A005.pdf

PDF 61 KB Posted

Attached to
WA PRA OLYM 12(2), Hurricane Ridge Road, Phase II
Solicitation number
69056718B000005
Issued by

View the file

Other files

File Type Posted
BidSum_Hurricane_Ridge.pdf PDF
Q&A_1-16-18.pdf PDF
Q&A_1-10-18.pdf PDF
Q&A_1-9-18.pdf PDF
A004.pdf PDF
Q&A_1-4-18.pdf PDF
A003.pdf PDF
Q&A_1-2-18.pdf PDF
114+75_INLET-E_OUTLET.mpg MPG file
119+58_INLET-E_OUTLET.mpg MPG file
191+29_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_307+27_App_A-13.pdf PDF
346+13_INLET-W_OUTLET.mpg MPG file
307+00_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_346+13_App_A-14.pdf PDF
196+76_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_191+28_App_A-7.pdf PDF
FLH_Culvert_Assessment_Form_141+46_App_A-4.pdf PDF
A002.pdf PDF
FLH_Culvert_Assessment_Form_274+88_App_A-11.pdf PDF
FLH_Culvert_Assessment_Form_196+76_App_A-8.pdf PDF
FLH_Culvert_Assessment_Form_153+25_App_A-5.pdf PDF
153+25_INLET-W_OUTLET.mpg MPG file
141+47_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_114+75_App_A-2.pdf PDF
FLH_Culvert_Assessment_Form_306+18_App_A-12.pdf PDF
306+00_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_119+57_App_A-3.pdf PDF
274+89_INLET-W_OUTLET.mpg MPG file
Q&A_12-20-17.pdf PDF
A001.pdf PDF
10_WA_PRA_OLYM_12(2)_-_Plans.pdf.pdf PDF
SWPPP_WA_PRA_OLYM12(2)_Hurricane_Ridge_Rd..pdf PDF
IFB_Hurricane_Ridge.pdf PDF
Plan_Request_form_Hurricane_Ridge.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A005 01/11/2018 N/A WA PRA OLYM 12(2)

Hurricane Ridge Road, Phase II

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X 69056718B000005

9B. DATED (SEE ITEM 11)

12/11/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA PRA OLYM 12(2), Hurricane Ridge Road, Phase II

Amendment A005 is issued to revise the following:

Page F-10, Subsection 209.10 Backfill. Revises requirements for backfill and patching with asphalt concrete.

ENCLOSURES: Page F-10

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

F-10

Special Contract Requirements Project: WA PRA OLYM 12(2), Hurricane Ridge Road, Phase II

03USC10/06/11

Section 209. — STRUCTURE EXCAVATION AND BACKFILL

Material

209.02 Add the following to the materials list:

Crushed Aggregate 703.06

Construction Requirements

209.09 Bedding. Add the following:

(c) Conduit. Install conduit bedding material that conforms to Subsection 704.02 and backfill material that conforms to Subsection 704.03(c).

209.10 Backfill. Amend as follows:

(d) Patching existing pavement areas. AddDelete the text of this Subsection and substitute the following:

Construct the top 15 inches with 12 inches of crushed aggregate according to Section 308 and 3 inches of asphalt concrete according to Section 404. For conduit trenches, construct the top 6 inches with crushed aggregate according to Section 308. If the trenching will extend through the winter, construct the top 2 inches with asphalt concrete according to Sections 404 or 417.

Add the following:

(e) Utility trenches. Place and compact backfill material in even layers. Place the material in layers that, when compacted, do not exceed 6 inches in thickness. Compact each layer according to Subsection 209.11. Construct the top 6 inches with crushed aggregate according to Section 308 inside of pavement areas.

Revised by Amendment A005

File details come from the government source that posted it.