Q&A_12-20-17.pdf

PDF 91 KB Posted

Attached to
WA PRA OLYM 12(2), Hurricane Ridge Road, Phase II
Solicitation number
69056718B000005
Issued by

View the file

Other files

File Type Posted
BidSum_Hurricane_Ridge.pdf PDF
Q&A_1-16-18.pdf PDF
Q&A_1-10-18.pdf PDF
A005.pdf PDF
Q&A_1-9-18.pdf PDF
A004.pdf PDF
Q&A_1-4-18.pdf PDF
A003.pdf PDF
Q&A_1-2-18.pdf PDF
114+75_INLET-E_OUTLET.mpg MPG file
119+58_INLET-E_OUTLET.mpg MPG file
191+29_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_307+27_App_A-13.pdf PDF
346+13_INLET-W_OUTLET.mpg MPG file
307+00_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_346+13_App_A-14.pdf PDF
196+76_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_191+28_App_A-7.pdf PDF
FLH_Culvert_Assessment_Form_141+46_App_A-4.pdf PDF
A002.pdf PDF
FLH_Culvert_Assessment_Form_274+88_App_A-11.pdf PDF
FLH_Culvert_Assessment_Form_196+76_App_A-8.pdf PDF
FLH_Culvert_Assessment_Form_153+25_App_A-5.pdf PDF
153+25_INLET-W_OUTLET.mpg MPG file
141+47_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_114+75_App_A-2.pdf PDF
FLH_Culvert_Assessment_Form_306+18_App_A-12.pdf PDF
306+00_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_119+57_App_A-3.pdf PDF
274+89_INLET-W_OUTLET.mpg MPG file
A001.pdf PDF
10_WA_PRA_OLYM_12(2)_-_Plans.pdf.pdf PDF
SWPPP_WA_PRA_OLYM12(2)_Hurricane_Ridge_Rd..pdf PDF
IFB_Hurricane_Ridge.pdf PDF
Plan_Request_form_Hurricane_Ridge.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA PRA OLYM 12(2)

Hurricane Ridge Road, Phase II

# General Technical Question Answer Date 1 X

The Bid Schedule lists Lining for 18” and 24” culvert pipe. The drawings call for lining 36” and 48” culvert pipe as well but these are not listed on the Bid Schedule. Please clarify sizes and quantities for Lining Culvert pipe.

The 36” and 48” pipe culvert liners are only required under Schedule B. Refer to the Tabulation of Drainage Quantities (Sheet H.1), and Summary of Quantities – Schedule B (Sheet B.5). Bid the Estimated Quantity shown in the Bid Schedule.

12/19/17

2 X

We are planning to bid as a subcontractor for the CIPP lining portion of this project, but I need to confirm that the lining system we use will be accepted. I am attaching a data sheet for one of the products we are likely to use. Please let me know if this material will be acceptable for use in this project.

We will not evaluate your proposal. Bid the project according to the specifications. The successful Contractor may propose changes after the contract is awarded.

12/19/17

3 X

Is it acceptable to bid either corrugated polyethylene culvert pipe or polypropylene culvert pipe on this project as an alternate to the CMP/PVC mentioned in the plans and specifications?

No. Refer to the ‘Allowable Pipe Culvert Material’ information included on Sheet H.1. No substitutions are allowed where Galvanized Steel is required.

12/19/17

4 X

Drawing page G6, note 2 “Conduit for fiber optic cable will be paid for separately” Does this mean that the fiber optic cable conduit is not in this contract?

The note is there to indicate that the pay item for System Installation does not include the Conduit. The conduit is paid for under the Conduit pay item.

12/20/17

5 X

From the drawings it is not clear in which utility vault the FO cable would terminate so we don’t know how much cable is needed. Please clarify the length of the fiber optic cable for bidding purposes and which utility vault it is to be terminated.

This will be addressed in a forthcoming Amendment. 12/20/2017

6 X

D.10 show the general location for the snow pole holder sleeves. What is the spacing required or how many total sleeves are required?

See Sheet K.9 for snow pole holder location and layout. Bid the Estimated Quantity included in the Bid Schedule. 12/20/2017

Check General or Technical