This invitation for bids solicits offers for a road construction project located in Glacier National Park and on the Blackfeet Indian Reservation in Montana. The project includes repairing three bridges along a 12-mile stretch of road, with estimated prices ranging from $15-20 million. Bids are due on November 22, 2019 and the project must be completed by fall 2021. Offers must be submitted in printed form and include completed forms, wage determinations, and plans. The solicitation is for full and open competition on an unrestricted basis.

IFB

View the file

Other files

File Type Posted
Bid Opening Summary_Many Glacier_R1.pdf PDF
Q&A_11-20-19.pdf PDF
Q&A_11-18-19.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
glac01404_XS_Signoff.pdf PDF
Prebid Meeting.pptx PPTX presentation
Amendment A002.pdf PDF
Q&A_11-15-19.pdf PDF
Amendment_A001.pdf PDF
Q&A_11-07-19.pdf PDF
Q&A_11-05-19.pdf PDF
Q&A_11-04-19.pdf PDF
Q&A_10-31-19.pdf PDF
Plan_Request.pdf PDF
plans_glac01404.pdf PDF
Physical_Data_Many_Glacier.zip ZIP file
Draft_Weed_Free_SCR_Many_Glacier.pdf PDF
ManyGlacierMaterialSourcesResearchEfforts_(08_30_2019).pdf PDF
PROJECT_DESCRIPTION_R1.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Prelim_Letter_.pdf PDF
Pre_AD_set_glac01404_Plans_Signoff_R1.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BIDS

Solicitation No. 69056719B000017

MT NPS GLAC 14(4), Rehabilitate Many Glacier Road MT NPS GLACIER 14(1), Many Glacier Road

Solicitation, Offer & Award, Bid Schedule, Contract Clauses, General Wage Decision, Special Contract Requirements, and Plans

This solicitation cites Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 This project uses U.S. Customary units of measure

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone: (360) 619-7520 – FAX: (360) 619-7932 e-mail : wfl.contracts@dot.gov

QUICK INDEX

Page Item --- Bid Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Bidders A-3 SF 1442, Solicitation, Offer and

Award A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 General Wage Decision E-1 Special Contract Requirements H-1 Permits I-1 Reserved J-1 Fire Protection and Suppression

BID REMINDERS

Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:

• Have you rechecked your bid figures?

• Have you completed the bid schedule?

• Have you completed and signed the SF 1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you completed the Representations &

Certifications (Page B-1)?

• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

• Does the lower left corner of the proposal envelope state “Bid Enclosed”?

• Does the lower left corner include the Solicitation Number and the project number/name?

Bid Opening Date:

See Page A-3, Block 13A

A-1 Notice to Bidders mailto:wfl.contracts@fhwa.dot.gov

PROJECT No. MT NPS GLAC 14(4) & MT NPS GLACIER 14(1)

PROJECT NAME Rehabilitate Many Glacier Road & Many Glacier

Road

BEGINNING AT See Plans

ENDING AT See Plans

LENGTH See Plans

NATIONAL Glacier National Park

COUNTY Glacier

STATE Montana

FIXED COMPLETION DATE See FAR Clause 52.211-10 (FAR Clauses begin on page C-1)

Bid Submittal Checklist

MT NPS GLAC 14(4), Rehabilitate Many Glacier Road & MT GLACIER 14(1), Many Glacier Road

Before submitting your bid, please review the following:

Done?

Is this in the envelope?

Bid Envelope Did I correctly address the envelope? (See page A-3, blocks 7 & 8) Does the lower left corner of the envelope include the Solicitation Number and the project name/number?

Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award) Did I include our firm name and address in block 14?

Did I include our firm’s phone number in block 15?

Did I include our firm’s remittance address in block 16?

(Use when different than block 14) Did I include my unique entity identifier and Cage Code?

Did I include the number & date of all amendments in block 19?

Did the appropriate official sign/date in block 20A, 20B & 20C?

Bid Schedule (see page A-7) Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?

Did the appropriate official initial corrections?

When applicable, did I include the totals for each schedule in the summary page? (See last page of bid schedules.)

Bid Bond (Standard Form 24) Bids received without a valid bid bond will be rejected.

Did I complete my bid bond correctly?

Did I include the original?

Did I attach the Power of Attorney to the bid bond?

Authority to Sign Did I include a completed form for each person signing the SF1442 and Bid Bond?

Representations & Certifications & FAR Clause Did I include the completed B-pages (beginning on B-1)?

Did I include the completed clause 1252.228-73 Notification of Miller Act Payment Bond Protection (See page C-124)?

System for Award Management (SAM) https://www.sam.gov/portal/public/SAM/ Do we have up-to-date data in SAM?

Veteran Reporting (FAR Clause 52.222-37) If applicable, did I ensure our firm has completed this annual report?

NOTE: The Contractor is fully responsible to verify that all data is correct each time a bid package is submitted. Failure to properly input and/or update your data may cause the bid to be rejected.

https://www.sam.gov/portal/public/SAM/

MT NPS GLAC 14(4), Rehabilitate Many Glacier Road & MT GLACIER 14(1), Many Glacier Road

Driving Directions to our Vancouver Washington Office:

Directions to WFLHD https://www.google.com/maps/place/610+E+5th+St,+Vancouver,+WA+98661/data=!4m2!3m1!1s0x5495a8ae3f2d7083:0x5b7adcfa96ade37a?hl=en

Authority to Sign

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.

Corporate Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the corporation named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

_____________________________________ (signature) Affix Corporate Seal

_____________________________________ (title)

Glacier Road

INSTRUCTIONS: When the offeror/principal is a limited liability company, include this certification with your offer/bid.

Limited Liability Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the limited liability company named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

_____________________________________ (signature) Affix Company Seal (as applicable) __________ _________________________ (title)

Glacier Road

INSTRUCTIONS: When the offeror/principal is a partnership, include this

Authority to Bind Partnership

This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all partners)

Glacier Road

INSTRUCTIONS: When the offeror/principal is a joint venture, include this

Authority to Bind Joint Venture

This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all applicable individuals)

INSTRUCTIONS: When the offeror/principal is a sole proprietorship, the signature on the offer/bid and on the bonds must be as follows:

Sole Proprietorship Requirement

An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor.

If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.

RESERVED

BID BOND

(See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date) OMB Control Number: 9000-0045

Expiration Date: 8/31/2022 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

SURETY(IES) (Name and business address)

PENAL SUM OF BOND BID IDENTIFICATION

PERCENT

OF BID

PRICE

AMOUNT NOT TO EXCEED BID DATE INVITATION NUMBER

MILLION(S) THOUSAND(S) HUNDRED(S) CENTS

FOR (Construction, Supplies or Services)

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

1.

(Seal)

2.

(Seal)

3.

(Seal) Corporate Seal NAME(S) &

TITLE(S)

(Typed)

1. 2. 3.

INDIVIDUAL SURETY(IES)

SIGNATURE(S) 1.

(Seal)

2.

(Seal)

NAME(S)

(Typed)

1. 2.

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

INDIVIDUAL PARTNERSHIP JOINT VENTURE

CORPORATION OTHER (Specify)

STATE OF INCORPORATION

69056719B000017

MT GLACIER 14(1), Many Glacier Road

SU

R

ET

Y

B

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

C

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

D

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S)

1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

E

NAME &

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

F

NAME &

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

G

NAME &

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE

SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.

The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

STANDARD FORM 24 (REV. 8/2016) BACK

Table of Contents Project: MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many Glacier Road

TABLE OF CONTENTS

08/01/19–FP14

DESCRIPTION PAGE

Notice to Bidders ........................................................................................................................ A-1

Solicitation, Offer, and Award (SF 1442) ................................................................................... A-3

Bid Schedule ............................................................................................................................... A-7

Solicitation Provisions ................................................................................................................ B-1

Contract Clauses ......................................................................................................................... C-1

General Wage Decision .............................................................................................................. D-1

SCRs Table of Contents

SPECIAL CONTRACT REQUIREMENTS (SCR)

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.

Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-41 Division 200 ..................................................................................................................... F-1 Division 250 ..................................................................................................................... F-5 Division 300 ................................................................................................................... F-13 Division 400 ................................................................................................................... F-22 Division 550 ................................................................................................................... F-46 Division 600 ................................................................................................................... F-50 Division 700 .................................................................................................................... G-1

Permits ........................................................................................................................................ H-1

Reserved ........................................................................................................................................ I-1

Fire Protection and Suppression Plan .......................................................................................... J-1

Table of Contents Project: MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many

(This page intentionally left blank)

A-1

Notice to Bidders Project: MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many Glacier Road

NOTICE TO BIDDERS

08/01/19–FP14

THIS PROJECT IS BEING SOLICITED AND AWARDED UNDER FP-14.

The FP-14 is FLH’s Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. To view the FP-14 electronically go to:

https://flh.fhwa.dot.gov/business/resources/specs/.

The FP-14 is a dual unit document with U.S. Customary units being the primary unit shown.

Metric equivalents are shown in parenthesis.

When submitting bids, drawings, calculations, and other construction documents, use only U.S. Customary units of measure, unless otherwise stated.

I. Project Location

General Location. The project work is located between the Many Glacier Lodge and Babb, MT in Glacier National Park and in Glacier County on the Blackfeet Indian Reservation. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are 48°48’03” N, 113°39’30” W.

Project Limits. Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.

II. Pre‐bid Information.

GENERAL AND TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR

THIS PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON

11/15/2019

Refer to page A-5 for information on how to submit questions related to General Information and Technical Information. Answers to General and Technical Questions will be posted at https://www.fbo.gov/spg/DOT/FHWA/WFL/69056719B000017/listing.html.

Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.

Base & Option Schedules. Offers for construction of this project are being invited under a Base schedule and three Option schedules (Option X, Option Y, and Option Z). Complete the Base schedule and all Options according to Subsection 102.02. Award of the contract will be made according to Subsection 102.05A. The apparent low bidder will be determined by the lowest bid for the combined total of the Base and Option schedules.

A-2

Project: MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many Glacier Road

Electronic Plan Sheets. This solicitation includes electronic plan sheets available at https://www.fbo.gov/spg/DOT/FHWA/WFL/69056719B000017/listing.html. A paper copy of the plan sheets is available by submitting the form posted with this solicitation.

Physical Data. Physical data applicable to this project is listed in FAR Clause 52.236-4 Physical Data.

TERO Requirements. This contract may require materials be obtained and will require work be performed within the boundaries of the Blackfeet Indian Reservation.

The Bidder should be familiar with the Blackfeet Tribal Employment Rights Office (TERO) requirements, and take into consideration any TERO fees that may be assessed by the Blackfeet Tribe when preparing their bid. See Subsection(s) 105.02(c) and 107.01B.

The Government is not subject to TERO requirements and is not a party to any agreements between the Tribe and Contractor pursuant to the TERO. The Tribe administers the TERO pursuant to its inherent sovereign powers of self-government.

A TERO fee will not be imposed on that portion of the project solely within the established Glacier National Park boundaries.

A Tribal TERO fee of 4% will be assessed by the Tribe for work performed within the Tribes jurisdictional boundaries. The bidders should not factor into their bid any TERO fee except as described in Section 105 for Materials. After award of the contract, the Government will assess the amount of contract work within the boundaries of the Blackfeet Reservation, apply a 4% TERO fee, and issue a Contract Modification to the awarded contractor to pay the TERO fee for the road construction work within the Blackfeet Reservation.

Indian Preference. Contractors are required to provide preference in employment opportunities under this contract to Indians. See Section 107A.

Improvements or Services (IOS) Fee Requirements. A Tribal IOS fee of 1.5% will be assessed by the Tribe for work performed within the Tribes jurisdictional boundaries. The bidders should not factor into their bid any IOS fee. After award of the contract, the Government will assess the amount of contract work within the boundaries of the Blackfeet Reservation, apply a 1.5% IOS fee, and issue a Contract Modification to the awarded contractor to pay the IOS fee for the road construction work within the Blackfeet Reservation.

Blackfeet Nation Transportation Impact Fee. To offset the project’s impact on the Blackfeet Nation, a onetime additional payment of $372,000 will be made to the Blackfeet Nation as soon as practicable after contract award. This sum of $372,000 is to mitigate impacts of the contract within the established boundaries of Glacier National Park, and is included in the Base Schedule as item number 67002-0000 Project Lump Sum (Blackfeet Impact Fee), CTSM.

A-2a

Project: MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many Glacier Road

Blackfeet Environmental Wetland Impact Fee. To offset the project’s impact on the Blackfeet Nation, a onetime additional payment of $95,000 will be made to the Blackfeet Nation as soon as practicable after contract award. This sum of $95,000 is to mitigate wetland impacts within the established boundaries of Blackfeet Nation, and is included in the Option X Schedule as item number 67002-0000 Project Lump Sum (Wetland Mitigation Fee), CTSM.

Representations & Certifications. Submit or update Representations and Certifications online at https://www.sam.gov/SAM/ before bid submittal. For more details go to FAR Provision 52.204- 8 Annual Representations and Certifications (see page B-2.). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.

Requests for Information. Requests for technical information (Plan and Division 100 – 700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).

Price Evaluation Factor. This solicitation contains a Price Evaluation Factor. In accordance with 13 CFR subsection 126.613, we will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a HUBZone small business; the 10% factor does not apply to an apparent low bid submitted by a small business.

HUBZone. If the contract is awarded after applying the price preference for HUBZone small business concerns under FAR clause 52.219-4; at least 50 percent of the cost of the contract performance incurred for personnel must be spent on the prime Contractor’s employees or the employees of other qualified HUBZone small business concerns.

SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.

Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.

Facsimile and email bids, modifications, and withdrawals. Facsimile and email bids are not authorized for this solicitation. Bids may be modified or withdrawn by facsimile, if such notice is received by the time specified for receipt of bids. The Government will not be responsible for any failure attributable to the transmission or receipt of facsimile data. See FAR Provision 52.214-5, Submission of Bids. FAX 360.619.7932. To confirm receipt, call 360.619.7520.

A-2b

Project: MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many Glacier Road

Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/SAM/.

III. Post Award Information.

Insurance. Insurance requirements are described in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the Contractor Performance Assessment Reporting System (CPARS); for additional information, see http://www.cpars.gov/index.htm. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

IV. Specifications and Permits.

Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition Regulation (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. An electronic version may be found at http://flh.fhwa.dot.gov/business/resources/specs/. A single paper copy can also be obtained from the Research & Technology Product Distribution Center (RTPDC) by e-mail to:

report.center@dot.gov, or by phone 814-239-1160, or fax 814-239-2156.

Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 103.06.

Brand Name or Equal. Section 646, Roadside Development, specifies a proprietary product. See FAR Provision 52.211-6, Brand Name or Equal, when opting to use alternate products. Base Schedule Bid Item 64603-1000, Fixture, Vault Toilet has been identified as "Brand Name or Equal". If your offer is based on a brand name different than that listed in the Special Contract Requirements, the proposed "equal" must be identified in the space provided on the Bid Schedule.

Include with your offer all documentation needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The evaluation of offers and the determination as to equality of the product offered is the responsibility of the Government and will be based on information furnished by the Offeror as well as other information reasonably available to the contracting office. If the proposed “equal” is determined by the government to be “not equal”, the bid will be considered nonresponsive.

A-2c

Project: MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many Glacier Road

Material Sources. Material sources and waste sites have not been identified for this project.

Secure all permits and clearances for Contractor-located sites and sources. The Government has determined six material sources on the west side of Glacier National Park were certified weed free for sand and gravel, and three were certified weed free for topsoil. Two material sources on the east side of the Park were certified weed free for sand and gravel, and none for topsoil (see physical data listed in FAR Clause 52.236-4 for a summary of the material sources research). See Subsection 105.02(c).

Lab Trailers. The Government offers to make available to the Contractor a laboratory trailer with test equipment. See Subsection 154.04A, Laboratory Trailer and Testing Equipment.

Preparation of the Storm Water Pollution Prevention Plan (SWPPP). There are two SWPPP’s for this project that will need to be updated and maintained throughout the life of the project.

See Subsection 107.01A(b).

Pre-bid Meeting. There will be a pre-bid meeting to allow the Blackfeet Tribal Agencies to go over tribal specific requirements regarding how work is performed within the boundaries of their reservation. The meeting will be held on November 12, 2019 from 1000 – 1200 MST at the following address.

Blackfeet TERO Office 65 Hospital Rd.

Browning, MT 59417

See also FAR Provision 52.236-27 Site Visit, on page B-17.

A-2d

Project: MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many

(This page intentionally left blank)

a. Sealed offers in original an

______________________ 11/22/2019

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE

SOLICITATION

(Construction, Alteration, or Repair)

3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

Western Federal Lands Highway Div.

610 E. 5th St.

Vancouver WA 98661

690567 8. ADDRESS OFFER TO

Federal Highway Administration Western Federal Lands Highway Div.

610 E. 5th St. Vancouver WA 98661

a. NAME

See Page A-5

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

See Block 10 x

10/23/2019

1. SOLICITATION NO.

69056719B000017

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This solicitation is designed MT NPS GLAC 14(4), Many Glacier Road Rehabilitate & MT Glacier 14(1), Many Glacier Road

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR).

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

See Page A-5

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time

________ 60 ______ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Federal Highway Administration Western Federal Lands Highway Div.

610 E. 5th St.

Vancouver WA 98661

690567

DEAN UMATHUM

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Unique Entity Identifier (Formerly DUNS) Cage Code:

See Bid Schedule

All Items on Bid Schedule

See Page A-5

X

A-4

Federal Highway Administration Western Federal Lands Highway Div.

610 E. 5th St.

Vancouver WA 98661

A-5

Continuation SF 1442

Glacier Road

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to 4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via fax (360.619.7932) or e-mail at wfl.plans-spec@dot.gov.

QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Federal Business Opportunities (FBO) Website https://www.fbo.gov/ .

• Insert the solicitation number in “Keyword / Solicitation #:”

• Scroll to the project.

• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.

FOR DAVIS-BACON WAGE RATE INFORMATION call the Department of Labor at 972.850.2627 (DRBA – Southwest Region).

FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. Physical Data will be posted with the solicitation on the Federal Business Opportunities website.

FOR BID RESULTS, Bid opening summary will be posted on the Federal Business Opportunities (FBO) Website https://www.fbo.gov/ shortly after bid opening. Bid tabulations will be available on our website approximately 3 work days after the bid opening. Our website is located at: http://flh.fhwa.dot.gov/business/construction/bids/ filter by WFL Division and applicable state.

Block 11 COMPLETION DATE: Work shall be completed on or before the date specified in

FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof. Contract Clauses begin on pages C-1.

Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units.

Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).

ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP- 14, U.S. Customary Units.

Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14, U.S. Customary Units.

mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://www.fbo.gov/ https://www.fbo.gov/ http://flh.fhwa.dot.gov/business/construction/bids/

A-6

Continuation SF 1442

Glacier Road

ESTIMATED PRICE RANGE. The price range of the project work is between $15,000,000 and $20,000,000.

SUBCONTRACTING PLAN. This invitation for bids requires a low bidder who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. Do not submit this form with your bid. A large business is one whose average gross annual receipts over the past 3 years equal $39.5 million or more. For your information the subcontracting plan form is included beginning on page A-6a. This requirement does not apply to SMALL businesses.

A-6a

MT Glacier 14(1), Many Glacier Road

SUBCONTRACTING PLAN

e. Rationale if establishing a goal lower than 3% for VOSB:

f. Rationale if establishing a goal lower than 3% for SDVOSB:

g. Rationale if establishing a goal lower than 3% for HUBZone:

1 Any dollar amount applied to SDVOSB also applies to VOSB.

2 In this document, the term WOSB includes Economically Disadvantaged WOSB (EDWOSB) concerns.

SUBCONTRACTING PLAN for Solicitation number: 69056719B000017

a. Total prime contract amount: $

RATIO PERCENT

b. Total planned subcontract awards: $

c. Total planned subcontract awards to other than small business concerns (i.e., large, non-profit, etc.) $ (c/b) % d.

Total planned subcontract awards to Small Business concerns (SB) (not elsewhere counted in e. f. g. or h. below) $ (d/b) e.

Total planned subcontract awards to Veteran Owned Small Business concerns (VOSB)1: $ (e/b) f.

Total planned subcontract awards to Service Disabled Veteran Owned Small Business concerns (SDVOSB): $ (f/b) g.

Total planned subcontract awards to Small Business concerns located in Historically Underutilized Business Zones (HUBZone):

$ (g/b) h.

Total planned subcontract awards to Small Disadvantaged Business (SDB) concerns (includes 8(a)s, Alaska Native Corporations (ANC) and Indian Tribes):

$ (h/b)

i. Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)2 concerns: $ (i/b) % j.

Combined total planned subcontract awards to all small business (SB) concerns:

NOTE: If a subcontractor qualifies in more than one sub-category of SB above, show that amount in each applicable sub-category, but include that amount only once in this line.

$ (c+d+e+f+ g+h+i)/b

A-6b

MT Glacier 14(1), Many Glacier Road

h. Rationale if establishing a goal lower than 5% for SDB:

i. Rationale if establishing a goal lower than 5% for WOSB:

j. Rationale if establishing a goal lower than 48.5% for SB:

2. The following principal types of supplies and/or services are planned to be subcontracted under this contract. [Attach additional pages if more space is needed.]

3. The following methods was used to develop the subcontract percentage goals:

4. The following methods were used to identify potential subcontract sources for solicitation purposes. (i.e. source lists used and organizations contacted to identify potential SB concerns, such as the System for Award Management (www.SAM.gov), Dynamic Small Business Search (www.DSBS.sba.gov), trade associations, industry conferences/fairs, etc.)

3 List all applicable size standards for each proposed subcontractor.

Type of Supply/Service to be Subcontracted

Company/Firm Name Address

Subcontractor Size Standard (Other Than

SB, SB, VOSB, SDVOSB,

HUBZone, SDB, WOSB)3 http://www.sam.gov/ http://www.dsbs.sba.gov/

A-6c

MT Glacier 14(1), Many Glacier Road

5. Indirect costs [were/were not] included in establishing the subcontracting goals specified in the table above.

6. If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, VOSB, SDVOSB, HUBZone, SDB and WOSB subcontractors:

7. The following individual will administer the subcontracting program:

Name:

Title:

Address:

Telephone:

E-mail:

This individual's specific duties, as they relate to the subcontracting program, are as follows:

8. The following efforts will be taken to ensure that SB, SDB, VOSB, SDVOSB, HUBZone, and WOSB subcontractors will have an equitable opportunity to compete for subcontracts:

[initial] It is agreed that FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts, which offer further subcontracting opportunities. It is further agreed that all subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $700,000 ($1.5M for construction of any public facility with further subcontracting possibilities) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9.

9. The following types of records will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan (i.e., establishment of source lists, guides and other data that identify SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns; a description of the offeror’s efforts to locate SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns and to award subcontracts to them, etc.) and shall be maintained through completion of the contract:

A-6d

MT Glacier 14(1), Many Glacier Road

10. In accordance with FAR Subpart 19.704(a)(10) through (15), the Contractor further agrees to:

[Initial each line]

Cooperate in any studies or surveys as may be required;

Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan;

After November 30, 2017, include subcontracting data for each order when reporting subcontracting achievements for indefinite-delivery, indefinite-quantity contracts intended for use by multiple agencies;

Submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov/ within the timeframes identified at FAR Subpart 19.704(a)(10)(iv);

Ensure that other than small business subcontractors with subcontracting plans agree to submit eSRS documents online as required;

Provide its prime contract number and its unique entity identifier, and the e-mail address of the offeror’s official responsible for acknowledging receipt of or rejecting the ISRs to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs;

Require that each subcontractor with a subcontracting plan provide the prime contract number, its own unique entity identifier, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans;

Make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that the offeror used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal;

Provide the contracting officer with a written explanation if the contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in FAR 19.704(a)(12) of this section. This written explanation will be submitted to the contracting officer within 30 days of contract completion;

Will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor; and

Pay its small business subcontractors on time and in accordance with the terms and http://www.esrs.gov/

A-6e

MT Glacier 14(1), Many Glacier Road conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor (see FAR 52.242-5).

Submitted by:

POC Name:

Title:

Email Address:

Company Name:

Mailing Address:

Signature http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_237.htm#P308_50712

A-6f

MT Glacier 14(1), Many Glacier Road

(RESERVED)

A-7

Bid Schedule Project: MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many Glacier Road

BID SCHEDULE

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When a “LPSM” (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total the amounts bid for all pay items and insert the total bid amount.

BRAND NAME OR EQUAL NOTIFICATION

If providing other than the listed brand name products, complete the following (See FAR Provision 52.211-6, Brand Name or Equal).

For Pay Item No. 64603-1000, Fixture, Vault Toilet, in Schedule A (Base Schedule), our firm offers in lieu of the brand name CXT® Double Vault Waterless Restroom, Double Cascadian specified in Subsection 725.21 Vault Toilet.

Brand: __________________________________________

Manufacturer’s Name: _____________________________

Include with your bid, all documents needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section(s). The determination as to the equality of the product offered is the responsibility of the Government and will be based on the information furnished by the bidder as well as other information reasonably available to the contracting office. If proposed “equal” is determined by the government to be “not equal”, the bid will be considered nonresponsive.

A-8

Contract Quantity Pay Items

20101-0000 CLEARING AND GRUBBING

20401-0000 ROADWAY EXCAVATION

21101-1000 ROADWAY OBLITERATION, METHOD 1

55901-1000 MEMBRANE WATERPROOFING, TYPE 1 (APIKUNI CREEK BRIDGE)

55901-1000 MEMBRANE WATERPROOFING, TYPE 1 (WINDY CREEK BRIDGE)

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

ALL LPSM $___LPSM_____ $____________

A0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0100 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

ALL LPSM $___LPSM_____ $____________

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

950 LNFT $____________ $____________

A0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL)

65 EACH $____________ $____________

A0180 15801-0000 WATERING FOR DUST CONTROL

1,000 MGAL $____________ $____________

A0200 20101-0000 CLEARING AND GRUBBING

1.2 ACRE $____________ $____________

A0220 20301-1900 REMOVAL OF PIPE CULVERT

1 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project:MT NPS GLAC 14(4), Rehabilitate Many Glacier Road, MT GLACIER 14(1), Many Glacier Road

A-9

A0240 20301-2400 REMOVAL OF SIGN

55 EACH $____________ $____________

A0260 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE

4,500 LNFT $____________ $____________

A0280 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

650 SQYD $____________ $____________

A0300 20303-3200 REMOVAL OF…