156-S11-3-4 FORE PEAK FRAMING.pdf

PDF 83 MB Posted

Attached to
T. S. KENNEDY - FY20 Drydocking Repairs and ABS Intermediate Survey
Solicitation number
6933A220Q000005
Issued by

About this file

This document provides details for a federal solicitation seeking drydocking repairs and an intermediate survey of the T.S. Kennedy training ship. The U.S. Department of Transportation Maritime Administration is soliciting fixed price proposals to perform drydocking and an ABS intermediate survey of the 536 foot steam ship T.S. Kennedy at a contractor's shipyard. Work must be completed between March 1st and May 1st 2020 and includes drydocking examinations, structural examinations, blasting and coating of the hull, tank cleaning and inspections, propeller and stern tube work, and repairs to steel structures and foundations. A site visit will be held on December 17th 2019 and questions are due by December 20th. The solicitation number is 6933A220Q000005. Minority, women-owned, and disadvantaged businesses are encouraged to consider pursuing this opportunity, which includes information on the DOT short-term lending program.

View the file

Other files

File Type Posted
6933A220Q000005 - Orig Attachment 1 Quote Pricing Sheet.xlsx XLSX spreadsheet
SHAFTING WRENCHES 1-2.pdf PDF
AUX MACH RM SW SERVICE SYS DIA- 540TV-001-524-20(E).pdf PDF
540TV-001-167-02 (ALL SHEETS).pdf PDF
SHAFTING DETAILS COUPLING C3-100-S43-1-2.pdf PDF
Interspeed 6400NA.pdf PDF
E-Program Files-AN-ConnectManager-SSIS-TDS-PDF-Intershield_300V_eng_usa_A4_20150204.pdf PDF
540TV-583-01E Fire & Safety Plan.pdf PDF
Approved Coatings Spreadsheet3.pdf PDF
18027 KENNEDY SHELL CONNECTIONS.PDF PDF
6933A220Q000005 T.S. KENNEDY FY-20 Drydocking Repairs.pdf PDF
540TV-001-835-09 WELDING SEQUENCE.pdf PDF
128-Shaft Alignment Guide_e.pdf PDF
DRW and Ref materials listed in the SOW.xlsx XLSX spreadsheet
SEA CHESTS C3-100 S48-23-1 REV 4.pdf PDF
Hydrotorque Origional Parts Outfitting.pdf PDF
540TV-001-321-01 REV. W ELECTRICAL LOAD ANALYSIS.pdf PDF
Internzational Interline 925.pdf PDF
Hinge DRW Figure 43A.pdf PDF
SHAFTING DETAILS COUPLING C3-100-S43-1-3.pdf PDF
TS Kennedy Tanks Log 5-29-2015 start of tank request.xls XLS spreadsheet
6933A220Q000005 - Attachment 1 Quote Pricing Sheet.xlsx XLSX spreadsheet
RUDDER STOCK CARRIER & BEARINGS C3-100-S22-1-3.pdf PDF
Intergard 264 (2).pdf PDF
Approved Coatings Spreadsheet2.pdf PDF
INTERLAC 665.pdf PDF
540TV-001-801-01 - General Arrangement.pdf PDF
Interfine 5703.pdf PDF
AUX SEA CHESTS PORT SIDE 1-3.pdf PDF
Detail of echo sounder.docx DOCX document
RRF Coatings Guidelines[Apr 2000].pdf PDF
Pages from SVR_Part_4_e-Jan18 2.pdf PDF
ARRGT. OF SHAFTING C3-1--S43-1-1.pdf PDF
156-s11-5-5 All sheets.pdf PDF
Interthane 990 Marine.pdf PDF
KDY CAPACITY PLAN.pdf PDF
TS Kennedy Valve Tracking.xlsx XLSX spreadsheet
172-S48-23-03BC - 48-23-3BC - OVERBOARD DISCHARGE SHELL EXPANSION & LIST OF SEA VALVES.pdf PDF
Docking Plan C3-100 S7-0-1BC.pdf PDF
ds-80.pdf PDF
TANK CAPACITY CURVES C3-100 S29-1-3 BC.pdf PDF
System Requirements.pdf PDF
SHELL EXP. AFT 1-5 C3-100-S11-1-2 .pdf PDF
1208-S33-2 KENNEDY navlab vestibule.pdf PDF
TG Gland seal Reg.pdf PDF
WELDING SEQUENCE C3-100-S29-6-3.pdf PDF
Suggested Sources AB removal.docx DOCX document
SHELL EXP. FWD 1-4 C3-100-S11-1-1.pdf PDF
RUDDER 1-4.pdf PDF
Surface Prep.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .