This document is a Contract Data Requirements List (CDRL) matrix related to a federal contract opportunity for the Surface Movement Radar, Model 4 (SMR4) to replace the existing Airport Surface Detection Equipment Model 3 Surface Movement Radar (ASDE-3 SMR). The CDRL matrix details the deliverables the contractor must provide, including Configuration Management, Implementation, Logistics Management, Program Management, Quality Assurance, Reliability Program, System Safety Assurance, Systems Engineering, System Security, Software Design & Development, Technical Data, and Training Program items. Each deliverable item includes details on the CLIN, authority, SOW paragraph reference, approval code, frequency, and submission dates. The key products and services required include procurement of the SMR4 hardware and software, development of the SMR4 interface with the Surface Surveillance Systems, testing, installation and integration, and provision of various support services. This CDRL matrix is related to the pre-solicitation for the SMR4 contract opportunity, which has an anticipated solicitation release in the future.

View the file

Other files

File Type Posted
SMR4 Attachment J-10 - Key Personnel Requirements Final.pdf PDF
SMR4 Section M - Evaluation Factors For Award Final.pdf PDF
SMR4 Section F - Deliveries or Performance Final.pdf PDF
SMR4 Section L - Instructions to Offerors Final.pdf PDF
SMR4 Attachment J-17 - ASDE-3 SMR Replacement PSP - Extracted from Portfolio Final.pdf PDF
SMR4 Section B - Supplies and Services Final.pdf PDF
SMR4 Section I - Contract Clauses Final.pdf PDF
SMR4 Attachment J-05 - SMR4 Site List_2024-08-26.xlsx XLSX spreadsheet
SMR4 Attachment J-04 - SMR4 IRD Draft.pdf PDF
SMR4 Attachment J-15 - Program Level IBR Guide Final.pdf PDF
SMR4 Attachment J-19 - LMI Requirements Template_Final.xlsx XLSX spreadsheet
SMR4 Section E - Inspection and Acceptance Final.pdf PDF
Attachment L-6 - Cost Price Workbook Final.xlsx XLSX spreadsheet
Attachment L-4 - SMR4 SIR Questions Matrix.xlsx XLSX spreadsheet
SMR4 Attachment J-13 - FAA Asset Identification Process and Procedure Guide Final.pdf PDF
SMR4 Attachment J-09 - SMR4 Program Extract of Applicable Sections - FAA WBS 5.3_v2.pdf PDF
SMR4 Attachment J-16 -Request For Visit Foreign National FAA Form 1600-78 pending.pdf PDF
SMR4 Attachment J-18 - Disclosure of Data-Assertion and Identification (Assertions List).pdf PDF
Attachment L-2 Past Performance Survey Form Final.docx DOCX document
SMR4 Attachment J-11 - Surface Surveillance Program RIO Management SOP Final.pdf PDF
SMR4 Attachment J-06 - GSIP Draft.pdf PDF
Attachment L-1 Past Performance List Final.docx DOCX document
SMR4 Section K - Representations Certifications and Other Statements of Offerors Final.pdf PDF
SMR4 Section H - Special Contracts Requirements Final.pdf PDF
SMR4 Attachment J-07 - SMR4 Technical Requirements Matrix_Final.xlsx XLSX spreadsheet
SMR4 Attachment J-03 - SMR4 SSD Draft.pdf PDF
Attachment L-3 - Business Declaration Form.pdf PDF
Attachment L-5 - FAA SMR-4 RunAcquisitions Vendor User Form.docx DOCX document
SMR4 Attachment J-12 - RIO Identification Worksheet (In Depth) Final.pdf PDF
693KA7-25-R-00001_SMR Section A final.pdf PDF
SMR4 Section C - ASDE-3 SMR Replacement SOW Final.pdf PDF
SMR4 Section G - Contracting Administration Data Final.pdf PDF
SMR4 Section D - Packaging and Marking Final.pdf PDF
J-02 SMR4-DIDs.zip ZIP file
FAA Responses to RFI Vendor Questions (published Nov 20 2023).pdf PDF
Request For Information - SMR 4 (Amendment 1) - published.pdf PDF
Attachment 2 - Draft SIR - Section J - SMR4 SSD (Release).docx DOCX document
Request For Information - SMR 4 - published.pdf PDF
Attachment 3 - Draft SIR - Section J - SMR4 to Surface Surveillance System IRD.v3.1 (Release).docx DOCX document
Attachment 4 - Draft SIR - Section L (Release).docx DOCX document
Attachment 7 - Business Declaration Form.pdf PDF
Attachment 1 - Draft SIR - Section C - ASDE-3 SMR Replacement SOW (Release).docx DOCX document
Attachment 5 - Draft SIR - Section M (Release).docx DOCX document
Attachment 6 - SMR4 Draft SIR Response Matrix.xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL Categories

CategoryDescription
CMConfiguration Management
IMImplementation
LMLogistics Management
PMProgram Management
QAQuality Assurance
RMReliability Program
SASystem Safety Assurance
SESystems Engineering
SSSystem Security
SWSoftware Design & Development
TDTechnical Data
TESystem Test & Evaluation
TPTraining Program

3SR CDRLs List

Requirements
The Contractor must deliver each item in the CDRL matrix to the CO and COR.
The Contractor must deliver each item in the CDRL matrix at the frequency listed in Column 7.
The Contractor must provide the deliverables in "Calendar" days unless otherwise specified.
The Contractor must deliver all CDRLs electronically
Notes:
*1. Data Item Description (DID) identification number (Filename of DID) where detailed preparation instructions are provided.
*2. Aprv-Requires Government approval, Info-for information only.
*3. All deliveries are in electronic format; refer to the SOW for hard copy delivery requirements.
#CDRL Category1. Data Item No.2. TITLE3. CLIN4. Authority
Note 1*5. SOW Paragraph Reference6. APP Code
Note 2*7. FREQUENCY8. Date of First Submission9. FAA REVIEW for First Submission (days)10. Date of Subsequent Submission11. FAA REVIEW for Subsequent Submission (days)12. REMARKS
1Configuration Management
2CMCM01Baseline Index Report0001, 1001, 2001SMR4-DID-CM013.3.2AprvASREQ, R/ASRSee RemarksSee RemarksSee Remarks30 (Commercial and Product Baselines)Commercial Baseline: 1st submission NLT 30 DAC; 1st FAA review 30D; revision due 30 DARC.

System Baseline: 1st submission due 7 DPT first TRR; subsequent submission due 7 DPT each subsequent TRR.

Product Baseline: 1st submission due 21 DA completion of FCA/PCA; 1st FAA review 30D; revision due 30 DARC.

For subsequent updates to product baseline, submission due 21 DA delta FCA/PCA or formal testing if no delta FCA/PCA. Revision due 30 DARC.

3CMCM02Engineering Change Proposal (ECP)0001, 1001, 2001SMR4-DID-CM023.3.3.2AprvASREQ, R/ASRASREQ3030 DARC30
4CMCM03Request for Variance (RFV)0001, 1001, 2001SMR4-DID-CM033.3.3.3AprvASREQ, R/ASRASREQ3030 DARC30
5CMCM04Configuration Audit Plan0001, 1001, 2001SMR4-DID-CM043.3.4AprvONE/R90 DPT FCA2121 DARC21
6CMCM05Configuration Audit Summary Report0001, 1001, 2001SMR4-DID-CM053.3.4AprvONE/R45 DA FCA/PCA3030 DARC30
7Implementation
8IMIM01EOSH Program Plan (EPP)0001, 1001, 2001SMR4-DID-IM013.4AprvONE/R45 DAC3030 DARC30
9IMIM02Site Engineering Report (SER)0012a, 1012a, 2012aSMR4-DID-IM023.10.2AprvSite/R30 DA Site Survey2130 DARC21
10IMIM03Construction Drawing Package (60%/90%/100%)0012b, 1012b, 2012bSMR4-DID-IM033.10.3AprvSite/RSee Remarks2130 DARC21Block 8:

- 60% 30 days after SER approval

- 90% 30 days after 60% approval

- 100% 14 days after 90% approval

11IMIM05Acceptance Data Package (ADP)0012c, 1012c, 2012cSMR4-DID-IM053.10.7AprvSite/R7 DA CAI2130 DARC21
12IMIM06System Installation Constraints Document0012a, 1012a, 2012aSMR4-DID-IM063.10.1AprvONE/R45 DAC2130 DARC21
13IMIM07NTE Site Implementation Estimate0012a, 1012a, 2012aSMR4-DID-IM073.10.2AprvSite/R30 DA Site Survey2130 DARC21
14IMIM08Siting Analysis Report (SAR)0012a, 1012a, 2012aSMR4-DID-IM083.10.1AprvSite/RSee Remarks2130 DARC21Block 8: The Government will determine if a SAR is required on a case-by-case basis per installation.
15Logistics Management
16LMLM01Integrated Support Plan (ISP)0007a, 1007a, 2007aSMR4-DID-LM013.8.4AprvASREQ90 DAC30See Remarks30Block 10: Subsequent submissions must be delivered 30 DARC and as required to reflect current program status or other changes affecting logistics support.
17LMLM02Logistics Management Information (LMI)0007a, 1007a, 2007aSMR4-DID-LM023.8.5.1AprvONE/R R/ASR60 DA CDR30See Remarks30Block 10: Subsequent submissions 60 DARC and 60 DA approved change in hw baseline
18LMLM03Recommended Site Spares0007cSMR4-DID-LM033.8.5.2AprvONE/R R/ASR90 DA CDR30See Remarks30Block 10: Subsequent submissions 30 DARC and 30 DA receipt of direction from Government to update this CDRL
19LMLM04List of Recommended Consumables0007cSMR4-DID-LM043.8.5.3AprvONE/R R/ASR90 DA CDR30See Remarks30Block 10: Subsequent submissions 30 DARC and as directed by the Government.
20LMLM05List of Recommended Depot Spares0007a, 1007a, 2007aSMR4-DID-LM053.8.5.4AprvONE/R R/ASR90 DA CDR30See Remarks30Block 10: Subsequent submissions 30 DARC and to document changes resulting from the test program, changes resulting from design modifications, and as directed by the Government
21LMLM06List of Recommended Support & Test Equipment0007eSMR4-DID-LM063.8.5.5AprvONE/R R/ASR90 DA CDR3030 DARC30
22LMLM09Asset Identification Report0007a, 1007a, 2007aSMR4-DID-LM093.8.5.7AprvONE/RSee Remarks14See Remarks14Block 8 (Date of first submission):

For Site Installations [ONE/R] - Initial submission 30 DPT each site’s CAI (one submittal per site)

Block 10 (Date of subsequent submissions) :

Site Installations - 30 DARC as part of the Contactors property management plan (Ref: Clause 3.10.3-2)

23LMLM10Piece Part List0007a, 1007a, 2007aSMR4-DID-LM103.8.5.8AprvONE/R R/ASR90 DA CDR3030 DARC30
24LMLM11COTS Hardware Description Document0007fSMR4-DID-LM113.8.6.12AprvONE/R60 DA CDR3030 DARC30
25LMLM12Lifecycle and Supportability Analysis Report0007a, 1007a, 2007aSMR4-DID-LM123.8.8.8InfoASREQ60 DA CDRN/AN/AN/A
26LMLM13ICDLS Depot Status Report0007b, 1007bSMR4-DID-LM133.8.8.6InfoMTHLYSee remarksN/AN/AN/ABlock 8: First due 30 days after CAI. Updates due monthly after first submission.
27LMLM14Depot Support Transition Plan (DSTP)0001, 1001, 2001SMR4-DID-LM143.8.8.9AprvONE/R30 DA CDR3030 DARC30
28Program Management
29PMPM01Program Management Plan0001, 1001, 2001SMR4-DID-PM013.1AprvONE/R45 DAC1414 DARC21
30PMPM02Contractor Work Breakdown Structure (CWBS)0001, 1001, 2001SMR4-DID-PM023.1.1AprvONE/R, R/ASR45 DAC1414 DARC21
31PMPM03Integrated Master Schedule (IMS)0001, 1001, 2001SMR4-DID-PM033.1.1AprvMTHLY45 DAC14See RemarksBlock 10: Next monthly submission must address comments provided by the Government.
32PMPM04Program Management Status Report (PMSR)0001, 1001, 2001SMR4-DID-PM043.1.2AprvMTHLY45 DAC14See RemarksBlock 10: Next monthly submission must address comments provided by the Government.
33PMPM05Contract Funds Status Reports (CFSR)0001, 1001, 2001SMR4-DID-PM053.1.2AprvMTHLY45 DAC14See RemarksBlock 10: Next monthly submission must address comments provided by the Government.
34PMPM06Financial Status Report0001, 1001, 2001SMR4-DID-PM063.1.2AprvMTHLY45 DAC14See RemarksBlock 10: Next monthly submission must address comments provided by the Government.
35PMPM07Contract Deliverables Status Report0001, 1001, 2001SMR4-DID-PM073.1.4InfoMTHLY60 DACN/ASee RemarksN/ABlock 10: Updates due monthly after first submission.
36PMPM08Meeting Agenda0001, 1001, 2001SMR4-DID-PM083.1.6InfoSee RemarksSee RemarksSee RemarksBlock 7: A Meeting Agenda must be submitted for each event specified by the SOW.

Block 8: A DRAFT agenda must be provided NLT 7 days prior to the associated event..

Block 10: A final agenda must be submitted 3 days prior to the associated event.

37 PM PM09 Presentation Materials 0001, 1001, 2001 SMR4-DID-PM09 3.1.6 Aprv ASGEN R/ASR See Remarks 14 14 DARC 21 Block 6: The final version of this CDRL includes any redlines from the meeting

Block 8: Required for each meeting or conference. (Note: DRAFT presentation materials are to be provided 7 days prior to meetings.) Final presentation materials must be submitted 3 days prior to meeting or conference.

38 PM PM10 Meeting Minutes 0001, 1001, 2001 SMR4-DID-PM10 3.1.6 Aprv See Remarks See Remarks 14 14 DARC 21 Block 7: Meeting Minutes must be submitted for each event specified by the SOW.

Block 8: First submission of Meeting Minutes occur NLT 7 days after completion of the event

39PMPM11Funds and Man-Hour Expenditure Report0001, 1001, 2001SMR4-DID-PM113.1.2AprvMTHLY45 DAC14See RemarksBlock 10: Next monthly submission must address comments provided by the Government.
40PMPM12Cost Performance Report0001, 1001, 2001SMR4-DID-PM123.1.2AprvMTHLY45 DAC14See RemarksBlock 10: Next monthly submission must address comments provided by the Government.
40.5PMPM13Continuity of Contract Performance Plan0001, 1001, 2001SMR4-DID-PM133.1.5.1InfoONE/R30 DAC1430 DARC21
41Quality Assurance
42QAQA01Quality System Plan0001, 1001, 2001SMR4-DID-QA013.2AprvONE/R30 DAC2130 DARC21
43Reliability Program
44RMRM01Reliability, Maintainability, Availability (RMA) Modeling and Prediction Report0002, 1002, 2002SMR4-DID-RM013.5.5.1AprvONE/R, R/ASR21 DPT CDR30See Remarks21Block 10: Subsequent submissions

• 30 DARC

• Revisions as required to update models and results based on information obtained from failure analysis, failure data, development activities, integration activities, and test activities

45RMRM02Reliability and Maintainability (R&M) Program Plan0002, 1002, 2002SMR4-DID-RM023.5.5.2AprvONE/R60 DPT PDR3030 DARC21
46System Safety Assurance
47SASA01System Safety Program Plan (SSPP)0002, 1002, 2002SMR4-DID-SA013.6.2AprvONE/R45 DAC2130 DARC21
48SASA02Functional Hazard Analysis (FHA)0002, 1002, 2002SMR4-DID-SA023.6.2AprvONE/R30 DPT SRR21See Remarks21Block 10: First resubmittal must occur NLT 30 DPT PDR and must address all Government comments from the first submission. Any required subsequent submissions must occur NLT 30 DARC.
49SASA03Sub-System Hazard Assessment (SSHA)0002, 1002, 2002SMR4-DID-SA033.6.2AprvONE/R30 DPT PDR21See Remarks21Block 10: First resubmittal must occur NLT 30 DPT CDR and must address all Government comments from the first submission. Any required subsequent submissions must occur NLT 30 DARC.
50SASA04System Safety Assessment Report (SSAR)0002, 1002, 2002SMR4-DID-SA043.6.2AprvONE/RFirst Site IOC2121 DARC14
51Systems Engineering
52SESE01Interface Design Description (IDD)3SMR4-DID-SE013.5.3.1AprvONE/R, R/ASR21 DPT PDR45See Remarks30Block 10: Subsequent submissions:

• 1st update 21 days prior to CDR

• Subsequent submissions 30 DARC

• Revisions as required to address approved changes to the interfaces 53 SE SE02 SMR4 to Surface Surveillance Systems Interface Control Document (ICD) 3 SMR4-DID-SE02 3.5.3.2 Aprv ONE/R, R/ASR 21 DPT CDR 60 See Remarks 30 Block 10: Subsequent submissions:

• 60 DARC

• R/ASR to address approved changes to the interfaces 54 SE SE03 Requirements Allocation Matrix (RAM) 0002, 1002, 2002 SMR4-DID-SE03 3.6.1 Aprv ONE/R, R/ASR 21 DPT SRR 30 See Remarks 21 Block 10: subsequent submissions

• 1st update 21 days prior to PDR

• 2nd update 21 days prior to CDR

• Subsequent submissions 30 DARC

• Revisions as required for any modification to SSD or IRD requirements after initial approval of this document 55 SE SE04 Program Trouble Report (PTR) 0002, 1002, 2002 SMR4-DID-SE04 3.6.4.1 Aprv ASGEN See Remarks See Remarks N/A N/A Block 8: Contractor to notify Government of new PTR generation in the PTR Database NLT 3 DA its generation.

Block 9: Government comments to be addressed through the Configuration Control Board (CCB)

56SESE05Problem Trouble Report (PTR) Database0002, 1002, 2002SMR4-DID-SE053.6.4.2InfoONE30 DPT Final Site's IOCN/AN/AN/A
57SESE06Optimization Procedures3SMR4-DID-SE063.5.4.1AprvONE/R, R/ASR30 DPT Installation at Key Site #145See Remarks21Block 10: Subsequent submissions:

• 30 DARC

• Revisions as required after initial approval to address changes to the optimization process 58 SE SE07 Master Adaptation Description Document (MADD) 3 SMR4-DID-SE07 3.5.4.1 Aprv ONE/R, R/ASR 14 DPT CDR 30 45 DARC 21 Block 10: Subsequent submissions:

• 45 DARC

• Revisions as required NLT 30 DA an approved change to a default parameter value 59 SE SE08 Site Adaptation Description Document (SADD) 0012c, 1012c, 2012c SMR4-DID-SE08 3.5.4.2 Aprv ASGEN, R/ASR See Remarks 21 See Remarks 21 A SADD must be submitted prior to each formal test event.

Block 8: first submission

• SADDs generated to support a Site Acceptance Test (SAT) must be submitted 21 days prior to the Test Readiness Review (TRR) for the associated SAT

• SADDs generated to support any other formal test event must be submitted 14 days prior to the TRR for the test event

Block 10: subsequent submissions

• For SADDs generated to support a SAT, revise as necessary and include in submission of the Acceptance Data Package (ADP) (CDRL IM05) for the associated site.

• For SADDs generated to support any other formal test event, if adaptation changes were implemented during formal test conduct that were not prescribed by the associated Test Procedure(s), revise and submit an updated version 21 DA Government approval that test execution is complete for the associated formal test event.

60System Security
61SSSS01System Characterization Document (SCD)0010, 1010, 2010SMR4-DID-SS013.6.3AprvONE/R, R/ASR30 DPT CDR21See Remarks21Block 10: subsequent submissions

• 90 DPT start of On Site DT

• Review/update as part of the annual security assessment.

62SW- Software Design & Development
63SWSW01Software Design Description (SDD)0002, 1002, 2002SMR4-DID-SW013.6.6.3.2AprvONE/R, R/ASR21 DPT CDR45See Remarks21Block 10: subsequent submissions

• 45 DARC

• Revisions as required after initial approval to address any approved software baseline changes that affect the content of this document 64 SW SW02 Software Version Description (SVD) 0002, 1002, 2002 SMR4-DID-SW02 3.6.6.3.3 Aprv ASREQ See Remarks 21 See Remarks 21 Block 8: 21 Days Prior to the first Development Test event

Block 10: subsequent submissions

• 30 DARC

• Concurrent with each approved software release 65 SW SW03 Software Test Description (STD) 0003 SMR4-DID-SW03 3.6.6 Aprv ONE/R, R/ASR 21 DPT CDR 30 See Remarks 21 Block 10: subsequent submissions

• 30 DARC

• Revisions as required after initial approval to address any approved software baseline changes that affect the content of this document 66 SW SW04 Software Development and Support Tools (SDT) 0007e SMR4-DID-SW04 3.7.2.2 Aprv ONE/R, R/ASR 60 DA After Final Key Site Testing 60 See Remarks 21 Block 10: subsequent submissions

• 30 DARC

• Revisions as required to address any changes to the software development and support tools

67SWSW05Software Development Plan (SDP)3SMR4-DID-SW053.6.6AprvONE/R60 DPT PDR3030 DARC21
68SWSW06Software Programs0007eSMR4-DID-SW063.7.2.3InfoASREQ60 DA After Final Key Site TestingNASee RemarksNABlock 10: resubmission after each approved software release
69SWSW07Software Transition Plan (STP)0001, 1001, 2001SMR4-DID-SW073.7.2.5AprvONE/R180 DA CDR2130 DARC21
70SWSW08Software Requirements Specification (SRS)0002, 1002, 2002SMR4-DID-SW083.6.6.3.1AprvONE/R, R/ASR21 DPT PDR45See Remarks45Block 10: subsequent submissions

• 30 DARC

• Revisions as required after initial approval to address any approved software baseline changes that affect the content of this document

71Technical Data
72TDTD01Engineering Drawing Tree0007fSMR4-DID-TD013.8.6.1AprvR/ASR60 DA CDR3030 DARC30
73TDTD02Product Drawings0007fSMR4-DID-TD023.8.6.2AprvR/ASR60 DA CDR3030 DARC30
74TDTD03Master Pattern and Plan View of Parts Layout0007fSMR4-DID-TD033.8.6.3AprvR/ASR60 DA PCA (must be included in PC)3030 DARC30
75TDTD05Original Equipment Manufacturer (OEM) Manuals/Information0007fSMR4-DID-TD053.8.6.4InfoASREQ30 DA3030 DAC30
76TDTD06Software User Manual0007fSMR4-DID-TD063.8.6.9AprvR/ASR30 DAC3030 DARC30Block 12:

• 30% Draft must be submitted 30 days after PDR

• 60% Draft must be submitted 60 days after CDR

• 90% Draft must be submitted 90 days prior to V&V event

• Final Draft must be submitted 60 days prior to V&V event

Upon Government approval of the draft TIBs, the Contractor must submit a final version of the TIBs, with all corrections incorporated.

77TDTD07Manuscript Plan0007fSMR4-DID-TD073.8.6.5.1AprvR/ASR30 DAC3030 DARC30
78TDTD08Manuscript Prospectus0007fSMR4-DID-TD083.8.6.5.2AprvR/ASR60 DA TD07 Delivery - 1rst Draft3030 DARC30has to be before work begins on the TIB
79TDTD09Technical Instruction Books (TIB)0007fSMR4-DID-TD093.8.6.5.6AprvR/ASRSee Remarks3030 DARC30Block 12:

• 30% Draft must be submitted 30 days after PDR

• 60% Draft must be submitted 60 days after CDR

• 90% Draft must be submitted 90 days prior to V&V event

• Final Draft must be submitted 60 days prior to V&V event

Upon Government approval of the draft TIBs, the Contractor must submit a final version of the TIBs, with all corrections incorporated.

80TDTD10Comment Resolution Report0007fSMR4-DID-TD103.8.6.5.3AprvR/ASRSee Remarks3030 DARC30BLOCK 12 and 13: The report will be reviewed after 30%, 60%, 90% IPR. The comment resolution reports must be updated and submitted 30 days after receiving comments from the Government.
81TDTD11Technical Manuscript Validation Plan0007fSMR4-DID-TD113.8.6.5.4AprvR/ASRSee remarks3060 DARC3030 days after submission the 100% draft version of the TIB
82TDTD12Technical Manuscript Validation Completion Report0007fSMR4-DID-TD123.8.6.5.5AprvASREQSee remarks3030 DARC3030 days after completion of the V&V event.
83TDTD13Test Equipment-Support Equipment Manuals0007fSMR4-DID-TD133.8.6.6InfoR/ASRSee Remarks3030 DARC30Block 10: Frequency of deliveries must be consistent with Block 12 and 13. Test Equipment/Support Equipment Manuals must be updated to reflect the baseline established at FCA/PCA if required.

Block 12:

• 30% Draft must be submitted 30 days after PDR

• 60% Draft must be submitted 60 days after CDR

• 90% Draft must be submitted 90 days prior to V&V event

• Final Draft must be submitted 60 days prior to V&V event

Block 13: Upon Government approval of the draft Test Equipment/Support Equipment Manuals, the Contractor must submit a final version of the Test Equipment/Support Equipment Manuals, with all corrections incorporated.

84 TD TD14 Depot Test Equipment Manuals 0007f SMR4-DID-TD14 3.8.6.7 Info R/ASR See Remarks 30 30 DARC 30 Block 12:

• 30% Draft must be submitted 30 days after PDR

• 60% Draft must be submitted 60 days after CDR

• 90% Draft must be submitted 90 days prior to V&V event

• Final Draft must be submitted 60 days prior to V&V event

Upon Government approval of the draft Depot Test Equipment Manuals, the Contractor must submit a final version of the Depot Test Equipment Manuals, with all corrections incorporated.

85 TD TD15 Depot Repair and Test Procedures Manual 0007f SMR4-DID-TD15 3.8.6.8 Info R/ASR See Remarks 30 30 DARC 30 Block 12:

• 30% Draft must be submitted 30 days after PDR

• 60% Draft must be submitted 60 days after CDR

• 90% Draft must be submitted 90 days prior to V&V event

• Final Draft must be submitted 60 days prior to V&V event

Upon Government approval of the draft Depot Repair and Test Procedures Manual, the Contractor must submit a final version of the Depot Repair and Test Procedures Manual, with all corrections incorporated.

86 TD TD16 Software Maintenance Manual (SMM) 0007f SMR4-DID-TD16 3.8.6.10 Info R/ASR See Remarks 30 30 DARC 30 Block 12:

• 30% Draft must be submitted 30 days after PDR

• 60% Draft must be submitted 60 days after CDR

• 90% Draft must be submitted 90 days prior to V&V event

• Final Draft must be submitted 60 days prior to V&V event

Upon Government approval of the draft SMM, the Contractor must submit a final version of the SMM, with all corrections incorporated.

87 TD TD17 Software Diagnostics Manual (SDM) 0007f SMR4-DID-TD17 3.8.6.11 Info R/ASR See Remarks 30 30 DARC 30 Block 12:

• 30% Draft must be submitted 30 days after PDR

• 60% Draft must be submitted 60 days after CDR

• 90% Draft must be submitted 90 days prior to V&V event

• Final Draft must be submitted 60 days prior to V&V event

Upon Government approval of the draft SDM, the Contractor must submit a final version of the SDM, with all corrections incorporated.

88System Test & Evaluation
89TETE01Contractor Master Test Plan (CMTP)0004SMR4-DID-TE013.11.1AprvONE/R, R/ASR30 DPT CDR21See Remarks21Block 7: Revisions as required to document modifications to the test program occurring after initial approval of this document. Initial approval will occur concurrently with initial approval of the TVRTM.

Block 10: Subsequent submissions occurring prior to initial approval due 21 DARC. Revisions submitted to address modifications to the test program after initial approval due NLT 21 DA receipt of Government direction to revise this document.

90 TE TE02 Test Verification Requirements Traceability Matrix (TVRTM) 0004 SMR4-DID-TE02 3.11.3 Aprv ONE/R, R/ASR 30 DPT CDR 21 See Remarks 21 Block 7: Revisions as required to comply with SOW instructions for incremental development of this document. Initial approval will occur concurrently with initial approval of the CMTP.

Block 10: Revisions submitted prior to initial approval due 21 DARC, revisions submitted after initial approval due per SOW instructions for incremental development of this CDRL with associated subsequent submittals due 7 DARC.

91 TE TE03 Analysis Report 0004 SMR4-DID-TE03 3.11.5 Aprv ASGEN/R, R/ASR See Remarks 21 30 DARC 21 Block 7: An Analysis Report is submitted to address verification of specific requirements, or parts of requirements, that are assigned a verification method of Analysis within the TVRTM (CDRL TE02). A separate Analysis Report must be submitted for each logical grouping of these requirements as identified in an approved revision of the TVRTM (CDRL TE02). R/ASR after initial approval to address baseline changes or invalidation of assumptions that impact results of the analysis presented.

Block 8: The System Baseline must be established and approved prior to first submission of any Analysis Reports. Government approval of a revised TVRTM (CDRL TE02) indicating Analysis as the test method and including test approaches and success criteria for all requirements, or parts of requirements, being verified within an Analysis Report must occur prior to first submission of the Analysis report.

92 TE TE04 Test Procedure 0004 SMR4-DID-TE04 3.11.8 Aprv ASGEN/R See Remarks 21 21 DARC 21 Block 7: At least one Test Procedure must be submitted for each formal test event, however, multiple Test Procedures may be submitted for any single formal test event.

Block 8: Government approval of a revised TVRTM (CDRL TE02) containing test approaches and success criteria for all requirements, or parts of requirements, that are verified within a Test Procedure must occur prior to first submission of the Test Procedure. The first submission of each Test Procedure must include all test input files, test output files, and results from a successfully completed dry run of all procedures within the document.

Block 10: Subsequent submissions must include all test input files, test output files, and results from a successfully completed dry run of all Government designated procedures within the document.

Test Procedures may be modified by agreement between the Government and the Contractor at any time prior to or during the conduct of tests to reflect changes required to fully meet test requirements.

93 TE TE05 Test Report 0004 SMR4-DID-TE05 3.11.8 Aprv ASGEN/R See Remarks 21 14 DARC 21 Block 7: A separate Test Report must be submitted for each formal test event.

Block 8: 21 DA Government approval that test execution is complete for the associated formal test event.

94 TE TE06 Test with Data Report 0004 SMR4-DID-TE06 3.11.6 Aprv ASGEN/R See Remarks 60 30 DARC 21 Block 7: A Test with Data Report is submitted to address verification of specific requirements, or parts of requirements, that are assigned a verification method of Test with Data within the TVRTM (CDRL TE02). A separate Test with Data Report must be submitted for each logical grouping of these requirements as identified in an approved revision of the TVRTM (CDRL TE02).

Block 8: The System Baseline must be established and approved prior to first submission of any Test with Data Reports. Government approval of a revised TVRTM (CDRL TE02) containing test approaches and success criteria for all requirements, or parts of requirements, that are verified within a Test with Data Report must occur prior to first submission of the Test with Data Report.

95 TE TE07 Design Review Data Package 0004 SMR4-DID-TE07 3.11.7 Aprv ASGEN/R See Remarks See Remarks See Remarks 21 Block 7: A Design Review Data Package is submitted to address verification of specific requirements, or parts of requirements, that are assigned a verification method of Design Review within the TVRTM (CDRL TE02). A separate Design Review Data Package must be developed for each Requirements Design Review meeting.

Block 8: Submit NLT 14 DPT start of the associated Requirements Design Review meeting. The System Baseline must be established and approved prior to first submission of any Design Review Data Packages. Government approval of a revised TVRTM (CDRL TE02) containing test approaches and success criteria for all requirements, or parts of requirements, that are verified within a Design Review Data Package must occur prior to first submission of the Design Review Data Package.

Block 9: The FAA review period for first submissions will end upon conclusion of the associated Requirements Design Review meeting. FAA comments will be addressed during conduct of the associated Requirements Design Review meeting.

Block 10: Subsequent submissions must occur concurrently with each submission of Meeting Minutes (PM10) from the associated Requirements Design Review meeting. Subsequent submissions must include any redlines incorporated by the Contractor or requested by the Government during the associated Requirements Design Review meeting.

96 TE TE08 Test Log 0004 SMR4-DID-TE08 3.11.8 Aprv ASGEN/R See Remarks 21 See Remarks 21 Block 7: A separate Test Log must be developed for each formal test event and for each Test Tool Certification test event. Informal submittals must occur at the Government's request, as required by the SOW, during conduct of the associated formal test event or Test Tool Certification test event.

Block 8: First formal submission 21 DA Government approval that test execution is complete for the associated formal test event or Test Tool Certification test event as an attachment to the associated Test Report (CDRL TE05) or Test Tool Certification Report (TE13).

Block 10: Subsequent submissions 14 DARC. Subsequent submissions of the Test Log must be as an attachment to its associated Test Report (TE05) or Test Tool Certification Report (TE13) and must occur each time the associated report is submitted.

97 TE TE09 Notification of Test Letter 0004 SMR4-DID-TE09 3.11.8 Info ASGEN/R See Remarks N/A N/A N/A Block 7: A separate Notification of Test Letter must be submitted for each formal test event and for each Test Tool Certification test event.

Block 8: 21 DPT scheduled start of the associated formal test event or Test Tool Certification test event.

98 TE TE10 Product Configuration Document (PCD) 0004 SMR4-DID-TE10 3.11.8 Aprv ASGEN/R See Remarks See Remarks See Remarks See Remarks Block 7: A Separate PCD must be submitted for each test bed to be utilized in a formal test event and as part of each ADP. R/ASR to incorporate redlines and corrections identified prior to or during conduct of the associated formal test event and to address Government comments.

Block 8: 7 DPT the associated TRR for PCDs developed to support a formal test event. Documents developed for inclusion in an ADP (CDRL IM05) must be included in initial submittal of the associated ADP.

Block 9: FAA review of initial submissions included in an ADP (CDRL IM05) will occur concurrently with review of the full ADP. PCDs developed to support a formal test event will be validated throughout conduct of the test event.

Block 10: Subsequent submissions of PCDs must occur as follows:

1. PCDs developed to support a formal test event must be revised to incorporate any redlines or corrections identified prior to or during conduct of the associated formal test, and submitted as an attachment to the Test Report (CDRL TE05) for the associated formal test event 21 DA Government approval that test execution is complete. The PCD must be included as an attachment to each submission of the associated Test Report (CDRL TE05).

2. PCDs developed as part of an ADP (CDRL IM05) must be included in each subsequent submission of the associated ADP (CDRL IM05).

Block 11: FAA review of subsequent submissions will be accomplished concurrently with review of the associated Test Report (CDRL TE05) or ADP (CDRL IM05).

99 TE TE11 First Article Production Test Report 0005 SMR4-DID-TE11 3.9.1 Aprv ASGEN/R See Remarks 21 14 DARC 21 Block 7: A separate First Article Production Test Report must be generated for each First Article system purchased prior to establishment and approval of the System Baseline.

Block 8: 14 DA completion of the associated production acceptance test.

100 TE TE12 Test Tool Certification Procedure 0004 SMR4-DID-TE12 3.11.9 Aprv ASGEN/R See Remarks 21 21 DARC 21 Block 7: A separate Test Tool Certification Procedure must be submitted for each hardware test tool and software simulator requiring Government certification.

Block 8: Government approval of test approaches and success criteria for certification of the associated hardware test tool or software simulator, along with successful completion of SOW required dry runs, must occur prior to first submission. The Contractor must provide all test input files, test output files, and results from the dry run as part of the initial submission.

Block 10: Subsequent submissions must include all test input files, test output files, and results from a successfully completed dry run of all Government designated procedures within the document.

101 TE TE13 Test Tool Certification Report 0004 SMR4-DID-TE13 3.11.9 Aprv ASGEN/R See Remarks 21 14 DARC 21 Block 7: A separate Test Tool Certification Report must be submitted for each hardware test tool and software simulator requiring Government certification.

Block 8: 21 DA Government approval that test execution is complete for the associated Test Tool Certification test event.

102Training Program
103TPTP01Personnel Qualifications Report (PQR)0007a, 1007a, 2007aSMR4-DID-TP013.8.7.1.2AprvONE/R, R/ASRSee remarks3030 DARC30Block 8: 60 DPT start of training course development.
104TPTP02Test Team Familiarization Training Package0008aSMR4-DID-TP023.8.7.2.1AprvONE/R, R/ASR60 DA CDR2121 DARC21
105TPTP03Second Level Engineering Support Training Materials0008bSMR4-DID-TP033.8.7.3.1AprvONE/R, R/ASRSee remarks3030 DARC30Block 8: TBD During the Training Guidance Conference
106TPTP04Depot Level Maintenance Training Materials0008cSMR4-DID-TP043.8.7.4.1AprvONE/R, R/ASRSee remarks3030 DARC30Block 8: TBD During the Training Guidance Conference
107TPTP05Training Development Plan (TDP)0008dSMR4-DID-TP053.8.7.5.2AprvONE/FEDCSee remarks3030 DARC30Block 8: TBD During the Training Guidance Conference
108TPTP06Course Design Guide (CDG)0008dSMR4-DID-TP063.8.7.5.2AprvONE/FEDCSee remarks3030 DARC30Block 8: Draft must be submitted 30 DA the 60-percent IPR for the TIB. CDG must be revised and resubmitted to align with the final version of the TIB.

Final 30 days prior to First Course Conduct. A final revised version of the CDG must be delivered with the final course materials.

109TPTP07Task and Skills Analysis (TASA)0008dSMR4-DID-TP073.8.7.5.2AprvONE/FEDCSee remarks3030 DARC30Block 8: 60 DA 60% CDRL TD09 - TIB submission
110TPTP08COTS Training Materials Report0008dSMR4-DID-TP083.8.7.5.1AprvONE/FEDCSee remarks3030 DARC30Block 8: TBD During the Training Guidance Conference
111TPTP09Testing and Examinations0008dSMR4-DID-TP093.8.7.5.3.3AprvONE/FEDCSee remarks3030 DARC30Block 8: TBD during training guidance conference
112TPTP10Contractor’s Training Course Presentation Materials0008dSMR4-DID-TP103.8.7.5.3.4.1AprvONE/R, R/ASRSee remarks3030 DARC30Block 8: TBD During the Training Guidance Conference
113TPTP11Operational Try Out Materials0008dSMR4-DID-TP113.8.7.5.3.4.2AprvONE/R, R/ASRSee remarks3030 DARC30Block 8: TBD During the Training Guidance Conference
114TPTP12Classroom Training Materials0008dSMR4-DID-TP123.8.7.5.3.4.2AprvONE/R, R/ASRSee remarks3030 DARC30Block 8: TBD During the Training Guidance Conference
115TPTP13First Course Conduct Report0008dSMR4-DID-TP133.8.7.5.3.4.3AprvASREQ60 DPT First Key Site CAI3030 DARC30
116TPTP14Data Collection Package0008dSMR4-DID-TP143.8.7.5.3.4.3AprvASREQ60 DPT First Key Site CAI3030 DARC30
117TPTP15Certificates of Completion0008dSMR4-DID-TP153.8.7.5.3.4.3AprvASREQSee remarksN/AN/AN/ABlock 8: 5 DA completion of course conduct. A Certificate of Completion must be submitted for each student that successfully completes the course at the end of each course conduct
118TPTP16Welcome Package0008hSMR4-DID-TP163.8.7.5.5AprvASREQSee remarks30N/AN/ABlock 8: 60 DPT course conduct

Sample

CDRL DataSample Entry
1. Data Item No.PM01Notes:
2. TITLEConfiguration Management Plan (CMP)*1. Data Item Description (DID) identification number (Filename of DID) where detailed preparation instructions are provided.
A. CLIN0001*2. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
4. Authority (Note 1*)SMR4-DID-CM-01*3. A-Requires Government approval, I-for information only.
5. Contract Reference (Note 2*)3.3.3*4. The Contractor must provide the deliverables in "Calendar" days unless otherwise specified.
8. APP Code (Note 3*)A
9. Distribution Statement RequiredA10. Frequency Acronyms12 & 13. Submission Acronyms:
10. FREQUENCYONE/RONE/R = One Time with RevisionsDAC = Days after Contract Award
12. Date of First Submission (Note 4*)30 DACMTHLY = MonthlyDARC = Days after Receipt of Comments
FAA REVIEW for First Submission (days)21R/ASR = Revisions as RequiredDARO = Days after Receipt of Order
13. Date of Subsequent Submission30 DARCASREQ = As RequiredIDR = Interface/Design Review
FAA REVIEW for Subsequent Submission (days)21TWO/R = Two Times with RevisionsDPT = Days Prior To
15. Distribution
a. Addressee, I. Approved ByCO, AJM-411ASGEN = As GeneratedDA = Days After
15. Distribution
b. Draft Copies (Hard/Soft)0/1ASGEN = As Generated
15. Distribution
c. Final Copies (Hard/Soft)0/1
14 REMARKSContractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via CD_ROM, DVD+R, or via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

• Microsoft Office Suite 2003

• Microsoft Project 2003

• Adobe Acrobat Reader

BLOCK 12

Tracking of SPRs shall begin at the start of the formal test program, including Contractor Preliminary Tests (CPT).

Accronyms

Block 7: Frequency AcronymsBlocks 8 & 10: Submission Acronyms:
ONE/R=One Time with RevisionsDAC=Days after Contract Award
ONE/FEDC= One For Each Developed CourseDARC=Days after Receipt of Comments
MTHLY=MonthlyDARO=Days after Receipt of Order
R/ASR=Revisions as RequiredIDR=Interface/Design Review
ASREQ=As RequiredDPT=Days Prior To
TWO/R=Two Times with RevisionsDA=Days After
ASGEN=As GeneratedASGEN=As Generated
ASGEN/R=As Generated with Revisions
Site/R=One per site w/revisions
Block 6: App Code
Aprv=Approval
Info=Information Only