This solicitation package describes a federal construction contract opportunity for bridge rehabilitation work on Glacier National Park roadways. The project includes concrete repair and waterproofing of two simple span bridges, as well as timber girder replacement on a third horse trail bridge. The work is located on Many Glacier Road in Glacier County, Montana and has an estimated price range between $15-20 million. The preliminary plans and additional information letter are provided electronically only through the federal procurement system link. Interested contractors must register as users to view the plans and full solicitation documents, which will include specifications when issued. The tentative completion deadline is fall 2021. The solicitation will be awarded through full and open competition on an unrestricted basis.
Preliminary Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Many Glacier_R1.pdf | ||
| Q&A_11-20-19.pdf | ||
| Q&A_11-18-19.pdf | ||
| Amendment A004.pdf | ||
| Amendment A003.pdf | ||
| glac01404_XS_Signoff.pdf | ||
| Prebid Meeting.pptx | PPTX presentation | |
| Amendment A002.pdf | ||
| Q&A_11-15-19.pdf | ||
| Amendment_A001.pdf | ||
| Q&A_11-07-19.pdf | ||
| Q&A_11-05-19.pdf | ||
| Q&A_11-04-19.pdf | ||
| Q&A_10-31-19.pdf | ||
| IFB_Many_Glacier.pdf | ||
| Plan_Request.pdf | ||
| plans_glac01404.pdf | ||
| Physical_Data_Many_Glacier.zip | ZIP file | |
| Draft_Weed_Free_SCR_Many_Glacier.pdf | ||
| ManyGlacierMaterialSourcesResearchEfforts_(08_30_2019).pdf | ||
| PROJECT_DESCRIPTION_R1.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| Prelim_Letter_.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIM
IN
ARY N
OT FOR C
ONSTRUCTIO
N
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
A C
T U
A L F I L E X
X X
X
D G
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
H.01
1 RGXXXX-AB. OLTMANNB. OLTMANN
Structure Number: 1430-030P PLAN AND ELEVATION
PLAN
SECTION B-B
Begin Bridge
L Many Glacier RoadCL
End Bridge overlay
Existing HMA
WORK ITEMS:
1 Mill and remove HMA overlay and install waterproofing membrane
37'-8"
B
B
APIKUNI CREEK BRIDGE
1" = 5'-0"
1" = 5'-0"
Remove and replace concrete at longitudinal extension joint
1" = 1'-0"
1'-6"
6'-0"
A A
SECTION A-A
Curb stone joint
Previous construction Previous bridge widening
As Shown
(2) Includes removal and repair of deteriorated concrete, assumes 2 CUYD minor concrete
(1) Contract Quantity
ESTIMATE - BASE SCHEDULE
Structure NumberNOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 3
MT NPS GLAC 14(4)
GLACIER COUNTY, MONTANA
GLACIER NATIONAL PARK
PMIS Pkg. No. XXXXXX NPS Drwg. No. GLACXXXXXXXXX
GLACIER 14(1)MT
JULY 2019
N
Do not disturb existing stone masonry.
concrete.
Use plywood only for sections of repair that show plywood form marks on existing
Provide formwork for concrete repair that matches the original formwork marks.
waterproofing according to the manufacture's instructions and details in the plans.
Perfrom bridge deck waterproofing according to Section 559. Install
Perform concrete repair according to Section 575.
and fabrication.
Field verify existing conditions and dimensions prior to ordering materials on Federal Highway Projects, FP-14
Administration Standard Specifications for Construction of Roads and Bridges
Provide all materials and perform all work according to the Federal Highway
6.
5.
4.
3.
2.
1.
D e fa u lt c p w w o r k d H
G
L A
C
P
E A p ik u n i
C r k
.D
G N
P
M
J u ly
GENERAL NOTES:
F lo w
ARY N
OT FOR C
T U
A L F I L E X
X X
X
D
H.02
2 RGXXXX-BB. OLTMANNB. OLTMANN
Structure Number: 1430-031P PLAN AND ELEVATION
PLAN
SECTION B-B
Begin Bridge
L Many Glacier RoadCL
End Bridge overlay
Existing HMA
WORK ITEMS:
1 Mill and remove HMA overlay and install waterproofing membrane
37'-8"
B
B
1" = 5'-0"
1" = 5'-0"
Remove and replace concrete at longitudinal extension joint
1" = 1'-0"
1'-6"
6'-0"
A A
SECTION A-A
Curb stone joint
Previous construction Previous bridge widening
As Shown
(2) Includes removal and repair of deteriorated concrete, assumes 2 CUYD minor concrete
(1) Contract Quantity
WINDY CREEK BRIDGE
ESTIMATE - BASE SCHEDULE
Structure NumberNOT
FOR
CO
NST
RUCTI
ON
PRE
NO.
U.S. DEPARTMENT OF TRANSPORTATION
MT NPS GLAC 14(4)
GLACIER COUNTY, MONTANA
N
Do not disturb existing stone masonry.
concrete.
Use plywood only for sections of repair that show plywood form marks on existing
Provide formwork for concrete repair that matches the original formwork marks.
waterproofing according to the manufacture's instructions and details in the plans.
Perfrom bridge deck waterproofing according to Section 559. Install
Perform concrete repair according to Section 575.
and fabrication.
Field verify existing conditions and dimensions prior to ordering materials on Federal Highway Projects, FP-14
Administration Standard Specifications for Construction of Roads and Bridges
Provide all materials and perform all work according to the Federal Highway
6.
5.
4.
3.
2.
1.
D e fa p w w o r k d H
G
L A
C
P
E W in d y C r k
.D
G N
J u ly
GENERAL NOTES:
F lo w
ARY N
OT FOR C
T U
A L F I L E X
X X
X
D r a il to r a il
O u t-to O u t)
(Roadway)(Shoulder) (Shoulder)
(Walkway)
(Clear span)
(Clear Span)
Existing Bridge Railing
C le a r a n c e
C le a r a n c e
Masonry Abutment (Typ) foundation
Existing masonry
"4 18'-0
9'-2"
10'-4"
12'-6"16'-0"12'-6"
41'-0"
N
ELEVATION
PLAN
TYPICAL SECTION
L of StructureCL railing
Existing bridge abutment (Typ.)
Stone masonry
Edge of pavement
45'-0"
H.03
3SL/BAOS. LOFTUS
"4 39'-0
" x 24" Timber glulam beam2 glulam beam
" x 24" Timber 2
1/2" = 1'-0"
1/4" = 1'-0"
1/4" = 1'-0"
Structure Number: 1430-053T
As Shown RGXXXX-C
(1) Includes replacing timber glulam beams, salvage and reconstruction of bridge rail, deck and running planks
45'-0" (Timber beam length)
NORTH HORSE TRAIL BRIDGE
BRIDGE DETAILS
Timber runners * 4 - 3" x 11.5"
(Typ) *
Existing rail
3" x 11" Timber deck *
*Salvage and reuse component
ESTIMATE - BASE SCHEDULE
lighting system *
Under bridge
(Typ.)
" max. gap2
Structure NumberNOT
FOR
CO
NST
RUCTI
ON
PRE
NO.
U.S. DEPARTMENT OF TRANSPORTATION
MT NPS GLAC 14(4)
GLACIER COUNTY, MONTANA
P
J u ly
D e fa p w w o r k d
M A
N Y G
L A
C I E
R P
E
.D
G N enlarge bearing seat openings only enough to fit new beams as shown.
Modify the stone masonry abutment seat to the minimal extent possible, Replace existing timber beams with glulam beams.
hardware (plates, brackets, connections). Provide new fasteners as needed.
lighting system according to Section 203. Salvage and reuse existing
Salvage and reinstall existing deck, running planks, rails, and under bridge and fabrication.
Field verify existing conditions and dimensions prior to ordering materials on Federal Highway Projects, FP-14
Administration Standard Specifications for Construction of Roads and Bridges
Provide all materials and perform all work according to the Federal Highway
5.
4.
3.
2.
1.
GENERAL NOTES:
PRELIM
IN
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ONSTRUCTIO
N
Michael.Traffalis Draft
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
ARY N
OT FOR C
| glac01404_SectionB |
| glac01404_PLANS_Signoff |
| glac01404ab-US_Int2D-001 |
| glac01404_PLANS_Signoff |
| GLAC 14(4) - Bridge PLANs - 95% |
| Combined-Many_Glacier-Final |
File details come from the government source that posted it. Updated .