A001.pdf

PDF 4 MB Posted

Attached to
CO FLAP US50(1) Little Blue Creek Canyon
Solicitation number
6982AF20B000008
Issued by

About this file

This is a presolicitation notice for project CO FLAP US50(1) Little Blue Creek Canyon. The project involves reconstructing 4.17 miles of US Route 50 to provide a consistent 12-foot travel way with variable shoulders between 4 to 8 feet, as well as adding 1.5 miles of climbing lanes. Major work includes large scale rock excavation and embankment, roadway realignment, widening, drainage culverts, guardrails, aggregate base, asphalt pavement, minor bridge work, and traffic control including closures and night work. Significant estimated quantities include 180,000 cubic yards of roadway excavation, 38,500 cubic yards of waste, 580 cubic yards of grouted riprap, 60,000 square feet of mechanically stabilized earth wall, 2,500 linear feet of rock bolts, 70,000 tons of aggregate base. The project is located in Montrose County, Colorado approximately 30 miles east of Montrose and 33 miles west of Gunnison. The route is classified as a rural collector and is part of the National Highway System.

View the file

Other files

File Type Posted
Bid Tabs - CO FLAP US50(1).pdf PDF
Bid Opening Summary - US50.pdf PDF
Final QnA 10.20.2020.pdf PDF
QnA 10.19.2020.pdf PDF
A004.pdf PDF
A003.pdf PDF
A002.pdf PDF
QnA 10.14.2020.pdf PDF
QnA 10.13.2020.pdf PDF
QnA 10.7.2020.pdf PDF
QnA 10.2.2020.pdf PDF
YA 2010- Draft Final Geotechnical Report US50 03-22-10.pdf PDF
QnA 9.23.2020.pdf PDF
YA 2020 218-112 US50 LBC Final Geotechnical Data Report_2020-03-30.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Y-Sheets.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Z-Sheets.pdf PDF
QnA 9.17.2020.pdf PDF
K-07-F WIDENING PROJECT BRF_050-2(20).pdf PDF
6982AF20B000008.pdf PDF
CO FLAP US50(1) FINAL GEOTECHNICAL Report- Appendicies only.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 2 of 2.pdf PDF
CO_FLAP_US50(1)_Hydraulics_Memo_Final.pdf PDF
fp14.pdf PDF
CO.FLAP.US50(1).Little Blue Creek Canyon.Pavement Report.2020.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 1 of 2.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 1 of 3.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 2 of 3.pdf PDF
CO FLAP US50(1) FINAL Geotechnical Report Signed 06.01.2020.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 3 of 3.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

TABLE OF CONTENTS

Notice to Bidders ..............................................................................................................A-i

Solicitation, Offer, and Award ........................................................................................ A-1

Basis for Award and Bid Schedule ................................................................................ A-4

Solicitation Provisions .....................................................................................................B-7

Contract Clauses ............................................................................................................. C-1

Construction Wage Rate Requirement............................................................................ D-1

Division 100 ..................................................................................................................... E-1

Division 150 ................................................................................................................... E-26 Division 200 ................................................................................................................... E-42 Division 300 ................................................................................................................... E-94

Division 400 ................................................................................................................... E-95 Division 500 ................................................................................................................. E-110 Division 600 ................................................................................................................. E-126 Division 700 ................................................................................................................. E-153

APPENDICES

Appendix A ...........................................................................Subcontracting Plan Template

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard

Specification for Construction of Roads and Bridges on Federal Highway Projects

Appendix B .........................................................................................................404 Permit

Amendment A001

C-16

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-1 Performance of Work by the Contractor (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty-five [25] percent of the total amount of work to be performed under the contract.

This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of Clause)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-4 Physical Data. (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The

Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by:

1) Final Geotechnical Report, Report No. CO-CX-0050-20-01 dated June 1, 2020

2) Pavement and Materials Report dated May 2020

3) Hydraulics Report dated July 8, 2020

4) K-07-F Widening Project BRF_050-2 (20) as-built

5) Draft Final Geotechnical Assessment/Investigation US 50 Blue Creek Canyon

Corridor dated March 22, 2010

6) Final Geotechnical Data Report US 50 Little Blue Canyon dated March 30, 2020

(b) Weather conditions Contact National Weather Service .

(End of clause)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements. (APR 1984)

"General Decision Number: CO20200012 08/28/2020

Superseded General Decision Number: CO20190012

State: Colorado

Construction Type: Highway

Counties: Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, La Plata, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan and San Miguel Counties in Colorado.

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 08/28/2020

CARP9901-009 11/01/2019

Rates Fringes

CARPENTER (Excludes Form Work)...$ 26.50 10.32

* ELEC0111-004 02/01/2020

Rates Fringes

ELECTRICIAN (Boom Truck Operator)........................$ 24.95 11.05

ENGI0009-016 05/01/2018

Rates Fringes

POWER EQUIPMENT OPERATOR:

D-1 Amendment A001

(3)- Drill Rig Caisson (smaller than Watson 2500 and similar)................$ 28.25 10.70 (4)-Mechanic La Plata County............$ 28.73 10.70 (5)-Drill Rig Caisson (Watson 2500 similar or larger).....................$ 28.57 10.70

SUCO2011-007 09/15/2011

Rates Fringes

CARPENTER (Form Work Only) Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel............$ 18.57 5.38 La Plata....................$ 18.60 5.38

CEMENT MASON/CONCRETE FINISHER

Alamosa, Archuleta, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Mineral, Montezuma, Ouray, Rio Grande, Saguache, San Juan, San Miguel............$ 17.67 2.85 Chaffee.....................$ 15.55 2.85 La Plata....................$ 18.99 2.85 Montrose....................$ 16.95 2.85

ELECTRICIAN......................$ 28.06 8.76

GUARDRAIL INSTALLER..............$ 12.78 3.31

HIGHWAY/PARKING LOT STRIPING:

Truck Driver (Line Striping Truck)...........................$ 14.60 3.49

HIGHWAY/PARKING LOT

STRIPING:Painter.................$ 12.90 3.07

IRONWORKER, REINFORCING

(Excludes Guardrail Installation)....................$ 16.94 6.77

IRONWORKER, STRUCTURAL

(Excludes Guardrail Installation)....................$ 16.76 6.01

LABORER

Asphalt Raker Alamosa....................$ 17.53 3.75 Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, San Juan, San Miguel...........$ 16.43 3.42 La Plata...................$ 15.38 3.12 Common or General

D-2 Amendment A001

Alamosa, Chaffee, Montezuma, Montrose........$ 12.44 3.53 Archuleta, Conejos, Custer, Delta, Dolores, Gunnison, Hindsdale, Ouray, Rio Grande, Saguache, San Miguel.......$ 13.70 3.53 Fremont....................$ 15.19 3.00 La Plata...................$ 14.07 3.53 Mineral....................$ 14.84 3.53 San Juan...................$ 13.73 3.53 Concrete Saw (Hand Held)....$ 16.00 6.14 Landscape and Irrigation Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 14.02 3.16 La Plata...................$ 13.54 3.16 Mason Tender- Cement/Concrete Alamosa, Archuleta, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 14.59 3.10 Chaffee....................$ 12.44 3.10 La Plata...................$ 15.67 3.10 Traffic Control (Flagger)...$ 9.42 3.21 Traffic Control (Sets Up/Moves Barrels, Cones, Install Signs, Arrow Boards and Place Stationary Flags)(Excludes Flaggers)...................$ 12.39 3.20

PAINTER (Spray Only).............$ 17.54 3.52

POWER EQUIPMENT OPERATOR:

Asphalt Laydown Alamosa, La Plata..........$ 22.67 8.72 Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 23.13 8.64 Asphalt Paver...............$ 22.67 8.72 Asphalt Plant...............$ 17.23 4.07 Asphalt Roller Alamosa....................$ 21.67 8.22 Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Mineral, Montrose, Ouray, Rio Grande, Saguache, San

D-3 Amendment A001

Juan, San Miguel...........$ 22.77 8.36 La Plata...................$ 22.68 7.30 Montezuma..................$ 22.67 8.72 Asphalt Spreader............$ 22.67 8.72 Backhoe/Trackhoe Alamosa....................$ 21.03 3.75 Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 19.75 3.75 La Plata...................$ 19.79 5.13 Mineral....................$ 19.17 5.53 Montezuma..................$ 16.42 4.42 Bobcat/Skid Loader Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel.....................$ 18.20 4.54 La Plata...................$ 19.98 4.88 Mineral....................$ 17.94 4.62 Broom/Sweeper Alamosa....................$ 20.67 9.22 Brooom/Sweeper Archuleta, Chaffee, COnejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, La Plata, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel.....................$ 21.70 9.22 Bulldozer Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel.....................$ 23.28 9.22 Fremont....................$ 23.67 9.22 La Plata...................$ 23.57 8.72 Chipper.....................$ 22.04 8.26 Crane Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 25.01 8.22 La Plata...................$ 25.21 8.22 Drill.......................$ 20.84 2.66 Forklift....................$ 18.30 5.01 Grade Checker...............$ 23.91 7.89 Grader/Blade

D-4 Amendment A001

Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel.....................$ 16.39 4.20 Fremont....................$ 19.68 3.37 La Plata...................$ 19.83 4.20 Guardrail/Post Driver.......$ 16.07 4.41 Loader (Front End) Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Gunnison, Hinsdale, Mineral, Montrose, Ouray, Rio Grande, Saguache, San Juan.$ 23.38 8.22 Fremont....................$ 23.67 9.22 La Plata...................$ 23.36 7.09 Montezuma..................$ 22.82 8.72 San Miguel.................$ 23.82 9.22 Mechanic Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Gunnison, Hinsdale, Mineral, Montezuma, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 16.74 4.20 Fremont....................$ 18.79 3.51 Oiler Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan,........$ 22.97 7.88 Fremont....................$ 22.97 8.56 La Plata...................$ 24.08 5.49 San Miguel.................$ 22.97 9.22 Roller/Compactor (Dirt and Grade Compaction) Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 19.24 4.96 Fremont....................$ 16.52 5.28 La Plata...................$ 18.33 2.98 Rotomill....................$ 16.28 4.41 Scraper.....................$ 17.62 2.96 Screed Alamosa....................$ 20.33 6.81 Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio

D-5 Amendment A001

Grande, Saguache, San Juan, San Miguel...........$ 19.58 4.96 La Plata...................$ 17.86 2.75 Tractor.....................$ 15.08 2.95

TRAFFIC SIGNALIZATION:

Groundsman.......................$ 17.04 2.28

TRUCK DRIVER

Distributor Alamosa....................$ 18.40 4.51 Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, La Plata, Mineral, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel.....................$ 17.62 5.27 Montezuma..................$ 15.80 5.27 Dump Truck Alamosa....................$ 14.15 3.83 Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Gunnison, Hinsdale, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 16.56 4.03 Fremont....................$ 16.55 4.34 La Plata...................$ 16.90 3.83 Mineral....................$ 16.97 4.61 Lowboy Truck................$ 17.25 5.84 Mechanic....................$ 17.79 3.51 Multi-Purpose Specialty & Hoisting Truck..............$ 14.60 3.49 Pickup and Pilot Car Alamosa, Archuleta, Chaffee, Conejos, Custer, Delta, Dolores, Fremont, Gunnison, Hinsdale, Mineral, Montezuma, Montrose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 14.04 3.49 La Plata...................$ 15.47 3.49 Semi truck Alamosa, Archuleta, Chaffee, Gunnison, Mineral, Montezuma, Montraose, Ouray, Rio Grande, Saguache, San Juan, San Miguel...........$ 19.42 5.41 Semi Truck Conejos, Custer, Delta, Dolores, Fremont, Hinsdale, La Plata.........$ 17.25 5.41 Water Truck Alamosa....................$ 17.58 3.75 Archuleta, Chafee, Conjeos, Custer, Delta, Dolores, Gunnision, Hinsdale, Mineral, Montrose, Ouray, Rio Grande, San Miguel, San

D-6 Amendment A001

Juan, Saguache.............$ 16.75 3.04 Fremont....................$ 16.15 3.14 La Plata...................$ 17.67 3.43 Montezuma..................$ 14.88 2.07

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing

D-7 Amendment A001 this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

D-8 Amendment A001

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

D-9 Amendment A001

E-36

CO FLAP US50(1)

Little Blue Creek Canyon

156.07 Maintaining Roadways During Non-Work Periods. Maintain roadways and traffic control for public traffic during periods when work is not in progress. Snow removal to provide public access is the responsibility of the maintaining agency. If a “shoo-fly” is used, submit design proposed for use.

Design shoo-flies that may be left in place over weekends, can accommodate two-way traffic and meet 25 mph design criteria according to the 2011 AASHTO Green Book. Remove all Shoo-fly’s prior to winter shutdown unless approved be CO.

156.07 Limitations on Construction Operations.

(c) Delete the first sentence and substitute the following:

For alternate one-way traffic control, provide a minimum lane width of 12 feet. For two-way traffic, provide a minimum roadway width of 24 feet.

(i) Delete the text and substitute the following:

(i) Impacts to public traffic. If emergency services needs to travel through the project, suspend operations and ensure the roadway is traversable to emergency services. In addition to the holidays and times shown in Section 108.01, the following restrictions shown below apply through the duration of project. The permitted closures and openings to public traffic are shown below. All traffic that arrives at the queue during opening times must be allowed to pass through the project.

Table 156-1 Closures/Openings to Public Traffic

Type Month - Month Day to

Day Time Remarks

Weekend Openings

Notice to Proceed – End of Project

Friday – Monday

5:30pm Friday – 8:30am Monday

US 50 open to two-way traffic without delays

Day Closure April 1, 2021 – July 31, 2021

Monday – Friday

8:30 a.m. - 12:30 p.m.

1:30 p.m. - 5:30 p.m.

Applies to Sta. 587+00 to Sta. 617+00 only. Refer to

108.01 for more information.

Day Closure April 1, 2021 – April 30, 2022

Monday – Friday

8:30 a.m. - 12:30 p.m.

1:30 p.m. - 5:30 p.m.

Alternating Traffic

May 1, 2022 – End of Project

Monday – Friday

6:30 a.m. – 7:30 p.m.

Limit construction caused delays to public traffic to a maximum of 30 minutes per passage through the project.

Nighttime Closure

April 1, 2021 – End of Project

Monday – Thursday

7:30 p.m. – 6:30 a.m. Refer to (1) below.

APPENDIX B

Nationwide Permit (404 Permit)

BUILDING STRONG®

U.S. ARMY CORPS OF ENGINEERS – SACRAMENTO DISTRICT

1325 J ST. – SACRAMENTO, CA 95814

www.spk.usace.army.mil www.facebook.com/sacramentodistrict www.youtube.com/sacramentodistrict www.twitter.com/USACESacramento www.flickr.com/photos/sacramentodistrict

Nationwide Permit Summary 33 CFR Part 330; Issuance of Nationwide Permits – March 19, 2017

23. Approved Categorical Exclusions. Activities undertaken, assisted, authorized, regulated, funded, or financed, in whole or in part, by another Federal agency or department where:

(a) That agency or department has determined, pursuant to the Council on Environmental Quality’s implementing regulations for the National Environmental Policy Act (40 CFR part 1500 et seq.), that the activity is categorically excluded from the requirement to prepare an environmental impact statement or environmental assessment analysis, because it is included within a category of actions which neither individually nor cumulatively have a significant effect on the human environment; and

(b) The Office of the Chief of Engineers (Attn: CECW– CO) has concurred with that agency’s or department’s determination that the activity is categorically excluded and approved the activity for authorization under NWP 23.

The Office of the Chief of Engineers may require additional conditions, including pre-construction notification, for authorization of an agency’s categorical exclusions under this NWP.

Notification: Certain categorical exclusions approved for authorization under this NWP require the permittee to submit a pre-construction notification to the district engineer prior to commencing the activity (see general condition 32). The activities that require pre-construction notification are listed in the appropriate Regulatory Guidance Letters. (Authorities:

Sections 10 and 404)

Note: The agency or department may submit an application for an activity believed to be categorically excluded to the Office of the Chief of Engineers (Attn: CECW–CO). Prior to approval for authorization under this NWP of any agency’s activity, the Office of the Chief of Engineers will solicit public comment. As of the date of issuance of this NWP, agencies with approved categorical exclusions are: the Bureau of Reclamation, Federal Highway Administration, and U.S. Coast Guard. Activities approved for authorization under this NWP as of the date of this notice are found in Corps Regulatory Guidance Letter 05–07, which is available at: http://www.usace.army.mil/Portals/2/docs/ civilworks/RGLS/rgl05-07.pdf. Any future approved categorical exclusions will be announced in Regulatory Guidance Letters and posted on this same Web site.

A. Regional Conditions

1. Regional Conditions for California, excluding the Tahoe Basin http://www.spk.usace.army.mil/Portals/12/documents/regula tory/nwp/2017_nwps/Final_SPK_Regional_Conditions_for _California.pdf?ver=2017-03-23-120307-207

2. Regional Conditions for Nevada, including the Tahoe Basin hhttp://www.spk.usace.army.mil/Portals/12/documents/regu latory/nwp/2017_nwps/Final_SPK_Regional_Conditions_fo r_Nevada.pdf?ver=2017-03-23-120306-910

3. Regional Conditions for Utah http://www.spk.usace.army.mil/Portals/12/documents/regula tory/nwp/2017_nwps/Final_SPK_Regional_Conditions_for _Utah.pdf?ver=2017-03-23-120303-503

4. Regional Conditions for Colorado.

http://www.spk.usace.army.mil/Portals/12/documents/regula tory/nwp/2017_nwps/Final_2017_Regional_Conditions_in_ Colorado.pdf?ver=2017-03-23-133821-047

B. Nationwide Permit General Conditions

Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific conditions imposed by the division engineer or district engineer.

Prospective permittees should contact the appropriate Corps district office to determine if regional conditions have been imposed on an NWP. Prospective permittees should also contact the appropriate Corps district office to determine the status of Clean Water Act Section 401 water quality certification and/ or Coastal Zone Management Act consistency for an NWP. Every person who may wish to obtain permit authorization under one or more NWPs, or who is currently relying on an existing or prior permit authorization under one or more NWPs, has been and is on notice that all of the provisions of 33 CFR 330.1 through 330.6 apply to every NWP authorization. Note especially 33 CFR 330.5 relating to the modification, suspension, or revocation of any NWP authorization.

1. Navigation.

(a) No activity may cause more than a minimal adverse effect on navigation.

(b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee’s expense on authorized facilities in navigable waters of the United States.

(c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or

Nationwide Permit 23 Summary Page 2 work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.

2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity’s primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. If a bottomless culvert cannot be used, then the crossing should be designed and constructed to minimize adverse effects to aquatic life movements.

3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized.

4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.

5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48, or is a shellfish seeding or habitat restoration activity authorized by NWP 27.

6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see section 307 of the Clean Water Act).

7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization.

8. Adverse Effects From Impoundments. If the activity creates an impoundment of water, adverse effects to the aquatic system due to accelerating the passage of water, and/or restricting its flow must be minimized to the maximum extent practicable.

9. Management of Water Flows. To the maximum extent practicable, the preconstruction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization, storm water management activities, and temporary and permanent road crossings, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the preconstruction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities).

10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-approved state or local floodplain management requirements.

11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance.

12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States during periods of low-flow or no-flow, or during low tides.

13. Removal of Temporary Fills. Temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The affected areas must be revegetated, as appropriate.

14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety and compliance with applicable NWP general conditions, as well as any activity-specific conditions added by the district engineer to an NWP authorization.

15. Single and Complete Project. The activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project.

16. Wild and Scenic Rivers.

(a) No NWP activity may occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a ‘‘study river’’ for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status.

(b) If a proposed NWP activity will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a ‘‘study river’’ for possible inclusion in the system while the river is in an official study status, the permittee must submit a pre-construction notification (see general condition 32). The district engineer will coordinate the PCN with the Federal agency with direct management responsibility for that river.

The permittee shall not begin the NWP activity until notified by the district engineer that the Federal agency with direct management responsibility for that river has determined in writing that the proposed NWP activity will not adversely affect the Wild and Scenic River designation or study status.

(c) Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency responsible for the designated Wild and Scenic River or study river (e.g., National Park Service, U.S. Forest

Nationwide Permit 23 Summary Page 3 Service, Bureau of Land Management, U.S. Fish and Wildlife Service). Information on these rivers is also available at: http://www.rivers.gov/.

17. Tribal Rights. No NWP activity may cause more than minimal adverse effects on tribal rights (including treaty rights), protected tribal resources, or tribal lands.

18. Endangered Species.

(a) No activity is authorized under any NWP which is likely to directly or indirectly jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species. No activity is authorized under any NWP which ‘‘may affect’’ a listed species or critical habitat, unless ESA section 7 consultation addressing the effects of the proposed activity has been completed. Direct effects are the immediate effects on listed species and critical habitat caused by the NWP activity. Indirect effects are those effects on listed species and critical habitat that are caused by the NWP activity and are later in time, but still are reasonably certain to occur.

(b) Federal agencies should follow their own procedures for complying with the requirements of the ESA. If preconstruction notification is required for the proposed activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation has not been submitted, additional ESA section 7 consultation may be necessary for the activity and the respective federal agency would be responsible for fulfilling its obligation under section 7 of the ESA.

(c) Non-federal permittees must submit a pre-construction notification to the district engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally-listed endangered or threatened species or designated critical habitat, the pre-construction notification must include the name(s) of the endangered or threatened species that might be affected by the proposed activity or that utilize the designated critical habitat that might be affected by the proposed activity. The district engineer will determine whether the proposed activity ‘‘may affect’’ or will have ‘‘no effect’’ to listed species and designated critical habitat and will notify the non-Federal applicant of the Corps’ determination within 45 days of receipt of a complete pre-construction notification. In cases where the non- Federal applicant has identified listed species or critical habitat that might be affected or is in the vicinity of the activity, and has so notified the Corps, the applicant shall not begin work until the Corps has provided notification that the proposed activity will have ‘‘no effect’’ on listed species or critical habitat, or until ESA section 7 consultation has been completed. If the non-Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps.

(d) As a result of formal or informal consultation with the FWS or NMFS the district engineer may add species specific permit conditions to the NWPs.

(e) Authorization of an activity by an NWP does not authorize the ‘‘take’’ of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with ‘‘incidental take’’ provisions, etc.) from the FWS or the NMFS, the Endangered Species Act prohibits any person subject to the jurisdiction of the United States to take a listed species, where ‘‘take’’ means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word ‘‘harm’’ in the definition of ‘‘take’’ means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding or sheltering.

(f) f the non-federal permittee has a valid ESA section 10(a)(1)(B) incidental take permit with an approved Habitat Conservation Plan for a project or a group of projects that includes the proposed NWP activity, the non-federal applicant should provide a copy of that ESA section 10(a)(1)(B) permit with the PCN required by paragraph (c) of this general condition. The district engineer will coordinate with the agency that issued the ESA section 10(a)(1)(B) permit to determine whether the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation conducted for the ESA section 10(a)(1)(B) permit. If that coordination results in concurrence from the agency that the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation for the ESA section 10(a)(1)(B) permit, the district engineer does not need to conduct a separate ESA section 7 consultation for the proposed NWP activity. The district engineer will notify the non-federal applicant within 45 days of receipt of a complete pre-construction notification whether the ESA section 10(a)(1)(B) permit covers the proposed NWP activity or whether additional ESA section 7 consultation is required.

(g) Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the FWS and NMFS or their world wide Web pages at http://www.fws.gov/ or http://www.fws.gov/ipac and http://www.nmfs.noaa.gov/pr/species/esa/ respectively.

19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for ensuring their action complies with the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting appropriate local office of the U.S. Fish and Wildlife Service to

Nationwide Permit 23 Summary Page 4 determine applicable measures to reduce impacts to migratory birds or eagles, including whether ‘‘incidental take’’ permits are necessary and available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity.

20. Historic Properties.

(a) In cases where the district engineer determines that the activity may have the potential to cause effects to properties listed, or eligible for listing, in the National Register of Historic Places, the activity is not authorized, until the requirements of Section 106 of the National Historic Preservation Act (NHPA) have been satisfied.

(b) Federal permittees should follow their own procedures for complying with the requirements of section 106 of the National Historic Preservation Act. If pre-construction notification is required for the proposed NWP activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation is not submitted, then additional consultation under section 106 may be necessary. The respective federal agency is responsible for fulfilling its obligation to comply with section 106.

(c) Non-federal permittees must submit a pre-construction notification to the district engineer if the NWP activity might have the potential to cause effects to any historic properties listed on, determined to be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places, including previously unidentified properties. For such activities, the preconstruction notification must state which historic properties might have the potential to be affected by the proposed NWP activity or include a vicinity map indicating the location of the historic properties or the potential for the presence of historic properties.

Assistance regarding information on the location of, or potential for, the presence of historic properties can be sought from the State Historic Preservation Officer, Tribal Historic Preservation Officer, or designated tribal representative, as appropriate, and the National Register of Historic Places (see 33 CFR 330.4(g)). When reviewing pre-construction notifications, district engineers will comply with the current procedures for addressing the requirements of section 106 of the National Historic Preservation Act. The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts, which may include background research, consultation, oral history interviews, sample field investigation, and field survey.

Based on the information submitted in the PCN and these identification efforts, the district engineer shall determine whether the proposed NWP activity has the potential to cause effects on the historic properties. Section 106 consultation is not required when the district engineer determines that the activity does not have the potential to cause effects on historic properties (see 36 CFR 800.3(a)).

Section 106 consultation is required when the district engineer determines that the activity has the potential to cause effects on historic properties. The district engineer will conduct consultation with consulting parties identified under 36 CFR 800.2(c) when he or she makes any of the following effect determinations for the purposes of section 106 of the NHPA: no historic properties affected, no adverse effect, or adverse effect.

Where the non-Federal applicant has identified historic properties on which the activity might have the potential to cause effects and so notified the Corps, the non-Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects to historic properties or that NHPA section 106 consultation has been completed.

(d) For non-federal permittees, the district engineer will notify the prospective permittee within 45 days of receipt of a complete pre-construction notification whether NHPA section 106 consultation is required. If NHPA section 106 consultation is required, the district engineer will notify the non- Federal applicant that he or she cannot begin the activity until section 106 consultation is completed. If the non- Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps.

(e) Prospective permittees should be aware that section 110k of the NHPA (54 U.S.C. 306113) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation specifying the circumstances, the degree of damage to the integrity of any historic properties affected, and proposed mitigation.