20240226_2023-0056_Approved_Sheets(2).pdf
PDF 31 MB Posted
- Attached to
- ROADWAY & SITEWIDE IMPROVEMENTS Federal contract opportunity
- Solicitation number
- 70FA5025R00000012
About this file
This document is a comprehensive set of civil engineering and demolition plans for the Mount Weather Emergency Operations Center (MWEOC) FM Maintenance 300-400 Demolition project. The project involves selective demolition of multiple buildings (B310, B315, B320, B400, B408, B410, B714A) and associated site infrastructure across two contract line items (CLINs), including complete building removal, utility disconnections, underground tank removals, and site restoration. The demolition work encompasses electrical, mechanical, and utility systems, with specific requirements for environmental compliance, including proper handling of registered underground fuel storage tanks and adherence to Virginia Department of Environmental Quality (DEQ) stormwater management regulations.
The project site is located at 19844 Blue Ridge Mountain Road in Bluemont, Virginia, with a total disturbed area of 4.43 acres. The owner is the U.S. Department of Homeland Security, specifically the Federal Emergency Management Agency (FEMA), with Gregory Eisenhauer from the Engineering Branch as the primary contact. The demolition plans include detailed site grading, erosion control measures, utility disconnection protocols, and post-demolition site stabilization using specific seeding and mulching techniques. The project emphasizes environmental protection, including managing potential naturally occurring asbestos, maintaining site drainage, and ensuring proper sediment control during and after demolition activities.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOUNT WEATHER EMERGENCY OPERATIONS CENTER
FM MAINTENANCE 300-400 DEMOLITION
MOUNT WEATHER, VIRGINIA 20135-2006
FEBRUARY 20, 2024
VICINITY MAP
SCALE: 1" = 5000'
PROJECT LOCATION
BLU
E R
ID
GE M
OUNTAIN
R
OAD
TO
INTERSTATE
TO 7
DEQ PROJECT#: 2023-0056
GKT
SKS
SMS
COVER SHEET
G-001
SMF
DEQ SUBMITTAL
PROJECT NO:
MA
RK
DA
TE
DE
SC
RI
PT
IO
N
BY
DESIGNED BY:
DRAWN BY:
EPS NO: 9630
B300-400 DEMOLITION
ISSUE BLOCK
M O
U N
T W
EA
TH
ER
EM
ER
G
EN
C
Y O
PE
R
AT
IO
N S
C
EN
TE
R
OFSHEET
WORK ORDER NO: 864554
218151.006
APPROVED BY:
M O
U N
T W
EA
TH
ER
, V
IR
G
IN
IA
-2
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
UNCLASSIFIED//FOR OFFICIAL USE ONLY
UNCLASSIFIED//FOR OFFICIAL USE ONLY
CHECKED BY:
FM
M
AI
N
TE
N
AN
C
E
-4
D
EM
O
LI
TI
O N
SHEET TITLE:
DEQ APPROVAL OF THIS STORMWATER MANAGEMENT PLAN FOR MOUNT WEATHER EMERGENCY OPERATIONS CENTER FM MAINTENANCE 300-400 DEMOLITION (2023-0XXX) AND RELATED CONSTRUCTION GENERAL PERMIT APPROVAL COVERS THE CONSTRUCTION PHASES DETAILED IN THIS PLAN SET. ANY LAND DISTURBING ACTIVITIES THAT DEVIATE FROM THE DEVELOPMENT OUTLINED ON SHEETS CS101-CS105 IN THIS PLAN SET SHALL NOT BE CONSTRUCTED UNTIL A PLAN MODIFICATION HAS BEEN SUBMITTED TO DEQ AND DEQ HAS PROVIDED APPROVAL.
LIST OF DRAWINGS
SHEET NUMBER SHEET TITLE
G-001 COVER SHEET
G-002 OVERALL PLAN
C-001 CIVIL NOTES, ABBREVIATIONS, AND LEGENDS
C-002 EROSION AND SEDIMENT CONTROL NOTES
CE101 EXISTING CONDITIONS PLAN - CLIN 001
CE103 B400 EXISTING CONDITIONS PLAN - CLIN 001
CE104 B408, B410 & B410A EXISTING CONDITIONS PLAN - CLIN 002
CE105 B714A EXISTING CONDITIONS PLAN - CLIN 002
CD101 DEMOLITION PLAN - CLIN 001
CD102 DEMOLITION PLAN - CLIN 002
CD103 B400 DEMOLITION PLAN - CLIN 001
CD104 B408, B410 & B410A DEMOLITION PLAN - CLIN 002
CD105 B714A DEMOLITION PLAN - CLIN 002
CS101 SITE PLAN - CLIN 001
CS102 SITE PLAN - CLIN 002
CS103 B400 SITE PLAN - CLIN 001
CS104 B408, B410 & B410A SITE PLAN - CLIN 002
CS105 B714A SITE PLAN - CLIN 002
CT102 PAVEMENT MARKING PLAN - CLIN 002
CT103 B400 PAVEMENT MARKING PLAN - CLIN 001
CT104 B408, B410 & B410A PAVEMENT MARKING PLAN - CLIN 002
C-501 CIVIL DETAILS
C-502 EROSION AND SEDIMENT CONTROL DETAILS
SITE INFORMATION:
SITE ADDRESS: 19844 BLUE RIDGE MOUNTAIN RD., BLUEMONT, VA 20135
TAX MAP ID: 33 A 15
PARCEL ACCOUNT: 677368855000
DISTURBED AREA: 4.43 AC
OWNER INFORMATION:
OWNER: U.S. DEPARTMENT OF HOMELAND SECURITY
CONTACT NAME: GREGORY EISENHAUER, ENGINEERING BRANCH
PHONE NUMBER: 540-542-2159
EMAIL: GREGORY.EISENHAUER@FEMA.DHS.GOV
...........APPROVAL BLOCK
DEPT. OF ENVIRONMENTAL QUALITY
DATE
DEQ PLAN # 2023 - 0056
02/20/2024 abq64963 Approval Stamp - NRO abq64963 Text Box 2/26/2024 abq64963 mking
1630 1635
17041702
X
X
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
X
X
X
X
X X
X
SD
SD
IIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIII
IIIIII
I I I
I I I
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
III
III
III
III
III
III
III
III
III
III
LandingLights
LandingLights
Entrance
Post
Ref
Wind Sock
Post
Post
Post
Post
Ref
Ref
Ref
Breather
Vault Water Faucet
Faucet Water
Abdn
Kero Tank
Post
Wind Sock
Safety marker marker Safety marker
Safety marker Safety marker Safety marker
Safety marker Safety marker Safety
Circuit breaker
Post
BALLOONSHED DRIVE
SUNRISE DRIVE
PK NAIL B
N=70
16.
E=11
.31
ELE
V.=1
.53
24' SWING
GATE
24' SWING
GATECA
BL
E G
UA
RD
RA
IL
N =7071026.055
E=11655461.736
ELEV=1648.78
P-K N
AIL B1
N =7070708.810
E=11655155.730
ELEV=1647.40
P-K N
AIL C
PROPOSED BUILDING (#602)
PROPOSED BUILDING (#602)
FF UPPER LEVEL 1648.00
PROPOSED BUILDING (#602)
FF BOTTOM LEVEL 1632.00
TREE LINE
TREE LINE
RIPRAP
RETAINING
W
ALL (TYP)
4" SOLID
W
HITE
LINE (TYP)
METAL
GUARDRAIL
METAL
GUARDRAIL
TREE
LINE
1631.20
1629.7
1629.61
1628.11
1628.11
1625.61
1627.79
RETAINING
W
ALL (REFER
TO LA)
18.82'
R ock(s)
Rock(s)
Rock(s)
Rock(s)
R oc k( s)
Rock(s)
R ock(s)
R ock(s)
Rock(s)
R ock(s)
R ock(s)
Rock(s)
R ock(s)
Rock(s)
R ock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Roc k(s
Rock(s)
R ock(s)
Rock(s)
Sign
Sign Sign
Sign
Sign
Sign
SignSign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
GuyGuy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Guy
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Ro ck
(s
Rock(s) Guy
Guy
Guy
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Guy
Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s) Guy
Rock(s)
Rock(s)
Guy
Rock(s) Guy
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Roc k(s
Rock(s) Rock(s)
Rock(s)
Rock(s)
Guy
Rock(s)
Rock(s)
Rock(s)
Guy
Rock(s)
Rock(s)
Rock(s)
SignSign
Guy
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Sign
Sign
Sign
Sign
Sign
Rock( s)
R oc k( s)
R oc k( s)
Rock(s) Rock(s)
Roc k(s
Rock(s)
Sign
Sign
Sign
Sign
Sign
Rock(s)
Rock(s)
Sign
Rock(s)
Rock(s)
Guy
Rock(s)
Rock(s)Sign
Guy
Sign
Sign
Guy
Guy
Rock(s)
Guy
Rock(s)
Sign
Sign
Sign
Sign
Sign
R oc k( s)
R ock(s)
Rock(s)
Rock(s)
Roc k(s
Rock(s)
Rock(s)
R oc k( s)
Roc k(s
Rock(s)
Rock(s)
Roc k(s
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Ro ck
(s
R ock(s)
Rock(s)
R ock(s)
Sign
Rock(s)
Rock(s)
Rock(s)
Ro ck
(s
Sign
Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Sign
Guy
Sign
Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Sign
Rock(s)
Rock(s)
Sign
Sign
Sign
Sign
Sign Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)Sign
Rock(s) Rock(s)
Rock(s)
Sign
Guy
Guy
Guy
Guy
Guy
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Rock(s)
Rock(s) Rock(s)
Rock(s)
Rock(s) Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s) Sign
Rock(s)
Rock(s)
Rock(s)
Guy
Guy
Guy
Sign
Ro ck
(s
Rock(s)
Rock(s)
Rock(s) Rock(s)
Rock(s)
Guy
Rock(s)
Rock( s)
Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Ro ck
(s
Rock(s)
Sign
Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s) Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Sign
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Guy
Guy
Guy
Guy
Sign
Sign Sign
Rock(s)
Rock(s)
Roc k(s
Roc k(s
Rock(s)
Rock(s)Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s) Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
Guy
Guy
LandingLights
LandingLights
Entrance
Post
Ref
Sign
Wind Sock
Sign
Sign
PostSign
Post
Post
Post
Ref
Ref
Sign
Ref
Sign
Breather
Vault Water Faucet
Faucet Water
Abdn
Kero Tank
Post
Wind Sock
Safety marker marker Safety marker
Safety marker Safety marker Safety marker
Safety marker Safety marker Safety
Circuit breaker
Guy
Guy
Guy
Guy
Post
1.
1.
75 10 1.
1.
BL
D
BL
D
BLD
BLD
BL
D
BL
D
BL
D
BL
D
BLD
BLD 713
BLD 710
BL
D
BLD 720
BLD 604
BLD 702
BLD
BLD
BLD
0B
BL
D 44
BL
D
BLD
BL
D 20
BL
D
BL
D
9A
BL
D
BL
D
BL
D 20
BLD
BLD 105
BLD
BL
D 11
BL
D
BLD
BL
D
BL
D 10
BLD
0A
BL
D 12
BLD
BLD
BLD
618 BLD 602
BLD 921
BLD 901
III
III
III
II
I
I I I
I I I
III
I I I I I I
I I I
ASBESTOS
WASTE
STORAGE
C
Y M
ET
AL
DU
M
PS
TE
R
40 CY CONST.
DUMPSTER
C
Y
CO
NS
T.
DU
M
PS
TE
R
40 CY RECYCL.
DUMPSTER
x x x x x x x x x x x x xx x x x x x x x x x x x x x x x x x x x x x x x
II
I
II
I
III
III
III
III
I I I
II
I
C
Y D
U M
PS
TE
R
II I
III
III
III
III
III
III
I I I
I I I
I I I
II
I
II
I
I I I
I I I
II
I
II
I
II
I
II
I
III
III
40 CY
DUMPSTER
TRASH
COMPACTOR
TC-1
WOODS
WOODS
18" HONEY LOCUST
10568 1728.542
LP
10590 1729.845
LP
10623 1729.808
TSP
10652 1728.953
LP
10653 1729.947
TSP
30" POPLAR
I I I
I I I
III
III
III
III
III
III
I I I
III
I I I
III
I I I
I I
I
III
III
I I I
I I I
III
III
I I I
III
III
III
III
III
III
III
III
III
I I I
I I I
I I I
I I I
IIII I I
WVWVWV
o o o o
E
10587 1729.149
EMH
C
10588 1729.739
TMH
WV
I I I
I I I
I I I
II
I
I I I
I I I
I I I
I I I
III
III
III
III
III
III
C
10588 1729.739
TMH
B
1711.424
BOL
B
1711.417
BOL
x x x x x xx x x
BM 9858
EL 1716.04
I I I
I I I
III
III
III
III
III
III
FU
EL
TA
NK
FU
EL
TA
NK
III
III
III
III
III
III
I I I
I I I
I I I
I I I
I I I
III
II
I
I I I
I IIIII
I I I
I I I
III
III
III
I I I
I I I
III
III
II I
STEP
10191 1723.175
STEP
STEP
10192 1723.120
STEP
STEP
10193 1723.081
STEPSTEP
10194 1721.893
STEPSTEP
10195 1722.017
STEP
STEP
10196 1723.110
STEP
STEP
10245 1720.180
STEP
STEP
10246 1720.214
STEP
STEP
10247 1721.889
STEP
STEP
10330 1720.092
STEPSTEP
10331 1720.097
STEP
STEP
10332 1723.126
STEP
STEP
10333 1723.057
STEP
I I I
III
II
I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
III
I I I
I I I
I I IIII
I I I
I I I
I I I
I I I
STDI 9394
STDI 9275
D
X
BA
LL
OO
NS
HE
D
DR
IV
E
SUNRISE DRIVE
FFE 1737.52
GB4
T
C
X=11657029.1432Y=7071521.7012
CANOPY
R ock(s)
Rock(s)
Rock(s)
Rock(s)
Rock(s)
1724.145
USMB
1709.782 C301
1724.145
USMB
1709.782 C301
" S
D
Rock(s)
Rock(s)
BLD
G
BLD
BLD 911
BLD
N =7071078.546
E=11655246.717
ELEV=1647.97
P-K N
AIL B2
30' SLIDING GATE
PAVED DITCH
911707
1724.145
USMB
STA2
1709.782 C301
25 16
35 1645
X
X
X
X X
X
X
X
X
X
X
X
X X
X X
SD
SDMH TOP 1456.5'
W
W
W
W
W
W
III
III
III
III
WOODS
WOODS
18" HONEY LOCUST
10568 1728.542
LP
10590 1729.845
LP
10623 1729.808
TSP
10652 1728.953
LP
10653 1729.947
TSP
30" POPLAR
I I I
I I I
III
III
III
III
III
III
I I I
III
I I I
III
I I I
I I
I
III
III
I I I
I I I
III
III
I I I
III
III
III
III
III
III
III
III
III
I I I
I I I
I I I
I I I
III
IIIIII
III
1724.145
USMB
1724.145
USMB
T
ACC
ACC
25 1725
6" TC
T
22D
9D
29C
9D22D
28B
43B
43C 40D
88C 40D
40E
59C
40E
43B
43C
40D
40E
43C 88C
B315
CLIN 001
COMPLETE DEMOLITION
B320
CLIN 001
COMPLETE DEMOLITION
B410
CLIN 002
SELECTIVE DEMOLITION
B310
CLIN 002
COMPLETE DEMOLITION
B408A
CLIN 002
COMPLETE DEMOLITION
B714A
CLIN 002
COMPLETE DEMOLITION
B400
CLIN 001
COMPLETE DEMOLITION
B320A
CLIN 001
COMPLETE DEMOLITION
B410A
CLIN 002
SELECTIVE DEMOLITION
B408
CLIN 002
COMPLETE DEMOLITION
GKT
CAT
SMS
OVERALL PLAN
G-002
SMF
PROJECT NO:
MA
RK
DA
TE
DE
SC
RI
PT
IO
N
BY
DESIGNED BY:
DRAWN BY:
EPS NO: 9630
B300-400 DEMOLITION
ISSUE BLOCK
M O
U N
T W
EA
TH
ER
EM
ER
G
EN
C
Y O
PE
R
AT
IO
N S
C
EN
TE
R
OFSHEET
WORK ORDER NO: 864554
218151.006
APPROVED BY:
M O
U N
T W
EA
TH
ER
, V
IR
G
IN
IA
-2
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
UNCLASSIFIED//FOR OFFICIAL USE ONLY
UNCLASSIFIED//FOR OFFICIAL USE ONLY
CHECKED BY:
FM
M
AI
N
TE
N
AN
C
E
-4
D
EM
O
LI
TI
O N
SHEET TITLE:
ERODIBILITY FACTORS, K
0.23 AND LOWER - LOW ERODIBILITY
0.23 TO 0.36 - MODERATE ERODIBILITY
0.36 AND UP - HIGH ERODIBILITY
HYDROLOGIC SOIL GROUPS, HSG
A - LOW RUNOFF POTENTIAL, SOILS HAVING HIGH
INFILTRATION RATES EVEN WHEN
THOROUGHLY WETTED.
B - SOILS HAVING MODERATE INFILTRATION RATES
WHEN THOROUGHLY WETTED.
C - SOILS HAVING SLOW INFILTRATION RATES WHEN
THOROUGHLY WETTED.
D - HIGH RUNOFF POTENTIAL, SOILS HAVING VERY
SLOW INFILTRATION RATES WHEN
THOROUGHLY WETTED.
SOILS
9D - CATOCTIN-MYERSVILLE VERY STONY SILT LOAMS
15-45 PERCENT SLOPES
WELL DRAINED
K FACTOR - 0.28
HYDROLOGIC SOILS GROUP - B
22D - LEW VERY STONY SILT LOAM
15-30 PERCENT SLOPES
WELL DRAINED
K FACTOR - 0.17
HYDROLOGIC SOILS GROUP - B
28B - MYERSVILLE-CATOCTIN SILT LOAMS
3-8 PERCENT SLOPES
WELL DRAINED
K FACTOR - 0.49
HYDROLOGIC SOILS GROUP - B
29C - MYERSVILLE-CATOCTIN VERY STONY SILT LOAMS
8-15 PERCENT SLOPES
WELL DRAINED
K FACTOR - 0.49
HYDROLOGIC SOILS GROUP - B
40D - CATOCTIN CHANNERY SILT LOAM
15-25 PERCENT SLOPES
WELL DRAINED
K FACTOR - 0.24
HYDROLOGIC SOILS GROUP - B
* IF A SOIL IS ASSIGNED TO A DUAL HYDROLOGIC GROUP (A/D, B/D, OR C/D), THE FIRST LETTER IS FOR DRAINED AREAS AND THE SECOND IS FOR UNDRAINED AREAS. ONLY THE SOILS THAT IN THEIR NATURAL CONDITION ARE IN GROUP D ARE ASSIGNED TO DUAL CLASSES.
SOILS DATA SOURCE
NATURAL RESOURCES CONSERVATION SERVICE
(NRCS) WEB SOIL SURVEY, PROVIDED BY THE
UNITED STATES DEPARTMENT OF AGRICULTURE
40E - CATOCTIN CHANNERY SILT LOAM
25-45 PERCENT SLOPES
WELL DRAINED
K FACTOR - 0.24
HYDROLOGIC SOILS GROUP - B
43B - MYERSVILLE-CATOCTIN COMPLEX
2-7 PERCENT SLOPES
WELL DRAINED
K FACTOR - 0.43
HYDROLOGIC SOILS GROUP - B
43C - MYERSVILLE-CATOCTIN COMPLEX
7-15 PERCENT SLOPES
WELL DRAINED
K FACTOR - 0.43
HYDROLOGIC SOILS GROUP - B
59C - FLAIRMONT VERY FLAGGY LOAM
7-15 PERCENT SLOPES, VERY RUBBLY
MODERATELY WELL DRAINED
K FACTOR - 0.10
HYDROLOGIC SOILS GROUP - B
88C - LEW CHANNERY SILT LOAM
7-15 PERCENT SLOPES, STONY
SOMEWHAT POORLY DRAINED
K FACTOR - 0.24
HYDROLOGIC SOILS GROUP - B
02/20/2024
PROJECT NO:
MA
RK
DA
TE
DE
SC
RI
PT
IO
N
BY
DESIGNED BY:
DRAWN BY:
EPS NO: 9630
B300-400 DEMOLITION
ISSUE BLOCK
M O
U N
T W
EA
TH
ER
EM
ER
G
EN
C
Y O
PE
R
AT
IO
N S
C
EN
TE
R
OFSHEET
WORK ORDER NO: 864554
218151.006
APPROVED BY:
M O
U N
T W
EA
TH
ER
, V
IR
G
IN
IA
-2
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
UNCLASSIFIED//FOR OFFICIAL USE ONLY
UNCLASSIFIED//FOR OFFICIAL USE ONLY
CHECKED BY:
FM
M
AI
N
TE
N
AN
C
E
-4
D
EM
O
LI
TI
O N
SHEET TITLE:
DESIGN EXISTING
1. ALL WORK MUST BE PERFORMED IN STRICT COMPLIANCE WITH THE MOST CURRENT APPLICABLE
FEDERAL, STATE , AND LOCAL LAWS AND REGULATIONS, INCLUDING BUT NOT LIMITED TO,
ENVIRONMENTAL PROTECTION AGENCY (EPA), OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
(OSHA), VIRGINIA OCCUPATIONAL AND SAFETY HEALTH COMPLIANCE PROGRAM (VOSH
ENFORCEMENT), VIRGINIA OVERHEAD HIGH VOLTAGE LINE SAFETY ACT, NATIONAL EMISSIONS
STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAPS), AND NATIONAL INSTITUTE OF
OCCUPATIONAL SAFETY AND HEALTH (NIOSH).
2. WHEN DURING THE COURSE OF CONSTRUCTION, ANY OBJECT OF AN UNUSUAL NATURE IS
ENCOUNTERED, CEASE WORK IN THAT AREA AND IMMEDIATELY NOTIFY THE COR.
3. DRAINAGE STRUCTURES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CURRENT VIRGINIA
DEPARTMENT OF TRANSPORTATION DESIGN STANDARDS AND SPECIFICATIONS.
4. SUITABLE SOIL, CONCRETE, AND ROCK CAN BE DISPOSED ONSITE IN THE EROSION CONTROL STOCKPILE OR IN AREAS DIRECTED BY THE COR. TOPSOIL MUST BE STOCKPILED WITHIN THE LIMITS OF CONSTRUCTION. UNSUITABLE SOILS MUST BE LOCATED AND SPREAD ONSITE WHERE DIRECTED BY THE COR. TOPSOIL AT THIS LOCATION WILL BE EXCAVATED, STOCKPILED, AND REAPPLIED OVER THE UNSUITABLE SOIL. CONCRETE AND ROCKS MUST BE BROKEN INTO PIECES NOT LARGER THAN EIGHT (8) INCHES AND THERE MUST NOT BE ANY EXPOSED REINFORCING STEEL. ALL OTHER DEBRIS MATERIAL AND UNSUITABLE SOILS MUST BE HAULED FROM THE SITE IN ACCORDANCE WITH ALL LAWS/REGULATIONS. ESTABLISH TURF AND APPLY EROSION AND SEDIMENT CONTROL MEASURES.
PROVIDE AN EROSION AND SEDIMENT CONTROL PLAN FOR ALL STOCKPILES AND ANY OFFSITE
DISPOSAL AREAS.
5. GRADING, EXCAVATING, AND CONSTRUCTION OF THE PROJECT MUST NOT COMMENCE UNTIL THE APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AS SPECIFIED ON THE DEQ APPROVED E&S PLAN. WHILE NO NATURALLY OCCURRING ASBESTOS HAS BEEN IDENTIFIED IN THE SUBSURFACE SOIL/ROCK LAYERS BELOW THE SITE DURING THE GEOTECHNICAL INVESTIGATION.
IF IT IS UNCOVERED IN THE FIELD, IMPLEMENT ALL BEST PRACTICES FOR EARTHWORK
CONSTRUCTION IN/AROUND NATURALLY OCCURRING ASBESTOS, EQUIPMENT AND PERSONNEL
DECONTAMINATION ALONG WITH AIR MONITORING AND DISPOSAL PRACTICES AS OUTLINED IN THE
NATURALLY OCCURRING ASBESTOS COMPLIANCE PLAN DEVELOPED BY ECS MID-ATLANTIC, LLC
DATED APRIL 7, 2021.
6. WITH THE EXCEPTION OF THE EROSION AND SEDIMENT CONTROL AND STORMWATER PLAN
APPROVAL, OBTAIN ALL NECESSARY PERMITS AND LICENSES REQUIRED BY THE STATE OF VIRGINIA
OR OTHER GOVERNING AGENCIES INVOLVED UNDER THIS CONTRACT.
7. APPROPRIATE FENCING AND BARRICADES MUST BE USED WHEN WORK OCCURS NEAR PEDESTRIAN
WALKWAYS.
8. DIMENSIONS SHOWN AT CURB ARE TO FACE OF CURB.
9. PROVIDE POSITIVE DRAINAGE AWAY FROM STRUCTURES AT ALL GRADED AREAS.
10. IF PORTABLE TOILETS ARE NECESSARY FOR THE CONSTRUCTION OF THE PROJECT, LOCATE A MINIMUM OF 25 FEET AWAY FROM THE NEAREST STORMWATER FEATURE (INLET, SWALE, POND, ETC.).
LOCATION OF PORTABLE TOILETS TO BE APPROVED BY COR.
11. A SMOOTH GRADE MUST BE MAINTAINED FROM EDGE OF EXISTING PAVEMENT TO PROPOSED CURB
AND GUTTER AND/OR PROPOSED PAVEMENT TO PRECLUDE THE FORMING OF FALSE GUTTERS
AND/OR THE PONDING OF ANY WATER ON THE PAVEMENT. REMOVE AND RECONSTRUCT EXISTING
PAVEMENT AND/OR CURB AS DICTATED BY FIELD CONDITIONS TO PROVIDE POSITIVE DRAINAGE AT
TIE-IN-POINTS.
12. ALL SOLID WASTE, HAZARDOUS WASTE, AND HAZARDOUS MATERIALS MUST BE MANAGED IN
ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL ENVIRONMENTAL REGULATIONS.
13. PROTECT ALL EXISTING MONITORING WELLS ON SITE.
14. AIR QUALITY REGULATIONS: THE FOLLOWING SECTIONS OF THE CODE OF VIRGINIA AND VIRGINIA
ADMINISTRATIVE CODE ARE APPLICABLE:
· ASPHALT PAVING OPERATIONS (9 VAC 5-45-780 ET. SEQ.)
· FUGITIVE DUST AND EMISSIONS CONTROL (9 VAC 5-50-60 ET. SEQ.)
· OPEN BURNING RESTRICTIONS (9 VAC 5-130)
15. DO NOT DISTURB ANY ANTENNA GUY WIRES OR GUY WIRE FOUNDATIONS DURING THE COURSE OF
CONSTRUCTION.
16. COORDINATE ALL WORK WITH THE FY24 ROAD REPAIR PROJECT.
17. ALL ROADS MUST BE ACCESSIBLE AT ALL TIMES. ONE LANE IS PERMITTED DURING WORKING HOURS WITH FLAGGERS REQUIRED. TWO WAY TRAFFIC IS REQUIRED DURING NON-DUTY HOURS. PROTECT
ANY GROUND OPENINGS WITH STEEL PLATES.
18. SEE SHEET E-001 FOR ELECTRICAL AND TECHNOLOGY DEMOLITION NOTES.
19. PROVIDE DEQ CLOSURE REPORT FOR EACH REGISTERED UNDERGROUND STORAGE TANK AFTER
CLOSURE IS COMPLETE.
1. A MINIMUM COVER OF THREE (3) FEET IS REQUIRED OVER PROPOSED LINES UNLESS SHOWN
OTHERWISE IN DESIGN PROFILE.
2. ALL EXISTING UTILITIES MAY OR MAY NOT BE SHOWN IN THEIR EXACT LOCATION.
3. VERIFY ALL UTILITY LOCATIONS PRIOR TO EXCAVATION.
4. REPAIR ANY ACTIVE UTILITIES DAMAGED DURING CONSTRUCTION AND NOTIFY THE COR OF THE
DAMAGE.
5. LENGTHS OF LINES INDICATED ON THE DRAWINGS FOR UTILITY SYSTEMS ARE APPROXIMATE ONLY.
DETERMINE THE EXACT AMOUNT OF PIPING REQUIRED TO FURNISH A COMPLETE WORKING SYSTEM IN
ACCORDANCE WITH THE INTENT OF THE DRAWINGS.
6. SUBMIT AN EXCAVATION REQUEST A MINIMUM OF SEVEN (7) DAYS PRIOR TO DIGGING; MOUNT
WEATHER PERSONNEL WILL MARK UNDERGROUND UTILITIES UPON RECEIPT OF THE REQUEST.
7. SUBMIT A UTILITY OUTAGE REQUEST A MINIMUM OF SEVEN (7) DAYS IN ADVANCE OF ANY UTILITY
OUTAGE FOR ALL UTILITIES THAT AFFECT BUILDINGS THAT WILL REMAIN IN SERVICE.
8. MAINTAIN UTILITY MARKINGS PROVIDED BY MWEOC THROUGH EXECUTION OF THE PROJECT.
9. PHASE CONSTRUCTION IN ORDER TO MINIMIZE DISRUPTION TO MWEOC UTILITIES DURING
INSTALLATION, DEMOLITION, AND REMOVAL. COORDINATE WITH MWEOC DURING ALL UTILITY
DISCONNECTION AND DEMOLITION. ALL TRANSITION AND RECONNECTION OF UTILITIES MUST BE
COORDINATED WITH OWNER. COORDINATE FINAL TRANSITION AND RECONNECTION PLAN AFTER
CONTRACT AWARD. THIS WORK MAY BE REQUIRED TO BE COMPLETED AFTER HOURS.
CONCRETE
X
ASPHALT REMOVAL
LIST OF ABBREVIATIONS
ACRE AC
BACK OF CURB BC
BUILDING BLD
COMMUNICATION COMM
CONTRACTING OFFICE REPRESENTATIVE COR
CORRUGATED METAL PIPE CMP
CUBIC YARD CY
DETENTION BASIN DB
DIAMETER DIA
DROP INLET DI
DUCTILE IRON PIPE DIP
EASTING E
EDGE OF CONCRETE EOC
EDGE OF PAVEMENT EOP
ELECTRICAL ELEC
ELECTRICAL MANHOLE EMH
ELEVATION ELEV
EROSION AND SEDIMENT E&S
EXISTING EX
FEET FT
FINISHED FLOOR FF
FIRE HYDRANT FH
HANDHOLE HH
HORIZONTAL BEND HB
INCHES IN
INSIDE DIAMETER ID
INVERT INV
LINEAR FOOT LF
MANHOLE MH
MAXIMUM MAX
MINIMUM MIN
MONUMENT MON
MOUNT WEATHER EMERGENCY MWEOC
OPERATIONS CENTER
NORTHING N
ON CENTER OC
OUTSIDE DIAMETER OD
POLYVINYL CHLORIDE PVC
POUNDS LBS
POUNDS PER SQUARE INCH PSI
REINFORCED CONCRETE PIPE RCP
SANITARY SEWER SS
STANDARD STD
STATION STA
STEAM STM
STORM DRAIN SD
STORM MANHOLE SMH
TOP OF CURB TC
TRAVERSE TRV
TYPICAL TYP
VERTICAL BEND VB
VIRGINIA DEPARTMENT OF VDOT
TRANSPORTATION
LEGENDGENERAL CIVIL NOTES
GENERAL UTILITY NOTES
GRAVEL REMOVAL
CONCRETE REMOVAL
1. THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE DIRECT AND RESPONSIBLE
CHARGE OF, BRIAN S HARVEY, LS FROM AN ACTUAL GROUND SURVEY MADE UNDER MY
SUPERVISION; THAT THE IMAGERY AND/OR ORIGINAL DATA WAS OBTAINED ON JULY 20 THRU
AUGUST 7, 2020; AND THAT THIS PLAT, MAP, OR DIGITAL GEOSPATIAL DATA INCLUDING
METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE NOTED.
2. SURVEY CONDUCTED BY WILEY|WILSON, JULY 20 THRU AUGUST 7, 2020. VERTICAL CONTROL:
NAVD 88; HORIZONTAL CONTROL: NAD 83 VIRGINIA STATE PLANE COORDINATE SYSTEM,
NORTH ZONE, U.S. SURVEY FOOT.
3. ALL EXISTING UNDERGROUND UTILITY LOCATIONS AS SHOWN ON THESE PLANS ARE
APPROXIMATE AND MAY NOT REPRESENT ALL UNDERGROUND UTILITIES OR SERVICE LINES.
SOURCE OF EXISTING UTILITY MAPPING: UTILITY LOCATIONS ARE BASED ON QUALITY LEVEL
"B" AS DEFINED BY ASCE STANDARD 38-02 "STANDARD GUIDELINE FOR THE COLLECTION AND
DEPICTION OF EXISTING SUBSURFACE UTILITY DATA". VERIFY THE EXACT LOCATION, DEPTH, SIZE, AND TYPE OF UTILITIES SHOWN AND NOTIFYING ENGINEER OF DISCREPANCIES.
DAMAGE TO PROPERTY, UTILITIES, OR PHYSICAL IMPROVEMENTS ARE AT NO ADDITIONAL
COST TO THE GOVERNMENT.
4. MISS UTILITY WAS NOT CONTACTED PRIOR TO TOPOGRAPHIC SURVEY.
5. PROPERTY LINE INFORMATION IS BASED ON CORRELATION OF FIELD MEASUREMENTS WITH
INFORMATION FOUND IN VARIOUS PLATS AND DEEDS OF RECORD. NO BOUNDARY SURVEY
WAS PERFORMED.
6. THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND IS NOT
INTENDED TO SHOW ALL EASEMENTS THAT MAY AFFECT THE PROPERTY.
7. ALL PROPERTY PINS DISTURBED BY THE WORK SHOWN ON THESE CONSTRUCTION
DOCUMENTS MUST BE REPLACED BY A VIRGINIA LICENSED LAND SURVEYOR.
8. THE EXISTENCE OF HAZARDOUS WASTE, VEGETATED WETLANDS, OR TIDAL WETLANDS WAS
NEITHER INVESTIGATED NOR CONFIRMED DURING THE PERFORMANCE OF THIS SURVEY.
9. THE FIELD SURVEY PERFORMED ONLY APPLIES TO FEATURES SHOWN WITHIN THE LIMITS OF
FIELD SURVEY BOUNDARY SHOWN ON EXISTING CONDITION SHEETS. ALL OTHER FEATURES
SHOWN OUTSIDE THE BOUNDARY WAS OBTAINED BY USE OF GIS/OWNER SUPPLEMENTAL
DATA.
GENERAL SURVEY NOTES
B
E
G
J
W
C
BENCHMARK
CONTROL POINT
CONTROL POINT - NAIL SET
DOWNSPOUT
ELECTRIC MANHOLE
LIGHT POLE
JUNCTION BOX
GUY WIRE
TRANSFORMER
WATER MANHOLE
FIRE HYDRANT
WATER VALVE
YARD HYDRANT
GAS MANHOLE
COMMUNICATIONS MANHOLE
SIGN
CARD READER
BOLLARD
FLAG POLE
FINISHED FLOOR ELEVATION
VENT
TREE
BUSH
ROOF OVERHANG
SOIL DELINEATION
EDGE OF PAVEMENT
GUARD RAIL
FENCELINE
TREELINE
MAJOR CONTOURS
MINOR CONTOURS
UNDERGROUND COMMUNICATIONS
UNDERGROUND FUEL LINE
UNDERGROUND FIRE ALARM
UNDERGROUND NATURAL GAS
UNDERGROUND ELECTRIC
STORM LINE
WATER LINE
DITCH
UTILITY DEMOLOTION
LIMITS OF CONSTRUCTION
LIMITS OF FIELD SURVEY
DEMOLITION
STRUCTURE/TREE DEMOLITION
DROP INLET
STORM MANHOLE
I I I I I I xx
UGT
FG
NG
UGE
SD
W
MULCHING AND SEEDING
T
GKT
CAT
SMS
CIVIL NOTES, ABBREVIATIONS,
AND LEGENDS
C-001
SMF
BUILDING DEMOLITION
GRAVEL
LFS
PROJECT NO:
MA
RK
DA
TE
DE
SC
RI
PT
IO
N
BY
DESIGNED BY:
DRAWN BY:
EPS NO: 9630
B300-400 DEMOLITION
ISSUE BLOCK
M O
U N
T W
EA
TH
ER
EM
ER
G
EN
C
Y O
PE
R
AT
IO
N S
C
EN
TE
R
OFSHEET
WORK ORDER NO: 864554
218151.006
APPROVED BY:
M O
U N
T W
EA
TH
ER
, V
IR
G
IN
IA
-2
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
UNCLASSIFIED//FOR OFFICIAL USE ONLY
UNCLASSIFIED//FOR OFFICIAL USE ONLY
CHECKED BY:
FM
M
AI
N
TE
N
AN
C
E
-4
D
EM
O
LI
TI
O N
SHEET TITLE:
1. PERMANENT OR TEMPORARY SOIL STABILIZATION MUST BE APPLIED TO DENUDED AREA WITHIN
SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY
STABILIZATION MUST BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION
MUST BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
RESPONSE: CONTRACTOR MUST ADHERE TO THESE STANDARDS.
2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS MUST BE
STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
RESPONSE: ANY STOCKPILES OF SOIL ON SITE MUST BE STABILIZED ACCORDINGLY. BORROW AREAS MAY
BE ON SITE OR OFF SITE AND WILL BE UNDER A SEPARATE PERMIT ONCE IDENTIFIED.
3. A PERMANENT VEGETATIVE COVER MUST BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE
PERMANENTLY STABILIZED. PERMANENT VEGETATION MUST NOT BE CONSIDERED ESTABLISHED
UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL
INHIBIT EROSION.
RESPONSE: SEE THE EROSION AND SEDIMENT CONTROL NOTES, NARRATIVE, AND PLAN FOR
STABILIZATION MEASURES.
4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT MUST BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND MUST BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
RESPONSE: SEE THE EROSION AND SEDIMENT CONTROL NOTES, NARRATIVE, AND PLAN FOR SEDIMENT
BASINS, TRAPS, AND BARRIERS.
5. STABILIZATION MEASURES MUST BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND
DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
RESPONSE: SEE THE EROSION AND SEDIMENT CONTROL NOTES, NARRATIVE, AND PLAN FOR
STABILIZATION OF EARTHEN STRUCTURES.
6. SEDIMENT TRAPS AND SEDIMENT BASINS MUST BE DESIGNED AND CONSTRUCTION BASED UPON THE
TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP MUST BE 143 CUBIC YARDS PER ACRE
OF DRAINAGE AREA AND THE TRAP MUST ONLY CONTROL DRAINAGE AREAS LESS THAN THREE
ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE
AREAS GREATER THAN OR EQUAL TO THREE ACRES MUST BE CONTROLLED BY A SEDIMENT
BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN MUST BE 134 CUBIC YARDS PER
ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM MUST, AT A MINIMUM, MAINTAIN THE
STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FAVE YEAR STORM OF 24-HOUR
DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS MUST CORRESPOND TO A
BARE EARTH CONDITION OF THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT
BASIN IS UTILIZED.
RESPONSE: SEE THE EROSION AND SEDIMENT CONTROL NOTES, NARRATIVE, AND PLAN FOR SEDIMENT
BASINS AND TRAPS.
7. CUT AND FILL SLOPES MUST BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE
EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF
PERMANENT STABILIZATION MUST BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES
UNTIL THE PROBLEM IS CORRECTED.
RESPONSE: SEE THE EROSION AND SEDIMENT CONTROL NOTES, NARRATIVE, AND PLAN FOR CUT AND
FILL SLOPE STABILIZATION. THE MAXIMUM CUT AND FILL SLOPE IS 3:1.
8. CONCENTRATED RUNOFF MUST NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN
AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
RESPONSE: SEE THE EROSION AND SEDIMENT CONTROL NOTES, NARRATIVE, AND PLAN FOR DIVERSIONS
OF CONCENTRATED RUNOFF AROUND CUT AND FILL SLOPES.
9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION MUST
BE PROVIDED.
RESPONSE. NO WATER SEEPAGE FROM A SLOPE FACE IS ANTICIPATED.
10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION MUST BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING
FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.
RESPONSE: SEE THE EROSION AND SEDIMENT CONTROL NOTES, NARRATIVE, AND PLAN FOR INLET
PROTECTION.
11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE
OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT
CHANNEL LINING MUST BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING
CHANNEL.
RESPONSE: SEE THE EROSION AND SEDIMENT CONTROL NOTES, NARRATIVE, AND PLAN FOR OUTLET
PROTECTION.
12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS MUST BE TAKEN TO MINIMIZE
ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE
GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL MUST BE USED FOR
THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE
STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS.
RESPONSE: NOT APPLICABLE TO THIS PROJECT.
13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN
ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF
NONERODIBLE MATERIAL MUST BE PROVIDED.
RESPONSE: NOT APPLICABLE TO THIS PROJECT.
14. ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR
CROSSING LIVE WATERCOURSES MUST BE MET.
RESPONSE: NOT APPLICABLE TO THIS PROJECT.
15. THE BED AND BANKS OF A WATERCOURSE MUST BE STABILIZED IMMEDIATELY AFTER WORK IN THE
WATERCOURSE IS COMPLETED.
RESPONSE: NOT APPLICABLE TO THIS PROJECT.
16. UNDERGROUND UTILITY LINES MUST BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING
STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL MUST BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS MUST BE FILTERED OR PASSED THROUGH AN
APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES
NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES MUST BE PROPERLY COMPACTED IN ORDER TO
MINIMIZE EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION MUST BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS.
F. APPLICABLE SAFETY REGULATIONS ALL BE COMPLIED WITH.
RESPONSE: CONTRACTOR MUST ADHERE TO THESE STANDARDS.
17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS,
PROVISIONS MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD
SURFACE, THE ROAD SURFACE MUST BE CLEANED THOROUGHLY AT THE END OF EACH DAY.
SEDIMENT MUST BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED
TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING MUST BE ALLOWED ONLY AFTER
SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION MUST APPLY TO INDIVIDUAL DEVELOPMENT
LOTS AS WELL AS TO LARGER LAND-DISTURBING ACTIVITIES.
RESPONSE: CONSTRUCTION ENTRANCE(S) WILL BE PLACED FOR SITE ACCESS.
18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES MUST BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND
THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OR TEMPORARY MEASURES MUST
BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
RESPONSE: SEE THE EROSION AND SEDIMENT CONTROL NOTES, NARRATIVE, AND PLAN.
19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES MUST BE PROTECTED
FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND
PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR
DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA.
A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE MUST BE DISCHARGED
DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM
SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE
SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE SYSTEM MUST BE
PERFORMED.
B. ADEQUACY OF ALL CHANNELS AND PIPES MUST BE VERIFIED IN THE FOLLOWING MANNER:
B.1. THE APPLICANT MUST DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF
ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING
DRAINAGE AREA OF THE PROJECT IN QUESTION; OR
B.2. CHANNELS
B.2.1. NATURAL CHANNELS MUST BE ANALYZED BY THE USE OF A TWO YEAR STORM TO VERIFY
THAT STORMWATER WILL NOT OVERTOP BANKS NOR CAUSE EROSION OF CHANNEL BED
OR BANKS; AND
B.2.2. ALL PREVIOUSLY CONSTRUCTED MANMADE CHANNELS MUST BE ANALYZED BY THE USE
OF A TEN YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS
AND BY THE USE OF A TWO YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL
NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND
B.2.3. PIPES AND STORM SEWER SYSTEMS MUST BE ANALYZED BY THE USE OF A TEN YEAR
STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR
SYSTEM.
C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MANMADE
CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT MUST:
C.1. IMPROVE THE CHANNEL TO CONDITION WHERE A TEN YEAR STORM WILL NOT OVERTOP THE
BANKS AND A TWO YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR BANKS;
OR
C.2. IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN YEAR STORM IS
CONTAINED WITHIN THE APPURTENANCES; OR
C.3. DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE
FROM A TWO YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL
CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TEN
YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MANMADE CHANNEL; OR
C.4. PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER
MEASURE WHICH IS SATISFACTORY TO THE PLAN APPROVING AUTHORITY TO PREVENT
DOWNSTREAM EROSION.
D. THE APPLICANT MUST PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.
E. ALL HYDROLOGIC ANALYSES MUST BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS
AND THE ULTIMATE DEVELOPMENT OF THE SUBJECT PROJECT.
F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION HE MUST
OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE REQUIREMENTS OF THE
FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE.
G. OUTFALL FROM A DETENTION FACILITY MUST BE DISCHARGED TO A RECEIVING CHANNEL, AND
ENERGY DISSIPATORS MUST BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS
NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING
CHANNEL.
H. ALL ON SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON
ADJACENT PROPERTY MUST BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR
PIPE SYSTEM, OR TO A DETENTION FACILITY.
J. IN APPLYING THESE STORMWATER RUNOFF CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A
RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT MUST NOT BE CONSIDERED TO BE
SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, MUST BE
CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT
REFLECT THE ULTIMATE DEVELOPMENT CONDITION MUST BE USED IN ALL ENGINEERING
CALCULATIONS.
K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS MUST BE EMPLOYED IN A
MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY
OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE.
L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT
THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR
MANMADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (i) DETAIN THE WATER QUALITY VOLUME AND RELEASE IT OVER 48 HOURS; (ii) DETAIN AND RELEASE OVER A 24 HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR 24 HOUR STORM; AND (iii) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10 YEAR, 24 HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK
FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE
WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE
SITE IN ITS PROPOSED CONDITION, AND MUST BE EXEMPT FROM ANY FLOW RATE CAPACITY AND
VELOCITY REQUIREMENTS FOR NATURAL OR MANMADE CHANNELS AS DEFINED IN ANY
REGULATIONS PROMULGATED PURSUANT TO SS 62.1-44.15:54 OR 62.1-55.15:65 OF THE ACT.
M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF SS 62.1-44.15"52 A OF THE ACT AND THIS SUBSECTION MUST BE SATISFIED BY
COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT
(SS 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND DISTURBING ACTIVITIES (i) ARE IN ACCORDANCE WITH PROVISIONS FOR TIME LIMITS ON APPLICABILITY OF APPROVED DESIGN CRITERIA IN 9VA25-870-47 OR GRANDFATHERING IN
9VA25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION, IN
WHICH CASE THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF SS 62.1-44.15:52 A OF THE ACT MUST APPLY, OR (ii) ARE EXEMPT PURSUANT TO SS 62.1-44.15:34 C 7 OF THE ACT.
N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF
THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION MUST BE DEEMED TO
SATISFY THE REQUIREMENTS OF THIS SUBDIVISION 19.
RESPONSE: THE PROJECT IS DESIGNED SO THAT THE POST-DEVELOPMENT RUNOFF RATE AT ALL
OUTFALLS FROM THE SITE IS EQUAL TO OR LESS THAN THE PRE-DEVELOPMENT RUNOFF RATE.
ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE "VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" AND THE
VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS.
ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE
WEEK PRIOR TO THE FINAL INSPECTION.
ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST
STEP IN CLEARING.
ES-4: A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN MUST BE MAINTAINED ON THE SITE AT ALL
TIMES.
ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR
MUST SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND
APPROVAL BY THE PLAN APPROVING AUTHORITY.
ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN
APPROVING AUTHORITY.
ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS
ACHIEVED.
ES-8: THE CONTRACTOR MUST INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE
EFFECTIVENESS OF THE EROSION CONTROL DEVICES MUST BE MADE IMMEDIATELY.
THE PURPOSE OF THE EROSION CONTROL MEASURES SHOWN ON THESE PLANS IS TO PRECLUDE THE TRANSPORT OF ALL WATERBORNE SEDIMENTS RESULTING FROM CONSTRUCTION ACTIVITIES FROM ENTERING ONTO ADJACENT PROPERTIES OR STATE WATERS. IF FIELD INSPECTION REVEALS THE INADEQUACY OF THE PLAN TO CONFINE SEDIMENT TO THE PROJECT SITE, APPROPRIATE MODIFICATIONS
WILL BE MADE TO CORRECT ANY PLAN DEFICIENCIES.
1. THE CONTRACTOR MUST BE THOROUGHLY FAMILIAR WITH ALL APPROVED PROCEDURES, WHICH
MAY BE PERTINENT TO THE PROJECT. MAINTENANCE WILL INCLUDE THE REPAIR OF MEASURES
DAMAGED BY ANY SUBCONTRACTOR INCLUDING THOSE OF THE PUBLIC UTILITY COMPANIES.
SUPPLY DEQ WITH THE NAME OF THE INDIVIDUAL RESPONSIBLE FOR ENSURING MAINTENANCE OF
INSTALLED MEASURES ON A DAILY BASIS PRIOR TO THE PRE-CONSTRUCTION MEETING.
2. SEDIMENT CONTROL DEVICES NOT LOCATED IN PROPOSED FILL OR EXCAVATION AREAS MUST BE CONSTRUCTED PRIOR TO ALL OTHER LAND DISTURBANCE. A PRE-CONSTRUCTION MEETING WILL BE
HELD AT THE SITE TO IDENTIFY THOSE MEASURES TO BE INITIALLY INSTALLED.
3. SURFACE FLOWS OVER CUT AND FILL SLOPES MUST BE CONTROLLED BY REDIRECTING FLOWS
FROM TRAVERSING THE SLOPES.
4. SEDIMENT CONTROL MEASURES MAY REQUIRE MINOR FIELD ADJUSTMENTS AT THE TIME OF
CONSTRUCTION TO ENSURE THEIR INTENDED PURPOSE IS ACCOMPLISHED. COR APPROVAL WILL BE
REQUIRED FOR OTHER DEVIATION FROM THE APPROVED PLANS.
5. TEMPORARY STOCKPILES OF SOIL / TOPSOIL EXCAVATED DURING SITE CONSTRUCTION ARE
ANTICIPATED. EXCESS SOIL / TOPSOIL MUST BE KEPT ONSITE AT A TEMPORARY LOCATION IN
ACCORDANCE WITH STATE AND FEDERAL LAW AND THE SWPPP FOR CONSTRUCTION WASTE.
6. THE CONTRACTOR MUST COMPLETE DRAINAGE FACILITIES WITHIN 30 DAYS FOLLOWING
COMPLETION OF ROUGH GRADING AT ANY POINT WITHIN THE PROJECT. THE INSTALLATION OF
DRAINAGE FACILITIES MUST TAKE PRECEDENCE OVER ALL UNDERGROUND UTILITIES. OUTFALL
DITCHES FROM DRAINAGE STRUCTURES MUST BE STABILIZED IMMEDIATELY AFTER CONSTRUCTION
OF SAME. THIS INCLUDES INSTALLATION OF EROSION CONTROL STONE WHERE REQUIRED.
7. TEMPORARY VEGETATIVE COVER MUST BE PROVIDED IN ALL AREAS WHICH ARE NOT DESIGNATED
FOR PAVING, UNDERGROUND UTILITIES, OR STRUCTURAL USES. SUCH AREAS MUST NOT BE
EXPOSED FOR PERIODS EXCEEDING 14 DAYS. TEMPORARY VEGETATIVE COVER MAY BE ELIMINATED IN FAVOR OF FINAL VEGETATIVE COVER IF CONSTRUCTION AND SEASONAL CONDITIONS PERMIT.
8. ALL AREAS DESIGNATED FOR PAVING, UNDERGROUND UTILITIES, AND STRUCTURAL USE MUST BE
COMPACTED, SEEDED, AND MULCHED AS SOON AS POSSIBLE BUT NOT EXCEEDING 14 DAYS
FOLLOWING INSTALLATION. NO MORE THAN 500' OF UTILITY TRENCHES ARE TO BE OPEN AT ONE
TIME.
9. THE TERM SEEDING, FINAL VEGETATIVE COVER OR STABILIZATION, ON THIS PLAN MUST MEAN THE
SUCCESSFUL GERMINATION AND ESTABLISHMENT OF A STABLE GRASS COVER FROM A PROPERLY
PREPARED SEEDBED CONTAINING THE SPECIFIED AMOUNTS OF SEED, LIME, AND FERTILIZER.
IRRIGATION MUST BE REQUIRED AS NECESSARY TO ENSURE ESTABLISHMENT OF GRASS COVER.
10. INLET PROTECTION MUST BE PROVIDED FOR ALL STORM DRAIN INLETS AS SOON AS PRACTICAL
FOLLOWING CONSTRUCTION OF SAME.
11. BASE COURSE MATERIAL MUST BE PLACED IN ALL PAVED AREAS WITHIN 30 DAYS OF FINAL GRADING.
12. TEMPORARY EROSION CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DISTURBED
AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE, ALL MEASURES MUST BE REMOVED
WITHIN 30 DAYS. TRAPPED SEDIMENT MUST BE SPREAD AND SEEDED.
13. SEED AND MULCH AND PROVIDE TOPSOIL TO ALL DISTURBED AREAS THAT WILL NOT BE COVERED
WITH PAVEMENT.
THE DEMOLITION AND REHABILITATION PROJECT'S OBJECTIVE IS TO DEMOLISH BUILDINGS BEYOND THEIR USEFUL LIFE OR REHABILITATE BUILDINGS NOT BEYOND THEIR USEFUL LIFE ONCE ALL OF THE FACILITIES MAINTENANCE PROGRAM PROJECTS ARE COMPLETED. THIS INCLUDES B716 (FACILITIES MAINTENANCE), B618 (VEHICLE MAINTENANCE), B470 (TRANSPORTATION BUILDING), AND B703 (ROADS AND GROUNDS). THE PERSONNEL MOVING INTO THOSE FACILITIES WILL MOVE OUT OF THE BUILDINGS TO BE DEMOLISHED OR REHABILITATED. IF DEMOLISHED, THE AREAS WILL BE RETURNED TO AN OPEN GRASS SITE, WITH ALL
UTILITIES AND SITE FEATURES REMOVED.
EXISTING CONDITIONS
THE PROJECT CONSISTS OF MULTIPLE SMALLER DEVELOPED SITES WITH BUILDINGS, GRAVEL, PAVEMENT, PARKING LOTS, AND OTHER SITE FEATURES.
ADJACENT PROPERTY
SEE SHEET G-002 FOR EACH SITE'S LOCATION AND CONSTRAINTS.
OFFSITE AREAS
IT IS NOT ANTICIPATED THAT THIS PROJECT WILL IMPACT OFF-SITE AREAS, THOUGH THE CONTRACTOR MAY DISPOSE OF CONSTRUCTION DEBRIS, SOIL, ROCK, OR OTHER ITEMS OFF-SITE. ANY OFF-SITE DISPOSAL
AREAS MUST BE PERMITTED AS NECESSARY FOR THIS DISPOSAL.
CRITICAL EROSION AREAS
THE PROJECT AREA IS MODERATELY TO STEEPLY SLOPED , WITH AVERAGE SLOPES OF BETWEEN 8 TO 15%.
THE PROJECT SITE IS DEVOID OF JURISDICTIONAL WETLANDS. ANY PROPOSED 3:1 SLOPES REQUIRED TO TIE-OUT THE PROPOSED GRADING ARE THE CRITICAL EROSION AREAS WITH THIS PROJECT. THE CRITICAL
EMBANKMENT SLOPES REQUIRE CONTINUED PROTECTION DURING GRADING OPERATIONS.
SOILS
SOILS WITHIN THE PROJECT LIMITS ARE PRIMARILY UNCONTROLLED FILL OF LEAN CLAY (CL), GRAVEL WITH SAND (GP), SILT WITH SAND AND GRAVEL (ML), CLAYEY GRAVEL (GC), SILTY GRAVEL (GM), AND FAT CLAY (CH) WITH BOULDERS, TOPSOIL, TRASH, AND CONSTRUCTION DEBRIS UNDERLAIN BY WEATHERED
METABASALT.
E&S SEQUENCE
CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BEGIN AND END AS QUICKLY AS
POSSIBLE.
1. INSTALL SILT FENCE DOWNSLOPE FROM DISTURBED AREAS.
2. INSTALL SEDIMENT BASINS AND DITCHES/DIVERSIONS TO THESE.
3. INSTALL ALL OTHER PERIMETER CONTROLS.
4. INSTALL TEMPORARY SEEDING ON ALL AREAS ONCE GRADING IS COMPLETE.
5. INSTALL PERMANENT SEEDING, MULCH, AND TOPSOIL ONCE ALL LAND DISTURBANCE HAS CEASED.
MANAGEMENT STRATEGIES
IN GENERAL, MANAGEMENT STRATEGIES WILL FOLLOW THE PRESCRIBED STRATEGIES OUTLINED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. ADDITIONAL GUIDANCE IS PROVIDED FOR
REFERENCE.
EROSION AND SEDIMENT CONTROL MEASURES
THE OVERALL INTENT OF THIS PLAN IS THAT SEDIMENT AND EROSION BE CONTROLLED AT ALL TIMES DURING CONSTRUCTION. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION
AND SEDIMENT CONTROL PRACTICES MUST MEET OR EXCEED THE MINIMUM STANDARDS AND
SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE PROPOSED MEASURES WERE SELECTED BASED ON DRAINAGE AREA SIZES AND PHYSICAL CHARACTERISTICS OF THE DISTURBED AREAS. THE MINIMUM STANDARDS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK MUST BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE AS ISSUED
BY DEQ.
STRUCTURAL PRACTICES
STORM DRAIN INLET PROTECTION - 3.07
ALL STORM DRAINAGE INLETS AND CULVERTS MUST BE PROTECTED DURING CONSTRUCTION.
SEDIMENT-LADEN RUNOFF MUST BE FILTERED BEFORE ENTERING THE STORM DRAIN SYSTEM.
VEGETATIVE PRACTICES
TEMPORARY SEEDING - 3.31
ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 14 DAYS MUST BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION 7 DAYS AFTER GRADING. SELECTION OF THE SEED MIXTURE
WILL DEPEND ON THE TIME OF YEAR IT IS APPLIED.
PERMANENT SEEDING - 3.32
ALL DENUDED AREAS WHERE PERMANENT, LONG-LIVED VEGETATIVE COVER IS NEED TO STABILIZE THE SOIL OR ROUGH-GRADED AREAS WHICH WILL NOT BE BROUGHT TO FINAL GRADE FOR A YEAR OR MORE WILL BE STABILIZED WITH PERMANENT SEED MIX. SEE LANDSCAPE PLAN FOR DESIGNATION OF AREAS TO
RECEIVE EACH SEED TYPE.
MULCHING - 3.35
MULCHING SHOULD BE APPLIED IMMEDIATELY FOLLOWING PERMANENT SEEDING. MULCH SHOULD BE SPREAD UNIFORMLY BY HAND OR MACHINE. ANCHORING TECHNIQUES MUST BE APPLIED IF STRAW MULCH
IS TO BE USED.
MANAGEMENT STRATEGIES
1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BEGIN AND END AS
QUICKLY AS POSSIBLE.
2. TEMPORARY SEEDING OR OTHER STABILIZATION WILL FOLLOW IMMEDIATELY AFTER GRADING.
3. AREAS WHICH ARE NOT TO BE DISTURBED WILL BE CLEARLY MARKED BY FLAGS, SIGNS, FENCING, ETC.
4. THE JOB SUPERINTENDENT MUST BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF
ALL EROSION AND SEDIMENT CONTROL PRACTICES.
5. DUST CONTROL TO BE PROVIDED BY SPRINKLING THE SITE WITH WATER, AS NEEDED, FROM CLOSEST
EXISTING HYDRANT OR USE OF WATER TRUCK.
PERMANENT STABILIZATION
ALL AREAS DISTURBED BY CONSTRUCTION OPERATIONS AND NEWLY GRADED ON SLOPES STEEPER THAN 3:1 MUST HAVE A SOIL BLANKET OR SODDED AND SEEDED ON ALL OTHER AREAS. IF SEEDING AND SODDING CANNOT BE ACCOMPLISHED DURING SCHEDULED TIME, PROTECT DISTURBED AREAS WITH MULCH OR JUTE MESH. RECOMMENDED SEEDING AND SODDING TIME MUST BE IN SPRING BETWEEN FEBRUARY 1 AND APRIL
30 OR IN FALL BETWEEN SEPTEMBER 1 AND OCTOBER 15.
SELECTION OF PLANT MATERIAL IS BASED ON CLIMATE, TOPOGRAPHY, SOILS, LAND USE, AND PLANTING SEASON. TO DETERMINE WHICH PLANT MATERIALS ARE BEST ADAPTED TO THE SITE, USE TABLE 3.32c OF THE VESCH, WHICH DESCRIBED PLANT CHARACTERISTICS AND LIST RECOMMENDED VARIETIES. ALL PERMANENT SEEDING MUST BE PLACED PER THE VESCH 3.32. IN ALL SEEDING OPERATIONS, SEED, FERTILIZER, AND LIME WILL BE APPLIED PRIOR TO MULCHING ACCORDING TO STD. & SPEC. 3.32 OF VESCH.
STORMWATER MANAGEMENT
WATER QUALITY AND WATER QUANTITY CONTROL FOR THE PROJECT WILL BE MANAGED IN ACCORDANCE WITH PART II B (TECHNICAL CRITERIA FOR REGULATED LAND-DISTURBING ACTIVITIES) OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS. COMPLYING WITH THESE REGULATIONS WILL ALSO ADDRESS THE REQUIREMENTS OF EISA SECTION 438, WHICH REQUIRES FEDERAL AGENCIES TO
REDUCE STORMWATER RUNOFF FROM FEDERAL DEVELOPMENT AND REDEVELOPMENT PROJECTS TO
PROTECT WATER RESOURCES.
STORMWATER IS TO BE COLLECTED BY STORM DRAINS AND ROUTED THROUGH A SURFACE POND SO THAT IT CAN BE SLOWLY RELEASED BACK INTO THE EXISTING STORMWATER SYSTEM TO DECREASE PEAK FLOWS. THE SITE IS GRADED SO THAT NO RUNOFF WILL FLOW THROUGH THE SALT EQUIPMENT STORAGE
AREA. THE RUNOFF FROM THIS AREA WILL BE COLLECTED BY A SERIES OF DROP INLETS AND DRAIN TO A SALT STORAGE POND. THIS POND WILL NOT HAVE A DISCHARGE, EVEN DURING A 100-YEAR STORM. SEE
THE APPENDICES FOR THE SLAT STORAGE CALCULATIONS.
THE WATER QUANTITY DETENTION POND WILL MANAGE THE 1-YEAR AND 10-YEAR, 24-HOUR STORMS SO AS
NOT TO INCREASE EROSION AND FLOODING CONDITIONS AS THE DOWNSTREAM OUTFALL.
MAINTENANCE
ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND WITHIN 48-HOURS OF ANY RUNOFF-PRODUCING RAINFALL EVENT. THE FOLLOWING ITEMS WILL BE CHECKED IN PARTICULAR:
STRUCTURAL PRACTICES:
1. THE MATERIAL REMOVED FROM THE EROSION AND SEDIMENT CONTROL STRUCTURES MAY BE
DISPOSED OF BY SPREADING THE MATERIAL ON-SITE OR BY HAULING IT AWAY IF NOT SUITABLE FOR
PLACEMENT AS TOPSOIL.
2. SEDIMENT CONTROL STRUCTURES MUST NOT BE REMOVED WITHOUT APPROVAL OF THE SITE
INSPECTOR.
STORM DRAIN INLET PROTECTION - 3.07
CHECK REGULARLY FOR SEDIMENT BUILDING, WHICH WILL PREVENT DRAINAGE. IF THE GRAVEL IS
CLOGGED BY SEDIMENT, IT MUST BE REMOVED AND CLEANED OR REPLACED.
VEGETATIVE PRACTICES:
1. ADDITIONAL SLOPE STABILIZATION MEASURES MUST BE PROVIDED FOR SLOPES, WHICH ARE FOUND
TO BE ERODING EXCESSIVELY WITHIN ONE YEAR UNTIL THE PROBLEM IS CORRECTED.
2. NO AREA MUST BE LEFT DENUDED FOR A PERIOD LONGER THAN 14 DAYS EXCEPT FOR THAT PORTION
OF THE SITE IN WHICH WORK WILL BE CONTINUOUS BEYOND 14 DAYS.
TEMPORARY SEEDING - 3.31
CHECK REGULARLY TO ENSURE THAT GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. AREAS DAMAGED BY RAINFALL ARE TO BE RESEEDED AND MULCHED WITHIN TWO DAYS AND WHENEVER GROUND COVER HAS NOT BEEN ADEQUATELY ESTABLISHED TO PREVENT EROSION.
PERMANENT SEEDING - 3.32
CHECK REGULARLY TO ENSURE THAT GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. AREAS DAMAGED BY RAINFALL ARE TO BE RESEEDED AND MULCHED WITHIN TWO DAYS AND WHENEVER GROUND COVER HAS NOT BEEN ADEQUATELY ESTABLISHED TO PREVENT EROSION.
CALCULATIONS FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES:
A MAXIMUM OF A QUARTER ACRE OF DRAINAGE IS ALLOWED PER 100 LINEAR FEET OF SILT FENCE. A MAXIMUM OF 5 ACRES IS ALLOWED PER TEMPORARY DIVERSION DIKE. 67 CY DRY STORAGE AND 67 CY WET STORAGE PER ACRE ARE REQUIRED FOR THE SEDIMENT BASIN. A MAXIMUM OF 1 ACRE IS ALLOWED PER INLET PROTECTION. SEE THE CALCULATIONS FOR EROSION AND SEDIMENT CONTROL DRAINAGE AREA
MAPS FOR EACH PHASE.
THE LIMITS OF WORK IS APPROXIMATELY 166,300 SF/3.82 ACRES.
DEQ APPROVAL OF THIS STORMWATER MANAGEMENT PLAN FOR MOUNT WEATHER EMERGENCY
OPERATIONS CENTER FM MAINTENANCE 300-400 DEMOLITION (2023-0056) AND RELATED CONSTRUCTION GENERAL PERMIT APPROVAL COVERS THE CONSTRUCTION PHASES DETAILED IN THIS PLAN SET. ANY LAND DISTURBING ACTIVITIES THAT DEVIATE FROM THE DEVELOPMENT OUTLINED ON SHEETS CS101-CS105 IN THIS PLAN SET SHALL NOT BE CONSTRUCTED UNTIL A PLAN MODIFICATION HAS BEEN SUBMITTED TO DEQ
AND DEQ HAS PROVIDED APPROVAL.
9VAC25-840-40 VIRGINIA EROSION AND SEDIMENT CONTROL
MINIMUM STANDARDS
VIRGINIA EROSION AND SEDIMENT
CONTROL NOTES
GENERAL EROSION AND SEDIMENT
CONTROL NOTES
EROSION CONTROL NARRATIVE
GKT
CAT
SMS
EROSION AND SEDIMENT
CONTROL NOTES
C-002
SMF
STEP
CONC.
AC ACACAC
AC
STEP
AS
PH
AL
T
W
AL
K
II
IIII
UNDERGROUND
FUEL TANK
WV W
WV W
WV W
GV
GV
P
UGE
UGE
UGE
UGE
UGE
4" PVC
SANMH 10095
RIM 1728.92
8" TC OUT 1720.34
8" TC IN 1722.42
SS
SS
SS
SS
SS
8" TC
8" TC
S
W
W
SS
SS
SS
AC
AC
CONC.
CONC.
STEP
PROPANE
PROPANE
I I I
III
I I I
I I I I I I I I I I I I I I I I I I I I I
III
I I I
II
I
II
I
II
I
II
I
III
IIIIIIIII
II
I
I II
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
ASPHALT
30" W OAK
22" PIN OAK
GRASS
GRASS
NG
NG
GRAVEL
GRASS
NAIL SET 43
N 7071167.73
E 11657206.93
EL 1714.01
B
1711.424
BOL
B
1711.417
BOL
GRASS
NAIL SET 39
N 7071299.65
E 11657419.83
EL 1705.46
J
J
J
J
J
ROCK
ROCK
JB
AR
x x x x x x x x x x x x x x
SANMH 9669
RIM 1711.20
8" TC OUT 1705.21
8" TC IN 1705.96
4" PVC IN 1707.81
4" PVC IN 1706.31
COCO
BM 9858
EL 1716.04
CO
1711.916
SS
4" PVC
BUILDING 315
BU
IL
DI
NG
BUILDING 320/320A
UGT
UGT
I…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .