Amendment 1 SAI SIR Section J.4 12.27.23.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Surface Awareness Initiative Federal contract opportunity
- Solicitation number
- 693KA7SAI
About this file
This document contains a Contract Data Requirements List (CDRL) for a federal contract solicitation for the Surface Awareness Initiative (SAI). The CDRL specifies 15 data items the contractor must deliver related to program management, testing, maintenance, implementation and acceptance. Delivery due dates range from 10 to 30 days after milestones such as contract award, site surveys, testing and program completion. The contractor must submit drafts for government review within the stated timelines and allow for a 10 day review period before providing finalized deliverables in electronic format. The solicitation also provides high-level details on the SAI opportunity, which is being conducted by the Department of Transportation Federal Aviation Administration Enroute Terminal Contracts to develop surface awareness capabilities. Interested offerors are encouraged to submit any remaining questions promptly in accordance with the solicitation instructions.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAI CDRLs
| CDRL | TITLE | AUTHORITY | |||||||||||
| Note 1* | SOW REFRENCE | ||||||||||||
| Note 2* | CLIN | A/I | |||||||||||
| Note 3* | INITIAL SUBMISSION | ||||||||||||
| Note 4* | FREQUENCY | FAA REVIEW (CALENDAR DAYS) | REVISED SUBMISSION | ||||||||||
| NOTE 4* | FAA REVIEW | ||||||||||||
| (CALENDAR DAYS) | DATE OF SUBSEQUENT SUBMISSION | APPROVED BY | |||||||||||
| Note 5* | QUANTITY OF DRAFT | DELIVERY FORMAT | |||||||||||
| OF FINAL (QUANTITY) | COMMENTS | ||||||||||||
| PM01 | INTEGRATED MASTER SCHEDULE | CDRL SAI-PM01 | 4.2.1.2 | 01.A1 | A | 15 DAC | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) | |||||||||||
| Electronic (1) | IMS is applicable from contract award through ADP completion | ||||||||||||
| PM02 | USER MANUAL | CDRL SAI-PM02 | 4.2.3 | 01.A1 | A | 20 DAC | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| TE01 | SERVICE REQUALIFICATION TEST PLAN | CDRL SAI-TE01 | 4.2.6 | 01.A2 | A | As required | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| TE02 | SERVICE REQUALIFICATION TEST PROCEDURE | CDRL SAI-TE02 | 4.2.6 | 01.A2 | A | As required | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| TE03 | SERVICE REQUALIFICATION TEST REPORT | CDRL SAI-TE03 | 4.2.6 | 01.A2 | A | 20 Days after test completion | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| SM01 | TECHNICAL PERFORMANCE MEASURE REPORT | CDRL SAI-SM01 | 4.2.8.2 | 01.A2 | A | 15th of the month for each month after completion of SAT | ONE/R | 10 | 5 DARC | 5 | Monthly | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| SM02 | MAINTENANCE PLAN | CDRL SAI-SM02 | 4.2.8.3 | 01.A1 | A | 20 DAC | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| IM01 | DESIGN SITE SURVEY REPORT | CDRL SAI-IM01 | 4.2.9.2 | 01.D | A | 15 Days after site survey completion | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| IM02 | SITE-SPECIFIC IMPLEMENTATION PLAN | CDRL SAI-IM02 | 4.2.9.3 | 01.D | A | 15 Days after site survey completion | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| IM03 | SERVICE ACCEPTANCE TEST PROCEDURES | CDRL SAI-IM03 | 4.2.9.6 | 01.A1 | A | 30 DAC | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | ||||||||||||
| 1 | Regular (1) |
Electronic (1)
| IM04 | SERVICE ACCEPTANCE TEST REPORT | CDRL SAI- IM04 | 4.2.9.6 | 01.A1 | A | 10 Days after test completion | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| IM05 | CONTRACTOR ACCEPTANCE (CAC) | CDRL SAI-IM05 | 4.2.9.7 | 01.A1 | A | 30 DAC | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| IMO6 | ACCEPTANCE DATA PACKAGE (ADP) | CDRL SAI-IMO6 | 4.2.9.7 | 01.A1 | A | Upon completion of ADP | ONE/R | 10 | 5 DARC | 5 | R/ASR | CO | |
| AJM-XXX | 1 | Regular (1) |
Electronic (1)
| Notes: |
| *1. Data Item Description (DID) identification number where detailed preparation instructions are provided. |
| *2. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be the Performance Work Statement (PWS) paragraph. |
| *3. A-Requires Government approval, I-for information only. |
| *4. The Contractor must provide the deliverables in "Calendar" days unless otherwise specified. |
| *5. Addressee responsible for approval. |
| Frequency Acronyms: | Submission Acronyms: |
| ONE/R = One Time with Revisions | DAC = Days after Contract Award |
| MTHLY = Monthly | DARC = Days after Receipt of Comments |
| R/ASR = Revisions as Required | DARO = Days after Receipt of Order |
| ASREQ = As Required |
File details come from the government source that posted it. Updated .