Q&A_11-04-19.pdf

PDF 59 KB Posted

Attached to
MT NPS GLAC 14(4), Many Glacier Road Rehabilitate & MT Glacier 14(1), Many Glacier Road
Solicitation number
69056719B000017
Issued by

About this file

This document contains questions and answers related to a federal construction contract opportunity with the Department of Transportation Federal Highway Administration to rehabilitate sections of the Many Glacier Road located in Glacier National Park, Montana. The contract work includes repairing three bridges, two of which require minor concrete repair and waterproof membrane replacement while the third bridge requires replacement of timber girders. The tentative completion date for the project is fall 2021, and the estimated price range is between $15-20 million. The document addresses questions on the location of government housing, allowable pH levels for topsoil, timing of culvert replacement work, tarping requirements for topsoil loads, and the intent regarding work timing.

View the file

Other files

File Type Posted
Bid Opening Summary_Many Glacier_R1.pdf PDF
Q&A_11-20-19.pdf PDF
Q&A_11-18-19.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
glac01404_XS_Signoff.pdf PDF
Prebid Meeting.pptx PPTX presentation
Amendment A002.pdf PDF
Q&A_11-15-19.pdf PDF
Amendment_A001.pdf PDF
Q&A_11-07-19.pdf PDF
Q&A_11-05-19.pdf PDF
Q&A_10-31-19.pdf PDF
IFB_Many_Glacier.pdf PDF
Plan_Request.pdf PDF
plans_glac01404.pdf PDF
Physical_Data_Many_Glacier.zip ZIP file
Draft_Weed_Free_SCR_Many_Glacier.pdf PDF
ManyGlacierMaterialSourcesResearchEfforts_(08_30_2019).pdf PDF
PROJECT_DESCRIPTION_R1.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Prelim_Letter_.pdf PDF
Pre_AD_set_glac01404_Plans_Signoff_R1.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT NPS GLAC 14(4) & MT Glacier 14(1) Rehabilitate Many Glacier Road & Many Glacier Road

# General Technical Question Answer Date

1 X

Per section 637.02, the government housing trailer pads are located at Glacier National Park Hudson’s Bay District. Could you please provide the exact location of these trailer pads?

Approximate GPS Coordinates for the trailer pads are 48°44’14.50” N, 113°25’39.33” W;

and 48°44’13.85” N, 113°25’37.78” W.

10/31/19

2 X

The required pH for furnished topsoil is between 6.0 and 8.0 per Subsection 713.01.

Since the pH for the existing topsoil on the project is between 5.5 and 5.8; can the specified pH for furnished topsoil be modified to match the existing topsoil pH, and reduce the cost of imported topsoil to be furnished?

This will be addressed under a forthcoming amendment.

11/4/19

3 X

Per Section 108.01 (c), the work at Sta: 716+46 is to be performed from March 1st to June 15th.

Section 108.01(g), indicates the culvert replacement work can not be done after the third Monday in May. Please clarify if this work be completed between the third Monday in May to June 15th?

This will be addressed under a forthcoming amendment.

11/4/19

4 X

Subsection 107.10(d)(5) says that all topsoil loads need to be tarped. If the source of topsoil is determined to be weed free and was not required to be treated, will WFLHD still require the loads to be tarped?

Yes. Comply with the requirements of Subsection 107.10(d)(5)

11/4/19

Check General or Technical

5 X

Per Section 108.01 (c), the work is to be done between March 1st and June 15th of any given year. Is it the intent of the contract to have the Contractor perform the work at this station during the high water period?

Perform work according to the requirements of Subsection 108.01(c).

11/4/19