156-s11-5-5 All sheets.pdf

PDF 7 MB Posted

Attached to
T. S. KENNEDY - FY20 Drydocking Repairs and ABS Intermediate Survey
Solicitation number
6933A220Q000005
Issued by

About this file

This document outlines a federal solicitation for drydocking repairs and an American Bureau of Shipping intermediate survey of the training ship T.S. Kennedy. The U.S. Department of Transportation Maritime Administration seeks a firm fixed price contract for work including tail shaft examination, line shaft bearing inspection, hull blasting and coating, tank cleaning and thickness gauging. The availability period is March 1st to May 1st, 2020, with the ship to be drydocked at the contractor's facility on February 26th and returned to service by May 5th. A pre-bid site visit will be held on December 17th, 2019, with questions due by December 20th. The solicitation package will be posted on December 6th and drawings can be requested from the contracting officer. The document encourages participation from minority, women-owned, and disadvantaged businesses.

View the file

Other files

File Type Posted
6933A220Q000005 - Orig Attachment 1 Quote Pricing Sheet.xlsx XLSX spreadsheet
SHAFTING WRENCHES 1-2.pdf PDF
AUX MACH RM SW SERVICE SYS DIA- 540TV-001-524-20(E).pdf PDF
540TV-001-167-02 (ALL SHEETS).pdf PDF
SHAFTING DETAILS COUPLING C3-100-S43-1-2.pdf PDF
Interspeed 6400NA.pdf PDF
E-Program Files-AN-ConnectManager-SSIS-TDS-PDF-Intershield_300V_eng_usa_A4_20150204.pdf PDF
540TV-583-01E Fire & Safety Plan.pdf PDF
Approved Coatings Spreadsheet3.pdf PDF
18027 KENNEDY SHELL CONNECTIONS.PDF PDF
6933A220Q000005 T.S. KENNEDY FY-20 Drydocking Repairs.pdf PDF
540TV-001-835-09 WELDING SEQUENCE.pdf PDF
128-Shaft Alignment Guide_e.pdf PDF
DRW and Ref materials listed in the SOW.xlsx XLSX spreadsheet
SEA CHESTS C3-100 S48-23-1 REV 4.pdf PDF
Hydrotorque Origional Parts Outfitting.pdf PDF
540TV-001-321-01 REV. W ELECTRICAL LOAD ANALYSIS.pdf PDF
Internzational Interline 925.pdf PDF
Hinge DRW Figure 43A.pdf PDF
SHAFTING DETAILS COUPLING C3-100-S43-1-3.pdf PDF
TS Kennedy Tanks Log 5-29-2015 start of tank request.xls XLS spreadsheet
6933A220Q000005 - Attachment 1 Quote Pricing Sheet.xlsx XLSX spreadsheet
RUDDER STOCK CARRIER & BEARINGS C3-100-S22-1-3.pdf PDF
Intergard 264 (2).pdf PDF
Approved Coatings Spreadsheet2.pdf PDF
INTERLAC 665.pdf PDF
540TV-001-801-01 - General Arrangement.pdf PDF
Interfine 5703.pdf PDF
AUX SEA CHESTS PORT SIDE 1-3.pdf PDF
Detail of echo sounder.docx DOCX document
RRF Coatings Guidelines[Apr 2000].pdf PDF
Pages from SVR_Part_4_e-Jan18 2.pdf PDF
ARRGT. OF SHAFTING C3-1--S43-1-1.pdf PDF
Interthane 990 Marine.pdf PDF
KDY CAPACITY PLAN.pdf PDF
TS Kennedy Valve Tracking.xlsx XLSX spreadsheet
172-S48-23-03BC - 48-23-3BC - OVERBOARD DISCHARGE SHELL EXPANSION & LIST OF SEA VALVES.pdf PDF
Docking Plan C3-100 S7-0-1BC.pdf PDF
ds-80.pdf PDF
TANK CAPACITY CURVES C3-100 S29-1-3 BC.pdf PDF
System Requirements.pdf PDF
SHELL EXP. AFT 1-5 C3-100-S11-1-2 .pdf PDF
1208-S33-2 KENNEDY navlab vestibule.pdf PDF
TG Gland seal Reg.pdf PDF
WELDING SEQUENCE C3-100-S29-6-3.pdf PDF
Suggested Sources AB removal.docx DOCX document
SHELL EXP. FWD 1-4 C3-100-S11-1-1.pdf PDF
RUDDER 1-4.pdf PDF
Surface Prep.pdf PDF
156-S11-3-4 FORE PEAK FRAMING.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

156-s11-5-5-1

156-s11-5-5-2
156-s11-5-5-3
156-s11-5-5-4
156-s11-5-5-5

File details come from the government source that posted it. Updated .