7-4.1 Attachment A FINAL GEC 2026 List of Potential Projects Update 8-17-2026.pdf
PDF 53 KB Posted
- Attached to
- General Engineering Consultant (GEC) Services
- Solicitation number
- RFQ 27-002
- Issued by
- Florida
About this file
This document is an attachment to RFQ Number 27-002 issued by the South Florida Regional Transportation Authority (SFRTA) Engineering and Construction Department and presents a comprehensive list of potential projects for which General Engineering Consultant (GEC) services may be required. The list encompasses a broad range of infrastructure, fleet, technology, and facility improvement projects across the SFRTA's transportation system, including rolling stock replacement and rehabilitation (such as F40 and GP49 locomotive overhauls and Rotem cab/coach midlife overhauls), station improvements and construction (including the Miami River-Miami Intermodal Center Capacity Improvement Project and Downtown Miami Station benchmark work), rail infrastructure projects (such as SFRC wood tie conversion, signal and safety improvements, and grade crossing improvements), facility enhancements (including the Northern Layover and Maintenance Facility and Pompano Beach Operations Center capital improvements), technology upgrades (such as network infrastructure, data center servers, and passenger information systems), and various system replacements and renovations (including elevator modernization, escalator upgrades, and security camera installations).
The document does not provide specific pricing information, response deadlines, award dates, contract terms, or other transactional details within this attachment. As a list of potential projects, this document serves as a reference guide for consultant qualifications and capabilities needed to support SFRTA's diverse engineering and construction initiatives. Interested consultants or consultant teams should refer to the full RFQ documentation for complete solicitation requirements, evaluation criteria, submission procedures, and contract terms.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ NUMBER 27-002 ATTA-1 OF 2
Attachment “A” List of Potential Projects
Agency Computer Replacement Amtrak Rail Car Wash APC Smart UPS VT Battery Replacement ATT Customer Fiber Construction Automated Fare Collection System Automated Passenger Count System Bill Note Recycler BL36 Overhauls Board Room Technology Upgrades Bombardier Rehabilitation - II Bridge Deck Rehabilitations Brookville Locomotive HEP overhaul Business Continuity Disaster Recovery System Business Intelligence Software Construction of Tri-Rail Extension to the West Palm Beach Veterans Affairs Medical Center Corporate Network Data Center Servers Corridor Station Rehabilitation Dania Cut-Off Canal Bridge Reconstruction Dispatch Data Center Servers Dispatch Radio System Upgrade Distributed Antenna System Replacement Downtown Miami Station Benchmark Work Downtown Spur & Track Rehabilitation Eaton 93 Replacement Batteries Electric Vehicle Charging Stations Elevator Modernization and Upgrades Escalator Upgrades F40 Locomotives Top-Deck Overhaul Fiber Installation along the SFRC Financial Management System Fleet Repairs Fleet Wraps Golden Glades Station and Pedestrian Bridge Rehabilitation GP49 Locomotive Top-Deck Overhaul Grade Crossing Improvements H.R. Document Management HEP Units F40 Locomotives HEP Units GP49 Locomotives Hialeah Storage Tracks Infrastructure Improvements on the SFRC Integrated Command and Communications Center
RFQ NUMBER 27-002 ATTA-2 OF 2
Miami River - Miami Intermodal Center Capacity Improvement Project (MR-MICCI) Network Infrastructure Upgrades Network Switch Replacement New Station Construction Non-Revenue Fleet Vehicles Northern Layover and Maintenance Facility On-Site Signal System Improvements (OSSI) Passenger Information System (PIS) Pedestrian Bridges Pompano Beach Operations Center Capital Improvements Positive Train Control on SFRC Power Distribution Project at the Stations Project Management Public Affairs Analytics Software Rail Maintenance Facilities Equipment Rail Maintenance Facility Improvements Rolling Stock for Service Expansion/Capacity Rolling Stock Replacement Rotem Cab/Coach Midlife Overhaul Security Cameras SFRC Wood Tie Conversion Signal and Safety Improvements on the SFRC Signs, Fences and System Upgrades on the SFRC Station Access and Placemaking Station and Train Wi-Fi Station Improvements Station Parking Lot Improvements Ticketing - Fare Interoperability Train Wash Video Surveillance Data Network on Rolling Stock
File details come from the government source that posted it. Updated .