This document is Section 01340, a technical specification section detailing requirements for Shop Drawings, Product Data, and Samples submission for a construction project. The section provides comprehensive guidelines for contractors regarding the preparation, submission, and review of technical documentation related to project materials and equipment. Contractors are required to submit Shop Drawings, Product Data, and Instruction Manuals electronically, with specific instructions for formatting and content.
The submission requirements mandate that all documents include detailed information such as submission dates, project title, contract number, names of contractor, supplier, and manufacturer, product identification, applicable standards, and any deviations from contract documents. Submittals must be clear, thorough, and include performance characteristics, dimensions, and clearances. Contractors must promptly submit documents in a sequence that prevents work delays, and they are expected to make corrections and resubmit documents as required by the Engineer until final approval is obtained. The specification emphasizes the importance of precise documentation and coordination between all project parties.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01340-1
SECTION 01340
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
PART 1 GENERAL
1.1 WORK INCLUDED
A. Submit Shop Drawings, Product Data, and Instruction Manuals required by Contract
Documents.
1.2 RELATED REQUIREMENTS
A. Definitions, and Additional Responsibilities of Parties: Conditions of the Contract.
1.3 SHOP DRAWINGS
A. Drawings shall be presented in a clear and thorough manner.
1. Details shall be identified by reference to sheet and detail, shown on
Contract Drawings.
1.4 PRODUCT DATA
A. Preparation
1. Clearly mark each copy to identify pertinent products or models.
2. Show performance characteristics and capacities.
3. Show dimensions and clearances required.
1.5 SUBMISSION REQUIREMENTS
A. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor.
B. Number of Submittals Required:
1. Shop Drawings: Submit electronically.
2. Product Data: Submit electronically.
C. Submittals Shall Contain:
01340-2
1. The date of submission and the dates of any previous submissions.
2. The Project title and contract number.
3. The names of:
a. Contractor.
b. Supplier.
c. Manufacturer.
4. Identification of the product, with the specification section number.
5. Applicable standards, such as ASTM or Federal Specification numbers.
6. Identification of deviations from Contract Documents.
7. Identification of revisions on resubmittals.
8. An 8 in. x 3 in. blank space for Contractor and Engineer stamps.
9. Contractor's stamp, initialed or signed, certifying to review of submittal, verification of products, field measurements and field construction criteria, and coordination of the information within the submittal with requirements of the Work and of Contract Documents.
1.6 RESUBMISSION REQUIREMENTS
A. Make any corrections or changes in the submittals required by the Engineer and resubmit until approved.
B. Shop Drawings and Product Data:
1. Revise initial drawings or data, and resubmit as specified for the initial submittal.
2. Indicate any changes which have been made other than those previously noted by the Engineer.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION