YA 2020 218-112 US50 LBC Final Geotechnical Data Report_2020-03-30.pdf

PDF 53 MB Posted

Attached to
CO FLAP US50(1) Little Blue Creek Canyon
Solicitation number
6982AF20B000008
Issued by

About this file

This document provides details of a presolicitation notice for a federal-aid highway project. The project will reconstruct and improve approximately 4.17 miles of US Route 50 between Montrose and Gunnison, Colorado to provide a consistent 12-foot travel way with 4 to 8-foot shoulders and add 1.5 miles of climbing lanes. Major work includes large scale rock excavation and embankment, roadway realignment and widening, MSE retaining walls, drainage culverts, guardrails, aggregate base, asphalt paving, minor bridge and railing work, pavement markings, traffic control restrictions and signage. Significant quantities of work include over 180,000 cubic yards of roadway excavation, 38,500 cubic yards of waste, 580 cubic yards of grouted riprap for stream armoring, 60,000 square feet of MSE walls, 2,500 linear feet of rock bolts, 70,000 tons of aggregate base and asphalt paving. The federal sponsor is the US Department of Transportation Federal Highway Administration. Plans and specifications for the project are not yet available as this is a presolicitation notice only.

View the file

Other files

File Type Posted
Bid Tabs - CO FLAP US50(1).pdf PDF
Bid Opening Summary - US50.pdf PDF
Final QnA 10.20.2020.pdf PDF
QnA 10.19.2020.pdf PDF
A004.pdf PDF
A003.pdf PDF
A002.pdf PDF
QnA 10.14.2020.pdf PDF
QnA 10.13.2020.pdf PDF
A001.pdf PDF
QnA 10.7.2020.pdf PDF
QnA 10.2.2020.pdf PDF
YA 2010- Draft Final Geotechnical Report US50 03-22-10.pdf PDF
QnA 9.23.2020.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Y-Sheets.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Z-Sheets.pdf PDF
QnA 9.17.2020.pdf PDF
K-07-F WIDENING PROJECT BRF_050-2(20).pdf PDF
6982AF20B000008.pdf PDF
CO FLAP US50(1) FINAL GEOTECHNICAL Report- Appendicies only.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 2 of 2.pdf PDF
CO_FLAP_US50(1)_Hydraulics_Memo_Final.pdf PDF
fp14.pdf PDF
CO.FLAP.US50(1).Little Blue Creek Canyon.Pavement Report.2020.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 1 of 2.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 1 of 3.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 2 of 3.pdf PDF
CO FLAP US50(1) FINAL Geotechnical Report Signed 06.01.2020.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 3 of 3.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .