25-norristown 2025 paving scope of work.pdf

PDF 24 KB Posted

Attached to
2025 Milling & Paving and ADA Ramps
Solicitation number
Not on record
Issued by
Montgomery County, Northern Cambria Borough, Pennsylvania

About this file

This document is a Scope of Work for the 2025 Norristown Milling & Paving and ADA Ramps project, likely involving local municipal infrastructure improvements. The project is anticipated to commence on or before March 30, 2026, with concrete work being completed first. The scope includes milling and paving various road sections, base repair, and ADA ramp installations according to PennDot RC standards. Each road section will have unit price bid items, and base repair areas will be determined after milling and marked by the Engineer. ADA ramps will include up to 30 linear feet of sidewalk and curb to meet required slopes, with provisions for additional sidewalk as needed.

Pricing for the project includes an asphalt escalation clause in accordance with PennDot requirements, based on the asphalt price index at the time of bid submission and Notice to Proceed. Payment for all work will be based on field-measured quantities, with no adjustments to unit prices. Curb replacement is limited to a specific schedule, with contractors prohibited from installing additional curb beyond the listed quantity. Delivery tickets for leveling course materials must be marked accordingly, and all curbs must be full depth with no face forming permitted.

View the file

Other files

File Type Posted
34-Front End Docs.pdf PDF
13-rco and bid documents D1 thru D-8.pdf PDF
10-01201 Preconstruction Conference.pdf PDF
21-W FORNANCE-11x17 Land.pdf PDF
30-02507 Concrete Sidewalk ADA Ramps.pdf PDF
15-Ordinance 22-10 - Amendment to Chapter 133, Article I titled Responsible Contractors (RCO) - EXECUTED 202301121156300469.pdf PDF
8-01700 Project Closeout.pdf PDF
23-WOOD-11x17 Land.pdf PDF
31-9695-2001-3 Sidewalk Detectable Warning Surface - Copy.pdf PDF
32-02930 Lawns Grasses.pdf PDF
6-01001 Special Provisions.pdf PDF
17-BUTTONWOOD-11x17 Land.pdf PDF
3-2025-09-16 2025 NORR CURB REPLACEMENT SCHEDULE.pdf PDF
20-E OAK-11x17 Land.pdf PDF
1-01025 Measurement Payment.pdf PDF
2-01010 Contractors Work.pdf PDF
19-JACKSON-11x17 Land.pdf PDF
22-W OAK-11x17 Land.pdf PDF
29-03300 Concrete.pdf PDF
16-E MARSHAL-11x17 Land.pdf PDF
7-01340 Shop Drawings, Samples.pdf PDF
27-02506 Concrete Curb.pdf PDF
26-PUB-72M 2010 Change-12.pdf PDF
9-PaDot Section - 411.pdf PDF
4-01720 Project Record Documents.pdf PDF
28-02260 Finish Grading.pdf PDF
35-penndot forms.pdf PDF
14-PaDot Section - 409.pdf PDF
12-wage rate determination.pdf PDF
18-E FORNANCE-11x17 Land.pdf PDF
11-PaDot Section - 491.pdf PDF
5-PaDot Section - 350.pdf PDF
24-NOBLE-11x17 Land.pdf PDF
33-PENNDOT 944 PROPOSAL FORM.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2025 Norristown Milling & Paving and ADA Ramps

Scope of work:

1. It is anticipated that work will be started on or before March 30, 2026, with the concrete work being completed first.

a. Contractor to provide the current asphalt price index the day the bids are submitted. Asphalt escalation clause in accordance with PennDot requirements will be permitted based on the Asphalt price index the date of Notice to Proceed.

b. Milling and Paving will be completed based on the unit price bid items established for each section of road. Base repair areas will be determined after the existing road surface is milled and will marked out by the Engineer.

The contractor will determine the amount of leveling course needed after the roadway is milled. Payment for the leveling course will be determined by delivery tickets of material and are required to be marked leveling course.

The payment for all unit price items will be based on field measured quantities and there will be no adjustments to the unit prices based on final field measured quantities

c. ADA ramps are designed build per PennDot RC standards. Ramps should include up to 30LF of sidewalk and curb in order to meet required slopes.

The separate additional sidewalk unit price item will be used when approved by the Engineer in order to meet ADA ramps slopes that may need limited additional sidewalk to meet slope requirements. All curbs are to be full depth curbs; no face forming will be permitted.

D. Property owners’ curb is for the replacement of curb listed on the curb replacement schedule. Contractor is not to install any addition curb beyond the listed quantity. The listed quantity is to be replaced and has been marked in the field and the mark outs will be updated prior to curb replacement.