SMR4 Attachment J-12 - RIO Identification Worksheet (In Depth) Final.pdf

PDF 1 MB Posted

Attached to
Surface Movement Radar, Model 4 , Replacement for Airport Surface Detection Equipment Model 3 Surface Movement Radar (ASDE-3 SMR)
Solicitation number
693KA7-23-R-00002
Issued by

About this file

This document is a Risk, Issue, and Opportunity (RIO) Identification Worksheet for the Surface Movement Radar, Model 4 (SMR4) contract opportunity. It provides a template for identifying, assessing, and developing mitigation plans for risks, issues, and opportunities related to the SMR4 procurement.

The key details include a description of the purpose and background of the SMR4 procurement, which is to replace the existing Airport Surface Detection Equipment Model 3 Surface Movement Radar (ASDE-3 SMR) at up to 34 locations. The procurement will involve the purchase of SMR4 hardware and software, development of an interface between the SMR4 and the FAA's existing Surface Surveillance Systems, testing, installation, and integration, as well as other related services. The RIO Worksheet outlines a structured process for identifying, assessing, and developing mitigation plans for risks, issues, and opportunities related to this effort. It includes sections for basic information, RIO identification, assessment, and mitigation planning.

View the file

Other files

File Type Posted
SMR4 Attachment J-10 - Key Personnel Requirements Final.pdf PDF
SMR4 Section M - Evaluation Factors For Award Final.pdf PDF
SMR4 Section F - Deliveries or Performance Final.pdf PDF
SMR4 Section L - Instructions to Offerors Final.pdf PDF
SMR4 Attachment J-17 - ASDE-3 SMR Replacement PSP - Extracted from Portfolio Final.pdf PDF
SMR4 Section B - Supplies and Services Final.pdf PDF
SMR4 Section I - Contract Clauses Final.pdf PDF
SMR4 Attachment J-05 - SMR4 Site List_2024-08-26.xlsx XLSX spreadsheet
SMR4 Attachment J-04 - SMR4 IRD Draft.pdf PDF
SMR4 Attachment J-15 - Program Level IBR Guide Final.pdf PDF
SMR4 Attachment J-19 - LMI Requirements Template_Final.xlsx XLSX spreadsheet
SMR4 Section E - Inspection and Acceptance Final.pdf PDF
Attachment L-6 - Cost Price Workbook Final.xlsx XLSX spreadsheet
Attachment L-4 - SMR4 SIR Questions Matrix.xlsx XLSX spreadsheet
SMR4 Attachment J-13 - FAA Asset Identification Process and Procedure Guide Final.pdf PDF
SMR4 Attachment J-09 - SMR4 Program Extract of Applicable Sections - FAA WBS 5.3_v2.pdf PDF
SMR4 Attachment J-16 -Request For Visit Foreign National FAA Form 1600-78 pending.pdf PDF
SMR4 Attachment J-18 - Disclosure of Data-Assertion and Identification (Assertions List).pdf PDF
Attachment L-2 Past Performance Survey Form Final.docx DOCX document
SMR4 Attachment J-11 - Surface Surveillance Program RIO Management SOP Final.pdf PDF
SMR4 Attachment J-06 - GSIP Draft.pdf PDF
Attachment L-1 Past Performance List Final.docx DOCX document
SMR4 Section K - Representations Certifications and Other Statements of Offerors Final.pdf PDF
SMR4 Section H - Special Contracts Requirements Final.pdf PDF
SMR4 Attachment J-07 - SMR4 Technical Requirements Matrix_Final.xlsx XLSX spreadsheet
SMR4 Attachment J-03 - SMR4 SSD Draft.pdf PDF
J-02 SMR4 Attachment - CDRLs and DIDs Matrix_2024-10-24 Final.xlsx XLSX spreadsheet
Attachment L-3 - Business Declaration Form.pdf PDF
Attachment L-5 - FAA SMR-4 RunAcquisitions Vendor User Form.docx DOCX document
693KA7-25-R-00001_SMR Section A final.pdf PDF
SMR4 Section C - ASDE-3 SMR Replacement SOW Final.pdf PDF
SMR4 Section G - Contracting Administration Data Final.pdf PDF
SMR4 Section D - Packaging and Marking Final.pdf PDF
J-02 SMR4-DIDs.zip ZIP file
FAA Responses to RFI Vendor Questions (published Nov 20 2023).pdf PDF
Request For Information - SMR 4 (Amendment 1) - published.pdf PDF
Attachment 2 - Draft SIR - Section J - SMR4 SSD (Release).docx DOCX document
Request For Information - SMR 4 - published.pdf PDF
Attachment 3 - Draft SIR - Section J - SMR4 to Surface Surveillance System IRD.v3.1 (Release).docx DOCX document
Attachment 4 - Draft SIR - Section L (Release).docx DOCX document
Attachment 7 - Business Declaration Form.pdf PDF
Attachment 1 - Draft SIR - Section C - ASDE-3 SMR Replacement SOW (Release).docx DOCX document
Attachment 5 - Draft SIR - Section M (Release).docx DOCX document
Attachment 6 - SMR4 Draft SIR Response Matrix.xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIR 693KA7-25-R-00001

Surface Movement Radar Model 4 (SMR4) Section J, Attachment J-12

RIO Identification Template (In Depth)

Title: [REQUIRED] A brief title that provides high level context of the RIO

This worksheet is intended for identification and drafting of new RIOs Page 1 of 8

Step 1: Basic Information

Identified by: [REQUIRED] The individual who identified the RIO Date Identified: [REQUIRED]

Involved Org(s): The organization(s) impacted/interested in the RIO

RIO Owner: [REQUIRED] The individual who identified the RIO The individual of primary responsibility for the RIO

Step 2: Identify the Risk, Issue, or Opportunity

RIO Management is the standardized, continuous, and proactive process that identifies RIOs, assesses and analyzes RIOs, effectively mitigates risks/issues, and leverages opportunities to achieve program/portfolio objectives.

☐ Risk: A future event or situation with a realistic probability of occurring that may have a negative impact to the successful accomplishment of one or more program/portfolio objectives.

☐ Issue: An event or situation that has occurred or is certain to occur and has a negative impact to the successful accomplishment of one or more program/portfolio objectives.

☐ Opportunity: A future event or situation with a realistic probability of occurring that may have a positive impact to the successful accomplishment of one or more program/portfolio objectives.

Step 3: More Information

Elaboration (optional, clarifying or contextual information)

Context: Circumstances, interrelationships, sources, and contributing factors

Root Cause: Summary of the underlying factor(s) that cause the RIO to occur

Impact: Summary of the RIO effect on the program if/when it materializes

Notes: Additional information that is important to document and maintain

Timeline (sketch out when the expected impact(s) might occur)

FINAL

RIO Statement IF [REQUIRED] form the beginning of the if/then RIO statement, THEN [REQUIRED] form the beginning of the if/then RIO statement

This worksheet is intended for identification and drafting of new RIOs Page 2 of 8

NOW IMPACT

Note: Consider plan start date, plan completion (target resolution) date, and realization date.

This worksheet is intended for identification and drafting of new RIOs Page 3 of 8

Step 4: RIO Assessment

Likelihood What is the probability that the "If" condition will occur? On the following page circle the applicable level (A, B, C, D or E) on the scorecard.

Impact Given the event occurs, what is the magnitude of the "Then" condition? On the following page circle the impact description in each facet (technical, schedule, and cost) column. Take note of the highest impact level (1, 2, 3, 4, or 5) from the three facets for use when rating the RIO

– this is the “driving impact”.

Rating On the following page circle the likelihood and highest impact level on the corresponding grid to identify the rating of the RIO. Rating can be expressed in two forms, alpha-numeric or the numeric equivalent (for example, a Risk or Issue rating can either be E2 or 13, and an Opportunity can be E2 or -13).

Scoring Notes Summarize the rationale for the selected rating

This worksheet is intended for identification and drafting of new RIOs Page 4 of 8

This worksheet is intended for identification and drafting of new RIOs Page 5 of 8

Step 5: RIO Plan

RIO plans consist of a specific course of action, approach concept(s), and discrete steps for each applicable RIO, and must be included for all RIOs with an approach strategy of Control.

• Risks: The objective of the plan is to reduce the likelihood of occurrence and/or negative impact if the risk is realized.

• Issues: The objective of the plan is to reduce the negative impact

• Opportunities: The objective of the plan is to improve the likelihood and/or positive impact.

Once a plan strategy has been chosen, a high level plan description is generated. If there are logical groupings of tasks or multiple methods used to enact the plan, these can be identified as unique approaches.

Plan Title: [REQUIRED] A brief title that provides high level context of the plan

Plan Description: [REQUIRED] Description of the course of action to address the RIO

Plan Owner The individual of primary responsibility for the Plan

This worksheet is intended for identification and drafting of new RIOs Page 6 of 8

Plan Strategy (Select One) Definition

☐ Avoidance Avert the potential of occurrence and/or impact by selecting a different programmatic path than planned.

☐ Transfer Shift the RIO to another organization. For more information on transferring a RIO see Section 2.3.6.

☐ Control MOST COMMON - Develop options & alternatives for taking action to address the RIO.

☐ Assumption Accept the likelihood/probability and the impacts associated with a RIO's occurrence.

☐ Research & Knowledge Expand experience and subject matter expertise

This worksheet is intended for identification and drafting of new RIOs Page 7 of 8

Step 6: RIO Mitigation Steps / Response Activities

Steps are required for Control and R&K, and recommended for all other strategies. Plans consist of a series of steps that when completed reduce the rating of the RIO to the desired threshold for the program. When developing the plan steps, interdependences should be identified and considered, when applicable. This level of detail will enable the organization to monitor the progress of reducing the likelihood and impact of Risks and Issues and achieving desired Opportunities.

Action Plan - First Approach

# Title/Notes Step Owner Target Start Date Target Due Date

[REQUIRED] Title provides context on the course of action Optional additional Step information

[REQUIRED]

Party of primary responsibility for the Step

[OPTIONAL] Date when the RIO Step will be initiated

[REQUIRED]

Date when the RIO Step will be completed

REQUIRED] Title provides context on the course of action Optional additional Step information

[REQUIRED]

Party of primary responsibility for the Step

[OPTIONAL] Date when the RIO Step will be initiated

[REQUIRED]

Date when the RIO Step will be completed

REQUIRED] Title provides context on the course of action Optional additional Step information

[REQUIRED]

Party of primary responsibility for the Step

[OPTIONAL] Date when the RIO Step will be initiated

[REQUIRED]

Date when the RIO Step will be completed

REQUIRED] Title provides context on the course of action Optional additional Step information

[REQUIRED]

Party of primary responsibility for the Step

[OPTIONAL] Date when the RIO Step will be initiated

[REQUIRED]

Date when the RIO Step will be completed

Action Plan - Second Approach (Optional)

# Title/Notes Step Owner Target Start Date Target Due Date

[REQUIRED] Title provides context on the course of action Optional additional Step information

[REQUIRED]

Party of primary responsibility for the Step

[OPTIONAL] Date when the RIO Step will be initiated

[REQUIRED]

Date when the

This worksheet is intended for identification and drafting of new RIOs Page 8 of 8

REQUIRED] Title provides context on the course of action Optional additional Step information

[REQUIRED]

Party of primary responsibility for the Step

[OPTIONAL] Date when the RIO Step will be initiated

[REQUIRED]

Date when the

Reference: Documented Sources (Optional)

Identify documents as required to describe context for the RIO.

Title of Document Revision / Date (when applicable) Location

Enter text. Enter text. Enter text.

Enter text. Enter text. Enter text.

Enter text. Enter text. Enter text.

Enter text. Enter text. Enter text.

File details come from the government source that posted it. Updated .