This federal contract opportunity notice is for a highway reconstruction project located in Montrose, Colorado along Route US50. The general scope of work includes reconstructing 4.17 miles of roadway to provide a consistent 12-foot travel way and variable shoulders between 4 to 8 feet wide, as well as adding 1.5 miles of climbing lanes. Major elements of the project consist of large scale rock excavation and embankment work, roadway realignment, drainage culvert installation, mechanically stabilized earth retaining walls, asphalt paving, guardrail installation, and minor bridge and roadwork. Significant line items include 180,000 cubic yards of roadway excavation, 38,500 cubic yards of waste, 580 cubic yards of grouted riprap stream armoring, 60,000 square feet of MSE walls, 2,500 linear feet of rock bolts, 70,000 tons of aggregate base, and asphalt paving. The solicitation number for this pre-solicitation notice is 6982AF20B000008. The federal agency is the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Bid Tabs - CO FLAP US50(1).pdf PDF
Bid Opening Summary - US50.pdf PDF
Final QnA 10.20.2020.pdf PDF
QnA 10.19.2020.pdf PDF
A004.pdf PDF
A003.pdf PDF
A002.pdf PDF
QnA 10.14.2020.pdf PDF
QnA 10.13.2020.pdf PDF
A001.pdf PDF
QnA 10.7.2020.pdf PDF
QnA 10.2.2020.pdf PDF
YA 2010- Draft Final Geotechnical Report US50 03-22-10.pdf PDF
QnA 9.23.2020.pdf PDF
YA 2020 218-112 US50 LBC Final Geotechnical Data Report_2020-03-30.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Y-Sheets.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Z-Sheets.pdf PDF
QnA 9.17.2020.pdf PDF
K-07-F WIDENING PROJECT BRF_050-2(20).pdf PDF
6982AF20B000008.pdf PDF
CO FLAP US50(1) FINAL GEOTECHNICAL Report- Appendicies only.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 2 of 2.pdf PDF
CO_FLAP_US50(1)_Hydraulics_Memo_Final.pdf PDF
fp14.pdf PDF
CO.FLAP.US50(1).Little Blue Creek Canyon.Pavement Report.2020.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 1 of 2.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 1 of 3.pdf PDF
CO FLAP US50(1) FINAL Geotechnical Report Signed 06.01.2020.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 3 of 3.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .