMATIONAL SUBMITTALS
A. Engineering Survey: Submit engineering survey of condition of building.
B. Survey of Existing Conditions: Submit survey.
C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property. Indicate proposed locations and construction of barriers.
SELECTIVE DEMOLITION 024119 - 2
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
D. Schedule of selective demolition activities with starting and ending dates for each activity.
E. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician.
1.5 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.6 FIELD CONDITIONS
A. Owner will not occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify COR of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials:
1. Hazardous materials may be present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is included in Section 003126 "Existing Hazardous Material Information" for review and use. Examine report to become aware of locations where hazardous materials are present.
E. On-site sale of removed items or materials is not permitted.
1.7 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
SELECTIVE DEMOLITION 024119 - 3
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
C. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video. Comply with Section 013233 "Photographic Documentation."
1. Inventory and record the condition of items to be removed for salvage or reinstallation.
Photograph or video conditions that might be misconstrued as damage caused by removal.
2. Photograph or video existing conditions of adjoining construction including finish surfaces, that might be misconstrued as damage caused by selective demolition operations or removal of items for salvage or reinstallation.
3.2 PREPARATION
A. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
B. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by COR, items may be removed to a suitable, protected storage location and cleaned and reinstalled in their original locations after selective demolition operations are complete.
D. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment in accordance with 40 CFR 82 and regulations of authorities having jurisdiction.
3.3 UTILITY SERVICES AND BUILDING SYSTEMS
A. Existing Services/Systems to Remain: Maintain utilities and building systems and equipment to remain and protect against damage during selective demolition operations.
SELECTIVE DEMOLITION 024119 - 4
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utilities and building systems serving areas to be selectively demolished.
1. Coordinate with COR when shutting off indicated utilities.
2. If disconnection of utilities and building systems will affect adjacent occupied parts of the building, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to those parts of the building.
3. Demolish and remove existing building systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment and components.
4. Abandon existing building systems, equipment, and components indicated on Drawings to be abandoned in place.
a. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
b. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
5. Remove and reinstall/salvage existing building systems, equipment, and components indicated on drawings to be removed and reinstalled or removed and salvaged:
a. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment and components; when appropriate, reinstall, reconnect, and make equipment operational.
b. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and components and deliver to Owner.
3.4 SALVAGE/REINSTALL
A. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
B. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
SELECTIVE DEMOLITION 024119 - 5
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and recycle or dispose of them in accordance with Section 017419 "Construction Waste Management and Disposal."
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Section 017419 "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
SELECTIVE DEMOLITION 024119 - 6
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
Directives Management System
DIRECTIVE
Number Date
MW DIR 04-001-1 8/23/2019
Utility and Life Safety System Outages Directive
I. Purpose
This directive describes the policies and procedures for obtaining approval for utility and life safety system outages at the Mount Weather Emergency Operations Center (MWEOC). This policy is intended to: 1) ensure the safety of personnel performing outages work and appropriate parties are notified; 2) reduce or eliminate the costs associated with accidental damage to utilities and equipment; 3) ensure that Mission Partner (MP) requested outages, contractor requested outages, and Facilities Management (FM) outages are properly coordinated and planned; and 4) ensure that sufficient FM and other MWEOC support is available, and that impacts to facility infrastructure and facility operations are understood prior to the system shutdown.
II. Scope
This directive applies to all resident personnel, contractors, MPs, and visitors at the MWEOC.
III. Supersession
This directive supersedes MWEOC directive, MW7500.19, "Utility and Life Safety System Outages Policy for the Mount Weather Emergency Operations Center," dated April 22, 2013, which is hereby rescinded.
IV. References
MWEOC directive, MW7500.17 “Lockout/Tagout Program for Control of Hazardous Energy Sources,” dated June 30, 2014.
V. Definitions
A. Controlled Shutdown: Actions to de-energize a utility.
B. Life Safety System: Includes, but is not limited to, fire alarm and fire sprinkler or suppression systems.
C. Requestor: MWEOC personnel, MPs, or contractor who requires a utility outage.
MW DIR 04-001-1 8/23/2019
D. Restart: Actions to re-energize a utility.
E. Utility System: Includes, but is not limited to chilled water, domestic hot water, domestic cold water, industrial hot water, steam/condensate, exhaust, heating/cooling, compressed air, gas, electrical, sanitary waste, and any other similar systems.
VI. Responsibilities
A. The MWEOC Executive Administrator, or designee, is responsible for administering these policies and procedures.
B. The FM Division is responsible for coordinating the utility outage approval process and the controlled shutdown of the utilities.
C. The Mount Weather Information Technology Services (MWITS) Division is responsible for all information technology (IT) services and for coordinating any outages of IT services. IT service outages are not covered in this directive.
D. Any MWEOC employee who has supervisory or contractual control over utility work is responsible for assuring adherence to the provisions of this directive as they apply to employees, contractors, MPs, and visitors.
VII. Policy and Procedures
A. Utility or Life Safety Systems
1. Any utility or life safety system at the MWEOC requiring shutdown for any period, must be pre-approved by FM. The pre-approval is to certify that all organizations affected are notified and provided ample time to prepare.
Coordination and notice are dependent upon the scope and impact of the outage. Outages impacting MP operations require advance notice and coordination. For example, maintenance on a single piece of equipment that does not impact MP operations can be coordinated internally within FM.
2. Unless otherwise directed, all utility outages will be performed by FM personnel.
3. Routine FM preventive maintenance task instructions shall specifically indicate whether outage coordination, per this Directive, are required for the specified task.
B. Outage Request Form
1. When a utility outage may impact MPs or other MWEOC division operations, the Requestor shall complete MW FORM 04-001-1, “Mount
MW DIR 04-001-1 8/23/2019
Weather Utility Outage Request” (see Attachment A) and submit to the FM Scheduling Branch (SB) for approval. Unclassified requests may be hand carried to the SB office, emailed to MWOPSMAIN@FEMA.DHS.GOV, or faxed to 540- 542-2681. All classified requests must be hand carried to the SB office in Building 5, room 10. SB can provide a fillable PDF form, upon request.
2. SB will review the outage request and based on the scope and impact of the outage, will determine the appropriate pre and post outage coordination, identify organizations and locations affected, then will notify the organizations and the MP Liaison to schedule the date and time for the utility outage.
a. SB will also coordinate with the appropriate maintenance shop(s) to perform the outage.
b. When SB receives proper input from affected organizations and coordination from the maintenance shops, the Requestor will be notified and provided a copy of the completed outage request. This completed outage request, with approvals from all responsible organizations, is considered an approved permit and allows the Requestor to proceed with the scheduled outage.
c. All affected organizations shall be requested to designate a point of contact who is to receive updates on the status of the outage as it progresses.
d. All organizations with critical equipment and or limited access to their spaces will be encouraged to remain present during the outage, allowing FM to verify that all utilities within the space are returned to normal.
3. Requestors should expect to receive an approved permit within five (5) business days of SB receiving a request, if the outage affects only one (1) building or a small portion of the site. Outages of a broader scope or those which impact site traffic, may take up to 10 business days to coordinate.
Outages need to be planned with the correct number of business days in mind.
4. All contractors shall submit requests for approval through the appropriate Contracting Officer’s Representative (COR). Approvals will be returned to the originator through the COR.
C. Pre-Brief
Prior to initiating the outage, a pre-brief will be held to ensure all impacted parties have been notified; that the process is understood for notifying impacted parties in case the outage does not go as planned; and that the FM Control Room (CR) has been briefed on the outage. The specific MWEOC personnel who will perform notifications, if necessary, shall be identified at this time. Also, the pre-brief will review the post outage inspections required in section E below.
mailto:MWOPSMAIN@FEMA.DHS.GOV mailto:MWOPSMAIN@FEMA.DHS.GOV
MW DIR 04-001-1 8/23/2019
D. Outage Implementation
1. All outages shall be coordinated with the FM CR at (540) 542-3041. The CR shall be notified throughout the execution of the outage to verify that all utilities have been returned to normal.
2. All affected organizations who designated a point of contact shall receive updates on the status of the outage as it progresses.
E. Post Outage Implementation (as determined step B.2)
1. When utilities and systems are returned to normal, an appropriate walk-though shall be conducted verifying that systems are normal, as allowed by access and the affected organization’s presence. FM will coordinate with MP personnel on site to verify systems are normal.
2. Affected organizations not present shall be notified, as appropriate:
a. that systems are returned to normal operation;
b. whether FM was able to verify the functioning of their equipment; and
c. that any systems potentially impacted by the outage, which are remotely monitored by the CR or other monitoring locations, shall be checked by remote monitoring to the extent possible in order to document system status.
3. Documentation of the Post Outage Implementation process shall be completed with names, dates, and times of the after-outage walk-through.
Coordination with the MP shall also be documented, and all documentation shall be submitted to the SB within five (5) business days. Due to the varying numbers of potentially impacted parties, there is no specified form for this step, a simple list with the applicable information is all that is required.
VIII. Questions
Questions or comments regarding this directive should be addressed to FM SB at (540) 542-2156.
IX. Attachments
A. MW FORM 04-001-1, “Mount Weather Utility Outage Request”
Berl D. Jones, Jr.
Executive Administrator
MW DIR 04-001-1 8/23/2019
MW FORM 04-001-1 Attachment A-1
Attachment A
Mount Weather Facilities Management
Utility Outage Request
A MINIMUM OF 5 WORKING DAYS NOTICE IS REQUIRED FOR SHUTDOWN REQUESTS.
Maintenance W/O # Service W/O #
Contract #
Request permission to shut down the following utility(ies) and or equipment:
Chilled Water Domestic Hot Water Domestic Cold Water Steam/Condensate Industrial Hot Water Exhaust Heating/Cooling Compressed Air (lab or control)
Gas Fire Alarm Fire Alarm Testing Electrical (high or low voltage) Fire Sprinkler System(s) Sanitary Waste Other
Details:
Building(s) affected:
Area of building(s) affected:
Shutdown Information Date: Time:
Restored Information Date: Time:
Reason for shutdown:
Contact on site during shut down:
Requested by: Date:
DO NOT WRITE BELOW THIS LINE
Date Received by:
Shop’s verified and approved / NOT approved by: Date:
Request approved / NOT approved by: Date:
Post Outage Walk-through conducted: All Conditions Normal Problems Identified (detail on reverse)
Shop Technician Signature:
Email to: MWOPSMAIN@fema.dhs.gov or phone 2-2156 with questions. Rev. Jul. 2019
WEATHER BARRIERS (ZIP System Sheathing – Wall Use) 072500-1
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
SECTION 072500 - WEATHER BARRIERS (ZIP System Sheathing – Wall Use)
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes
1. Wall sheathing with integral water-resistive barrier and air barrier.
1.2 REFERENCES
A. American Society of Mechanical Engineers (ASME): www.asme.org
1. ASME B18.6.1 - Wood Screws (Inch Series)
B. ASTM International (ASTM): www.astm.org
1. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
2. ASTM E96/E96M - Standard Test Methods for Water Vapor Transmission of Materials
3. ASTM E108 - Standard Test Methods for Fire Tests of Roof Coverings
4. ASTM E119 - Standard Test Methods for Fire Tests of Building Construction and
Materials
5. ASTM E2357 - Standard Test Method for Determining Air Leakage of Air Barrier
Assemblies
C. US Department of Commerce (DOC): http://gsi.nist.gov/global/index.cfm/L1-5/l2-44/A-355
1. DOC PS 2 - Performance Standard for Wood-Based Structural Panels
D. International Code Council (ICC): www.iccsafe.org
1. ICC IBC - International Building Code
2. ICC IRC - International Residential Code for One- and Two-Family Dwellings
E. ICC Evaluation Service, Inc. (ICC-ES): www.icc-es.org
1. ICC-ES AC38 - Acceptance Criteria for Weather-Resistive Barriers
2. ICC-ES AC116 - Acceptance Criteria for Nails and Spikes
3. ICC-ES AC148 - Acceptance Criteria For Flexible Flashing Materials
4. ICC-ES AC201 - Acceptance Criteria for Staples
5. ICC-ES AC310 - Acceptance Criteria for Water-Resistive Membranes Factory-bonded to
Wood-based Structural Sheathing, Used as Water-Resistive Barriers
6. ICC-ES ESR-1539 - Power Driven Staples and Nails for Use in Engineered and Non-
Engineered Connections
7. ICC-ES NER-272 - Power Driven Staples and Nails for Use in All Types of Building
Construction
F. International Association of Plumbing and Mechanical Officials (IAPMO) http://www.asme.org/ http://www.astm.org/ http://gsi.nist.gov/global/index.cfm/L1-5/l2-44/A-355 http://www.iccsafe.org/ http://www.icc-es.org/
WEATHER BARRIERS (ZIP System Sheathing – Wall Use) 072500-2
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
1. IAPMO ER365 (ZIP System Stretch Tape)
1.3 ACTION SUBMITTALS
A. Product Data: For each type of sheathing product specified.
1.4 INFORMATIONAL SUBMITTALS
A. Evaluation Reports: From ICC-ES, for wood sheathing and seam tape.
B. Product Certifications: From manufacturer, indicating that sheathing products comply with
ICC-ES AC310.
1.5 CLOSEOUT SUBMITTALS
A. Warranty: Executed copy of manufacturer special warranties.
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications: Provide wood products from manufacturer certified by SFI, FSC, or comparable sustainable forestry program acceptable to Architect.
B. Provide wall sheathing products meeting requirements for water-resistive barrier in accordance with ICC-ES AC310.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Comply with manufacturer's written instructions for protection of sheathing products from weather prior to installation.
1.8 WARRANTY
A. Special Manufacturer's Warranty: Manufacturer's standard form in which sheathing manufacturer agrees to repair or replace sheathing products that demonstrate deterioration or failure under normal use due to manufacturing defects within warranty period specified, when installed according to manufacturer's instructions.
1. Warranty Period for Sheathing Products: 30 years following date of Substantial Completion.
2. Warranty Conditions: Special warranties exclude deterioration or failure due to structural movement resulting in stresses on sheathing products exceeding manufacturer's written specifications, or due to air or moisture infiltration resulting from cladding failure or mechanical damage.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis-of-Design Product: Provide weather barrier sheathing products manufactured by Huber Engineered Woods LLC, Charlotte NC; Phone: (800) 933-9220; Website:
www.huberwood.com;
http://www.huberwood.com/
WEATHER BARRIERS (ZIP System Sheathing – Wall Use) 072500-3
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
2.2 PERFORMANCE REQUIREMENTS
A. Fire-Test-Response Characteristics:
1. Fire-Resistance Ratings: Where indicated, provide assemblies tested for fire resistance per ASTM E119.
B. Air-Barrier Assembly Air Leakage: Less than 0.04 cfm/sq. ft. at 1.57 lbf/sq. ft.
C. Water-Vapor Permeance, Facer: Minimum 12 perms, ASTM E96/E96M.
D. Weather Exposure: Manufacturer warranty applies for maximum allowable exposure period of 180 days.
2.3 WOOD PANEL PRODUCTS
A. Single Source Limitations: Provide wall sheathing/weather barrier by a single manufacturer.
B. Oriented Strand Board: DOC PS 2, made with binder containing no added urea formaldehyde.
2.4 WALL SHEATHING WITH INTEGRAL WATER-RESISTIVE BARRIER AND AIR
BARRIER
A. Oriented-Strand-Board Wall Sheathing: Exposure 1 sheathing with factory-laminated water-resistive barrier facer with printed fastener location symbols.
1. Basis-of-Design Product: Provide Huber Engineered Woods LLC; ZIP System Wall Sheathing.
2. Span Rating, Panel Grade and Performance Category: Not less than 24/16; Structural 1;
7/16 Performance Category.
3. Edge Profile: Square edge.
4. Weather Barrier Facer: Medium-density, phenolic-impregnated sheet material qualifying as a Grade D weather-resistive barrier in accordance with ICC-ES AC38.
a. Provide fastener spacing symbols on facer for 16-inch and 24-inch on center spacing.
2.5 FASTENERS
A. Fasteners, General: Size and type complying with manufacturer's written instructions for Project conditions and requirements of authorities having jurisdiction.
1. Corrosion Resistance: [Hot-dip zinc coating, ASTM A153/A153M] [or] [Type 304 stainless steel].
B. Nails, Brads, and Staples: ICC AC116 and ICC AC201.
C. Power-Driven Fasteners: ICC-ES-1539 or NER-272.
WEATHER BARRIERS (ZIP System Sheathing – Wall Use) 072500-4
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
2.6 SHEATHING JOINT-AND-PENETRATION TREATMENT MATERIAL
A. Self-Adhering Seam and Flashing Tape: Pressure-sensitive, self-adhering, cold-applied, seam tape consisting of polyolefin film with acrylic adhesive, meeting ICC-ES AC148, and tested as part of an assembly meeting performance requirements.
1. Basis-of-Design Product: Provide Huber Engineered Woods; ZIP System Tape.
2. Thickness: 0.012 inchLiquid-Applied Flashing Membrane: Gun-grade, cold-applied, silyl-terminated polyether (STPE) liquid flashing membrane compatible with sheathing/weather barrier and self-adhering seam and flashing tape, and tested as part of an assembly meeting performance requirements. Follow manufacturer’s recommendation for integration with ZIP System Tape.
3. Basis-of-Design Product: Provide Huber Engineered Woods; ZIP System Liquid Flash.
B. Hardness, Shore A, ASTM C 661: 40 to 45.
C. Self-Adhering Flexible Flashing Tape: Pressure-sensitive, self-adhering, cold-applied, seam tape consisting of polyolefin film with acrylic adhesive, meeting ICC-ES AC148, and tested as part of an assembly meeting performance requirements.
1. Basis-of-Design Product: Provide Huber Engineered Woods; ZIP System Stretch Tape.
2. Thickness: 0.042 inch
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine framing spacing and alignment to determine if work is ready to receive sheathing.
Proceed with sheathing work once conditions meet requirements.
3.2 SHEATHING INSTALLATION
A. Install sheathing panels in accordance with manufacturer's written instructions, requirements of applicable Evaluation Reports, and requirements of authorities having jurisdiction.
B. Air and Moisture Barrier: Coordinate sheathing installation with flashing and joint sealant sequencing and installation and with adjacent building air and moisture barrier components to provide complete, continuous air- and moisture- barrier.
C. Do not bridge expansion joints; allow joint spacing equal to spacing of structural supports.
D. Install panels with laminated facer to exterior. Stagger end joints of adjacent panel runs.
Support all panel edges.
1. Space square-edged panels 0.125 inch (3 mm).
2. Butt edges of self-spacing edge panels.
E. Attach sheathing panels securely to substrate with manufacturer-approved fasteners in compliance with the following:
1. ICC-ES ESR-1539 or ICC-NES NER-272 for power-driven fasteners.
WEATHER BARRIERS (ZIP System Sheathing – Wall Use) 072500-5
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
2. IBC: Table 2304.9.1 Fastening Schedule.
F. Apply ZIP System tape at all panel seams, penetrations, and facer defects or cracks to form continuous weathertight surface. Apply tape according to manufacturer's written instructions and requirements of ICC-ES applicable to tape application.
G. Apply liquid-applied flashing membrane at penetrations, gaps, and cracks to form continuous weathertight surface. Apply liquid membrane according to manufacturer's written instructions.
Follow manufacturer’s recommendation for integration with ZIP System Tape.
H. Apply ZIP System Stretch Tape around window and window frames, door frames, radius fenestrations and wall penetrations to form continuous weathertight surface. Apply tape according to manufacturer’s written instructions and requirements of IAPMO ER365 applicable to tape application.
END OF SECTION
FIBER-CEMENT SIDING 074646 - 1
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
SECTION 074646 - FIBER-CEMENT SIDING
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes fiber-cement siding.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For fiber-cement siding including related accessories.
1.3 INFORMATIONAL SUBMITTALS
A. Product certificates.
B. Product test reports.
C. Research/evaluation reports.
D. Sample warranty.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.5 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace products that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 25 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 FIBER-CEMENT SIDING
A. General: ASTM C1186, Type A, Grade II, fiber-cement board, noncombustible when tested in accordance with ASTM E136; with a flame-spread index of 25 or less when tested in accordance with ASTM E84.
1. Shingle Siding: HardieShingle HZ5 siding as manufactured by James Hardie Building Products, Inc.
FIBER-CEMENT SIDING 074646 - 2
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023
a. Type: HardieShingle Straight-Edge Notched Panel 48 inches wide by 16 inches high with 7 inches exposure.
B. Labeling: Provide fiber-cement siding that is tested and labeled in accordance with ASTM C1186 by a qualified testing agency acceptable to authorities having jurisdiction.
C. Nominal Thickness: Not less than 5/16 inch.
D. Factory Priming: Manufacturer's standard acrylic primer.
2.2 ACCESSORIES
A. Siding Accessories, General: Provide starter strips, edge trim, outside and inside corner caps, and other items as recommended by siding manufacturer for building configuration.
B. Flashing: Provide Berger trim coil flashing at wall penetrations, doors, windows and at corners C. Fasteners:
1. For fastening to wood, use same method as existing shingles, of sufficient length to penetrate a minimum of 1 inch into substrate.
2. For fastening to metal, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1/4 inch, or three screw-threads, into substrate.
3. For fastening fiber cement, use hot-dip galvanized fasteners.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General: Comply with manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
1. Install fasteners no more than 24 inches o.c.
B. Install joint sealants as specified in Section 079200 "Joint Sealants" and to produce a weathertight installation.
3.2 ADJUSTING AND CLEANING
A. Remove damaged, improperly installed, or otherwise defective materials and replace with new materials complying with specified requirements.
B. Clean finished surfaces according to manufacturer's written instructions and maintain in a clean condition during construction.
END OF SECTION 074646
SHEET METAL FLASHING AND TRIM 076200 - 1
UNCLASSIFIED
FM Maintenance 300-400 Demolition IFC Submittal EPS NO. 9630 8 December 2023