3-2025-09-16 2025 NORR CURB REPLACEMENT SCHEDULE.pdf

PDF 405 KB Posted

Attached to
2025 Milling & Paving and ADA Ramps
Solicitation number
Not on record
Issued by
Montgomery County, Northern Cambria Borough, Pennsylvania

About this file

The document is the Norristown 2025 Curb Replacement Schedule, a comprehensive municipal infrastructure project detailing curb replacement locations throughout Norristown. The schedule, last revised on 9/16/2025 and based on information from Thomas Odenigbo, covers multiple streets including W. Fornance Street, E. Marshall Street, Buttonwood Street, Noble Street, W. Wood Street, and others. The project involves systematic curb replacement across various residential and municipal areas, with detailed listings of specific addresses, quantities of linear feet (LF) to be replaced, and notes about special conditions such as land development projects, ADA ramps, and apron paving.

The schedule indicates a total of 6,061 linear feet of curb replacement is planned, with most locations showing zero cost at the time of the document. Some entries are marked as "Replaced by Property Owner" or have specific comments like "Pave Apron" or "Push Buttons and ADA Ramps". The document is meticulously organized, listing each street segment with its location, quantity of linear feet, and potential special requirements. Notably, some locations such as Thomas Barone Park and a cemetery are included, with varying levels of planned intervention. The comprehensive nature of the schedule suggests a systematic approach to municipal infrastructure maintenance and improvement.

View the file

Other files

File Type Posted
34-Front End Docs.pdf PDF
13-rco and bid documents D1 thru D-8.pdf PDF
10-01201 Preconstruction Conference.pdf PDF
21-W FORNANCE-11x17 Land.pdf PDF
30-02507 Concrete Sidewalk ADA Ramps.pdf PDF
15-Ordinance 22-10 - Amendment to Chapter 133, Article I titled Responsible Contractors (RCO) - EXECUTED 202301121156300469.pdf PDF
8-01700 Project Closeout.pdf PDF
23-WOOD-11x17 Land.pdf PDF
31-9695-2001-3 Sidewalk Detectable Warning Surface - Copy.pdf PDF
32-02930 Lawns Grasses.pdf PDF
6-01001 Special Provisions.pdf PDF
17-BUTTONWOOD-11x17 Land.pdf PDF
20-E OAK-11x17 Land.pdf PDF
1-01025 Measurement Payment.pdf PDF
2-01010 Contractors Work.pdf PDF
19-JACKSON-11x17 Land.pdf PDF
22-W OAK-11x17 Land.pdf PDF
29-03300 Concrete.pdf PDF
16-E MARSHAL-11x17 Land.pdf PDF
7-01340 Shop Drawings, Samples.pdf PDF
27-02506 Concrete Curb.pdf PDF
26-PUB-72M 2010 Change-12.pdf PDF
9-PaDot Section - 411.pdf PDF
4-01720 Project Record Documents.pdf PDF
28-02260 Finish Grading.pdf PDF
35-penndot forms.pdf PDF
14-PaDot Section - 409.pdf PDF
12-wage rate determination.pdf PDF
18-E FORNANCE-11x17 Land.pdf PDF
11-PaDot Section - 491.pdf PDF
5-PaDot Section - 350.pdf PDF
24-NOBLE-11x17 Land.pdf PDF
33-PENNDOT 944 PROPOSAL FORM.pdf PDF
25-norristown 2025 paving scope of work.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORRISTOWN 2025 CURB REPLACEMENT SCHEDULE

REVISED BASED ON CURB INFORMATION RECEIVED FROM THOMAS ODENIGBO

LAST REVISED: 9/16/2025

REVISED PER CURB INFO. FROM TOM ODENIGBO

# STREET FROM TO QUANTITY UNIT UNIT PRICE COST

1 W. FORNANCE ST. DEKALB ST. HARDING BLVD.

58 LF -$

55 LF -$

27 LF -$

39 LF -$

20 LF -$

44 LF -$

20 LF -$

20 LF -$

20 LF -$

21 LF -$

20 LF -$

48 LF -$

8 LF -$

11 LF -$

32 LF -$

2 LF -$

10 LF -$

4 LF -$

0 LF -$

52 LF -$

7 LF -$

12 LF -$

5 LF -$

5 LF -$

10 LF -$

5 LF -$

5 LF -$

17 LF -$

38 LF -$

11 LF -$

6 LF -$

26 LF -$

16 LF -$

24 LF -$

0 LF -$

45 LF -$

20 LF -$

14 LF -$

20 LF -$

17 LF -$

16 LF -$

84 LF -$

139 LF -$

REPLACED BY

PROPERTY OWNER

24 E. FORNANCE ST.

26 E. FORNANCE ST.

COMMENTS

REPLACE AS PART OF LAND DEVELOPMENT PROJECT

PAVE APRON

PUSH BUTTONS AND ADA RAMPS

28 E. FORNANCE ST.

1352 WILLOW ST.

1351 DEKALB ST.

104 W. FORNANCE ST.

1301 POWELL ST. (ELON @ MONTGOMERY PARK DEVELOPMENT)

1350 POWELL ST. (MONTGOMERY HOSPITAL)

20 E. FORNANCE ST.

22 E. FORNANCE ST.

118 W. FORNANCE ST.

112 W. FORNANCE ST.

110 W. FORNANCE ST.

108 W. FORNANCE ST.

106 W. FORNANCE ST.

210 W. FORNANCE ST.

206 W. FORNANCE ST.

204 W. FORNANCE ST.

200 W. FORNANCE ST.

122 W. FORNANCE ST.

ALLEY (PUBLIC)

424 W. FORNANCE ST.

420 W. FORNANCE ST.

418 W. FORNANCE ST.

414 W. FORNANCE ST.

412 W. FORNANCE ST.

410 W. FORNANCE ST.

422 W. FORNANCE ST.

316 W. FORNANCE ST.

314 W. FORNANCE ST.

312 W. FORNANCE ST.

408 W. FORNANCE ST.

406 W. FORNANCE ST.

1353 MARKLEY ST.

222 W. FORNANCE ST.

216 W. FORNANCE ST.

212 W. FORNANCE ST.

330 W. FORNANCE ST.

404 W. FORNANCE ST.

402 W. FORNANCE ST.

LOCATION COST OF CURB REPLACEMENT

1346 HARDING BLVD.

326 W. FORNANCE ST.

318 W. FORNANCE ST.

U:\Accounts\NORRB\_GENERAL\Misc. Projects\00105 - 2025 ROAD PROGRAM\CURB SCHEDULE\SCHEDULE\3RD DRAFT\2025-09-16_2025 NORR CURB REPLACEMENT SCHEDULE.xlsx PAGE 1 OF 7

LAST REVISED: 9/16/2025

REVISED PER CURB INFO. FROM TOM ODENIGBO

# STREET FROM TO QUANTITY UNIT UNIT PRICE COST

REPLACED BY

PROPERTY OWNER

COMMENTSLOCATION COST OF CURB REPLACEMENT

251 LF -$

10 LF -$

20 LF -$

17 LF -$

11 LF -$

114 LF -$

107 LF -$

24 LF -$

39 LF -$

27 LF -$

21 LF -$

17 LF -$

0 LF -$

10 LF -$

28 LF -$

24 LF -$

50 LF -$

15 LF -$

32 LF -$

32 LF -$

4 LF -$

8 LF -$

8 LF -$

31 LF -$

47 LF -$

19 LF -$

15 LF -$

17 LF -$

36 LF -$

3 LF -$

41 LF -$

6 LF -$

34 LF -$

56 LF -$

15 LF -$

26 LF -$

19 LF -$

27 LF -$

26 LF -$

22 LF -$

34 LF -$

28 LF -$

150 LF -$

411 W. FORNANCE ST.

1400 HARDING BLVD.

325 W. FORNANCE ST.

327 W. FORNANCE ST.

401 W. FORNANCE ST.

403 W. FORNANCE ST.

409 W. FORNANCE ST.

417 W. FORNANCE ST.

419 W. FORNANCE ST.

315 W. FORNANCE ST.

317 W. FORNANCE ST.

319 W. FORNANCE ST.

321 W. FORNANCE ST.

323 W. FORNANCE ST.

225 W. FORNANCE ST.

235 W. FORNANCE ST.

237 W. FORNANCE ST.

239 W. FORNANCE ST.

119 W. FORNANCE ST.

1401 PINE ST.

215 W. FORNANCE ST.

1401 DEKALB (REGIONAL HEALTH)

413 W. FORNANCE ST.

415 W. FORNANCE ST.

1401 MARKLEY ST.

421 W. FORNANCE ST.

423 W. FORNANCE ST.

425 W. FORNANCE ST.

113 W. FORNANCE ST.

115 W. FORNANCE ST.

31 E. FORNANCE ST.

29 E. FORNANCE ST.

27 E. FORNANCE ST.

25 E. FORNANCE ST.

1400 POWELL ST.

1405 POWELL ST.

27 W. FORNANCE ST.

101 W. FORNANCE ST.

103 W. FORNANCE ST.

105 W. FORNANCE ST.

107 W. FORNANCE ST.

109 W. FORNANCE ST.

111 W. FORNANCE ST.

U:\Accounts\NORRB\_GENERAL\Misc. Projects\00105 - 2025 ROAD PROGRAM\CURB SCHEDULE\SCHEDULE\3RD DRAFT\2025-09-16_2025 NORR CURB REPLACEMENT SCHEDULE.xlsx PAGE 2 OF 7

LAST REVISED: 9/16/2025

REVISED PER CURB INFO. FROM TOM ODENIGBO

# STREET FROM TO QUANTITY UNIT UNIT PRICE COST

REPLACED BY

PROPERTY OWNER

COMMENTSLOCATION COST OF CURB REPLACEMENT

2,574 -$

2 E. MARSHALL ST. NEW HOPE ST. ARCH ST.

20 LF -$

13 LF -$

20 LF -$

23 LF -$

20 LF -$

20 LF -$

21 LF -$

5 LF -$

10 LF -$

10 LF -$

19 LF -$

45 LF -$

98 LF -$

24 LF -$

6 LF -$

0 LF -$

15 LF -$

8 LF -$

86 LF -$

12 LF -$

15 LF -$

14 LF -$

10 LF -$

20 LF -$

6 LF -$

8 LF -$

19 LF -$

20 LF -$

16 LF -$

18 LF -$

8 LF -$

13 LF -$

35 LF -$

42 LF -$

20 LF -$

20 LF -$

45 LF -$

21 LF -$

22 LF -$

16 LF -$

20 LF -$

7 LF -$

TOTALS

655 MOORE ST.

530 E. MARSHALL ST.

600 E. MARSHALL ST.

604 E. MARSHALL ST.

616 E. MARSHALL ST.

618 E. MARSHALL ST.

620 E. MARSHALL ST.

622 E. MARSHALL ST.

624 E. MARSHALL ST.

632 E. MARSHALL ST.

650 E. MARSHALL ST.

652 E. MARSHALL ST.

653 MOORE ST.

643 E. MARSHALL ST.

700 HIGH ST.

531 E. MARSHALL ST.

527 E. MARSHALL ST.

ALLEY (PUBLIC)

505 E. MARSHALL ST.

400 E. MARSHALL ST.

500 E. MARSHALL ST.

526 E. MARSHALL ST.

649 E. MARSHALL ST.

647 E. MARSHALL ST.

645 E. MARSHALL ST.

711 E. MARSHALL ST.

701 E. MARSHALL ST.

673 E. MARSHALL ST.

671 E. MARSHALL ST.

669 E. MARSHALL ST.

667 E. MARSHALL ST.

653 E. MARSHALL ST.

651 E. MARSHALL ST.

662 E. MARSHALL ST.

664 E. MARSHALL ST.

608 E. MARSHALL ST.

610 E. MARSHALL ST.

612 E. MARSHALL ST.

666 E. MARSHALL ST.

674 E. MARSHALL ST.

708 E. MARSHALL ST.

716 E. MARSHALL ST.

U:\Accounts\NORRB\_GENERAL\Misc. Projects\00105 - 2025 ROAD PROGRAM\CURB SCHEDULE\SCHEDULE\3RD DRAFT\2025-09-16_2025 NORR CURB REPLACEMENT SCHEDULE.xlsx PAGE 3 OF 7

LAST REVISED: 9/16/2025

REVISED PER CURB INFO. FROM TOM ODENIGBO

# STREET FROM TO QUANTITY UNIT UNIT PRICE COST

REPLACED BY

PROPERTY OWNER

COMMENTSLOCATION COST OF CURB REPLACEMENT

5 LF -$

7 LF -$

22 LF -$

25 LF -$

41 LF -$

18 LF -$

23 LF -$

1,031 -$

3 BUTTONWOOD ST. MARSHALL ST. ELM ST.

12 LF -$

11 LF -$

30 LF -$

26 LF -$

19 LF -$

5 LF -$

13 LF -$

10 LF -$

4 LF -$

8 LF -$

3 LF -$

7 LF -$

18 LF -$

3 LF -$

2 LF -$

3 LF -$

4 LF -$

2 LF -$

5 LF -$

11 LF -$

3 LF -$

2 LF -$

20 LF -$

2 LF -$

26 LF -$

4 LF -$

12 LF -$

4 LF -$

2 LF -$

13 LF -$

32 LF -$

14 LF -$

71 LF -$

401 -$

4 W. WOOD ST. SWEDE ST. HARDING BLVD.

711 BUTTONWOOD ST.

712 BUTTONWOOD ST.

724 BUTTONWOOD ST.

732 BUTTONWOOD ST.

740 BUTTONWOOD ST.

TOTALS

714 BUTTONWOOD ST.

726 BUTTONWOOD ST.

738 BUTTONWOOD ST.

720 E. MARSHALL ST.

722 E. MARSHALL ST.

738 E. MARSHALL ST.

736 E. MARSHALL ST.

CURB DEPRESSION

724 E. MARSHALL ST.

726 E. MARSHALL ST.

734 E. MARSHALL ST.

614 BUTTONWOOD ST.

616 BUTTONWOOD ST.

618 BUTTONWOOD ST.

622 BUTTONWOOD ST.

624 BUTTONWOOD ST.

610 BUTTONWOOD ST.

TOTALS

1031 W. MARSHALL ST.

606 BUTTONWOOD ST.

608 BUTTONWOOD ST.

630 BUTTONWOOD ST.

710 BUTTONWOOD ST.

718 BUTTONWOOD ST.

722 BUTTONWOOD ST.

600 BUTTONWOOD ST.

602 BUTTONWOOD ST.

628 BUTTONWOOD ST.

604 BUTTONWOOD ST.

728 BUTTONWOOD ST.

730 BUTTONWOOD ST.

734 BUTTONWOOD ST.

736 BUTTONWOOD ST.

729 BUTTONWOOD ST.

727 BUTTONWOOD ST.

725 BUTTONWOOD ST.

605 BUTTONWOOD ST. (ST. FRANCIS)

U:\Accounts\NORRB\_GENERAL\Misc. Projects\00105 - 2025 ROAD PROGRAM\CURB SCHEDULE\SCHEDULE\3RD DRAFT\2025-09-16_2025 NORR CURB REPLACEMENT SCHEDULE.xlsx PAGE 4 OF 7

LAST REVISED: 9/16/2025

REVISED PER CURB INFO. FROM TOM ODENIGBO

# STREET FROM TO QUANTITY UNIT UNIT PRICE COST

REPLACED BY

PROPERTY OWNER

COMMENTSLOCATION COST OF CURB REPLACEMENT

0 LF -$

46 LF -$

16 LF -$

21 LF -$

22 LF -$

10 LF -$

8 LF -$

9 LF -$

18 LF -$

14 LF -$

119 LF -$

16 LF -$

18 LF -$

20 LF -$

15 LF -$

6 LF -$

23 LF -$

51 LF -$

40 LF -$

42 LF -$

123 LF -$

637 -$

5 NOBLE ST. MARSHALL AIRY ST.

13 LF -$

40 LF -$

24 LF -$

28 LF -$

28 LF -$

20 LF -$

10 LF -$

5 LF -$

20 LF -$

18 LF -$

12 LF -$

34 LF -$

14 LF -$

15 LF -$

18 LF -$

8 LF -$

12 LF -$

2 LF -$

4 LF -$

11 LF -$

6 LF -$

308 W. WOOD ST.

1301 MARKLEY ST.

325 W. WOOD ST.

407 W. WOOD ST.

1232 ASTOR ST.

1000 W. MARSHALL ST.

535 NOBLE ST.

521 NOBLE ST.

509 NOBLE ST.

1231 ASTOR ST.

314 W. WOOD ST.

312 W. WOOD ST.

318 W. WOOD ST.

555 NOBLE ST.

555 NOBLE ST.

545 NOBLE ST.

541 NOBLE ST.

539 NOBLE ST.

411 W. WOOD ST.

306 W. WOOD ST.

304 W. WOOD ST.

302 W. WOOD ST.

316 W. WOOD ST.

321 W. WOOD ST.

THOMAS BARONE PARK (PUBLIC)

ALLEY (PUBLIC)

405 W. WOOD ST.

317 W. WOOD ST.

319 W. WOOD ST.

1000 THOMAS BARONE ST.

1308 HARDING BLVD.

TOTALS

327 W. WOOD ST.

533 NOBLE ST.

531 NOBLE ST.

525 NOBLE ST.

523 NOBLE ST.

519 NOBLE ST.

515 NOBLE ST.

513 NOBLE ST.

511 NOBLE ST.

507 NOBLE ST.

505 NOBLE ST.

U:\Accounts\NORRB\_GENERAL\Misc. Projects\00105 - 2025 ROAD PROGRAM\CURB SCHEDULE\SCHEDULE\3RD DRAFT\2025-09-16_2025 NORR CURB REPLACEMENT SCHEDULE.xlsx PAGE 5 OF 7

LAST REVISED: 9/16/2025

REVISED PER CURB INFO. FROM TOM ODENIGBO

# STREET FROM TO QUANTITY UNIT UNIT PRICE COST

REPLACED BY

PROPERTY OWNER

COMMENTSLOCATION COST OF CURB REPLACEMENT

54 LF -$

14 LF -$

10 LF -$

7 LF -$

6 LF -$

16 LF -$

20 LF -$

0 LF -$

17 LF -$

3 LF -$

42 LF -$

4 LF -$

7 LF -$

9 LF -$

7 LF -$

5 LF -$

16 LF -$

5 LF -$

4 LF -$

17 LF -$

9 LF -$

6 LF -$

4 LF -$

9 LF -$

70 LF -$

703 -$

6 W. OAK ST. STANBRIDGE NOBLE ST.

72 LF -$

80 LF -$

101 LF -$

51 LF -$

108 LF -$

412 -$

7 E. OAK ST. WALNUT ST. ARCH ST.

24 LF -$

34 LF -$

103 LF -$

102 LF -$

263 -$

8 E. FORNANCE ST. SANDY HILL RD 815 E. FORNANCE ST.

9 JACKSON ST. ROSEMONT AVE. HARTRANFT ST.

30 LF -$

10 LF -$

915 W. OAK ST.

TOTALS

512 NOBLE ST.

524 NOBLE ST.

542 NOBLE ST.

640 NOBLE ST.

703 STANBRIDGE ST.

931 W. AIRY ST.

510 NOBLE ST.

514 NOBLE ST.

516 NOBLE ST.

518 NOBLE ST.

520 NOBLE ST.

526 NOBLE ST.

532 NOBLE ST.

536 NOBLE ST.

538 NOBLE ST.

546 NOBLE ST.

554 NOBLE ST.

556 NOBLE ST.

558 NOBLE ST.

560 NOBLE ST.

562 NOBLE ST.

564 NOBLE ST.

572 NOBLE ST.

932 W. MARSHALL ST.

566 NOBLE ST.

568 NOBLE ST.

570 NOBLE ST.

801 SMITH ST.

800 ARCH ST.

TOTALS

E. OAK ST. BRIDGE (PLAYGROUND SIDE)

800 SMITH ST.

663 STANBRIDGE ST.

700 NOBLE ST.

CEMETERY

TOTALS

NO CURB REPAIRS REQUIRED

ALLEY (PUBLIC)

U:\Accounts\NORRB\_GENERAL\Misc. Projects\00105 - 2025 ROAD PROGRAM\CURB SCHEDULE\SCHEDULE\3RD DRAFT\2025-09-16_2025 NORR CURB REPLACEMENT SCHEDULE.xlsx PAGE 6 OF 7

LAST REVISED: 9/16/2025

REVISED PER CURB INFO. FROM TOM ODENIGBO

# STREET FROM TO QUANTITY UNIT UNIT PRICE COST

REPLACED BY

PROPERTY OWNER

COMMENTSLOCATION COST OF CURB REPLACEMENT

40 -$

6,061 -$

TOTALS

OVERALL TOTALS