FAA Responses to RFI Vendor Questions (published Nov 20 2023).pdf

PDF 120 KB Posted

Attached to
Surface Movement Radar, Model 4 , Replacement for Airport Surface Detection Equipment Model 3 Surface Movement Radar (ASDE-3 SMR)
Solicitation number
693KA7-23-R-00002
Issued by

View the file

Other files

File Type Posted
SMR4 Attachment J-10 - Key Personnel Requirements Final.pdf PDF
SMR4 Section M - Evaluation Factors For Award Final.pdf PDF
SMR4 Section F - Deliveries or Performance Final.pdf PDF
SMR4 Section L - Instructions to Offerors Final.pdf PDF
SMR4 Attachment J-17 - ASDE-3 SMR Replacement PSP - Extracted from Portfolio Final.pdf PDF
SMR4 Section B - Supplies and Services Final.pdf PDF
SMR4 Section I - Contract Clauses Final.pdf PDF
SMR4 Attachment J-05 - SMR4 Site List_2024-08-26.xlsx XLSX spreadsheet
SMR4 Attachment J-04 - SMR4 IRD Draft.pdf PDF
SMR4 Attachment J-15 - Program Level IBR Guide Final.pdf PDF
SMR4 Attachment J-19 - LMI Requirements Template_Final.xlsx XLSX spreadsheet
SMR4 Section E - Inspection and Acceptance Final.pdf PDF
Attachment L-6 - Cost Price Workbook Final.xlsx XLSX spreadsheet
Attachment L-4 - SMR4 SIR Questions Matrix.xlsx XLSX spreadsheet
SMR4 Attachment J-13 - FAA Asset Identification Process and Procedure Guide Final.pdf PDF
SMR4 Attachment J-09 - SMR4 Program Extract of Applicable Sections - FAA WBS 5.3_v2.pdf PDF
SMR4 Attachment J-16 -Request For Visit Foreign National FAA Form 1600-78 pending.pdf PDF
SMR4 Attachment J-18 - Disclosure of Data-Assertion and Identification (Assertions List).pdf PDF
Attachment L-2 Past Performance Survey Form Final.docx DOCX document
SMR4 Attachment J-11 - Surface Surveillance Program RIO Management SOP Final.pdf PDF
SMR4 Attachment J-06 - GSIP Draft.pdf PDF
Attachment L-1 Past Performance List Final.docx DOCX document
SMR4 Section K - Representations Certifications and Other Statements of Offerors Final.pdf PDF
SMR4 Section H - Special Contracts Requirements Final.pdf PDF
SMR4 Attachment J-07 - SMR4 Technical Requirements Matrix_Final.xlsx XLSX spreadsheet
SMR4 Attachment J-03 - SMR4 SSD Draft.pdf PDF
J-02 SMR4 Attachment - CDRLs and DIDs Matrix_2024-10-24 Final.xlsx XLSX spreadsheet
Attachment L-3 - Business Declaration Form.pdf PDF
Attachment L-5 - FAA SMR-4 RunAcquisitions Vendor User Form.docx DOCX document
SMR4 Attachment J-12 - RIO Identification Worksheet (In Depth) Final.pdf PDF
693KA7-25-R-00001_SMR Section A final.pdf PDF
SMR4 Section C - ASDE-3 SMR Replacement SOW Final.pdf PDF
SMR4 Section G - Contracting Administration Data Final.pdf PDF
SMR4 Section D - Packaging and Marking Final.pdf PDF
J-02 SMR4-DIDs.zip ZIP file
Request For Information - SMR 4 (Amendment 1) - published.pdf PDF
Attachment 2 - Draft SIR - Section J - SMR4 SSD (Release).docx DOCX document
Request For Information - SMR 4 - published.pdf PDF
Attachment 3 - Draft SIR - Section J - SMR4 to Surface Surveillance System IRD.v3.1 (Release).docx DOCX document
Attachment 4 - Draft SIR - Section L (Release).docx DOCX document
Attachment 7 - Business Declaration Form.pdf PDF
Attachment 1 - Draft SIR - Section C - ASDE-3 SMR Replacement SOW (Release).docx DOCX document
Attachment 5 - Draft SIR - Section M (Release).docx DOCX document
Attachment 6 - SMR4 Draft SIR Response Matrix.xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page # Section # and Name Question/Comment/Rationale FAA Response n/a all

Has the FAA considered requesting a ROM price from Industry based on the entire program, now that the Draft SOW (Section C) has been released? The combination of scope for ROM prices requested in the past RFIs (SMR and Installation) and this current RFI (Integration and a portion of the SMR installation work scope) do not represent the entire program price. In fact, the ROM prices requested may represent less than half of the total price when considering the work scope associated with non-recurring expenses (NRE) needed to meet the requirements within the SSD (Section C) and the required scope of work including 110 CDRL requirements contained in the SOW (Section J) such as the "Reviews, Meetings, Conferences" of section 3.8.3.

The previous RFIs appeared to indicate that a COTS solution was acceptable, however, it is unlikely that any COTS item will also comply with over 500 requirements, nor have existing artifacts to satisfy the CDRL requirements without significant additional work.

The FAA has sufficient ROM cost information at this time. No additional ROM costs are needed from industry.

1 1 Overview

Regarding "The FAA intends to acquire a Commercial Off The Shelf (COTS) Surface Movement Radar (SMR) subsystem with necessary form, fit, and function enhancements to integrate with the existing surface surveillance systems. The changes are anticipated to be limited to developing the interface between the SMR and the surface surveillance system and support remote maintenance and monitoring. Additional development work is expected to be required to mount the SMR on existing towers. " The number of requirements contained in Section J SSD and the CDRLs in this document seem incongruent with any COTS solution. Is the FAA open to consideration of COTS equivalent substitutes or requirements tailoring to maximize the cost advantage of a COTS solution?

The FAA anticipates SMR4 will be based on a commercial product which may require modification. The FAA priorities are safety, security, and maintainability. The requirements are intended to support these priorities.

3.9.2

Production Systems

Is the 34 system count on page 1, section 1 inclusive of the 3 systems in section

3.9.2 subsections 1., 2. and 3.? Yes.

79 3.10.3 Site Survey

How is the work scope required from the Not-To-Exceed (NTE) cost estimate following each site survey to be funded if the site surveys for each of the 34 existing ASDE-3 SMR sites will be performed after contract award?

"The Contractor must develop a Not-to-Exceed (NTE) T&M estimate from the Site Survey, to include, but not limited to, site preparation, equipment removal, equipment installation, checkout, and acceptance costs, including ancillary material requirements to be expressly used at the identified site. "

FAA requirements remain under development. The FAA will allow Offerors to perform a site visit to an operational FAA facility to support their SIR proposal development. The information from this visit should be used in development of the basis of estimate for all sites. The FAA will issue delivery/task orders for each site survey based on approval of the NTE cost estimates.