2-01010 Contractors Work.pdf

PDF 74 KB Posted

Attached to
2025 Milling & Paving and ADA Ramps
Solicitation number
Not on record
Issued by
Montgomery County, Northern Cambria Borough, Pennsylvania

About this file

This document is a Contractors Work section (Section 01010) for a municipal infrastructure project in Norristown involving complete milling, paving, and ADA ramp improvements. The project requires the contractor to perform work strictly within designated rights-of-way and easements, with responsibilities including obtaining necessary permits, providing temporary utilities, protecting existing structures and public access, and ensuring proper site cleanup upon project completion.

The contract emphasizes the contractor's financial responsibilities, including covering costs for temporary power, water, telephone, testing services, road opening permits, and construction licenses. Payment will be based on actual quantities of authorized work at stipulated unit prices, with no claims allowed for anticipated profit losses. The contractor must adhere to all state, county, and local permit requirements, provide adequate public safety protections compliant with OSHA standards, and restore any disturbed areas. The project terms stress that time is of the essence, with no extensions granted for weather-related delays, and the contractor will receive up to three sets of contract documents at no initial cost.

View the file

Other files

File Type Posted
34-Front End Docs.pdf PDF
13-rco and bid documents D1 thru D-8.pdf PDF
10-01201 Preconstruction Conference.pdf PDF
21-W FORNANCE-11x17 Land.pdf PDF
30-02507 Concrete Sidewalk ADA Ramps.pdf PDF
15-Ordinance 22-10 - Amendment to Chapter 133, Article I titled Responsible Contractors (RCO) - EXECUTED 202301121156300469.pdf PDF
8-01700 Project Closeout.pdf PDF
23-WOOD-11x17 Land.pdf PDF
31-9695-2001-3 Sidewalk Detectable Warning Surface - Copy.pdf PDF
32-02930 Lawns Grasses.pdf PDF
6-01001 Special Provisions.pdf PDF
17-BUTTONWOOD-11x17 Land.pdf PDF
3-2025-09-16 2025 NORR CURB REPLACEMENT SCHEDULE.pdf PDF
20-E OAK-11x17 Land.pdf PDF
1-01025 Measurement Payment.pdf PDF
19-JACKSON-11x17 Land.pdf PDF
22-W OAK-11x17 Land.pdf PDF
29-03300 Concrete.pdf PDF
16-E MARSHAL-11x17 Land.pdf PDF
7-01340 Shop Drawings, Samples.pdf PDF
27-02506 Concrete Curb.pdf PDF
26-PUB-72M 2010 Change-12.pdf PDF
9-PaDot Section - 411.pdf PDF
4-01720 Project Record Documents.pdf PDF
28-02260 Finish Grading.pdf PDF
35-penndot forms.pdf PDF
14-PaDot Section - 409.pdf PDF
12-wage rate determination.pdf PDF
18-E FORNANCE-11x17 Land.pdf PDF
11-PaDot Section - 491.pdf PDF
5-PaDot Section - 350.pdf PDF
24-NOBLE-11x17 Land.pdf PDF
33-PENNDOT 944 PROPOSAL FORM.pdf PDF
25-norristown 2025 paving scope of work.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01010-1

SECTION 01010

CONTRACTORS WORK

PART 1 GENERAL

1.1 RESPONSIBILITY OF CONTRACTOR

A. This project scope is the complete milling, paving and ADA ramps in Norristown

1.2 CONSTRUCTION LIMITS

A. Contractor shall confine their operations strictly within the limits of rights-of-way and easements as indicated by the plans and/or directed by the Engineers, unless written permission is obtained to occupy additional ground. Upon completion of work the Contractor shall cleanup and restore the area of their operations to a condition at least equal to original conditions. Unless specified elsewhere herein, all restoration shall be included in the Contractor's unit and/or lump sum price bid. Damage to property outside of specified construction limits shall be the responsibility of the Contractor and restoration of same shall be made at the

Contractor's expense.

1.3 MEASUREMENT OF WORK AND MATERIALS

A. The Contractor will be paid for the actual quantity of authorized work or material furnished under each item of the contract, at the prices stipulated for each item. If the quantity of any unit price item is decreased the Contractor shall have no claim for damages on the basis of loss of anticipated profits. All quantities of work and materials to be paid will be determined by the Engineers in accordance with working lines specified in the contract documents.

1.4 DELETED

1.5 CONTRACTOR'S RESPONSIBILITIES

A. The Contractor shall be responsible for all costs, including temporary power, water, telephone, testing services, road opening permits in local roads, construction permits, and licenses.

1.6 PROTECTION OF WORK AND PROPERTY

A. Contractor shall protect and maintain existing structures, access to existing homes and driveways, equipment and new construction (unless otherwise specified) in an undisturbed condition during the contract period.

01010-2

B. Contractor shall provide adequate protection for the public, the Borough, and their employees during the contract period. Provide protective devices and equipment for protection of people and property. Protective measures shall comply with the

Occupational Safety and Health Administration (OSHA) and other codes having jurisdiction.

C. The Contractor shall provide adequate protection against injury or loss arising in connection with this Contract for all their work and the property of the Borough.

He shall make good any such damage, injury or loss. He shall adequately protect adjacent property as provided by law and the specifications and drawings. He shall provide facilities for protection required by public authority or local conditions as passageways, guard fences, lights, etc.

1.7 CLEAN-UP

A. Each Contractor shall periodically remove waste so that at no time shall there be undue accumulation in the work area. Upon completion of the work, the

Contractor shall remove from the project and adjacent property, all surplus and discarded materials, equipment and temporary structures and leave the premises broom clean.

B. A final cleaning inspection shall be made by the Engineer. The Contractor shall perform any additional cleaning as required by the Engineer.

1.8 TIME OF THE ESSENCE

A. Time is of the essence in the performance of the Work required by this Contract.

No extensions of time will be granted for rain days, snow days or cold weather.

1.9 COPIES OF DOCUMENTS

A. Furnished Copies: Contractor will be furnished at no cost to them a maximum of three (3) sets of full-size Contract Drawings, (in addition to as-built set) including revised drawings, and a maximum of three (3) copies of the Contract

Specifications in addition to those used in the execution of the Agreement.

B. Additional Copies: Additional copies of the above documents will be supplied with the Contractor paying for printing, handling and delivery cost upon receipt.

1.10 RELATED DOCUMENTS

A. The Contractor shall adhere to the rules, regulations and requirements of all state, county and local permits and/or approvals issued for this project. Permitting agencies must be notified by the Contractor prior to construction per the requirements of the permits.

01010-3

1.11 WORK WITHIN PRIVATE PROPERTY RIGHT-OF-WAY

A. The Contractor's construction operations, equipment, materials and any other such items shall not leave the permanent right-of-ways or easement areas without the written permission of the property Owner and Engineer.

B. The Contractor shall neither damage nor destroy any trees or shrubs not located in the permanent right-of-way. Any trees or shrubs damaged or destroyed that are located outside of the permanent right-of-way shall be replaced in kind by the

Contractor at no additional cost to the Borough.

C. Contractor shall restore all disturbed areas as specified herein.

1.12 CONSTRUCTION STAKEOUT

A. The Contractor shall perform all construction stakeout required for the installation of the facilities, using the information provided on the drawings.

B. The Contractor shall provide the Engineer with one (1) copy of the cut sheets.

END OF SECTION