B420 Demolition and Parking Drawings IFC 3-5-2025.pdf
PDF 17 MB Posted
- Attached to
- ROADWAY & SITEWIDE IMPROVEMENTS
- Solicitation number
- 70FA5025R00000012
About this file
These are construction drawings issued for the demolition of Building 420 and construction of a new parking lot at the FEMA Mount Weather Emergency Operations Center, dated March 5, 2025. The project involves comprehensive site work including: demolishing the existing 10,830 square foot single-story building, removing a 1,500-gallon underground fuel storage tank, salvaging two structural steel antennas, and constructing a new parking lot with 116 total parking spaces (113 standard and 3 oversized).
The project scope includes hazardous material abatement for asbestos and lead-based paint, utility removals and relocations, installation of a stormwater management system with six StormCapture modules, electrical infrastructure upgrades with new service equipment, lighting, underground conduits, and provisions for future electric vehicle charging stations. Additional features include a bus shelter, concrete sidewalks, landscaping, and erosion control measures. The total disturbed area is approximately 1.81 acres, with careful attention to environmental and safety requirements throughout the demolition and construction process.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .