This document contains a bid tabulation report and details of a federal contract opportunity for road construction work. The bid tabulation report summarizes bids received in response to Solicitation Number 6982AF20B000008 for the CO FLAP US50(1) Little Blue Creek Canyon project located in Montrose, Colorado. The project involves reconstructing approximately 4.17 miles of roadway to widen the travel way and add climbing lanes, and includes large scale excavation and embankment work, drainage structures, retaining walls, pavement, and bridge work. Significant work quantities include roadway excavation, riprap, mechanically stabilized earth walls, aggregate base, and asphalt pavement. The report lists six contractors who submitted bids along with their unit pricing and total pricing for various line items. No award has been made as of the report date of October 27, 2020. The related federal contract opportunity notice provides additional details on the general scope of improvements and confirms this is a presolicitation notice and plans/specifications are not yet available.

View the file

Other files

File Type Posted
Bid Opening Summary - US50.pdf PDF
Final QnA 10.20.2020.pdf PDF
QnA 10.19.2020.pdf PDF
A004.pdf PDF
A003.pdf PDF
A002.pdf PDF
QnA 10.14.2020.pdf PDF
QnA 10.13.2020.pdf PDF
A001.pdf PDF
QnA 10.7.2020.pdf PDF
QnA 10.2.2020.pdf PDF
YA 2010- Draft Final Geotechnical Report US50 03-22-10.pdf PDF
QnA 9.23.2020.pdf PDF
YA 2020 218-112 US50 LBC Final Geotechnical Data Report_2020-03-30.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Y-Sheets.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Z-Sheets.pdf PDF
QnA 9.17.2020.pdf PDF
K-07-F WIDENING PROJECT BRF_050-2(20).pdf PDF
6982AF20B000008.pdf PDF
CO FLAP US50(1) FINAL GEOTECHNICAL Report- Appendicies only.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 2 of 2.pdf PDF
CO_FLAP_US50(1)_Hydraulics_Memo_Final.pdf PDF
fp14.pdf PDF
CO.FLAP.US50(1).Little Blue Creek Canyon.Pavement Report.2020.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 1 of 2.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 1 of 3.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 2 of 3.pdf PDF
CO FLAP US50(1) FINAL Geotechnical Report Signed 06.01.2020.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 3 of 3.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 10/27/20

1 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Contractor Responsive?

Engineer's Estimate

American Civil Constructors LLC

Flatiron Constructors Inc

Kiewit Infrastructure Co.

Kissner G.C., Inc.

Missouri River Contractors LLC

Base Schedule A

$33,760,000.00

$33,580,791.00

$45,703,324.00

$38,661,825.00

$44,000,571.06

$34,332,117.00

Base Schedule B

$38,583,601.00

$37,294,587.00

$52,793,248.50

$44,330,280.00

$51,466,193.65

$41,424,369.00

2 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF20B000008

Division: Central Federal Lands

State: CO County: Gunnison

Federal Land: BLM, NPS, USFS Opened at: Lakewood, CO

Opened by: Ryan Phillips

Date: 10/21/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

American Civil Constructors LLC $33,580,791.00 4901 S Windermere St Littleton, CO 80120

Missouri River Contractors LLC $34,332,117.00 3384 E US Hwy 12 Helena, MT 59601

Kiewit Infrastructure Co. $38,661,825.00 160 Inverness Drive West Englewood, CO 80112

Kissner G.C., Inc. $44,000,571.06 PO Box 682 Cedaredge, CO 81413, CO 81413

Flatiron Constructors Inc $45,703,324.00 385 Interlocken Crescent Suite 900 Broomfield, CO 80021

Engineer's Estimate $33,760,000.00

3 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

American Civil Constructors LLC Lump Sum $3,300,000.00 Missouri River Contractors LLC Lump Sum $4,900,000.00 Kiewit Infrastructure Co. Lump Sum $4,515,000.00 Kissner G.C., Inc. Lump Sum $2,044,296.00 Flatiron Constructors Inc Lump Sum $4,500,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,796,640.00

A0040 15214-2000 SURVEY AND STAKING, RETAINING WALL

American Civil Constructors LLC Lump Sum $29,000.00 Missouri River Contractors LLC Lump Sum $65,000.00 Kiewit Infrastructure Co. Lump Sum $800,000.00 Kissner G.C., Inc. Lump Sum $111,360.00 Flatiron Constructors Inc Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

A0060 15215-1000 SURVEY AND STAKING, APPROACH ROAD

American Civil Constructors LLC $1,700.00 $6,800.00 Missouri River Contractors LLC $3,000.00 $12,000.00 Kiewit Infrastructure Co. $2,500.00 $10,000.00 Kissner G.C., Inc. $5,320.00 $21,280.00 Flatiron Constructors Inc $2,000.00 $8,000.00 Engineer's Estimate 4 EACH $2,500.00 $10,000.00

A0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

American Civil Constructors LLC $1,300.00 $39,000.00 Missouri River Contractors LLC $3,000.00 $90,000.00 Kiewit Infrastructure Co. $500.00 $15,000.00 Kissner G.C., Inc. $2,895.00 $86,850.00 Flatiron Constructors Inc $2,000.00 $60,000.00 Engineer's Estimate 30 EACH $1,500.00 $45,000.00

A0100 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

American Civil Constructors LLC $21,000.00 $50,232.00 Missouri River Contractors LLC $25,000.00 $59,800.00 Kiewit Infrastructure Co. $25,000.00 $59,800.00 Kissner G.C., Inc. $39,546.00 $94,594.03 Flatiron Constructors Inc $16,000.00 $38,272.00 Engineer's Estimate 2.392 MILE $25,000.00 $59,800.00

4 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0120 15236-2000 SURVEY CONTROL, GRADE FINISHING

American Civil Constructors LLC $9,700.00 $43,747.00 Missouri River Contractors LLC $15,500.00 $69,905.00 Kiewit Infrastructure Co. $25,000.00 $112,750.00 Kissner G.C., Inc. $26,536.50 $119,679.62 Flatiron Constructors Inc $10,000.00 $45,100.00 Engineer's Estimate 4.510 MILE $7,500.00 $33,825.00

A0140 15301-0000 CONTRACTOR QUALITY CONTROL

American Civil Constructors LLC Lump Sum $280,000.00 Missouri River Contractors LLC Lump Sum $615,000.00 Kiewit Infrastructure Co. Lump Sum $900,000.00 Kissner G.C., Inc. Lump Sum $330,600.00 Flatiron Constructors Inc Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $550,000.00

A0160 15401-0000 CONTRACTOR TESTING

American Civil Constructors LLC Lump Sum $490,000.00 Missouri River Contractors LLC Lump Sum $467,000.00 Kiewit Infrastructure Co. Lump Sum $450,000.00 Kissner G.C., Inc. Lump Sum $270,164.00 Flatiron Constructors Inc Lump Sum $600,000.00 Engineer's Estimate ALL LPSM Lump Sum $750,000.00

A0180 15501-0000 CONSTRUCTION SCHEDULE

American Civil Constructors LLC Lump Sum $35,000.00 Missouri River Contractors LLC Lump Sum $55,000.00 Kiewit Infrastructure Co. Lump Sum $80,000.00 Kissner G.C., Inc. Lump Sum $29,000.00 Flatiron Constructors Inc Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $200,000.00

A0200 15701-0000 SOIL EROSION CONTROL (EROSION CONTROL)

American Civil Constructors LLC Lump Sum $13,000.00 Missouri River Contractors LLC Lump Sum $200,000.00 Kiewit Infrastructure Co. Lump Sum $100,000.00 Kissner G.C., Inc. Lump Sum $11,628.00 Flatiron Constructors Inc Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $300,000.00

5 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0220 15701-0000 SOIL EROSION CONTROL (NON-STORMWATER CONTROL)

American Civil Constructors LLC Lump Sum $136,000.00 Missouri River Contractors LLC Lump Sum $147,000.00 Kiewit Infrastructure Co. Lump Sum $15,000.00 Kissner G.C., Inc. Lump Sum $164,030.00 Flatiron Constructors Inc Lump Sum $175,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00

A0240 15701-0000 SOIL EROSION CONTROL (SEDIMENT CONTROL)

American Civil Constructors LLC Lump Sum $63,000.00 Missouri River Contractors LLC Lump Sum $150,000.00 Kiewit Infrastructure Co. Lump Sum $750,000.00 Kissner G.C., Inc. Lump Sum $59,740.00 Flatiron Constructors Inc Lump Sum $110,000.00 Engineer's Estimate ALL LPSM Lump Sum $300,000.00

A0260 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

American Civil Constructors LLC Lump Sum $3,600.00 Missouri River Contractors LLC Lump Sum $125,000.00 Kiewit Infrastructure Co. Lump Sum $75,000.00 Kissner G.C., Inc. Lump Sum $3,341.00 Flatiron Constructors Inc Lump Sum $7,500.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0280 15802-0000 WATERING FOR DUST CONTROL

American Civil Constructors LLC Lump Sum $353,000.00 Missouri River Contractors LLC Lump Sum $300,000.00 Kiewit Infrastructure Co. Lump Sum $250,000.00 Kissner G.C., Inc. Lump Sum $185,600.00 Flatiron Constructors Inc Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $300,000.00

A0300 20101-0000 CLEARING AND GRUBBING

American Civil Constructors LLC $4,300.00 $141,900.00 Missouri River Contractors LLC $6,500.00 $214,500.00 Kiewit Infrastructure Co. $4,300.00 $141,900.00 Kissner G.C., Inc. $15,595.00 $514,635.00 Flatiron Constructors Inc $10,500.00 $346,500.00 Engineer's Estimate 33.0 ACRE $5,000.00 $165,000.00

6 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0320 20301-0300 REMOVAL OF BOX CULVERT

American Civil Constructors LLC $12,000.00 $12,000.00 Missouri River Contractors LLC $50,000.00 $50,000.00 Kiewit Infrastructure Co. $30,000.00 $30,000.00 Kissner G.C., Inc. $58,000.00 $58,000.00 Flatiron Constructors Inc $40,000.00 $40,000.00 Engineer's Estimate 1 EACH $50,000.00 $50,000.00

A0340 20301-0700 REMOVAL OF DELINEATOR

American Civil Constructors LLC $2.00 $160.00 Missouri River Contractors LLC $6.00 $480.00 Kiewit Infrastructure Co. $10.00 $800.00 Kissner G.C., Inc. $5.80 $464.00 Flatiron Constructors Inc $13.50 $1,080.00 Engineer's Estimate 80 EACH $15.00 $1,200.00

A0360 20301-1100 REMOVAL OF GATE

American Civil Constructors LLC $77.00 $308.00 Missouri River Contractors LLC $223.00 $892.00 Kiewit Infrastructure Co. $110.00 $440.00 Kissner G.C., Inc. $232.00 $928.00 Flatiron Constructors Inc $220.00 $880.00 Engineer's Estimate 4 EACH $1,000.00 $4,000.00

A0380 20301-1900 REMOVAL OF PIPE CULVERT

American Civil Constructors LLC $1,400.00 $42,000.00 Missouri River Contractors LLC $1,670.00 $50,100.00 Kiewit Infrastructure Co. $2,600.00 $78,000.00 Kissner G.C., Inc. $3,190.00 $95,700.00 Flatiron Constructors Inc $8,000.00 $240,000.00 Engineer's Estimate 30 EACH $1,500.00 $45,000.00

A0400 20301-2400 REMOVAL OF SIGN

American Civil Constructors LLC $3.00 $150.00 Missouri River Contractors LLC $60.00 $3,000.00 Kiewit Infrastructure Co. $44.00 $2,200.00 Kissner G.C., Inc. $58.00 $2,900.00 Flatiron Constructors Inc $220.00 $11,000.00 Engineer's Estimate 50 EACH $150.00 $7,500.00

7 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 20302-0700 REMOVAL OF FENCE

American Civil Constructors LLC $2.00 $35,000.00 Missouri River Contractors LLC $3.00 $52,500.00 Kiewit Infrastructure Co. $1.00 $17,500.00 Kissner G.C., Inc. $2.90 $50,750.00 Flatiron Constructors Inc $2.00 $35,000.00 Engineer's Estimate 17,500 LNFT $5.00 $87,500.00

A0440 20302-1200 REMOVAL OF GUARDRAIL

American Civil Constructors LLC $7.00 $33,600.00 Missouri River Contractors LLC $5.00 $24,000.00 Kiewit Infrastructure Co. $5.00 $24,000.00 Kissner G.C., Inc. $11.89 $57,072.00 Flatiron Constructors Inc $4.00 $19,200.00 Engineer's Estimate 4,800 LNFT $12.00 $57,600.00

A0460 20302-1300 REMOVAL OF GUARDRAIL, CONCRETE BARRIER

American Civil Constructors LLC $8.00 $12,400.00 Missouri River Contractors LLC $100.00 $155,000.00 Kiewit Infrastructure Co. $7.50 $11,625.00 Kissner G.C., Inc. $29.94 $46,407.00 Flatiron Constructors Inc $16.00 $24,800.00 Engineer's Estimate 1,550 LNFT $50.00 $77,500.00

A0480 20303-0200 REMOVAL OF BRIDGE DECK (CDOT CLASS 1)

American Civil Constructors LLC $230.00 $6,900.00 Missouri River Contractors LLC $1,000.00 $30,000.00 Kiewit Infrastructure Co. $172.00 $5,160.00 Kissner G.C., Inc. $100.00 $3,000.00 Flatiron Constructors Inc $475.00 $14,250.00 Engineer's Estimate 30 SQYD $100.00 $3,000.00

A0500 20303-0200 REMOVAL OF BRIDGE DECK (CDOT CLASS 2)

American Civil Constructors LLC $730.00 $21,900.00 Missouri River Contractors LLC $1,000.00 $30,000.00 Kiewit Infrastructure Co. $228.00 $6,840.00 Kissner G.C., Inc. $125.00 $3,750.00 Flatiron Constructors Inc $1,100.00 $33,000.00 Engineer's Estimate 30 SQYD $300.00 $9,000.00

8 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0520 20303-0200 REMOVAL OF BRIDGE DECK (CDOT CLASS 3)

American Civil Constructors LLC $2,100.00 $10,500.00 Missouri River Contractors LLC $2,500.00 $12,500.00 Kiewit Infrastructure Co. $287.00 $1,435.00 Kissner G.C., Inc. $284.20 $1,421.00 Flatiron Constructors Inc $2,200.00 $11,000.00 Engineer's Estimate 5.0 SQYD $650.00 $3,250.00

A0540 20401-0000 ROADWAY EXCAVATION

American Civil Constructors LLC $96.00 $11,520,000.00 Missouri River Contractors LLC $75.00 $9,000,000.00 Kiewit Infrastructure Co. $77.35 $9,282,000.00 Kissner G.C., Inc. $150.02 $18,002,400.00 Flatiron Constructors Inc $135.00 $16,200,000.00 Engineer's Estimate 120,000 CUYD $85.00 $10,200,000.00

A0560 20402-0000 SUBEXCAVATION

American Civil Constructors LLC $30.00 $60,000.00 Missouri River Contractors LLC $42.00 $84,000.00 Kiewit Infrastructure Co. $35.00 $70,000.00 Kissner G.C., Inc. $69.92 $139,840.00 Flatiron Constructors Inc $55.00 $110,000.00 Engineer's Estimate 2,000 CUYD $50.00 $100,000.00

A0580 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

American Civil Constructors LLC $37.00 $20,720.00 Missouri River Contractors LLC $175.00 $98,000.00 Kiewit Infrastructure Co. $182.00 $101,920.00 Kissner G.C., Inc. $329.70 $184,632.00 Flatiron Constructors Inc $120.00 $67,200.00 Engineer's Estimate 560 CUYD $150.00 $84,000.00

A0600 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

American Civil Constructors LLC $37.00 $4,995.00 Missouri River Contractors LLC $225.00 $30,375.00 Kiewit Infrastructure Co. $170.00 $22,950.00 Kissner G.C., Inc. $330.25 $44,583.75 Flatiron Constructors Inc $300.00 $40,500.00 Engineer's Estimate 135 CUYD $200.00 $27,000.00

9 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0620 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4

American Civil Constructors LLC $37.00 $13,320.00 Missouri River Contractors LLC $225.00 $81,000.00 Kiewit Infrastructure Co. $130.00 $46,800.00 Kissner G.C., Inc. $335.50 $120,780.00 Flatiron Constructors Inc $275.00 $99,000.00 Engineer's Estimate 360 CUYD $400.00 $144,000.00

A0640 25112-2400 PARTIALLY GROUTED RIPRAP, METHOD B, CLASS 4

American Civil Constructors LLC $163.00 $198,860.00 Missouri River Contractors LLC $185.00 $225,700.00 Kiewit Infrastructure Co. $320.00 $390,400.00 Kissner G.C., Inc. $486.00 $592,920.00 Flatiron Constructors Inc $290.00 $353,800.00 Engineer's Estimate 1,220 CUYD $750.00 $915,000.00

A0660 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED

American Civil Constructors LLC $42.00 $75,600.00 Missouri River Contractors LLC $125.00 $225,000.00 Kiewit Infrastructure Co. $49.00 $88,200.00 Kissner G.C., Inc. $325.00 $585,000.00 Flatiron Constructors Inc $130.00 $234,000.00 Engineer's Estimate 1,800 CUYD $200.00 $360,000.00

A0680 25210-0000 ROCKERY

American Civil Constructors LLC $32.00 $153,600.00 Missouri River Contractors LLC $85.00 $408,000.00 Kiewit Infrastructure Co. $112.00 $537,600.00 Kissner G.C., Inc. $116.48 $559,104.00 Flatiron Constructors Inc $58.00 $278,400.00 Engineer's Estimate 4,800 SQFT $110.00 $528,000.00

A0700 25305-1000 REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED

American Civil Constructors LLC $644.00 $193,200.00 Missouri River Contractors LLC $300.00 $90,000.00 Kiewit Infrastructure Co. $630.00 $189,000.00 Kissner G.C., Inc. $442.14 $132,642.00 Flatiron Constructors Inc $1,200.00 $360,000.00 Engineer's Estimate 300 SQYD $275.00 $82,500.00

10 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0720 25701-1000 CONTRACTOR FURNISHED GEOSYNTHETIC REINFORCED SOIL (GRS) RETAINING WALL DESIGN

American Civil Constructors LLC Lump Sum $94,000.00 Missouri River Contractors LLC Lump Sum $100,000.00 Kiewit Infrastructure Co. Lump Sum $243,000.00 Kissner G.C., Inc. Lump Sum $88,160.00 Flatiron Constructors Inc Lump Sum $125,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

A0740 26001-0000 ROCK BOLT

American Civil Constructors LLC $120.00 $98,400.00 Missouri River Contractors LLC $100.00 $82,000.00 Kiewit Infrastructure Co. $150.00 $123,000.00 Kissner G.C., Inc. $203.00 $166,460.00 Flatiron Constructors Inc $105.00 $86,100.00 Engineer's Estimate 820 LNFT $150.00 $123,000.00

A0760 26002-0000 ROCK DOWEL

American Civil Constructors LLC $70.00 $329,000.00 Missouri River Contractors LLC $110.00 $517,000.00 Kiewit Infrastructure Co. $75.00 $352,500.00 Kissner G.C., Inc. $127.60 $599,720.00 Flatiron Constructors Inc $95.00 $446,500.00 Engineer's Estimate 4,700 LNFT $80.00 $376,000.00

A0780 26201-0000 GEOSYNTHETIC REINFORCED SOIL (GRS) RETAINING WALL

American Civil Constructors LLC $97.00 $5,238,000.00 Missouri River Contractors LLC $78.00 $4,212,000.00 Kiewit Infrastructure Co. $125.00 $6,750,000.00 Kissner G.C., Inc. $118.53 $6,400,620.00 Flatiron Constructors Inc $130.00 $7,020,000.00 Engineer's Estimate 54,000 SQFT $61.00 $3,294,000.00

A0800 30101-0000 AGGREGATE BASE (CLASS 6)

American Civil Constructors LLC $34.00 $1,292,000.00 Missouri River Contractors LLC $42.00 $1,596,000.00 Kiewit Infrastructure Co. $40.00 $1,520,000.00 Kissner G.C., Inc. $39.47 $1,499,860.00 Flatiron Constructors Inc $55.00 $2,090,000.00 Engineer's Estimate 38,000 TON $33.00 $1,254,000.00

11 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0860 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3 MILLION ESAL

American Civil Constructors LLC $161.00 $2,270,100.00 Missouri River Contractors LLC $110.00 $1,551,000.00 Kiewit Infrastructure Co. $215.00 $3,031,500.00 Kissner G.C., Inc. $180.74 $2,548,434.00 Flatiron Constructors Inc $185.00 $2,608,500.00 Engineer's Estimate 14,100 TON $110.00 $1,551,000.00

A0880 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

American Civil Constructors LLC $390.00 $54,600.00 Missouri River Contractors LLC $500.00 $70,000.00 Kiewit Infrastructure Co. $200.00 $28,000.00 Kissner G.C., Inc. $365.40 $51,156.00 Flatiron Constructors Inc $335.00 $46,900.00 Engineer's Estimate 140.0 TON $300.00 $42,000.00

A0920 40601-0000 FOG SEAL

American Civil Constructors LLC $804.00 $17,688.00 Missouri River Contractors LLC $1,000.00 $22,000.00 Kiewit Infrastructure Co. $840.00 $18,480.00 Kissner G.C., Inc. $754.00 $16,588.00 Flatiron Constructors Inc $620.00 $13,640.00 Engineer's Estimate 22.0 TON $1,000.00 $22,000.00

A0940 41102-1000 PRIME COAT, METHOD 1

American Civil Constructors LLC $2.00 $102,000.00 Missouri River Contractors LLC $1.20 $61,200.00 Kiewit Infrastructure Co. $1.30 $66,300.00 Kissner G.C., Inc. $1.10 $56,100.00 Flatiron Constructors Inc $1.05 $53,550.00 Engineer's Estimate 51,000 SQYD $1.00 $51,000.00

A0960 41105-0000 BLOTTER

American Civil Constructors LLC $167.00 $12,525.00 Missouri River Contractors LLC $200.00 $15,000.00 Kiewit Infrastructure Co. $100.00 $7,500.00 Kissner G.C., Inc. $156.60 $11,745.00 Flatiron Constructors Inc $140.00 $10,500.00 Engineer's Estimate 75 TON $100.00 $7,500.00

12 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0980 41201-0000 TACK COAT

American Civil Constructors LLC $1,200.00 $27,600.00 Missouri River Contractors LLC $1,300.00 $29,900.00 Kiewit Infrastructure Co. $550.00 $12,650.00 Kissner G.C., Inc. $1,044.00 $24,012.00 Flatiron Constructors Inc $950.00 $21,850.00 Engineer's Estimate 23.0 TON $1,000.00 $23,000.00

A1000 41301-0000 ASPHALT PAVEMENT MILLING (BRIDGE DECK)

American Civil Constructors LLC $15.00 $8,235.00 Missouri River Contractors LLC $100.00 $54,900.00 Kiewit Infrastructure Co. $50.00 $27,450.00 Kissner G.C., Inc. $32.25 $17,705.25 Flatiron Constructors Inc $23.00 $12,627.00 Engineer's Estimate 549 SQYD $50.00 $27,450.00

A1020 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1

American Civil Constructors LLC $106.00 $265,000.00 Missouri River Contractors LLC $100.00 $250,000.00 Kiewit Infrastructure Co. $100.00 $250,000.00 Kissner G.C., Inc. $98.60 $246,500.00 Flatiron Constructors Inc $235.00 $587,500.00 Engineer's Estimate 2,500 SQYD $150.00 $375,000.00

A1040 55221-0000 REPAIR CONCRETE (CDOT DECK PATCHING)

American Civil Constructors LLC $2,700.00 $13,500.00 Missouri River Contractors LLC $3,000.00 $15,000.00 Kiewit Infrastructure Co. $4,000.00 $20,000.00 Kissner G.C., Inc. $3,758.40 $18,792.00 Flatiron Constructors Inc $3,500.00 $17,500.00 Engineer's Estimate 5.0 CUYD $2,500.00 $12,500.00

A1060 55222-0000 REPAIR CONCRETE (CURB)

American Civil Constructors LLC Lump Sum $5,900.00 Missouri River Contractors LLC Lump Sum $15,000.00 Kiewit Infrastructure Co. Lump Sum $10,000.00 Kissner G.C., Inc. Lump Sum $10,022.00 Flatiron Constructors Inc Lump Sum $9,400.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

13 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1080 55603-1000 REMOVE AND RESET BRIDGE RAILING

American Civil Constructors LLC Lump Sum $658.00 Missouri River Contractors LLC Lump Sum $16,000.00 Kiewit Infrastructure Co. Lump Sum $12,000.00 Kissner G.C., Inc. Lump Sum $33,640.00 Flatiron Constructors Inc Lump Sum $7,600.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

A1100 56901-0000 CONCRETE OVERLAY (POLYESTER CONCRETE)

American Civil Constructors LLC $342.00 $187,758.00 Missouri River Contractors LLC $550.00 $301,950.00 Kiewit Infrastructure Co. $400.00 $219,600.00 Kissner G.C., Inc. $299.00 $164,151.00 Flatiron Constructors Inc $300.00 $164,700.00 Engineer's Estimate 549 SQYD $200.00 $109,800.00

A1120 60103-0240 CONCRETE, HEADWALL FOR 54-INCH PIPE CULVERT

American Civil Constructors LLC $17,200.00 $86,000.00 Missouri River Contractors LLC $55,000.00 $275,000.00 Kiewit Infrastructure Co. $40,000.00 $200,000.00 Kissner G.C., Inc. $44,660.00 $223,300.00 Flatiron Constructors Inc $70,000.00 $350,000.00 Engineer's Estimate 5 EACH $25,000.00 $125,000.00

A1140 60201-0600 18-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $85.00 $8,500.00 Missouri River Contractors LLC $179.00 $17,900.00 Kiewit Infrastructure Co. $135.00 $13,500.00 Kissner G.C., Inc. $116.30 $11,630.00 Flatiron Constructors Inc $240.00 $24,000.00 Engineer's Estimate 100 LNFT $100.00 $10,000.00

A1160 60201-0800 24-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $101.00 $18,180.00 Missouri River Contractors LLC $155.00 $27,900.00 Kiewit Infrastructure Co. $140.00 $25,200.00 Kissner G.C., Inc. $103.20 $18,576.00 Flatiron Constructors Inc $320.00 $57,600.00 Engineer's Estimate 180 LNFT $125.00 $22,500.00

14 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1180 60201-1000 36-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $120.00 $156,000.00 Missouri River Contractors LLC $310.00 $403,000.00 Kiewit Infrastructure Co. $250.00 $325,000.00 Kissner G.C., Inc. $128.45 $166,985.00 Flatiron Constructors Inc $360.00 $468,000.00 Engineer's Estimate 1,300 LNFT $200.00 $260,000.00

A1200 60201-1200 48-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $155.00 $49,600.00 Missouri River Contractors LLC $310.00 $99,200.00 Kiewit Infrastructure Co. $260.00 $83,200.00 Kissner G.C., Inc. $169.60 $54,272.00 Flatiron Constructors Inc $450.00 $144,000.00 Engineer's Estimate 320 LNFT $225.00 $72,000.00

A1220 60201-1300 54-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $180.00 $90,000.00 Missouri River Contractors LLC $360.00 $180,000.00 Kiewit Infrastructure Co. $510.00 $255,000.00 Kissner G.C., Inc. $217.20 $108,600.00 Flatiron Constructors Inc $550.00 $275,000.00 Engineer's Estimate 500 LNFT $250.00 $125,000.00

A1240 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $450.00 $1,800.00 Missouri River Contractors LLC $900.00 $3,600.00 Kiewit Infrastructure Co. $410.00 $1,640.00 Kissner G.C., Inc. $1,856.00 $7,424.00 Flatiron Constructors Inc $650.00 $2,600.00 Engineer's Estimate 4 EACH $1,000.00 $4,000.00

A1260 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $520.00 $3,120.00 Missouri River Contractors LLC $900.00 $5,400.00 Kiewit Infrastructure Co. $340.00 $2,040.00 Kissner G.C., Inc. $1,914.00 $11,484.00 Flatiron Constructors Inc $850.00 $5,100.00 Engineer's Estimate 6 EACH $1,500.00 $9,000.00

15 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1280 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $1,000.00 $17,000.00 Missouri River Contractors LLC $1,550.00 $26,350.00 Kiewit Infrastructure Co. $1,160.00 $19,720.00 Kissner G.C., Inc. $2,267.50 $38,547.50 Flatiron Constructors Inc $1,000.00 $17,000.00 Engineer's Estimate 17 EACH $1,750.00 $29,750.00

A1300 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $1,900.00 $13,300.00 Missouri River Contractors LLC $2,350.00 $16,450.00 Kiewit Infrastructure Co. $2,100.00 $14,700.00 Kissner G.C., Inc. $2,761.00 $19,327.00 Flatiron Constructors Inc $2,500.00 $17,500.00 Engineer's Estimate 7 EACH $2,000.00 $14,000.00

A1320 60210-1300 END SECTION FOR 54-INCH PIPE CULVERT (CMP)

American Civil Constructors LLC $2,000.00 $2,000.00 Missouri River Contractors LLC $2,850.00 $2,850.00 Kiewit Infrastructure Co. $2,500.00 $2,500.00 Kissner G.C., Inc. $3,921.00 $3,921.00 Flatiron Constructors Inc $4,000.00 $4,000.00 Engineer's Estimate 1 EACH $2,500.00 $2,500.00

A1340 60212-1000 ELBOW, 36-INCH

American Civil Constructors LLC $1,700.00 $5,100.00 Missouri River Contractors LLC $1,680.00 $5,040.00 Kiewit Infrastructure Co. $2,500.00 $7,500.00 Kissner G.C., Inc. $2,252.33 $6,756.99 Flatiron Constructors Inc $1,200.00 $3,600.00 Engineer's Estimate 3 EACH $1,300.00 $3,900.00

A1360 60212-1200 ELBOW, 48-INCH

American Civil Constructors LLC $1,800.00 $1,800.00 Missouri River Contractors LLC $1,850.00 $1,850.00 Kiewit Infrastructure Co. $3,000.00 $3,000.00 Kissner G.C., Inc. $2,407.00 $2,407.00 Flatiron Constructors Inc $1,400.00 $1,400.00 Engineer's Estimate 1 EACH $1,600.00 $1,600.00

16 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1380 60403-0000 INLET (TYPE D)

American Civil Constructors LLC $3,200.00 $51,200.00 Missouri River Contractors LLC $7,600.00 $121,600.00 Kiewit Infrastructure Co. $12,000.00 $192,000.00 Kissner G.C., Inc. $3,368.20 $53,891.20 Flatiron Constructors Inc $14,000.00 $224,000.00 Engineer's Estimate 16 EACH $12,000.00 $192,000.00

A1400 60403-0000 INLET (VANE GRATE INLET)

American Civil Constructors LLC $4,000.00 $4,000.00 Missouri River Contractors LLC $12,200.00 $12,200.00 Kiewit Infrastructure Co. $10,000.00 $10,000.00 Kissner G.C., Inc. $5,120.00 $5,120.00 Flatiron Constructors Inc $14,000.00 $14,000.00 Engineer's Estimate 1 EACH $10,000.00 $10,000.00

A1420 60501-0000 STANDARD UNDERDRAIN SYSTEM

American Civil Constructors LLC $52.00 $130,000.00 Missouri River Contractors LLC $67.00 $167,500.00 Kiewit Infrastructure Co. $100.00 $250,000.00 Kissner G.C., Inc. $51.11 $127,775.00 Flatiron Constructors Inc $65.00 $162,500.00 Engineer's Estimate 2,500 LNFT $100.00 $250,000.00

A1440 60602-0900 PIPE ANCHOR ASSEMBLY, 36-INCH (CMP)

American Civil Constructors LLC $1,300.00 $2,600.00 Missouri River Contractors LLC $4,600.00 $9,200.00 Kiewit Infrastructure Co. $10,000.00 $20,000.00 Kissner G.C., Inc. $2,489.00 $4,978.00 Flatiron Constructors Inc $2,800.00 $5,600.00 Engineer's Estimate 2 EACH $3,000.00 $6,000.00

A1460 60901-1200 CURB, CONCRETE, 14-INCH DEPTH

American Civil Constructors LLC $40.00 $29,400.00 Missouri River Contractors LLC $130.00 $95,550.00 Kiewit Infrastructure Co. $50.00 $36,750.00 Kissner G.C., Inc. $96.60 $71,001.00 Flatiron Constructors Inc $85.00 $62,475.00 Engineer's Estimate 735 LNFT $40.00 $29,400.00

17 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1480 60908-1000 PAVED DITCH, ASPHALT

American Civil Constructors LLC $87.00 $28,275.00 Missouri River Contractors LLC $236.00 $76,700.00 Kiewit Infrastructure Co. $100.00 $32,500.00 Kissner G.C., Inc. $81.20 $26,390.00 Flatiron Constructors Inc $150.00 $48,750.00 Engineer's Estimate 325 SQYD $50.00 $16,250.00

A1500 61701-4100 GUARDRAIL SYSTEM CRG, TYPE 2, CLASS A

American Civil Constructors LLC $38.00 $1,900.00 Missouri River Contractors LLC $37.00 $1,850.00 Kiewit Infrastructure Co. $46.00 $2,300.00 Kissner G.C., Inc. $103.24 $5,162.00 Flatiron Constructors Inc $33.00 $1,650.00 Engineer's Estimate 50 LNFT $50.00 $2,500.00

A1520 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

American Civil Constructors LLC $30.00 $210,000.00 Missouri River Contractors LLC $29.00 $203,000.00 Kiewit Infrastructure Co. $35.00 $245,000.00 Kissner G.C., Inc. $65.13 $455,910.00 Flatiron Constructors Inc $27.00 $189,000.00 Engineer's Estimate 7,000 LNFT $45.00 $315,000.00

A1540 61702-0000 TERMINAL SECTION (TYPE 3K)

American Civil Constructors LLC $2,200.00 $2,200.00 Missouri River Contractors LLC $2,120.00 $2,120.00 Kiewit Infrastructure Co. $2,600.00 $2,600.00 Kissner G.C., Inc. $4,901.00 $4,901.00 Flatiron Constructors Inc $2,000.00 $2,000.00 Engineer's Estimate 1 EACH $2,500.00 $2,500.00

A1560 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

American Civil Constructors LLC $3,750.00 $3,750.00 Missouri River Contractors LLC $3,620.00 $3,620.00 Kiewit Infrastructure Co. $4,500.00 $4,500.00 Kissner G.C., Inc. $6,821.00 $6,821.00 Flatiron Constructors Inc $3,500.00 $3,500.00 Engineer's Estimate 1 EACH $4,000.00 $4,000.00

18 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1580 61702-1600 TERMINAL SECTION, TYPE MGS FLARED

American Civil Constructors LLC $3,900.00 $7,800.00 Missouri River Contractors LLC $3,800.00 $7,600.00 Kiewit Infrastructure Co. $4,700.00 $9,400.00 Kissner G.C., Inc. $6,821.00 $13,642.00 Flatiron Constructors Inc $3,500.00 $7,000.00 Engineer's Estimate 2 EACH $5,000.00 $10,000.00

A1600 61702-1700 TERMINAL SECTION, TYPE MGS-BAT

American Civil Constructors LLC $8,200.00 $8,200.00 Missouri River Contractors LLC $7,900.00 $7,900.00 Kiewit Infrastructure Co. $10,000.00 $10,000.00 Kissner G.C., Inc. $18,821.00 $18,821.00 Flatiron Constructors Inc $7,000.00 $7,000.00 Engineer's Estimate 1 EACH $5,000.00 $5,000.00

A1620 61707-0000 STRUCTURE TRANSITION RAILING (TYPE 3S)

American Civil Constructors LLC $125.00 $12,500.00 Missouri River Contractors LLC $118.00 $11,800.00 Kiewit Infrastructure Co. $147.00 $14,700.00 Kissner G.C., Inc. $307.40 $30,740.00 Flatiron Constructors Inc $675.00 $67,500.00 Engineer's Estimate 100 LNFT $100.00 $10,000.00

A1640 61707-0000 STRUCTURE TRANSITION RAILING (TYPE 3G)

American Civil Constructors LLC $125.00 $6,250.00 Missouri River Contractors LLC $118.00 $5,900.00 Kiewit Infrastructure Co. $150.00 $7,500.00 Kissner G.C., Inc. $307.40 $15,370.00 Flatiron Constructors Inc $625.00 $31,250.00 Engineer's Estimate 50 LNFT $120.00 $6,000.00

A1660 61801-0000 CONCRETE BARRIER (TYPE 9 SINGLE SLOPE BARRIER)

American Civil Constructors LLC $151.00 $117,780.00 Missouri River Contractors LLC $240.00 $187,200.00 Kiewit Infrastructure Co. $200.00 $156,000.00 Kissner G.C., Inc. $190.30 $148,434.00 Flatiron Constructors Inc $350.00 $273,000.00 Engineer's Estimate 780 LNFT $200.00 $156,000.00

19 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1680 61901-0000 FENCE (SNOW FENCE)

American Civil Constructors LLC $306.00 $367,200.00 Missouri River Contractors LLC $290.00 $348,000.00 Kiewit Infrastructure Co. $275.00 $330,000.00 Kissner G.C., Inc. $212.18 $254,616.00 Flatiron Constructors Inc $330.00 $396,000.00 Engineer's Estimate 1,200 LNFT $200.00 $240,000.00

A1700 61901-0000 FENCE (WILDLIFE FRIENDLY)

American Civil Constructors LLC $11.00 $195,800.00 Missouri River Contractors LLC $10.00 $178,000.00 Kiewit Infrastructure Co. $10.00 $178,000.00 Kissner G.C., Inc. $13.34 $237,452.00 Flatiron Constructors Inc $11.50 $204,700.00 Engineer's Estimate 17,800 LNFT $10.00 $178,000.00

A1720 61902-0000 GATE

American Civil Constructors LLC $750.00 $3,750.00 Missouri River Contractors LLC $725.00 $3,625.00 Kiewit Infrastructure Co. $1,000.00 $5,000.00 Kissner G.C., Inc. $522.00 $2,610.00 Flatiron Constructors Inc $700.00 $3,500.00 Engineer's Estimate 5 EACH $10,000.00 $50,000.00

A1740 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

American Civil Constructors LLC $130.00 $13,000.00 Missouri River Contractors LLC $124.00 $12,400.00 Kiewit Infrastructure Co. $155.00 $15,500.00 Kissner G.C., Inc. $106.33 $10,633.00 Flatiron Constructors Inc $135.00 $13,500.00 Engineer's Estimate 100 HOUR $130.00 $13,000.00

A1760 62201-0350 BACKHOE

American Civil Constructors LLC $145.00 $5,800.00 Missouri River Contractors LLC $165.00 $6,600.00 Kiewit Infrastructure Co. $120.00 $4,800.00 Kissner G.C., Inc. $140.00 $5,600.00 Flatiron Constructors Inc $150.00 $6,000.00 Engineer's Estimate 40 HOUR $160.00 $6,400.00

20 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1780 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

American Civil Constructors LLC $150.00 $12,000.00 Missouri River Contractors LLC $200.00 $16,000.00 Kiewit Infrastructure Co. $125.00 $10,000.00 Kissner G.C., Inc. $140.00 $11,200.00 Flatiron Constructors Inc $175.00 $14,000.00 Engineer's Estimate 80 HOUR $150.00 $12,000.00

A1800 62201-2750 MOTOR GRADER

American Civil Constructors LLC $140.00 $8,400.00 Missouri River Contractors LLC $210.00 $12,600.00 Kiewit Infrastructure Co. $165.00 $9,900.00 Kissner G.C., Inc. $174.00 $10,440.00 Flatiron Constructors Inc $200.00 $12,000.00 Engineer's Estimate 60 HOUR $185.00 $11,100.00

A1820 62201-3000 HYDRAULIC EXCAVATOR

American Civil Constructors LLC $232.00 $46,400.00 Missouri River Contractors LLC $165.00 $33,000.00 Kiewit Infrastructure Co. $152.00 $30,400.00 Kissner G.C., Inc. $210.00 $42,000.00 Flatiron Constructors Inc $215.00 $43,000.00 Engineer's Estimate 200 HOUR $200.00 $40,000.00

A1840 62301-0000 GENERAL LABOR

American Civil Constructors LLC $46.00 $3,680.00 Missouri River Contractors LLC $75.00 $6,000.00 Kiewit Infrastructure Co. $40.00 $3,200.00 Kissner G.C., Inc. $64.00 $5,120.00 Flatiron Constructors Inc $70.00 $5,600.00 Engineer's Estimate 80 HOUR $45.00 $3,600.00

A1860 62302-0100 SPECIAL LABOR, SLOPE SCALING

American Civil Constructors LLC $161.00 $177,100.00 Missouri River Contractors LLC $225.00 $247,500.00 Kiewit Infrastructure Co. $230.00 $253,000.00 Kissner G.C., Inc. $209.00 $229,900.00 Flatiron Constructors Inc $225.00 $247,500.00 Engineer's Estimate 1,100 HOUR $75.00 $82,500.00

21 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1880 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

American Civil Constructors LLC $226.00 $13,560.00 Missouri River Contractors LLC $600.00 $36,000.00 Kiewit Infrastructure Co. $220.00 $13,200.00 Kissner G.C., Inc. $104.00 $6,240.00 Flatiron Constructors Inc $175.00 $10,500.00 Engineer's Estimate 60 HOUR $150.00 $9,000.00

A1900 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

American Civil Constructors LLC $285.00 $28,500.00 Missouri River Contractors LLC $200.00 $20,000.00 Kiewit Infrastructure Co. $150.00 $15,000.00 Kissner G.C., Inc. $243.60 $24,360.00 Flatiron Constructors Inc $200.00 $20,000.00 Engineer's Estimate 100 HOUR $175.00 $17,500.00

A1920 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH

American Civil Constructors LLC $3.00 $213,000.00 Missouri River Contractors LLC $2.00 $142,000.00 Kiewit Infrastructure Co. $0.66 $46,860.00 Kissner G.C., Inc. $2.56 $181,760.00 Flatiron Constructors Inc $5.75 $408,250.00 Engineer's Estimate 71,000 SQYD $1.50 $106,500.00

A1940 62510-2000 SEEDING, HYDRAULIC METHOD

American Civil Constructors LLC $1,300.00 $17,550.00 Missouri River Contractors LLC $1,200.00 $16,200.00 Kiewit Infrastructure Co. $1,450.00 $19,575.00 Kissner G.C., Inc. $1,191.00 $16,078.50 Flatiron Constructors Inc $1,200.00 $16,200.00 Engineer's Estimate 13.5 ACRE $1,750.00 $23,625.00

A1960 62515-2000 MULCHING, HYDRAULIC METHOD

American Civil Constructors LLC $1,300.00 $17,550.00 Missouri River Contractors LLC $1,200.00 $16,200.00 Kiewit Infrastructure Co. $2,300.00 $31,050.00 Kissner G.C., Inc. $1,209.00 $16,321.50 Flatiron Constructors Inc $1,200.00 $16,200.00 Engineer's Estimate 13.5 ACRE $1,750.00 $23,625.00

22 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1980 62632-0000 PLANTINGS (WILLOW STAKES)

American Civil Constructors LLC Lump Sum $700.00 Missouri River Contractors LLC Lump Sum $650.00 Kiewit Infrastructure Co. Lump Sum $3,400.00 Kissner G.C., Inc. Lump Sum $626.50 Flatiron Constructors Inc Lump Sum $1,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

A2000 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4

American Civil Constructors LLC $5.00 $65,000.00 Missouri River Contractors LLC $4.00 $52,000.00 Kiewit Infrastructure Co. $5.60 $72,800.00 Kissner G.C., Inc. $4.00 $52,000.00 Flatiron Constructors Inc $3.75 $48,750.00 Engineer's Estimate 13,000 SQYD $6.00 $78,000.00

A2020 63301-0000 SIGN SYSTEM

American Civil Constructors LLC $900.00 $40,500.00 Missouri River Contractors LLC $1,000.00 $45,000.00 Kiewit Infrastructure Co. $1,085.00 $48,825.00 Kissner G.C., Inc. $841.00 $37,845.00 Flatiron Constructors Inc $225.00 $10,125.00 Engineer's Estimate 45 EACH $700.00 $31,500.00

A2040 63309-0100 DELINEATOR, TYPE 1

American Civil Constructors LLC $61.00 $7,930.00 Missouri River Contractors LLC $60.00 $7,800.00 Kiewit Infrastructure Co. $32.00 $4,160.00 Kissner G.C., Inc. $58.00 $7,540.00 Flatiron Constructors Inc $45.00 $5,850.00 Engineer's Estimate 130 EACH $50.00 $6,500.00

A2060 63309-0200 DELINEATOR, TYPE 2

American Civil Constructors LLC $63.00 $315.00 Missouri River Contractors LLC $60.00 $300.00 Kiewit Infrastructure Co. $35.00 $175.00 Kissner G.C., Inc. $59.00 $295.00 Flatiron Constructors Inc $50.00 $250.00 Engineer's Estimate 5 EACH $50.00 $250.00

23 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2080 63309-0300 DELINEATOR, TYPE 3

American Civil Constructors LLC $65.00 $5,525.00 Missouri River Contractors LLC $60.00 $5,100.00 Kiewit Infrastructure Co. $44.00 $3,740.00 Kissner G.C., Inc. $61.50 $5,227.50 Flatiron Constructors Inc $55.00 $4,675.00 Engineer's Estimate 85 EACH $50.00 $4,250.00

A2100 63326-0000 MUMBLE STRIP

American Civil Constructors LLC $2,500.00 $6,250.00 Missouri River Contractors LLC $8,400.00 $21,000.00 Kiewit Infrastructure Co. $2,060.00 $5,150.00 Kissner G.C., Inc. $3,062.40 $7,656.00 Flatiron Constructors Inc $12,500.00 $31,250.00 Engineer's Estimate 2.5 MILE $2,750.00 $6,875.00

A2120 63402-0700 PAVEMENT MARKINGS, TYPE D, SOLID

American Civil Constructors LLC $8,800.00 $38,720.00 Missouri River Contractors LLC $8,100.00 $35,640.00 Kiewit Infrastructure Co. $3,600.00 $15,840.00 Kissner G.C., Inc. $3,051.00 $13,424.40 Flatiron Constructors Inc $7,250.00 $31,900.00 Engineer's Estimate 4.40 MILE $4,000.00 $17,600.00

A2140 63412-0700 RECESSED PAVEMENT MARKINGS, TYPE D, SOLID

American Civil Constructors LLC $12,000.00 $52,800.00 Missouri River Contractors LLC $12,300.00 $54,120.00 Kiewit Infrastructure Co. $8,500.00 $37,400.00 Kissner G.C., Inc. $7,023.90 $30,905.16 Flatiron Constructors Inc $11,000.00 $48,400.00 Engineer's Estimate 4.40 MILE $10,000.00 $44,000.00

A2160 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

American Civil Constructors LLC Lump Sum $610,000.00 Missouri River Contractors LLC Lump Sum $650,000.00 Kiewit Infrastructure Co. Lump Sum $900,000.00 Kissner G.C., Inc. Lump Sum $674,685.00 Flatiron Constructors Inc Lump Sum $525,000.00 Engineer's Estimate ALL LPSM Lump Sum $500,000.00

24 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2180 63501-3500 TEMPORARY TRAFFIC CONTROL, PUBLIC INFORMATION PROGRAM

American Civil Constructors LLC Lump Sum $74,000.00 Missouri River Contractors LLC Lump Sum $400,000.00 Kiewit Infrastructure Co. Lump Sum $30,000.00 Kissner G.C., Inc. Lump Sum $62,148.16 Flatiron Constructors Inc Lump Sum $190,000.00 Engineer's Estimate ALL LPSM Lump Sum $200,000.00

A2200 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

American Civil Constructors LLC $430.00 $8,600.00 Missouri River Contractors LLC $400.00 $8,000.00 Kiewit Infrastructure Co. $230.00 $4,600.00 Kissner G.C., Inc. $406.00 $8,120.00 Flatiron Constructors Inc $180.00 $3,600.00 Engineer's Estimate 20 EACH $275.00 $5,500.00

A2220 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

American Civil Constructors LLC $20.00 $21,000.00 Missouri River Contractors LLC $18.00 $18,900.00 Kiewit Infrastructure Co. $10.00 $10,500.00 Kissner G.C., Inc. $17.40 $18,270.00 Flatiron Constructors Inc $5.00 $5,250.00 Engineer's Estimate 1,050 EACH $15.00 $15,750.00

A2240 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

American Civil Constructors LLC $37.00 $16,650.00 Missouri River Contractors LLC $35.00 $15,750.00 Kiewit Infrastructure Co. $70.00 $31,500.00 Kissner G.C., Inc. $34.80 $15,660.00 Flatiron Constructors Inc $45.00 $20,250.00 Engineer's Estimate 450 EACH $70.00 $31,500.00

A2260 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

American Civil Constructors LLC $2,000.00 $76,000.00 Missouri River Contractors LLC $1,900.00 $72,200.00 Kiewit Infrastructure Co. $200.00 $7,600.00 Kissner G.C., Inc. $1,856.00 $70,528.00 Flatiron Constructors Inc $150.00 $5,700.00 Engineer's Estimate 38 EACH $45.00 $1,710.00

25 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2280 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

American Civil Constructors LLC $18,500.00 $185,000.00 Missouri River Contractors LLC $1,800.00 $18,000.00 Kiewit Infrastructure Co. $10,000.00 $100,000.00 Kissner G.C., Inc. $17,400.00 $174,000.00 Flatiron Constructors Inc $7,500.00 $75,000.00 Engineer's Estimate 10 EACH $10,000.00 $100,000.00

A2300 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION

American Civil Constructors LLC $12,000.00 $48,000.00 Missouri River Contractors LLC $11,400.00 $45,600.00 Kiewit Infrastructure Co. $10,000.00 $40,000.00 Kissner G.C., Inc. $11,020.00 $44,080.00 Flatiron Constructors Inc $5,000.00 $20,000.00 Engineer's Estimate 4 EACH $7,500.00 $30,000.00

A2320 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM

American Civil Constructors LLC $205,000.00 $205,000.00 Missouri River Contractors LLC $200,000.00 $200,000.00 Kiewit Infrastructure Co. $100,000.00 $100,000.00 Kissner G.C., Inc. $194,880.00 $194,880.00 Flatiron Constructors Inc $60,000.00 $60,000.00 Engineer's Estimate 1 EACH $25,000.00 $25,000.00

A2340 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

American Civil Constructors LLC $48.00 $288,000.00 Missouri River Contractors LLC $100.00 $600,000.00 Kiewit Infrastructure Co. $80.00 $480,000.00 Kissner G.C., Inc. $152.05 $912,300.00 Flatiron Constructors Inc $160.00 $960,000.00 Engineer's Estimate 6,000 LNFT $75.00 $450,000.00

A2360 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

American Civil Constructors LLC $3.00 $3,000.00 Missouri River Contractors LLC $15.00 $15,000.00 Kiewit Infrastructure Co. $10.00 $10,000.00 Kissner G.C., Inc. $4.64 $4,640.00 Flatiron Constructors Inc $12.00 $12,000.00 Engineer's Estimate 1,000 LNFT $5.00 $5,000.00

26 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2380 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

American Civil Constructors LLC $10.00 $40,000.00 Missouri River Contractors LLC $10.00 $40,000.00 Kiewit Infrastructure Co. $15.00 $60,000.00 Kissner G.C., Inc. $9.28 $37,120.00 Flatiron Constructors Inc $11.00 $44,000.00 Engineer's Estimate 4,000 SQFT $35.00 $140,000.00

A2400 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

American Civil Constructors LLC $4,800.00 $110,400.00 Missouri River Contractors LLC $500.00 $11,500.00 Kiewit Infrastructure Co. $2,200.00 $50,600.00 Kissner G.C., Inc. $1,798.00 $41,354.00 Flatiron Constructors Inc $2,300.00 $52,900.00 Engineer's Estimate 23.0 MILE $3,750.00 $86,250.00

A2420 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

American Civil Constructors LLC $40.00 $1,360,000.00 Missouri River Contractors LLC $32.00 $1,088,000.00 Kiewit Infrastructure Co. $28.50 $969,000.00 Kissner G.C., Inc. $37.12 $1,262,080.00 Flatiron Constructors Inc $27.25 $926,500.00 Engineer's Estimate 34,000 HOUR $40.00 $1,360,000.00

A2440 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

American Civil Constructors LLC $80.00 $400,000.00 Missouri River Contractors LLC $75.00 $375,000.00 Kiewit Infrastructure Co. $60.00 $300,000.00 Kissner G.C., Inc. $75.40 $377,000.00 Flatiron Constructors Inc $62.00 $310,000.00 Engineer's Estimate 5,000 HOUR $70.00 $350,000.00

A2460 65101-1000 DRAPED ROCKFALL PROTECTION, WIRE MESH

American Civil Constructors LLC $34.00 $309,400.00 Missouri River Contractors LLC $49.50 $450,450.00 Kiewit Infrastructure Co. $65.00 $591,500.00 Kissner G.C., Inc. $60.32 $548,912.00 Flatiron Constructors Inc $56.00 $509,600.00 Engineer's Estimate 9,100 SQYD $100.00 $910,000.00

27 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

American Civil Constructors LLC $33,580,791.00 Missouri River Contractors LLC $34,332,117.00 Kiewit Infrastructure Co. $38,661,825.00 Kissner G.C., Inc. $44,000,571.06 Flatiron Constructors Inc $45,703,324.00 Engineer's Estimate $33,760,000.00

28 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: B

Schedule Type: Base

Solcitation No: 6982AF20B000008

Division: Central Federal Lands

State: CO County: Gunnison

Federal Land: BLM, NPS, USFS Opened at: Lakewood, CO

Opened by: Ryan Phillips

Date: 10/21/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

American Civil Constructors LLC $37,294,587.00 4901 S Windermere St Littleton, CO 80120

Missouri River Contractors LLC $41,424,369.00 3384 E US Hwy 12 Helena, MT 59601

Kiewit Infrastructure Co. $44,330,280.00 160 Inverness Drive West Englewood, CO 80112

Kissner G.C., Inc. $51,466,193.65 PO Box 682 Cedaredge, CO 81413, CO 81413

Flatiron Constructors Inc $52,793,248.50 385 Interlocken Crescent Suite 900 Broomfield, CO 80021

Engineer's Estimate $38,583,601.00

29 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: B

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0020 15101-0000 MOBILIZATION

American Civil Constructors LLC Lump Sum $3,600,000.50 Missouri River Contractors LLC Lump Sum $4,900,000.00 Kiewit Infrastructure Co. Lump Sum $4,506,000.00 Kissner G.C., Inc. Lump Sum $2,044,296.00 Flatiron Constructors Inc Lump Sum $5,250,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,183,461.00

B0040 15214-2000 SURVEY AND STAKING, RETAINING WALL

American Civil Constructors LLC Lump Sum $27,000.00 Missouri River Contractors LLC Lump Sum $65,000.00 Kiewit Infrastructure Co. Lump Sum $800,000.00 Kissner G.C., Inc. Lump Sum $111,360.00 Flatiron Constructors Inc Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

B0060 15215-1000 SURVEY AND STAKING, APPROACH ROAD

American Civil Constructors LLC $1,235.00 $17,290.00 Missouri River Contractors LLC $3,000.00 $42,000.00 Kiewit Infrastructure Co. $2,500.00 $35,000.00 Kissner G.C., Inc. $5,320.00 $74,480.00 Flatiron Constructors Inc $2,000.00 $28,000.00 Engineer's Estimate 14 EACH $2,500.00 $35,000.00

B0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

American Civil Constructors LLC $1,235.00 $49,400.00 Missouri River Contractors LLC $3,000.00 $120,000.00 Kiewit Infrastructure Co. $500.00 $20,000.00 Kissner G.C., Inc. $2,171.50 $86,860.00 Flatiron Constructors Inc $2,000.00 $80,000.00 Engineer's Estimate 40 EACH $1,500.00 $60,000.00

B0100 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

American Civil Constructors LLC $15,445.00 $68,251.46 Missouri River Contractors LLC $25,000.00 $110,475.00 Kiewit Infrastructure Co. $25,000.00 $110,475.00 Kissner G.C., Inc. $39,588.00 $174,939.37 Flatiron Constructors Inc $16,000.00 $70,704.00 Engineer's Estimate 4.419 MILE $25,000.00 $110,475.00

30 out of 54

Project No: CO FLAP US50(1)

Project Name: Little Blue Creek Canyon

Schedule: B

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0120 15236-2000 SURVEY CONTROL, GRADE FINISHING

American Civil Constructors LLC $9,265.00 $79,345.46 Missouri River Contractors LLC $15,500.00 $132,742.00 Kiewit Infrastructure Co. $25,000.00 $214,100.00 Kissner G.C., Inc. $26,524.00 $227,151.54 Flatiron Constructors Inc $10,000.00 $85,640.00 Engineer's Estimate 8.564 MILE $7,500.00 $64,230.00

B0140 15301-0000 CONTRACTOR QUALITY CONTROL

American Civil Constructors LLC Lump Sum $326,000.00 Missouri River Contractors LLC Lump Sum $615,000.00 Kiewit Infrastructure Co. Lump Sum $900,000.00 Kissner G.C., Inc. Lump Sum $330,600.00 Flatiron Constructors Inc Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $650,000.00

B0160 15401-0000 CONTRACTOR TESTING

American Civil Constructors LLC Lump Sum $472,000.00 Missouri River Contractors LLC Lump Sum $467,000.00 Kiewit Infrastructure Co. Lump Sum $450,000.00 Kissner G.C., Inc. Lump Sum $270,164.00 Flatiron Constructors Inc Lump Sum $600,000.00 Engineer's Estimate ALL LPSM Lump Sum $850,000.00

B0180 15501-0000 CONSTRUCTION SCHEDULE

American Civil Constructors LLC Lump Sum $34,000.00 Missouri River Contractors LLC Lump Sum $60,000.00 Kiewit Infrastructure Co. Lump Sum $80,000.00 Kissner G.C., Inc.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .