ds-80.pdf

PDF 164 KB Posted

Attached to
T. S. KENNEDY - FY20 Drydocking Repairs and ABS Intermediate Survey
Solicitation number
6933A220Q000005
Issued by

About this file

This solicitation package seeks proposals for drydocking repairs and an American Bureau of Shipping intermediate survey of the T.S. Kennedy, the training ship of the Massachusetts Maritime Academy. Work includes tailshaft examination, blasting and coating of the hull, ultrasonic thickness gauging, tank cleaning and inspections, propeller and stern tube bearing replacement, and structural repairs. The ship will be available for drydocking on February 26, 2020 at the contractor's shipyard. All work must be completed by May 1, 2020 to accommodate the ship's scheduled departure on May 5, 2020. A site visit will be held on December 17, 2019 to allow contractors to understand work requirements. Proposals are due by December 27, 2019. The contracting agency is the United States Department of Transportation Maritime Administration.

View the file

Other files

File Type Posted
6933A220Q000005 - Orig Attachment 1 Quote Pricing Sheet.xlsx XLSX spreadsheet
SHAFTING WRENCHES 1-2.pdf PDF
AUX MACH RM SW SERVICE SYS DIA- 540TV-001-524-20(E).pdf PDF
540TV-001-167-02 (ALL SHEETS).pdf PDF
SHAFTING DETAILS COUPLING C3-100-S43-1-2.pdf PDF
Interspeed 6400NA.pdf PDF
E-Program Files-AN-ConnectManager-SSIS-TDS-PDF-Intershield_300V_eng_usa_A4_20150204.pdf PDF
540TV-583-01E Fire & Safety Plan.pdf PDF
Approved Coatings Spreadsheet3.pdf PDF
18027 KENNEDY SHELL CONNECTIONS.PDF PDF
6933A220Q000005 T.S. KENNEDY FY-20 Drydocking Repairs.pdf PDF
540TV-001-835-09 WELDING SEQUENCE.pdf PDF
128-Shaft Alignment Guide_e.pdf PDF
DRW and Ref materials listed in the SOW.xlsx XLSX spreadsheet
SEA CHESTS C3-100 S48-23-1 REV 4.pdf PDF
Hydrotorque Origional Parts Outfitting.pdf PDF
540TV-001-321-01 REV. W ELECTRICAL LOAD ANALYSIS.pdf PDF
Internzational Interline 925.pdf PDF
Hinge DRW Figure 43A.pdf PDF
SHAFTING DETAILS COUPLING C3-100-S43-1-3.pdf PDF
TS Kennedy Tanks Log 5-29-2015 start of tank request.xls XLS spreadsheet
6933A220Q000005 - Attachment 1 Quote Pricing Sheet.xlsx XLSX spreadsheet
RUDDER STOCK CARRIER & BEARINGS C3-100-S22-1-3.pdf PDF
Intergard 264 (2).pdf PDF
Approved Coatings Spreadsheet2.pdf PDF
INTERLAC 665.pdf PDF
540TV-001-801-01 - General Arrangement.pdf PDF
Interfine 5703.pdf PDF
AUX SEA CHESTS PORT SIDE 1-3.pdf PDF
Detail of echo sounder.docx DOCX document
RRF Coatings Guidelines[Apr 2000].pdf PDF
Pages from SVR_Part_4_e-Jan18 2.pdf PDF
ARRGT. OF SHAFTING C3-1--S43-1-1.pdf PDF
156-s11-5-5 All sheets.pdf PDF
Interthane 990 Marine.pdf PDF
KDY CAPACITY PLAN.pdf PDF
TS Kennedy Valve Tracking.xlsx XLSX spreadsheet
172-S48-23-03BC - 48-23-3BC - OVERBOARD DISCHARGE SHELL EXPANSION & LIST OF SEA VALVES.pdf PDF
Docking Plan C3-100 S7-0-1BC.pdf PDF
TANK CAPACITY CURVES C3-100 S29-1-3 BC.pdf PDF
System Requirements.pdf PDF
SHELL EXP. AFT 1-5 C3-100-S11-1-2 .pdf PDF
1208-S33-2 KENNEDY navlab vestibule.pdf PDF
TG Gland seal Reg.pdf PDF
WELDING SEQUENCE C3-100-S29-6-3.pdf PDF
Suggested Sources AB removal.docx DOCX document
SHELL EXP. FWD 1-4 C3-100-S11-1-1.pdf PDF
RUDDER 1-4.pdf PDF
Surface Prep.pdf PDF
156-S11-3-4 FORE PEAK FRAMING.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Model:

DS-80

www.furuno.com

FURUNO ELECTRIC CO., LTD.

Nishinomiya, Hyogo, Japan www.furuno.com

FURUNO U.S.A., INC.

Camas, Washington, U.S.A.

www.furunousa.com

FURUNO (UK) LIMITED

Havant, Hampshire, U.K.

www.furuno.co.uk

FURUNO NORGE A/S

Ålesund, Norway www.furuno.no

FURUNO DANMARK A/S

Hvidovre, Denmark www.furuno.dk

FURUNO SVERIGE AB

Västra Frölunda, Sweden www.furuno.se

FURUNO FINLAND OY

Espoo, Finland www.furuno.fi

FURUNO POLSKA Sp. Z o.o.

Gdynia, Poland www.furuno.pl

FURUNO DEUTSCHLAND GmbH Rellingen, Germany www.furuno.de

FURUNO FRANCE S.A.S.

Bordeaux-Mérignac, France www.furuno.fr

FURUNO ESPAÑA S.A.

Madrid, Spain www.furuno.es

FURUNO ITALIA S.r.l.

Genoa, Italy

FURUNO HELLAS S.A.

Glyfada, Greece www.furuno.gr

FURUNO (CYPRUS) LTD

Limassol, Cyprus www.furuno.com.cy

FURUNO EURUS LLC

St. Petersburg, Russian Federation www.furuno.com.ru

FURUNO SHANGHAI CO., LTD.

Shanghai, China www.furuno.com/cn

FURUNO KOREA CO., LTD.

Busan, Korea

RICO (PTE) LTD

Singapore www.rico.com.sg

Optional or Local Supply

ARPA/RADAR,

ECDIS, AIS,

VDR, GMDSS

IEC 61162-1

Junction Box

115/230 VAC

Analog display

Remote Distance Indicator

DS-840

Digital Indicator

DS-830

Display Unit

DS-800

Transducer Unit

DS-820

Distribution Box

DS-801

Transceiver Unit

DS-810

TTYCY-3S

Max 150 m

TTYCY-2S

Max 150 m

TTYCY-2STTYCY-3S

Terminal Box

DS-802

Terminal Box

DS-802

Terminal Box

DS-802

CI-630

/2

0/ m

M ax m T

T Y

C Y-

2S M ax m

T T

Y C

Y- 2S

Speed and distance run indicated on a large illuminated LCD display

Compact display unit and transducer

High accuracy by utilizing the Doppler principle, paired beam eliminating effect of pitching, and velocity correction for change of water temperature

Easy speed correction at mile post run

Speed output to ARPA, radar, ECDIS, AIS, VDR, GMDSS equipment, etc.

Complies with IMO standards MSC.96 (72), A.824 (19), A.694 (17), IEC 61023 and other related standards

Fully meets SOLAS carriage requirement for ships over 300GT

Fits to the hull either directly or with a gate valve

SPECIFICATIONS

1. Product Name DOPPLER SPEED LOG

2. Measuring System Paired-beam Doppler log, 1 MHz

3. Display unit 4.5" (95 x 60 mm) Monochrome LCD 120 x 64 pixels

Character size: 15 or 21 mm high selectable

4. Speed Range

Forward: 0 - 40 kn, 0.1 kn steps Astern: 0 - 10 kn, 0.1 kn steps

5. Distance Run 0-999,999.99 NM, resettable to any value.

6. Accuracy Speed through-the-water (STW):

1%, display resolution 0.1 kn Distance run: 1%, in steps of 0.1 NM

7. Water Depth Deeper than 3 m

8. Correction

Sound velocity: Automatic correction for change of water temperature

Mile post run: ±10% on menu

9. Test -10 and 40 kn

10. Power Supply 115/230 VAC

11. Interface IEC 61162-1

Output: VBW, VLW

ENVIRONMENT (IEC 60945 test method) Temperature -15℃ to +55℃ (Display unit) Waterproofing Display unit; IPX5 CFR-46 (USCG)

EQUIPMENT LIST

Standard

1. Main Display DS-800 1 unit

2. Transducer Unit DS-820 with 10/20/30 m cable 1 unit

3. Transceiver Unit DS-810 1 unit

4. Distribution Box DS-801 1 unit

5. Terminal Box DS-802 1 unit

Option

1. Digital Indicator DS-830 1 unit

2. Remote Distance Indicator DS-840 1 unit

3. Transducer Tank DS-850 1 unit

4. Flush Mount Kit F type or S type 1 unit

5. Gate Valve DS-782, DS-786 1 unit

6. Junction Box CI-630 1 unit

7. Analog Display 1 unit

2.

4"

315 12.4" 340 14.0"

.5

0.

7"

3.

7"

111 4.4"

108 4.3"

5.

6"

TRANCEIVER UNIT

DS-810

8.0 kg, 17.6 lb

5.

8"

3.

8" 25 1.

0"

355 14.0"

440 17.3"

4.

8"

4.

6"

133 5.2" 5.1"

DISTRIBUTION BOX

DS-801

14 kg, 30.9 lb

INTERCONNECTION DIAGRAM

DISPLAY UNIT DS-800

0.6 kg, 1.3 lb

209 8.2" 175 6.9"

85 3.4" 78 3.1" 15 0.6"

(140 5.5") (32 1.3")

.9

.9

4- 6

70 2.8"215 8.5"

205 8.1"

187 7.4"

.1

0.8"

0.5"max

(5

.0

.8

68 2.7"17 0.7" 61 2.4"

4- 5.5

183 7.2"

63 2.5"

4- 5.5

3.

6"

3.

6"

4.

4"

167 6.6"

.4

Cutout for flush mount

Cutout for flush mount

Flush Mout Kit F type

Flush Mout Kit S type

7.

7"

445 17.6"

25 1.0"

GATE VALVE

DS-782

75 kg, 165.3 lb

3.

0"

348 13.7"

20 0.8"

DS-786

40 kg, 88.1 lb

14073SK Printed in Japan Catalogue No. FX-616h

File details come from the government source that posted it. Updated .