CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 1 of 2.pdf
PDF 81 MB Posted
- Attached to
- CO FLAP US50(1) Little Blue Creek Canyon
- Solicitation number
- 6982AF20B000008
About this file
This document provides details for a federal contract opportunity to reconstruct sections of Colorado State Highway 50 near Montrose, Colorado. The project involves reconstructing approximately 4.17 miles of the existing two-lane roadway to provide consistent 12-foot travel lanes with 4-to-8-foot shoulders, and adding 1.5 miles of climbing lanes. Major work items include large-scale rock excavation and embankment work, roadway realignment, drainage culvert installation, guardrail installation, paving, minor bridge work, and traffic control measures. Significant quantities listed include over 180,000 cubic yards of roadway excavation, 38,500 cubic yards of waste material, 580 cubic yards of grouted riprap for stream armoring, 60,000 square feet of mechanically stabilized earth walls, 2,500 linear feet of rock bolts, and over 70,000 tons of aggregate base and asphalt paving. The pre-solicitation notice indicates that plans and specifications are not yet available for the project being undertaken by the Colorado Department of Transportation and Federal Highway Administration.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .