SIR 697DCK-22-R-00033.pdf

PDF 757 KB Posted

Attached to
Basic Ordering Agreements (BOA) for Design/Build (D/B) and Bid/Build (B/B) Services
Solicitation number
697DCK-22-R-00033
Issued by

View the file

Other files

File Type Posted
Nationwide BOA Presentation.pdf PDF
Questions and Responses Jan 7 2025.pdf PDF
Questions and Responses Jan 6 2025.pdf PDF
697DCK-22-R-00033 Amendment 0006 Revised.pdf PDF
697DCK-22-R-00033 Amendnent 0006.pdf PDF
697DCK-22-R-00033 Amendment 0005.pdf PDF
697DCK-22-R-00033 Amendment 0004.pdf PDF
Attachment J-1_Statement of Work_Amendment 0004.pdf PDF
Questions and Responses January 28 2022.pdf PDF
697DCK-22-R-00033 Amendment 0004.pdf PDF
697DCK-22-R-00033 Amendment 0003.pdf PDF
Questions and Responses January 21 2022.pdf PDF
BOA Virtual Vendor Meeting Attendee List.pdf PDF
697DCK-22-R-00033 Amendment 0003.pdf PDF
697DCK-22-R-00033 Amendment 0001.pdf PDF
697DCK-22-R-00033 Amendment 0002.pdf PDF
BOA 697DCK-22-R-00033 Presentation.pdf PDF
697DCK-22-R-00033 Amendment 0002.pdf PDF
Questions and Responses January 18 2022.pdf PDF
Questions and Responses January 7 2022.pdf PDF
SIR 697DCK-22-R-00033.pdf PDF
697DCK-22-R-00033 Amendment 0001.pdf PDF
SIR 697DCK-22-R-00033.pdf PDF
BOA Location Information.xlsx XLSX spreadsheet
FINANICAL CAPABILITY.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE_697DCK-22-R-00033.pdf PDF
Attachment J-1_Statement of Work_BOA.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED BID (RFP)

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

AAQ510ATL-AFN

Katherine Fogle 757-348-2542 x

12/16/2021 72

PURCHASE REQUEST NO.

697DCK-22-R-00033

10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The FAA has been exempted from several Federal laws and regulations as part of the

1996 DOT Appropriations Act, signed into law by President Clinton on November 15, 1995. Some of the exemptions include the Federal Acquisition Streamlining Act of

1994, the Small Business Act, the Competition in Contracting Act, and the Federal

Acquisition Regulations. The FAA’s Acquisition Management System (AMS), which became effective on April 1, 1996, is utilized in place of the Federal Acquisition

Regulation (FAR).

This screening information request (SIR) is for Basic Ordering Agreements (BOA) for

Design/Build (D/B) and Bid/Build s(B/B) services construction required by the Air

Traffic Control (ATC) Facilities and other programs necessary to perform its mission.

A virtual meeting is scheduled for January 19, 2022 at 13:00 ET via Zoom. Interested vendors must submit their request to attend to Katie Fogle at Katherine.fogle@faa.gov no later than January 17, 2022. A Zoom link we be sent out to all registered vendors prior to the meeting.

All questions regarding this SIR should be submitted in writing to Katie Fogle at

Katherine.fogle@faa.gov. All questions must be received no later than January 27, 2022. Questions received after January 27, 2021 will not be considered.

Proposals are due no later than February 4, 2022 @ 17:00 ET. Any proposal received after 17:00 MT on February 4, 2022 will be considered non-responsive and will not be eligible for award.

11. The Contractor shall begin performance within

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and is not required.is, B. An offer guarantee

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.

D. Offers providing less than

12B. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in item 12B.)

0 0 calendar days and complete it within ________________ ________________ calendar days after receiving

02/04/2022 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (MUST BE FULLY COMPLETED BY OFFEROR)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Contract Authority)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE

BY

2PAGE OF

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

AAQ510ATL-AFN

Kimberly Burt-Whatley

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

Continued...

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 72

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

697DCK-22-R-00033

(A) (B) (C) (D) (E) (F)

00001 Base Year (120 months) for Basic Ordering

Agreement (BOA) for Design/Build and Bid/Build construction services.

Period of Performance: 04/01/2022 to 03/31/2032

Section B - Supplies or Services/Prices Section B - Schedule

B.1 GENERAL

The FAA has the requirement for Design/Build (D/B) and Bid/Build (B/B) services construction required by the Air Traffic Control (ATC) Facilities and other programs necessary to perform its mission and will be utilized for the following programs: EnRoute Facilities Planning and Modernization and Program, Terminal Facilities Planning and Execution Program and additional programs supporting NAS facilities, such as Mobile Assets Management (MAMP), Facility Security and Risk Management (FSRM), Unstaffed Infrastructure Sustainment (UIS) and OPS Sustainment. Contractors must furnish all labor, materials, equipment, transportation, insurance, notification, licenses, permits, fees and supervision necessary to provide the required services in Attachment J-1 Statement of Work.

The FAA intends to award multiple Basic Ordering Agreements (BOA), resulting from this SIR. Projects will be ordered via Firm-Fixed Price (FFP) or Time and Materials (T&M) Call Orders and negotiated on a project-by-project basis. T&M Call Orders will be reserved for emergency requirements. See Section H for ordering procedures. The only person authorized to either issue or modify call orders is a Contracting Officer. Additional and applicable clauses will be added on each task/delivery order as needed. The intention is to compete the Call Orders amongst the BOA holders; however, the Government reserves the right to make a direct awards if it is in the best interest of the Government. The Government reserves the right evaluate BOA holders performance’s and/or responsiveness on an annual basis as described in Section H.

B.2 NUMBER OF AGREEMENTS

a. Offerors may submit a proposal for one (1) or more of the BOAs listed below

b. The FAA anticipates this SIR will result in the following BOAs, but reserves the right to award more or less:

i. The government anticipates awarding up to five (5) Small BOAs for the Eastern Service Area for Bid/Build projects ranging from $10,000.00 - $500,000.00.

ii. The government anticipates awarding up to five (5) Small BOAs for the Central Service Area for Bid/Build projects ranging from $10,000.00 - $500,000.00.

iii. The government anticipates awarding up to five (5) Small BOAs for the Western Service Area for Bid/Build projects ranging from $10,000.00 - $500,000.00.

iv The government anticipates awarding up to five (5) Medium BOAs for the Eastern Service Area for Bid/Build projects ranging from $500,000.00 - $2,000,000.00.

v. The government anticipates awarding up to five (5) Medium BOAs for the Central Service Area for Bid/Build projects ranging from $500,000.00 - $2,000,000.00.

vi. The government anticipates awarding up to five (5) Medium BOAs for the Western Service Area for Bid/Build projects ranging from $500,000.00 - $2,000,000.00.

vii. The government anticipates awarding up to five (5) Small BOAs for Alaska for Bid/Build projects ranging from $10,000.00 - $500,000.00.

viii. The government anticipates awarding up to five (5) Medium BOAs for Alaska for Bid/Build projects ranging from $500,000.00 - $2,000,000.

ix. The government anticipates awarding up to five (5) Nationwide BOAs for Design/Build and Bid/Build projects ranging from $2,000,000.00 and above.

B.3 AREA OF RESPONSBILITY

The area of responsibility for the Small and Medium BOAs is designated as either Eastern, Central or Western Service Area as depicted in the maps below. Alaska is considered a separate Service Area and Offerors must have the ability to service all of Alaska. However, if it is in the best interest of the FAA, a contractor may be required to perform work outside of their designated area of responsibility.

B.4 NORTH AMERICAN INDUSTRY CLASSIFICATION CODE

The North American Industry Classification System (NAICS) code applicable for the predominant overall effort is 236220 Commercial and Institutional Building Construction, . The size standard exception under this code for $39.5M.

B.5 AGREEMENT TERM

Base Period of 120 months with no options.

Clause List

The remainder of this page has been intentionally left blank.

Section C - Description/Specifications Scope of Work

All work is to be performed in accordance with Attachment J-1 Statement of Work.

Section D - Packaging and Marking Clause List

D.1 Marking

All deliverables must be marked with the following:

• Federal Aviation Administration (FAA) contract number and call order number;

• Contractor's name and address;

• List of contents, partial or final delivery; and

• Contract Data Requirements List (CDRL) number.

Section E - Inspection and Acceptance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.4-11 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS

(APR 1996)

3.10.4-5 INSPECTION - TIME-AND-MATERIAL AND LABOR-HOUR (APR 1996)

(a) Definitions.

(1) 'Contractor's managerial personnel,' as used in this clause, means any of the Contractor's directors, officers, managers, superintendents, or equivalent representatives who have supervision or direction of--

(i) All or substantially all of the Contractor's business;

(ii) All or substantially all of the Contractor's operation at any one plant or separate location at which the contract is being performed; or

(iii) A separate and complete major industrial operation connected with the performance of this contract.

(2) 'Materials,' as used in this clause, includes data when the contract does not include the "Warranty of Data" clause.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the material, fabricating methods, work, and services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) Unless otherwise specified in the contract, the Government shall accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they shall be presumed accepted 60 days after the date of delivery, unless accepted earlier.

(f) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (h) below, the cost of replacement or correction shall be determined under the "Payments Under Time-and-Materials and Labor-Hour Contracts" clause, but the 'hourly rate' for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken.

(g) (1) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may--

(i) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or

(ii) Terminate this contract for default.

(2) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute.

(h) Notwithstanding paragraphs (f) and (g) above, the Government may at any time require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to:

(1) fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel or

(2) the conduct of one or more of the Contractor's employees selected or retained by the Contractor after any of the Contractor's managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.

(i) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.

(j) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.

(k) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.

(End of clause)

3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)

(a) 'Work' includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.

The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless the Government determines that it is in the public interest to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may:

(1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or

(2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(j) In the absence of any formal disputes, a project will be deemed physically and financially complete within one year after final acceptance and excess funds will be deobligated at that time.

(End of clause)

Section F - Deliveries or Performance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.1-24 NOTICE OF DELAY (MAR 2009)

3.2.2.8-5 LIQUIDATED DAMAGES - CONSTRUCTION (OCT 2019)

(a) If the Contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor must pay to FAA as liquidated damages, the sum of $Established per Call Order (if applicable) for each day of delay.

(b) If FAA terminates the Contractor's right to proceed, the resulting damage will consist of liquidated damages until such reasonable time as may be required for final completion of the work, together with any increased costs to FAA in completing the work.

(c) If FAA does not terminate the Contractor's right to proceed, the resulting damage will consist of liquidated damages until the work is completed or accepted.

(End of clause)

SA13 HOLIDAYS

The following Federal holidays are observed by the Federal Aviation Administration.

New Year's Day January 1st

Martin Luther King's Birthday Third Monday in January

Presidents Day Third Monday in February

Memorial Day Last Monday in May

Independence Day July 4th

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day November 11th

Thanksgiving Day Fourth Thursday in November

Christmas Day December 25th

Juneteenth June 19th

SA35 FAA HOLIDAY MORATORIUM

No work shall be scheduled or take place during the week of and the weekend preceding the following holidays: Thanksgiving, Christmas and New Year's Day. Only emergency work to restore critical services to the facility will be considered and a moratorium waiver must be submitted and approved. The moratorium period will not be counted against the contract construction duration for the project.

(End of Clause)

Section G - Contract Administration Data Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR

2012)

(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within 1 calendar days prior to the notice to proceed. COR duties may include, but are not limited to:

(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.

(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.

(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:

(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;

(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;

(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and

(4) final acceptance under the contract.

(End of clause)

SA14 AUTHORITY OF THE GOVERNMENT

No one other than the Contracting Officer has the authority to authorize or make changes in the terms, conditions, change the scope of work or specifications in the contract, make any commitments or otherwise obligate the Government, or authorize any changes which affect the contract price, delivery schedule, period of performance, or other terms and conditions of the contract.

SA36 CORRESPONDENCE

The contracting officer prefers to receive written communication and documents electronically via email at katherine.fogle@faa.gov. All email correspondence to the FAA must state the contract number in the 'Subject' field.

Electronic documents must be accompanied by an explanatory email and should be sent in a portable-document-format type file (file extension pdf), such as Adobe Acrobat. Vendors are required to ensure that the quality of the administrative content in electronic files represents a reasonably high business standard. The Government is not responsible for the administrative ordering or legibility of correspondence received electronically. Emailed files/documents may not be in a zipped format. If electronic file sizes (i.e., typically expressed as kilobytes or megabytes) are too large for email attachments, recommend delivery in compact disk (CD) format submitted via hard-copy mail. Any CD mailing or printed-paper, hard-copy correspondence will be sent to the contracting officer at the following address.

NA.

Section H - Special Contract Requirements

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section

5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.

(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:

Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.

(End of Clause)

3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019)

(a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the course of the contract.

(b) Prior to removing, replacing, or diverting any of the specified personnel and/or facilities, the Contractor must notify in writing, and receive consent from, the Contracting Officer reasonably in advance of the action and must submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this contract.

(c) No diversion will be made by the Contractor without the written consent of the Contracting Officer.

(d) The key personnel and/or facilities under this contract are:

Refer Factor 4 in Section M [ ]

(List key personnel and/or facilities)

(End of clause)

H.1 CALL ORDER PROCESSING

1. Work under this contract will be solicited via a Request for Proposal (RFP) and ordered by written Call Orders to the contractor by the Contracting Officer.

2. Each award as a result of this solicitation will cite an individual contract number. Individual Call Orders will be placed in a numbering system, which relate back to the basic contract and their assigned Call Order Number.

3. The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by duly executed Call Orders. Requests for proposals will indicate funds availability. The Government may request proposals with no assurance of funding and provides no assurance that Call orders will be issued.

4. Call Orders will be Firm-Fixed Price (FFP) or Time and Materials (T&M) and clearly define the specific services to be performed and evaluation criteria. Each Call Order may contain additional applicable clauses, site or project specific provisions and wage determinations.

5. Call Orders may be issued by the Contracting Officer (CO) at any time within the term of this contract or any extension under the option clause.

6. Call Orders may be modified by the Contracting Officer. Modifications to Call Orders will be issued on Standard Form (SF) 30 and cite the Call Order Number.

7. Contractors are required to contact the CO within two days after receipt of Call Order Request for Proposal (RFP) if a contractor will not participate in the walk-through/site visit or submit a proposal on a Call Order.

H.2 CALL ORDER AWARD

1. Contractors awarded agreements as a result of this SIR/RFP will compete for subsequent Call Orders. Failure by contract awardees to participate responsibly in RFPs and/or documented poor performance may result in the exclusion of the contractor from further competition.

2. The Contracting Officer will act with broad discretion in determining procedures for awardees to receive a fair opportunity to be considered for each order.

3. As Call Order requirements are identified the Contracting Officer reserves the right to award a Call Order without competition under circumstances which include, but not limited to the following:

a. The agency need for such services is of such urgency that providing such opportunity would result in unacceptable delays.

b. The order should be issued on a single source basis, in the interest of economy and efficiency, as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.

c. The order should be issued on a single source basis, in the interest of economy and efficiency, when an awardee is already mobilized and currently performing under a previously issued order.

d. The order should be issued on a single source basis, in the interest of economy and efficiency, when a rational basis has been established and documented.

e. The order should be issued after exclusion of awardees based on one of the following circumstances:

i. If an awardee’s performance under recent orders under the contract raises questions regarding that awardee’s ability to perform at an acceptable level, that awardee need not be given an opportunity to compete.

ii. Where information is available to indicate that an awardee has a conflict of interest with the work anticipated under the order, or does not have the capacity to perform a particular order at the level of quality required or within the time required due to the volume or complexity of ongoing work, that awardee need not be given an opportunity to compete.

iii. Other circumstances that in the judgment of the Contracting officer that provides a sufficient basis for excluding an awardee from a particular order, when a rational basis has been established and documented.

f. Call Orders may be issued to the contractors whom were awarded the basic contract. Each basic contract will be for a 10-year base period. The Call Orders will be placed against the basic contracts to fund projects throughout the year.

H.3 SUBSEQUENT CALL ORDER EVALUATION CRITERIA

Subsequent Call Orders may be awarded on Lowest Price Technically Acceptable basis or Best Value basis. In addition to price/cost, Call Order evaluation criteria may include, but is not limited to the following:

1. Technical approach

2. Schedule Requirements

3. Corporate Experience

4. Past Performance

5. Current workload

6. Geographic location

The government reserves the right to make a direct award to a BOA holder if it is in the best interest of the government.

H.4 BOA HOLDER PERFORMANCE & RESPONSIVENESS

The Government reserves the right evaluate BOA holder's Call Order performance and responsiveness to RFPs on an annual basis from the date of the issuance of the BOAs. If it is determined a BOA holder has not performed in accordance with the Call Order(s) terms and conditions and/or has not provide the required deliverable the BOA holder may be terminated in accordance with AMS clause 3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT 1996), 3.10.6-3 TERMINATION (COST-REIMBURSEMENT) (OCT 2014) - ALTERNATE IV (JAN 2015) or 3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996).

If a BOA holder has not been responsive to any RFPs issued within a year from the date of the last evaluation the BOA holder may be terminated in accordance with AMS clause 3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT 1996). The Government reserves the right solicit new BOA holders if adequate performance and/or responsiveness is not achieved.

Section I - Contract Clauses Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JUL 2018)

3.1.7-5 DISCLOSURE OF CONFLICTS OF INTEREST (JUL 2018)

3.1.8-1 CANCELLATION, RESCISSION AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (OCT 2014)

3.1.8-2 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (OCT 2019)

3.2.2.3-33 ORDER OF PRECEDENCE (MAR 2009)

3.2.2.3-42 DIFFERING SITE CONDITIONS (JUL 2004)

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004)

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004) -

ALTERNATE I (JAN 2021)

3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2004)

3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2004)

3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2004)

3.2.2.3-48 OTHER CONTRACTS (MAR 2009)

3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS (JUL 2004)

3.2.2.3-50 PROPERTY PROTECTION (OCT 2014)

3.2.2.3-51 OPERATIONS AND STORAGE AREAS (APR 2012)

3.2.2.3-52 USE AND POSSESSION BEFORE THE PROJECT IS COMPLETE (JUL 2004)

3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2004)

3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2004)

3.2.2.3-55 AVAILABILITY AND USE OF UTILITY SERVICES (JUL 2004)

3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2004)

3.2.2.3-58 LAYOUT OF WORK (MAR 2009)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009)

3.2.2.3-61 RESPONSIBILITY OF THE ARCHITECT-ENGINEER CONTRACTOR (JUL 2004)

3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2004)

3.2.2.3-67 SPECIAL PRECAUTIONS FOR WORK AT OPERATING AIRPORTS (JUL 2004)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)

3.2.2.3-69 SUBCONTRACTS - CONSTRUCTION (JUL 2004)

3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (OCT 2015)

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2011)

3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)

3.2.5-1 OFFICIALS NOT TO BENEFIT (APR 2021)

3.2.5-3 GRATUITIES OR GIFTS (OCT 2019)

3.2.5-4 CONTINGENT FEES (OCT 1996)

3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2019)

3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 1996)

3.2.5-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)

3.2.5-14 DISPLAY OF HOTLINE POSTER(S) (APR 2008)

3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (JUL 2018)

3.3.1-3 PAYMENTS UNDER FIXED-PRICE ARCHITECT-ENGINEER CONTRACTS (JUL 2018)

3.3.1-5 PAYMENTS UNDER TIME-AND-MATERIALS AND LABOR-HOUR CONTRACTS (OCT

2021)

3.3.1-7 LIMITATION ON WITHHOLDING OF PAYMENTS (JUL 2018)

3.3.1-9 INTEREST (JUL 2018)

3.3.1-18 PROMPT PAYMENT FOR FIXED-PRICE ARCHITECT-ENGINEER CONTRACTS (JAN

2021)

3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)

3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS

(OCT 2012)

3.3.1-31 PROGRESS PAYMENTS (JUL 2018)

3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD

MANAGEMENT (JUL 2018)

3.3.1-40 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (JAN 2021)

3.3.2-1 FAA COST PRINCIPLES (OCT 2019)

3.4.1-6 ADDITIONAL BOND SECURITY (APR 1996)

3.4.1-7 NOTICE TO PROCEED (OCT 2019)

3.4.1-9 DEPOSIT OF ASSETS INSTEAD OF SURETY BONDS (APR 1996)

3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (OCT 2020)

3.4.1-12 INSURANCE (OCT 2019)

3.4.2-6 TAXES - CONTRACTS PERFORMED IN U.S. POSSESSIONS OR PUERTO RICO (OCT

1996)

3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (JUL 2019)

3.5-1 AUTHORIZATION AND CONSENT (JAN 2019)

3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-

DISABLED VETERAN OWNED, AND HUBZONE SMALL BUSINESS CONCERNS (JAN 2021)

3.6.1-4 SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-DISABLED VETERAN

OWNED, AND HUBZONE SMALL BUSINESS SUBCONTRACTING PLAN (JUL 2021)

3.6.1-15 POST-AWARD SMALL BUSINESS PROGRAM RE-REPRESENTATION (JAN 2021)

3.6.2-1 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME

COMPENSATION (OCT 2018)

3.6.2-2 CONVICT LABOR (APR 1996)

3.6.2-9 EQUAL OPPORTUNITY (JUL 2020)

3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (JUL 2020)

3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (OCT 2018)

3.6.2-18 DAVIS BACON ACT (OCT 2018)

3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (JUL 2017)

3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2017)

3.6.2-21 APPRENTICES, TRAINEES, AND HELPERS (JAN 2019)

3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (JAN 2019)

3.6.2-23 CERTIFICATION OF ELIGIBILITY (JAN 2019)

3.6.2-35 PREVENTION OF SEXUAL HARASSMENT (OCT 2018)

3.6.2-39 TRAFFICKING IN PERSONS (APR 2019)

3.6.2-44 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (JAN 2019)

3.6.3-9 OZONE DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL

HYDROFLUOROCARBONS (OCT 2016)

3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (JAN 2020)

3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (JAN 2020)

3.6.3-16 DRUG FREE WORKPLACE (MAR 2009)

3.6.3-17 EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (JAN 2020)

3.6.3-19 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (JAN 2020)

3.6.3-21 EFFICIENCY IN WATER CONSUMING PRODUCTS AND SERVICES (JAN 2020)

3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (JAN 2020)

3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2015)

3.6.3-25 AEROSOLS (OCT 2016)

3.6.3-26 FOAMS (OCT 2016)

3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)

3.6.4-23 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (JAN 2021)

3.9.1-1 CONTRACT DISPUTES (JAN 2020)

3.9.1-2 PROTEST AFTER AWARD (AUG 1997)

3.10.1-7 BANKRUPTCY (APR 1996)

3.10.1-8 SUSPENSION OF WORK (SEP 1998)

3.10.1-12 CHANGES - FIXED-PRICE (APR 1996) - ALTERNATE III (APR 1996)

3.10.1-14 CHANGES - TIME AND MATERIALS OR LABOR HOURS (APR 1996)

3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF

IMPROVEMENTS (JUL 1996)

3.10.1-16 CHANGES AND CHANGED CONDITIONS (APR 1996)

3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)

3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)

3.10.1-26 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (APR 2021)

3.10.2-3 SUBCONTRACTS (TIME-AND-MATERIALS AND LABOR-HOUR CONTRACTS) (APR

1996)

3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT

1996)

3.10.6-3 TERMINATION (COST-REIMBURSEMENT) (OCT 2014) - ALTERNATE IV (JAN 2015)

3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)

3.10.6-7 EXCUSABLE DELAYS (OCT 1996)

3.13-5 SEAT BELT USE BY CONTRACTOR EMPLOYEES (OCT 2001)

3.13-13 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JAN 2011)

3.2.2.3-41 PERFORMING WORK (JUL 2004)

The Contractor (you) must perform, using your own organization, work equivalent to at least 25 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.

(End of clause)

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (OCT 2021)

The Contractor must (a) begin work under this contract within [Contracting Officer (CO) insert number] calendar days after the date you receive the notice to proceed, (b) perform the work diligently, and (c) complete the entire work ready for use not later than [CO insert date]. The time allowed for completion must include final cleanup of the premises.

(End of clause)

3.2.4-5 ALLOWABLE COST AND PAYMENT (OCT 2019)

(a) Invoicing. The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with the Federal Aviation Administration's (FAA) "Contract Cost Principles" in effect on the date of this contract and the terms of this contract (upon request, the Contracting Officer will provide a copy of the FAA Contract Cost Principles). The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract. Any payments for costs under this contract, particularly for costs of Indirect Rates under paragraph (d), must be subject to the provisions of the "Limitation of Costs" clause, or the "Limitation of Funds" clause, if applicable. The

Contractor must be responsible to manage and control the allowable cost of performance of the contract, such that payments for any allowable costs, including Indirect Rates under paragraph (d), must not exceed the estimated cost set forth in the schedule, or the funded amount, less an allowance for fee, if the contract is incrementally funded.

(b) Reimbursing costs.

(1) For the purpose of reimbursing allowable costs (except as provided in subparagraph (2) below, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term costs includes only:

(i) Those costs the Contractor has incurred and recorded at the time of the request for reimbursement;

(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid for-

(A) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;

(B) Direct labor;

(C) Direct travel;

(D) Other direct in-house costs; and

(E) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under FAA contracts; and

(iii) The amount of payments that have been paid to the Contractor's subcontractors under similar cost standards.

(2) Contractor contributions to any pension or other post-retirement benefit, profit-sharing or employee stock ownership plan funds that are paid quarterly or more often may be included in indirect costs for payment purposes: Provided, that the Contractor pays the contribution to the fund within 30 days after the close of the period covered. Payments made 31 days or more after the close of a period must not be included until the Contractor actually makes the payment. Accrued costs for such contributions that are paid less often than quarterly must be excluded from indirect costs for payment purposes until the Contractor actually makes the payment.

(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) below, allowable indirect costs under this contract must be obtained by applying indirect cost rates established in accordance with paragraph (d) below.

(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government will be disregarded for purposes of cost-reimbursement under this clause.

(c) Small business concerns. A small business concern may be paid more often than every 2 weeks and may invoice and be paid for recorded costs for items or services purchased directly for the contract, even though the concern has not yet paid for those items or services.

(d) Final indirect cost rates.

(1) Final annual indirect cost rates and the appropriate bases must be established for the period covered by the indirect cost rate proposal.

(2) The Contractor must, within 180 days after the expiration of each of its fiscal years, or by a later date approved by the Contracting Officer, submit to the cognizant Contracting Officer and to the cognizant audit activity proposed certified final indirect cost rates for that period and supporting cost data specifying the contract and/or subcontract to which the rates apply. The proposed rates must be based on the Contractor's actual cost experience for that period. The appropriate Government representative and Contractor will establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.

(i) An adequate indirect cost rate proposal must include the following data unless otherwise specified by the cognizant Contracting Officer:

(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.

(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).

(C) Overhead expenses (final indirect cost pool). Schedule claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.

(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Charts of Accounts) and expense reallocation to final indirect cost pools.

(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.

(F) Facilities capital cost of money factors computation.

(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost elements.

(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.

(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.

(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers;

subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contract information).

(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.

(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.

(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.

(N) Certificate of final indirect cost.

(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).

(3) The Contractor and the appropriate Government representative will execute a written understanding setting forth the final indirect cost rates.

This is the start of the file's text. The full file is on GovTribe.