PROJECT_DESCRIPTION_R1.pdf

PDF 194 KB Posted

Attached to
MT NPS GLAC 14(4), Many Glacier Road Rehabilitate & MT Glacier 14(1), Many Glacier Road
Solicitation number
69056719B000017
Issued by

About this file

This document package includes a project description and related federal contract opportunity notice for road rehabilitation work. The project consists of 12 miles of pavement rehabilitation, culvert replacement, bridge repairs, sidewalks, curbing, drainage, signage, and striping on Many Glacier Road in Glacier County, Montana. Three bridges will be repaired, including two 3-span slab bridges requiring concrete and waterproofing work, and one timber horse bridge requiring timber girder replacement. The tentative completion date is Fall 2021. The estimated price range for the work is between $15 million and $20 million. The solicitation number is 69056719B000017 and was issued by the Department of Transportation Federal Highway Administration for full and open competition. Interested vendors must register on FBO.gov to view the interested vendors list and receive notifications when solicitation documents are posted.

View the file

Other files

File Type Posted
Bid Opening Summary_Many Glacier_R1.pdf PDF
Q&A_11-20-19.pdf PDF
Q&A_11-18-19.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
glac01404_XS_Signoff.pdf PDF
Prebid Meeting.pptx PPTX presentation
Amendment A002.pdf PDF
Q&A_11-15-19.pdf PDF
Amendment_A001.pdf PDF
Q&A_11-07-19.pdf PDF
Q&A_11-05-19.pdf PDF
Q&A_11-04-19.pdf PDF
Q&A_10-31-19.pdf PDF
IFB_Many_Glacier.pdf PDF
Plan_Request.pdf PDF
plans_glac01404.pdf PDF
Physical_Data_Many_Glacier.zip ZIP file
Draft_Weed_Free_SCR_Many_Glacier.pdf PDF
ManyGlacierMaterialSourcesResearchEfforts_(08_30_2019).pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Prelim_Letter_.pdf PDF
Pre_AD_set_glac01404_Plans_Signoff_R1.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT NPS GLAC 14(4), Many Glacier Road Rehabilitate & MT Glacier 14(1), Many Glacier Road, Glacier County, MT

This work consists of 12 miles of pavement rehabilitation, culvert replacement, bridge repairs, sidewalks, curbing, drainage, signage , and striping. The project includes repair of three simple span bridges. Two bridge are 3 span, slab bridges needing minor concrete repair and waterproof membranes, and the third bridge is a timber horse bridge that required replacement of the timber girders.

Project length: 12 Miles

Tentative Fixed Completion Date: Fall 2021 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $15 million to $20 Million

Location: 0.5 Miles West of Babb, MT.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

Sc h

Na m e

_B as e_

Ad di tio na l S ch

Sc h Na m e

Op tio n

Y_

Ad di tio na

Na m e

_O pt io n

X_

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices) 1500 lnft 16000 lnft 2900 lnft 158 Watering for Dust Control 500 mgal 1600 mgal 1000 mgal

DIVISION 200 – Earthwork 201 Clearing & Grubbing 1 ac 7 ac 3 ac 204 Excavation & Embankment 6000 cuyd 6000 cuyd 5500 cuyd 204 Subexcavation 3500 cuyd 28500 cuyd 22000 cuyd 204 Select borrow 6500 ton 67000 ton 48000 ton 207 Earthwork Geosynthetics 13000 sqyd 99000 sqyd 95000 sqyd 211 Roadway Obliteration 2500 sqyd ch ed ul e

Sc h

Na m e

_B as e_

Ad di tio na

Na m e

Op tio n tio na

Na m e

_O pt io n

X_

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 75 cuyd 4500 cuyd 252 Rockery, Special Rock Embankment, and Rock Buttress 1575 sqft 255 Mechanically Stabilized Earth Walls (retaining walls) 225 sqft 257 Contactor-Designed Retaining Walls (contractor completed designs) Yes

DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 12000 ton 17500 ton 31000 ton 313 Aggregate-Topsoil Course 30 cuyd

DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 12000 ton 15000 ton 403 Asphalt Concrete 4000 ton 412 Asphalt Tack Coat (asphalt surface treatment) 60 ton 30 ton 413 Asphalt Pavement Milling 3000 sqyd

DIVISION 550 – Bridge Construction 559 Waterproofing (concrete – major structures) Yes 562 Temporary Works Yes 575 Minor Bridge Work Yes

DIVISION 600 – Incidental Construction 602 Culverts 3400 lnft 2300 lnft 1600 lnft 604 Manholes, Inlets, & Catch Basins (manhole) 1 each 605 Underdrains, Sheet Drains & Pavement Edge Drains (under drain) 2400 lnft 400 lnft 4100 lnft 609 Curb & Gutter (concrete – minor structures) (curb & gutter) 3100 lnft ch ed ul e

Sc h

Na m e

_B as e_

Ad di tio na

Na m e

Op tio n tio na

Na m e

_O pt io n

X_

615 Sidewalks, Pads & Paved Medians (concrete – minor structures) 900 sqyd 617 Guardrail 325 lnft 619 Fences, Gates, Cattle Guards & Bollard Posts (cattle guard) 1 each 620 Stone Masonry (guard wall) 1000 lnft 620 Stone Masonry (minor culvert head wall) 7 each 16 each 5 each 620 Stone Masonry (culvert repair/repoint) 140 sqyd 13 sqyd 621 Monuments & Markers (construction survey & staking) (yes/no) No Yes No 622 Rental Equipment (yes/no) Yes Yes Yes 623 General Labor (yes/no) Yes Yes Yes 624 Topsoil (landscaping & related items) 0.5 ac 3.5 ac 1.5 ac 625 Turf Establishment (indicate seeding or mulching separately) 2 slry 15 slry 6 slry 633 Permanent Traffic Control (traffic control devices) (signs) 70 each 8 each 634 Permanent Pavement Markings (traffic pavement markings) 235000 lnft 200000 lnft 635 Temporary Traffic Control – Flagger 3000 hr 4400 hr 1000 hr 635 Temporary Traffic Control – Pilot Car 200 hr 200 hr 636 Traffic Signal, Traffic Counter, Lighting, & Electrical Systems (lighted bollards) 15 each 646 Roadside Development (remove and reset kiosk) 1 each

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 550 – Bridge Construction

File details come from the government source that posted it. Updated .