Bid Opening Summary - US50.pdf

PDF 190 KB Posted

Attached to
CO FLAP US50(1) Little Blue Creek Canyon
Solicitation number
6982AF20B000008
Issued by

About this file

This document contains a bid opening summary and federal contract opportunity notice for the CO FLAP US50(1) Little Blue Creek Canyon project. The bid opening summary shows that Missouri River Contractors submitted the lowest bid of $34,332,117 for Schedule A work. Flatiron submitted the second lowest bid of $45,703,324 for Schedule A. The engineer's estimate for Schedule A work was $33,760,000. The federal contract opportunity notice indicates the project is located in Montrose, Colorado and involves reconstructing 4.17 miles of US Route 50 to provide a consistent 12-foot travel way with 4 to 8-foot shoulders, as well as adding 1.5 miles of climbing lanes. Significant work includes large scale rock excavation and embankment, roadway realignment, drainage structures, retaining walls, guardrails and pavement. The solicitation number is 6982AF20B000008 and the opportunity was posted as a pre-solicitation notice by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Bid Tabs - CO FLAP US50(1).pdf PDF
Final QnA 10.20.2020.pdf PDF
QnA 10.19.2020.pdf PDF
A004.pdf PDF
A003.pdf PDF
A002.pdf PDF
QnA 10.14.2020.pdf PDF
QnA 10.13.2020.pdf PDF
A001.pdf PDF
QnA 10.7.2020.pdf PDF
QnA 10.2.2020.pdf PDF
YA 2010- Draft Final Geotechnical Report US50 03-22-10.pdf PDF
QnA 9.23.2020.pdf PDF
YA 2020 218-112 US50 LBC Final Geotechnical Data Report_2020-03-30.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Y-Sheets.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_Z-Sheets.pdf PDF
QnA 9.17.2020.pdf PDF
K-07-F WIDENING PROJECT BRF_050-2(20).pdf PDF
6982AF20B000008.pdf PDF
CO FLAP US50(1) FINAL GEOTECHNICAL Report- Appendicies only.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 2 of 2.pdf PDF
CO_FLAP_US50(1)_Hydraulics_Memo_Final.pdf PDF
fp14.pdf PDF
CO.FLAP.US50(1).Little Blue Creek Canyon.Pavement Report.2020.pdf PDF
CO FLAP US50(1)_Little_Blue_Creek_Canyon_FINAL_PLANS 1 of 2.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 1 of 3.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 2 of 3.pdf PDF
CO FLAP US50(1) FINAL Geotechnical Report Signed 06.01.2020.pdf PDF
CO FLAP US50(1)_Little Blue Creek Canyon_X-Sheets 3 of 3.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: Little Blue Creek Canyon Project Number: CO FLAP US50(1)

Bid Opening Date: 10/21/2020 Time: 2:00 p.m. MST

Bid Opening Location: Lakewood, CO Bid Opening Officer: Ryan Phillips

Amendments: A001, A002, A003, A004

Bidder’s Name Schedule A Schedule B

1. Missouri River Contractors

Helena, Montana

$34,332,117.00 $41,424,369.00

2. Kissner General Contractors, Inc.

Cedaredge, Colorado

$44,003,926.10 $51,466,192.90

3. Flatiron

Denver, Colorado

$45,703,324.00 $52,793,248.50

4. Kiewit Infrastructure Co.

Englewood, CO

$38,661,825.00 $44,330,280.00

5. American Civil Constructors

Littleton, CO

$33,580,791.00 $37,294,587.00

6.

7.

8.

Engineer’s Estimate

$33,760,000.00 $38,583,601.00