QnA 9.17.2020.pdf

PDF 154 KB Posted

Attached to
CO FLAP US50(1) Little Blue Creek Canyon
Solicitation number
6982AF20B000008
Issued by

About this file

This document contains questions and answers from a presolicitation for the CO FLAP US50(1) Little Blue Creek Canyon project. The project involves reconstructing 4.17 miles of US Route 50 to provide a consistent 12-foot travel way and 1.5 miles of climbing lanes near Montrose, Colorado. Significant work includes large scale rock excavation and embankment, roadway realignment and widening, MSE retaining walls, drainage culverts, guardrail, asphalt pavement, minor bridge work, and traffic control measures. Notable quantities include 180,000 cubic yards of roadway excavation, 38,500 cubic yards of waste, 580 cubic yards of grouted riprap for stream armoring, 60,000 square feet of mechanically stabilized earth walls, 2,500 linear feet of rock bolts, and 70,000 tons of aggregate base. Electronic CAD files will not be provided to contractors. Excavation required for stream armoring is considered incidental and will not be paid under the roadway excavation item. The project is administered by the Federal Highway Administration and Colorado Department of Transportation.

View the file

Other files

File Type Posted
Bid Tabs - CO FLAP US50(1).pdf PDF
Bid Opening Summary - US50.pdf PDF
Final QnA 10.20.2020.pdf PDF
QnA 10.19.2020.pdf PDF
A004.pdf PDF
A003.pdf PDF
A002.pdf PDF
QnA 10.14.2020.pdf PDF
QnA 10.13.2020.pdf PDF
A001.pdf PDF
QnA 10.7.2020.pdf PDF
QnA 10.2.2020.pdf PDF
YA 2010- Draft Final Geotechnical Report US50 03-22-10.pdf PDF
QnA 9.23.2020.pdf PDF
YA 2020 218-112 US50 LBC Final Geotechnical Data Report_2020-03-30.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Y-Sheets.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Z-Sheets.pdf PDF
K-07-F WIDENING PROJECT BRF_050-2(20).pdf PDF
6982AF20B000008.pdf PDF
CO FLAP US50(1) FINAL GEOTECHNICAL Report- Appendicies only.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 2 of 2.pdf PDF
CO_FLAP_US50(1)_Hydraulics_Memo_Final.pdf PDF
fp14.pdf PDF
CO.FLAP.US50(1).Little Blue Creek Canyon.Pavement Report.2020.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 1 of 2.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 1 of 3.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 2 of 3.pdf PDF
CO FLAP US50(1) FINAL Geotechnical Report Signed 06.01.2020.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 3 of 3.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for

CO FLAP US50(1) Little Blue Creek Canyon

September 17, 2020

Questions Answers

1 Are there electronic CAD files for the project that can be made available to contractors? Having the electronic files increases the efficiency and accuracy of our earthwork take-offs.

No, electronic CAD files will not be provided.

2 The Ditch Armoring at STA. 614+25 – 614+80 LT is not shown on the cross sections. Will cross sections be provided showing the

Ditch Armoring at STA 614+25 – 614+80 LT.? If yes, please provide.

Armoring is not shown in sections. Armoring to be field fitted to meet the existing slope, and fit within the criteria shown on the sheet. Cross Sections showing the armoring will not be provided.

3 The Bank Stabilization at STA 615+80 to 616+10 LT is not shown on the cross sections. Will cross sections be provided showing the bank stabilization at STA 615+80 to 616+10 LT? If yes, please provide.

Stabilization is not shown in sections. Armoring to be field fitted to meet the existing slope, and fit within the criteria shown on the sheet. Cross

Sections showing the armoring not to be provided.

4 Will the FHWA consider changing the Mumble strips (sinusoidal) specification to a standard CDOT rumble strip detail?

No, bid the project using mumble strips.

5 To install the Riprap per the cross sections and typical section(s) on sheets G2-G3, excavation and backfill will be required. Please confirm the excavated quantities will be paid under 20401-0000

Roadway Excavation.

Excavation required to place the stream armoring is incidental to the pay item. Excavation material generated is shown under Available Material in the grading summary.

Refer to the SCR’s and the FP-14 for work considered incidental.

Excavation for these quantities is not measured for payment and not paid for under the 20401-000, Roadway Excavation Item.