10_WA_PRA_OLYM_12(2)_-_Plans.pdf.pdf
PDF 23 MB Posted
- Solicitation number
- 69056718B000005
About this file
Plans
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
Lee Taylor 09/16/16
Laura Joss 09/07/16
Robert Lale 11/08/16
NPS PMIS No. 7347 NPS Dwg. No. 149/80058
BRITISH COLUMBIA
I D
A H
O
OREGON
UNITED STATES
CANADA
P
A C I F I C
O C
A E
N tS rait ofJuan deFuca
OC
LU
MBIA R
IV
ER
A
SN
KE
R
VERI
M
COLU B
I A
V R I
E R
Lakes
Banks
Lakes
Moses
Reservoir
Potholes
OLYMPIC
NATIONAL
PARK
MOUNT
RAINIER
N.P.
MOUNT
ST. HELENS
NAT'L VOLC.
MON.
NORTH
CASCADES
NATIONAL
PARK
BELLINGHAM
Forks
Aberdeen
Chehalis
Longview
OLYMPIA
TACOMA
SEATTLE
EVERETT
Wenatchee
Lake
Moses
SPOKANE
Pullman
Pasco
RICHLAND
Kennewick Walla Walla
ANGELES
PORT
Townsend
Port Vernon
Mt.
VANCOUVER
WASHINGTON KEY MAP
YAKIMA
u n d o S t e g u
P
A.1
STATE PROJECT
NUMBER
SHEET
WA
PRA OLYM 12(2)
D A
T E
P
A T
H
R J o h n s o n
C h e c k e d b y
D
S la n in a e s ig n e d b y
NATIONAL
PARK
SERVICE
Department of the Interior
PROJECT MANAGER
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
TYPE OF CONSTRUCTION:
and parking improvements.
concrete curb and gutter, drainage improvements, Restore, resurface, rehabilitate (3R)
K. LOFTSGAARDEN
OLYMPIC
NATIONAL
PARK
The Foothills
E lw h a
River
Range
Kla hh an e
Ra ng e
Co x
Va lle y
R idge
Hurricane
OLYMPIC
NATIONAL
FOREST
LOWER ELWHA
INDIAN RES
HARBOR
ANGELES
PORT
STRAIT OF JUAN DE FUCA
L A
K E
A L D
W E
L L
E L
W H
A
R
IV
E R
WASHINGTON
CLALLAM COUNTY
NPS PMIS NO. 7347
WA PRA OLYM 12(2)
PLANS FOR PROPOSED PROJECT
OLYMPIC NATIONAL PARK
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
SEE SHEET A.2 FOR INDEX TO SHEETS
115 MILES
TO OLYMPIA
T 30 N
T 29 N
R W
R W
R W
R W
R W
R W
T 30 N
T 29 N
MI
LE
S
TO
ABERDEEN
T 31 N
T 30 N
R W
R W
R W
R W
Project Location
HURRICANE RIDGE ROAD, PHASE II
SCALE IN MILES
2 0 1 2 3 4 51
SPECIFICATION:
Projects, FP-03 US Customary Units of Roads and Bridges on Federal Highway
Standard Specifications for Construction
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PLANS PREPARED BY
e (max)
V
ADT (2023):
ADT (2003):
4%
45 MPH
A N
G E
L E S
R D
LAURIDSEN
H E
A R
T O
T H
E H
IL
L S
P A R
K W
A Y
L A
U R
E L
L
IN
C O
L N
1ST
FRONT
R A
C E
M T
PARK
HURRICANE
RI
D G E
ROAD
APPROVED:
DATE
DATE
DATE
307+26
306+18
CULVERT SITES
346+12
CULVERT SITE
380+72
CULVERT SITE
Western Federal Lands Highway Division
Chief of Engineering, Robert Lale, National Park Service
Regional Director, Pacific West Region, Laura Joss, Olympic National Park
Superintendent, Lee Taylor, 283+00.00
SUSPEND PROJECT
381+25
END PROJECT
6+10.85
RESUME PROJECT
3+05
TURNOUT SITE
PROJECT LENGTH 5.302 MILES
INDEX TO SHEETS
A.2
STATE PROJECT
D A
T E
P
A T
J o h n s e c k e d b
S la n s ig n e d b y
INDEX TO SHEETS
G. MISCELLANEOUS PLAN DETAILS
F. EROSION CONTROL
E. APPROACH ROADS AND PARKING AREAS
D. PLAN-PROFILE
C. TYPICAL SECTION(S)
B. SUMMARIES
A. GENERAL INFORMATION
G.7
G.6
G.5
G.4
G.3
G.2
G.1
F.7
F.2-F.6
F.1
E.10
E.8-E.9
E.7
E.6
E.5
E.4
E.3
E.2
E.1
D.3-D.12
D.1-D.2
C.5
C.4
C.3
C.2
C.1
B.1-B.6
A.3
A.2
A.1
UTILITY VAULT DETAILS
UTILITY TRENCH DETAILS
TRANSVERSE RUMBLE STRIPS
GATE DETAIL
ACCESSIBILITY RAMP DETAILS
CONCRETE SIDEWALK DETAILS
CONCRETE CURB & GUTTER DETAILS
SILT FENCE DETAIL
EROSION CONTROL PLAN
TABULATION OF EROSION CONTROL QUANTITIES
OBLITERATION DETAILS
PAVED TURNOUT DETAILS
PARKING AREA DETAIL STATION 235+80
INTERSECTION DETAIL HEATHER PARK ACCESS ROAD STATION 283+15
INTERSECTION DETAIL LAKE DAWN ROAD STATION 268+70
INTERSECTION DETAIL MT. ANGELES ROAD STATION 10+00
PARKING AREA AND TURNOUT TYPICAL SECTIONS
ROAD APPROACH, TYPICAL SECTION AND DETAILS
ROAD APPROACH AND PARKING AREA QUANTITIES
PLAN AND PROFILE
TABULATION OF PLAN QUANTITIES
TYPICAL SECTION BASE REHABILITATION
TYPICAL SECTION SUBEXCAVATION
TYPICAL SECTION DETAILS
TYPICAL SECTION
TABULATION OF TYPICAL SECTION QUANTITIES
SUMMARY OF QUANTITIES
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
K. PERMANENT TRAFFIC CONTROL PLAN
J. TEMPORARY TRAFFIC CONTROL PLAN
I. SAFETY FEATURES
H. DRAINAGE
PERMANENT SIGN INSTALLATION WOOD POSTS
RAISED PAVEMENT MARKER DETAILS
PAVEMENT MARKING SYMBOLS AND WORDS
SNOW POLE HOLDER DETAILS
PARKING AREA STRIPING PLAN STATION 235+80
INTERSECTION STRIPING PLAN MT. ANGELES ROAD
PERMANENT TRAFFIC CONTROL PLAN
PERMANENT TRAFFIC CONTROL PAVEMENT MARKING DETAILS
TABULATION OF PERMANENT TRAFFIC CONTROL QUANTITIES
TEMPORARY TRAFFIC CONTROL PLAN CLOSURE GUIDELINES
TEMPORARY TRAFFIC CONTROL SIGN INSTALLATION DETAIL
TEMPORARY TRAFFIC CONTROL CLOSURE DETAILS
TABULATION OF TEMPORARY TRAFFIC CONTROL QUANTITIES
G4 W-BEAM GUARDRAIL ROUND END SECTION
G4 W-BEAM GUARDRAIL DETAILS
GEOCOMPOSITE UNDERDRAIN DETAILS
CONCRETE PAVED WATERWAY, TYPE 4
PLACED RIPRAP AT CULVERT OUTLETS/INLETS WITH DITCH
PLACED RIPRAP AT CULVERT OUTLETS/INLETS WITHOUT DITCH
METAL FRAME AND GRATE TYPE B (STD DWG 604-3)
CATCH BASIN TYPE 1 (STD DWG 604-1)
METAL END SECTIONS (STD DWG 602-4)
METAL AND PLASTIC PIPE CULVERT BEDDING (STD DWG 602-3)
METAL PIPE CULVERT COUPLING BAND (STD DWG 602-2)
METAL PIPE CULVERT (STD DWG 602-1)
TABULATION OF DRAINAGE QUANTITIES
K.13
K.12
K.11
K.10
K.9
K.8
K.3-K.7
K.2
K.1
J.5
J.4
J.2-J.3
J.1
I.6
I.1-I.5
H.11
H.10
H.9
H.8
H.7
H.6
H.5
H.4
H.3
H.2
H.1
Sheet and Description
Section C Section D Section E Section F Section G Section H Section I Section J
Typical Section Plan & Profile Approach Roads Erosion Control Misc. Plan
Details Drainage Temporary Traffic Control
Permanent Traffic Control ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND
ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15703-1500 SOIL EROSION CONTROL, TEMPORARY SOIL
TACKIFIER ACRE 2.0 2.0
A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 2,435 65 2,500
A0160 15801-0000 WATERING FOR DUST CONTROL MGAL 1,000 1,000
A0180 20301-0200 REMOVAL OF BOULDER EACH 8 8
A0200 20301-0500 REMOVAL OF CATCH BASIN EACH 2 2
A0220 20301-1900 REMOVAL OF PIPE CULVERT EACH 12 12
A0240 20301-2400 REMOVAL OF SIGN EACH 24 24
A0260 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 732 18 750
A0280 20302-1200 REMOVAL OF GUARDRAIL LNFT 6,617 13 6,630
A0300 20302-1300 REMOVAL OF GUARDRAIL, CONCRETE BARRIER LNFT 20 5 25
A0320 20315-0000 SAWCUTTING PAVEMENT LNFT 294 6 300
A0340 20402-0000 SUBEXCAVATION CUYD 5,062 48 5,110
A0360 20410-0000 SELECT BORROW CUYD 3,758 42 3,800
A0380 20701-0100 EARTHWORK GEOTEXTILE, TYPE I-A SQYD 602 18 620
A0400 20701-1200 EARTHWORK GEOTEXTILE, TYPE IV-A,
NON-WOVEN SQYD 8,918 32 8,950
A0420 20703-2000 GEOGRID, BIAXIAL SQYD 5,336 14 5,350
A0440 21101-2000 ROADWAY OBLITERATION, METHOD 2 SQYD 160 10 170
A0460 25101-2000 PLACED RIPRAP, CLASS 2 CUYD 154 6 160
A0480 25101-3000 PLACED RIPRAP, CLASS 3 CUYD 17 3 20
A0500 30303-3000 ROADWAY RECONDITIONING SQYD 586 14 600
A0520 30503-0000 AGGREGATE-TOPSOIL COURSE CUYD 1,296 54 1,350
A0540 30801-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 888 12 900
A0560 31001-0000 RECYCLED AGGREGATE BASE, 6" DEPTH SQYD 2,782 4,800 33 7,615
A0580 40101-5600 SUPERPAVE PAVEMENT, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL TON 13,057 777 408 14,242
A0600 40205-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 131 41 19 191
A0620 40401-0000 MINOR HOT ASPHALT CONCRETE TON 1,238 62 1,300
A0640 41202-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1,
OR SS-1H GAL 15,942 961 35 16,938
A0660 41301-1200 ASPHALT PAVEMENT MILLING, 5-INCH DEPTH SQYD 1,566 39 1,605
7- D ec -2
:3
PM
c:
\m yf ile s\ pw
_p ro du ct io n\ dm s8
W
A P
R A O
LY
M
2(
2) S ch ed ul e
A E st im at e-
.x ls x]
S he et
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.1PRA OLYM 12(2)WA
Typical Section Plan & Profile Approach Roads Erosion Control Misc. Plan
Details Drainage Temporary Traffic Control
Permanent Traffic Control ALLOWANCE Bid
Schedule
A0680 41602-2000 CONTINUOUS COLD RECYCLED ASPHALT BASE
COURSE TYPE B, 3" DEPTH SQYD 75,379 121 75,500
A0700 41606-0000 EMULSIFIED ASPHALT (ENGINEERED) TON 208 12 220
A0720 41610-1000 FOG SEAL GRADE CSS-1, CSS-1H, SS-1 OR
SS-1H TON 32 3 35
A0740 41611-1000 BLOTTER TON 415 19 434
A0760 60201-0600 18-INCH PIPE CULVERT LNFT 149 11 160
A0780 60201-0800 24-INCH PIPE CULVERT LNFT 484 26 510
A0800 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 5 5
A0820 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 17 17
A0840 60404-1000 CATCH BASIN, TYPE 1 EACH 1 1
A0860 60409-0200 INLET TOP, METAL FRAME AND GRATE TYPE B EACH 1 1
A0880 60502-0000 GEOCOMPOSITE UNDERDRAIN SYSTEM LNFT 1,600 10 1,610
A0900 60707-0300 LINING 18-INCH PIPE CULVERT LNFT 267 13 280
A0920 60707-0500 LINING 24-INCH PIPE CULVERT LNFT 447 13 460
A0940 60802-0400 PAVED WATERWAY, TYPE 4 LNFT 20 5 25
A0960 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 1,942 695 13 2,650
A0980 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH
DEPTH LNFT 150 1,255 15 1,420
A1000 61501-0100 SIDEWALK, CONCRETE SQYD 173 5 178
A1020 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B
WOOD POSTS LNFT 5,688 522 6,210
A1040 61702-0300 TERMINAL SECTION, TYPE G4-BAT EACH 10 10
A1060 61702-0600 TERMINAL SECTION, TYPE FLARED EACH 2 2 4
A1080 61702-0800 TERMINAL SECTION TYPE TANGENT EACH 22 22
A1100 61703-2000 TERMINAL END, TYPE ROUND END SECTION EACH 2 2 4
A1120 61902-0000 GATE WIRE, 20 FT WIDTH EACH 1 1
A1140 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM
CAPACITY HOUR 100 100
A1160 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM
RATED CAPACITY HOUR 100 100
A1180 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 50 50
A1200 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED,
1.0 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 100 100
A1220 62301-0000 GENERAL LABOR HOUR 300 300
A1240 62407-0000 PLACING CONSERVED TOPSOIL CUYD 67 3 70
A1260 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN EACH 5 5
A1280 63302-0000 SIGN SYSTEM SQFT 173 173
A1300 63315-0000 RUMBLE STRIP SQYD 45 5 50
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
7- D ec -2
:3
PM
c:
\m yf ile s\ pw
_p ro du ct io n\ dm s8
W
A P
R A O
LY
M
2(
2) S ch ed ul e
A E st im at e-
.x ls x]
S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2PRA OLYM 12(2)WA
Typical Section Plan & Profile Approach Roads Erosion Control Misc. Plan
Details Drainage Temporary Traffic Control
Permanent Traffic Control ALLOWANCE Bid
Schedule
A1320 63316-1000 REMOVE AND RESET SIGN EACH 9 9
A1340 63318-1000 SNOWPOLE HOLDER EACH 27 2 29
A1360 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
(YELLOW) LNFT 74,780 120 74,900
A1380 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
(WHITE) LNFT 111,886 124 112,010
A1400 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN LNFT 18,600 100 18,700
A1420 63405-0850 PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL EACH 2 2
A1440 63406-0000 RAISED PAVEMENT MARKER EACH 30 30
A1460 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE
36-INCH EACH 500 500
A1480 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL
PANEL EACH 80 80
A1500 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING
LIGHT TYPE A EACH 100 100
A1520 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING
LIGHT TYPE B EACH 20 20
A1540 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING
LIGHT TYPE C EACH 50 50
A1560 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE
CHANGEABLE MESSAGE SIGN EACH 2 2
A1580 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT
MARKINGS LNFT 110,000 110,000
A1600 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC
FENCE LNFT 1,500 1,500
A1620 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 770 770
A1640 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 600 600
A1660 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND
SAFETY SUPERVISOR DAY 90 90
A1680 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 2,400 2,400
A1700 63601-3100 SYSTEM INSTALLATION, TELEPHONE (FIBER
OPTIC) LPSM ALL
A1720 63610-1600 CONDUIT, 2-INCH, PVC LNFT 82,740 120 82,860
A1740 63621-5000 UTILITY BOX, CONCRETE EACH 25 25
A1760 63622-0000 UTILITY TRENCH LNFT 27,580 60 27,640
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
7- D ec -2
:3
PM
c:
\m yf ile s\ pw
_p ro du ct io n\ dm s8
W
A P
R A O
LY
M
2(
2) S ch ed ul e
A E st im at e-
.x ls x]
S he et
3)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.3PRA OLYM 12(2)WA
Typical Section Plan & Profile Approach
Roads Erosion Control
Misc. Plan Details Drainage Temporary
Traffic Control Permanent
Traffic Control ALLOWANCE Bid Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
B0060 15301-0010 CONTRACTOR QUALITY CONTROL AND
ASSURANCE LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15703-1500 SOIL EROSION CONTROL, TEMPORARY SOIL
TACKIFIER ACRE 2.0 2.0
B0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 2,435 65 2,500
B0160 15801-0000 WATERING FOR DUST CONTROL MGAL 1,000 1,000
B0180 20301-0200 REMOVAL OF BOULDER EACH 8 8
B0200 20301-0500 REMOVAL OF CATCH BASIN EACH 2 2
B0220 20301-1900 REMOVAL OF PIPE CULVERT EACH 17 17
B0240 20301-2400 REMOVAL OF SIGN EACH 24 24
B0260 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 732 18 750
B0280 20302-1200 REMOVAL OF GUARDRAIL LNFT 6,617 13 6,630
B0300 20302-1300 REMOVAL OF GUARDRAIL, CONCRETE BARRIER LNFT 20 5 25
B0320 20315-0000 SAWCUTTING PAVEMENT LNFT 294 6 300
B0340 20402-0000 SUBEXCAVATION CUYD 5,062 48 5,110
B0360 20410-0000 SELECT BORROW CUYD 3,758 42 3,800
B0380 20701-0100 EARTHWORK GEOTEXTILE, TYPE I-A SQYD 879 21 900
B0400 20701-1200 EARTHWORK GEOTEXTILE, TYPE IV-A,
NON-WOVEN SQYD 8,918 32 8,950
B0420 20703-2000 GEOGRID, BIAXIAL SQYD 5,336 14 5,350
B0440 21101-2000 ROADWAY OBLITERATION, METHOD 2 SQYD 160 10 170
B0460 25101-2000 PLACED RIPRAP, CLASS 2 CUYD 189 11 200
B0480 25101-3000 PLACED RIPRAP, CLASS 3 CUYD 40 10 50
B0500 25101-4000 PLACED RIPRAP, CLASS 4 CUYD 45 5 50
B0520 30303-3000 ROADWAY RECONDITIONING SQYD 586 14 600
B0540 30503-0000 AGGREGATE-TOPSOIL COURSE CUYD 1,296 54 1,350
B0560 30801-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 888 12 900
B0580 31001-0000 RECYCLED AGGREGATE BASE, 6" DEPTH SQYD 2,782 4,800 33 7,615
B0600 40101-5600 SUPERPAVE PAVEMENT, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL TON 13,057 777 408 14,242
B0620 40205-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 131 41 19 191
B0640 40401-0000 MINOR HOT ASPHALT CONCRETE TON 1,238 62 1,300
B0660 41202-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1,
OR SS-1H GAL 15,942 961 35 16,938
B0680 41301-1200 ASPHALT PAVEMENT MILLING, 5-INCH DEPTH SQYD 1,566 39 1,605
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
7- D ec -2
:3
PM
c:
\m yf ile s\ pw
_p ro du ct io n\ dm s8
W
A P
R A O
LY
M
2(
2) S ch ed ul e
B E st im at e-
.x ls x]
S he et
STATE PROJECT
B.4PRA OLYM 12(2)WA
Typical Section Plan & Profile Approach
Roads Erosion Control
Misc. Plan Details Drainage Temporary
Traffic Control Permanent
Traffic Control ALLOWANCE Bid Schedule
B0700 41602-2000 CONTINUOUS COLD RECYCLED ASPHALT BASE
COURSE TYPE B, 3" DEPTH SQYD 75,379 121 75,500
B0720 41606-0000 EMULSIFIED ASPHALT (ENGINEERED) TON 208 12 220
B0740 41610-1000 FOG SEAL GRADE CSS-1, CSS-1H, SS-1 OR
SS-1H TON 32 3 35
B0760 41611-1000 BLOTTER TON 415 19 434
B0780 60201-0600 18-INCH PIPE CULVERT LNFT 216 14 230
B0800 60201-0800 24-INCH PIPE CULVERT LNFT 776 34 810
B0820 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 5 5
B0840 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 27 27
B0860 60404-1000 CATCH BASIN, TYPE 1 EACH 1 1
B0880 60409-0200 INLET TOP, METAL FRAME AND GRATE TYPE B EACH 1 1
B0900 60502-0000 GEOCOMPOSITE UNDERDRAIN SYSTEM LNFT 1,600 10 1,610
B0920 60707-0300 LINING 18-INCH PIPE CULVERT LNFT 267 13 280
B0940 60707-0500 LINING 24-INCH PIPE CULVERT LNFT 884 16 900
B0960 60707-0700 LINING 36-INCH PIPE CULVERT LNFT 254 11 265
B0980 60707-0900 LINING 48-INCH PIPE CULVERT LNFT 142 8 150
B1000 60802-0400 PAVED WATERWAY, TYPE 4 LNFT 20 5 25
B1020 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 1,942 695 13 2,650
B1040 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH
DEPTH LNFT 150 1,255 15 1,420
B1060 61501-0100 SIDEWALK, CONCRETE SQYD 285 5 290
B1080 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B
WOOD POSTS LNFT 5,688 522 6,210
B1100 61702-0300 TERMINAL SECTION, TYPE G4-BAT EACH 10 10
B1120 61702-0600 TERMINAL SECTION, TYPE FLARED EACH 2 2 4
B1140 61702-0800 TERMINAL SECTION TYPE TANGENT EACH 22 22
B1160 61703-2000 TERMINAL END, TYPE ROUND END SECTION EACH 2 2 4
B1180 61902-0000 GATE WIRE, 20 FT WIDTH EACH 1 1
B1200 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM
CAPACITY HOUR 100 100
B1220 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM
RATED CAPACITY HOUR 100 100
B1240 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 50 50
B1260 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED,
1.0 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 100 100
B1280 62301-0000 GENERAL LABOR HOUR 300 300
B1300 62407-0000 PLACING CONSERVED TOPSOIL CUYD 67 3 70
B1320 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN EACH 5 5
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
7- D ec -2
:3
PM
c:
\m yf ile s\ pw
_p ro du ct io n\ dm s8
W
A P
R A O
LY
M
2(
2) S ch ed ul e
B E st im at e-
.x ls x]
S he et
2)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.5PRA OLYM 12(2)WA
Typical Section Plan & Profile Approach
Roads Erosion Control
Misc. Plan Details Drainage Temporary
Traffic Control Permanent
Traffic Control ALLOWANCE Bid Schedule
B1340 63302-0000 SIGN SYSTEM SQFT 173 173
B1360 63315-0000 RUMBLE STRIP SQYD 45 5 50
B1380 63316-1000 REMOVE AND RESET SIGN EACH 9 9
B1400 63318-1000 SNOWPOLE HOLDER EACH 33 2 35
B1420 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
(YELLOW) LNFT 74,780 120 74,900
B1440 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
(WHITE) LNFT 111,886 124 112,010
B1460 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN LNFT 18,600 100 18,700
B1480 63405-0850 PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL EACH 2 2
B1500 63406-0000 RAISED PAVEMENT MARKER EACH 30 30
B1520 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE
36-INCH EACH 500 500
B1540 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL
PANEL EACH 80 80
B1560 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING
LIGHT TYPE A EACH 100 100
B1580 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING
LIGHT TYPE B EACH 20 20
B1600 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING
LIGHT TYPE C EACH 50 50
B1620 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE
CHANGEABLE MESSAGE SIGN EACH 2 2
B1640 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT
MARKINGS LNFT 110,000 110,000
B1660 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC
FENCE LNFT 1,500 1,500
B1680 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 770 770
B1700 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 600 600
B1720 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND
SAFETY SUPERVISOR DAY 90 90
B1740 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 2,400 2,400
B1760 63601-3100 SYSTEM INSTALLATION, TELEPHONE (FIBER
OPTIC) LPSM ALL
B1780 63610-1600 CONDUIT, 2-INCH, PVC LNFT 82,740 120 82,860
B1800 63621-5000 UTILITY BOX, CONCRETE EACH 25 25
B1820 63622-0000 UTILITY TRENCH LNFT 27,580 60 27,640
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
7- D ec -2
:3
PM
c:
\m yf ile s\ pw
_p ro du ct io n\ dm s8
W
A P
R A O
LY
M
2(
2) S ch ed ul e
B E st im at e-
.x ls x]
S he et
3)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.6PRA OLYM 12(2)WA
SECTION QUANTITIES
TABULATION OF TYPICAL
C.1
STATE PROJECT
D A
T E
P
A T
J o h n s e c k e d b
S la n s ig n e d b
C.2
STATE PROJECT
D A
T E
P
A T
J o h n s e c k e d b
S la n s ig n e d b y
TYPICAL SECTION
Varies
FOOTNOTE:
CUT SLOPE DETAIL
C o n s tr u c ti o n L im it
T y p ic a l
C le a r in g
C o n s tr u c ti o n L im it
T y p ic a l
C le a r in g
Match existing cross slope d g e o f p a v e m e n t
E x is ti n g
LC
Va rie s Varies
NOTE:
SAFETY EDGE DETAIL
Second lift of asphalt
First lift of asphalt
See Sheet C.3 for details
Provide grade to drain.
aggregate-topsoil course.
4" depth and replace with
Excavate existing ground, Section detail
See Pavement
See Cut Slope detail
2' typ.
Daylight distance
2' typ.
2' typ.
Shoulder
2' typ.
Shoulder
2' typ.
26' typ.
Traveled way
11' typ.
Traveled way
11' typ.
unless otherwise noted.
1. Clearing limits equal construction limits throughout this project
Superelevate roadway to match existing roadway superelevation.
existing ground + 3"
Overlay grade =
Base course
Cover safety edge with aggregate-topsoil.
HURRICANE RIDGE ROAD
course type B, 3" depth recycled asphalt base
Continuous cold
CSS-1H, SS-1, or SS-1H
Fog seal grade CSS-1, existing ground +3"
Overlay grade =
Existing ground
11+57.48 to 272+00.00
PAVEMENT SECTION DETAIL
281+50.00 to 283+00.00
PAVEMENT SECTION DETAIL
profile grade
Match existing depth varies
Existing, undisturbed asphalt, SS-1, or SS-1H
CSS-1, CSS-1H
Tack coat grade existing ground +3"
Overlay grade =
Existing ground
272+00.00 to 281+00.00
PAVEMENT SECTION DETAIL
depth varies
Existing, undisturbed asphalt, SS-1, or SS-1H
CSS-1, CSS-1H
Tack coat grade
6+10.85 to 11+07.48
PAVEMENT SECTION DETAIL
profile grade
Match existing two equal lifts roughness, 3" depth, placed in
0.3 to <3 million ESAL, type II nominal maximum size aggregate, " 4 3" or 2
1Superpave pavement two equal lifts roughness, 3" depth, placed in
0.3 to <3 million ESAL, type II nominal maximum size aggregate, " 4 3" or 2
1Superpave pavement two equal lifts roughness, 5" depth, placed in
0.3 to <3 million ESAL, type II nominal maximum size aggregate, " 4 3" or 2
1Superpave pavement two equal lifts roughness, 3" depth, placed in
0.3 to <3 million ESAL, type II nominal maximum size aggregate, " 4 3" or 2
1Superpave pavement milling, 5-inch depth
Asphalt pavement milling, 5-inch depth
Asphalt pavement
S a w c u t
CONNECTION DETAIL
MOUNT ANGELES ROAD
Taper profile grade elevation
Taper profile grade elevation
S ta ti o n
.4
S ta ti o n
.4
S ta ti o n
.0
S ta ti o n
.0
S a w c u t
L in e
STATION 283+00
CONNECTION DETAIL
HURRICANE RIDGE ROAD
11+07.48 TO 11+57.48
PROFILE GRADE TRANSITION DETAIL
HURRICANE RIDGE ROAD
281+00.00 TO 281+50.00
PROFILE GRADE TRANSITION DETAIL
HURRICANE RIDGE ROAD
C.3
NUMBER
SHEET
D
A T
E
P
A T
J o h n s e c k e d b
S la n s ig n e d b y
TYPICAL SECTION DETAILS
WA PRA OLYM 12(2)
for Surfacing Depths
Sheet C.2
See Typical Section, for Surfacing Depths
Sheet C.2
See Typical Section, L a n e
T r a v e l
E d g e o f
Variable fill slope
R a il
F a c e o f
P a v e m e n t
E d g e o f
L a n e
T r a v e l
E d g e o f
Variable fill slope
2'11'
NOTE:
1.
2.
TYPICAL SHOULDER WITH GUARDRAIL
C o n s tr u c ti o n L im it
T y p ic a l
C le a r in g
C o n s tr u c ti o n L im it
T y p ic a l
C le a r in g
R a il C u r b
F a c e o f
DETAIL AT BACK OF CURB
AGGREGATE TOPSOIL
DETAIL AT EDGE OF PAVEMENT
AGGREGATE TOPSOIL
50'
6"
6"
Mt. Angeles Road
Ridge Road Construction
Proposed Hurricane
Ridge Road
Existing Hurricane then 18" to match existing course - 6" at 2% slope
Aggregate-topsoil of pavement edge
Proposed
See sheet G.1 curb and gutter.
Proposed curb or then 30" to match existing course - 6" at 2% slope
Aggregate-topsoil ground
Existing ground
Existing ground, 4" depth
Excavate existing ground, 4" depth
Excavate existing
FOOTNOTE:
Excavation to be done per Section 204.
3" depth base course type B, recycled asphalt
3" Continuous cold depth varies asphalt pavement, Existing undisturbed
Clearing limit equals construction limit unless otherwise noted.
Clearing limits to be approved by the CO.
See sheet D.1 for topsoil quantities.
See sheet G.1
Proposed curb.
See sheet I.1
Proposed guardrail.
See sheet I.1
Proposed guardrail.
24"
36"
2'11'
50'
SS-1 or SS-1H
CSS-1, CSS-1H
Tack coat grade milling, 5-inch depth
Asphalt pavement
Match existing profile grade
Provide joint sealer.
Match existing profile grade.
Match existing profile grade
SS-1 or SS-1H
CSS-1, CSS-1H
Tack coat grade milling, 5-inch depth
Existing roadway section roughness, placed in two equal lifts
5" depth, type II pavement
0.3 to <3 million ESAL, nominal maximum size aggregate, "4 3" or 2
1Superpave pavement roughness, placed in two equal lifts
3" depth, type II pavement
0.3 to <3 million ESAL, nominal maximum size aggregate, "4 3" or 2
1Superpave pavement roughness, placed in two equal lifts
5" depth, type II pavement
0.3 to <3 million ESAL, nominal maximum size aggregate, "4 3" or 2
1Superpave pavement
SS-1 or SS-1H
CSS-1, CSS-1H
Tack coat grade roughness, placed in two equal lifts
5" depth, type II pavement
0.3 to <3 million ESAL, nominal maximum size aggregate, "4 3" or 2
1Superpave pavement
Grade = Existing grade + 3" milling, 5-inch depth
Asphalt pavement milling, 5-inch depth
Asphalt pavement
Existing roadway section
Ridge Road Construction
Proposed Hurricane roughness, placed in two equal lifts
5" depth, type II pavement
0.3 to <3 million ESAL, nominal maximum size aggregate, "4 3" or 2
1Superpave pavement
Provide joint sealer.
Match existing profile grade.
SS-1 or SS-1H
CSS-1, CSS-1H
Tack coat grade
FOOTNOTE:
Super %Super %
C.4
STATE PROJECT
D A
T E
P
A T
J o h n s e c k e d b
S la n s ig n e d b y
SUBEXCAVATION
TYPICAL SECTION
3-inch compacted depth
Minor Hot Asphalt Concrete, Select Borrow
6-inch compacted depth
Roadway Aggregate, Method 2, Geogrid, Biaxial of roadway
Finished edge
LC (see table)
Subex. depth
Full depth of subexcavation
Subexcavation limit
1V:5H
S u b e x c a v a ti o n
B e g in E n d
TRANSITION AT SUBEXCAVATION AREAS
asphalt surfacing
Existing and end of subexcavation limit
Sawcut existing pavement at begin
Select borrow aggregate, method 2 Roadway
FULL-WIDTH SUBEXCAVATION
e d g e o f r o a d
F in is h e d
11'-0"11'-0"2'-0"
Type IV-A, non-woven Earthwork geotextile
1'-6"
Method 2, 6" depth
Roadway Aggregate, d e p th
S e le c t b o r r o w depth limits
Subexcavation
2.00%
:1 ty p
Subexcavation limit where shown in table
Trench to daylight ground
Existing e d g e o f r o a d
F in is h e d
:1 t y p
2'-0"
1'-6" limit
Subexcavation outlet pipe
4" dia. solid where shown in table
Trench to daylight outlet pipe
4" dia. solid
B e g in s u b e x c a v a ti o n
E n d s u b e x c a v a ti o n
1:5
Transition Transition
1:5 collector pipe
4" dia. perforated collector pipe
4" dia. perforated
PLAN
Sheet C.2 structure detail
See pavement detail on Sheet C.3
See aggregate topsoil Finish grade biaxial
Geogrid, Geocomposite underdrain system length
Match existing superelevation, or crown at 2%.
Before final cold in-place recycling and overlay.
Place geotextile according to Section 207.
Volume calculations include 1:5 transition to full depth.
FOR INFORMATION ONLY - See Sheet C.1 for bid item quantities.
PAVEMENT SECTION DETAIL
SUBEXCAVATION TEMPORARY
See sheet H.11 for details
Geocomposite underdrain sytem
FOOTNOTE:
Travel lane Travel lane Shoulder
Super %Super %
BASE REINFORCEMENT
TYPICAL SECTION
S h o u ld e r
PAVEMENT SECTION DETAIL
BASE REINFORCEMENT TEMPORARY
Match existing superelevation, or crown at 2%.
Before final cold in-place recycling and overlay.
Place geotextile according to Section 207.
Do not measure for payment.
INFORMATION ONLY - See Sheet C.1 for bid item quantities.
BASE REHABILITATION
TYPICAL SECTION
C.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft c m y fi le s p w p r o d u c ti o n d m s o ly m c e .d g
WA PRA OLYM 12(2)
C h e c k e d b y
D e s ig n e d b y
P
M
N o v e m b e r
9-inch Compacted Depth
Recycled Aggregate Base, Type IV-A, non-woven
Earthwork geotextile
3-inch compacted depth
Minor Hot Asphalt Concrete, Existing base
11' 11' 2'
LC
Finish grade
Mainline Typical Section
See Sheet C.2 for
Width varies - See table detail on Sheet C.3
See aggregate topsoil 4 4
Type IV-A, non-woven
Earthwork geotextile
D.1 o ly m fa .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
PLAN QUANTITIES
TABULATION OF
FOOTNOTE:
Subsection 713.01.
course is acceptable if providing a topsoil mix according to General use of subexcavation material in aggregate-topsoil
Excavate and conserve topsoil per Section 204.
D.2 o ly m fb .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
PLAN QUANTITIES
TABULATION OF
FOOTNOTE:
NOTE:
1.
terminal section lengths.
conditions may vary and require adjustments to the BAT Assumed length of BAT terminal section is 100 feet. Field include the terminal sections.
the terminal section begins. Payment for guardrail does not Stations are the point where the guardrail system ends and
W
W
G A
T E
RETAINING WALL
ˆ
E
W
W
.4
+6
.7
+6 .6
8%
+7 .6
8%
100' VC
+8
.9
+7 .6
8%
+6 .6 4%
100' VC
.6
80' VC
.6
+5 .95
+1.0000%
+5
.2
CP22104
CP22102
CP22101
CP22103
Type Tangent
Terminal Section
Type Flared
Terminal Section
See detail sheets I.2-I.6
B
F
T
GUARDRAIL TERMINALS
Type G4-BAT
Terminal Section
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22104
CP22103
CP22102
CP22101
409853.833
410404.018
410805.364
411415.055
1006275.214
1006541.290
1006968.896
1007440.423
473.28'
453.53'
423.94'
373.84'
CUYD
EXC.
CUYD
EMB.
30 25 20 15 10 10 5
350 430
360 440
370 450
380 460
390 470
400 480
410 490
420 500
D.3
STATE PROJECT
o ly m fc .d g n
U
S S u r ft
J o h n s e c k e d b
.S la n s ig n e d b y
N
.0
.0
.0
.0
UV
UV
UV
UV
TO REMIAN
(Island) concrete curb
Portland cement
Line B
Contact: Brad Partridge 360-565-3251
Port Angeles, WA 98362
2431 East Highway 101
Clallam County Public Utility District
Frequent caller I.D. number 34184
1-800-424-5555
Utility Locates
Power:
M T
A N
G E L E S R
O A
D
Center
Park Visitor
Olympic National
RACE
STREET
1.
m ile s
To U
S
RESUME PROJECT
RESUME PROJECT
grade
Profile
LINE B LINE A
detail sheet E.4
See Intersection
UTILITIES:
of asphalt
Existing edge of asphalt
Existing edge
Paving limit
20'R
R
20'
LC
A
E 1007449.7349
N 411823.5749
STA: 6+10.85
LINE B
HURRICANE RIDGE ROAD
WA PRA OLYM 12(2)
E 1007480.5836
N 411400.5563
STA: 9+90.87
LINE A
HURRICANE RIDGE ROAD
WA PRA OLYM 12(2)
Concrete Barrier
Remove Guardrail, R
Round End Section
Terminal Section
.5
.0
TB
Guardrail RT
3 - 2" Conduit LT
Hurricane Ridge Road
Match profile grade
11+07.48
Hurricane Ridge Road
Match profile grade
11+07.48
See Sheet G.5 rumble strips.
Construct
See Sheet G.4
Install 20' gate.
15+41, 38' RT
See Sheet G.7 for details
Install utility vault.
30+50 LT
(approx. 494 LNFT)
Remove guardrail
Existing ground
Existing ground +3"
Profile grade =
Existing ground
Existing ground
Existing ground +3"
Profile grade =
(Mt. Angeles Rd.)
24" Pipe culvert
10+45
Line to be constructed
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
See Sheet C.5
Base Rehabilitation
See Sheet C.5
Base Rehabilitation
Line A
E x is ti n g p ip e c u lv e r t
Remove existing 24" pipe culvert
Schedule A and B:
10+51 end sections, and inlet/outlet protection
Schedule A and B: Install 63 LNFT 24" pipe culvert, 10+44
See Sheet C.3
11+07.48 to 11+57.48
Profile grade transition
Turnout site.
See Section 103.
See Sheet G.7 for details
Install utility vault.
7+20 RT
3 - 2" Conduit RT curb concrete cement
Portland
See Sheet G.7 for details
Install utility vault.
18+50 LT
of existing roadway
Approximate centerline
1 - 2" Conduit RT 1 - 2" Conduit RT
See Sheet G.9 for details
Install utility vault.
10+10 LT
CP22104
CP22105
CP22106
CP22107
CP22108
CUYD
EXC.
CUYD
EMB.
60 55 50 45 40 35 30
470 550
480 560
490 570
500 580
510 590
520 600
530 610
540 620
D.4
STATE PROJECT
o ly m fd .d g n
U
S S u r ft jo h n s e c k e d b
S la n s ig n e d b y
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22108
CP22107
CP22106
CP22105
CP22104
406978.188
407757.268
408432.589
409030.611
409853.833
1005482.833
1005673.735
1006101.721
1006246.355
1006275.214
628.14'
564.98'
520.46'
499.35'
473.28'
N
.0
.0
.0
.0
.0
.0
.0
UV
UV
UV
BT
TB
B T
.0
.5
.0
.5
.0
.0
TB
.0
.0
Guardrail LT
Guardrail RT
Guardrail RT
Guardrail RT
Existing ground existing ground + 3"
Profile grade =
Existing groundexisting ground + 3"
Profile grade =
See Sheet G.7 for details
Install utility vault.
30+50 LT
(approx. 225 LNFT)
Remove guardrail
See Sheet G.7 for details
Install utility vault.
42+50 LT
existing roadway centerline of
Approximate
(approx. 298 LNFT)
Remove guardrail
See Sheet G.7 for details
Install utility vault.
54+50 LT
(approx. 472 LNFT)
Remove guardrail
(approx. 200 LNFT)
Remove guardrail
Line to be constructed
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t c u lv e r t
E x is ti n g p ip
See Sheet C.5
Base Rehabilitation
See Sheet C.5
Base Rehabilitation
See Sheet C.5
Base Rehabilitation LT
See Sheet C.5
Base Rehabilitation LT
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
Install inlet/outlet protection.
Schedule B: Install lining in 195 LNFT 24" CMP
55+52
Install end sections and inlet/outlet protection.
61 LNFT 18" CMP
Schedule A and B: Remove and replace
35+94
3 - 2" Conduit LT
CP22111
CP22110
CP22109
CP22108
5 8
CUYD
EXC.
CUYD
EMB.
90 85 80 75 70 65 60
630 780
640 790
650 800
660 810
670 820
680 830
690 840
700 850
D.5
STATE PROJECT
o ly m fe .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
780700
N
UV
UV
UV
See sheet E.8
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22111
CP22110
CP22109
CP22108
404443.034
405273.161
406153.921
406978.188
1006019.139
1005730.411
1005535.816
1005482.833
814.38'
758.58'
692.81'
628.14'
.6
.8
.8
.6 type 4 concrete
Paved waterway, curb and gutter RT
Concrete
Turnout RT
Existing ground
Existing ground + 3"
Profile grade =
Existing groundExisting ground + 3"
Profile grade =
Existing ground + 3"
Profile grade =
Existing ground
See Sheet G.7 for details
Install utility vault.
65+50 LT
existing roadway centerline of
Approximate
See Sheet G.7 for details
Install utility vault.
77+50 LT
See Sheet E.8
Construct turnout.
See Sheet G.7 for details
Install utility vault.
89+50 LT
Line to be constructed p ip e c u lv e r t
E x is ti n g
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
.0
.0
.0
See Sheet C.5
Base Rehabilitation
See Sheet C.5
Base Rehabilitation LT
E x is ti n g p ip e c u lv e r t
E x is ti n g d r o p i n le t a n d
C
M P
R
T
Install end section and inlet protection.
Schedule A and B: Extend 18" CMP 5 LNFT.
80+78 RT drop inlet and 12" CMP
Remove existing
Schedule A and B:
84+78 RT
CP22116
CP22114
CP22112
CP22113
CP22115
CUYD
EXC.
CUYD
EMB.
120 115 110 105 100 95 90
840 1030
850 1040
860 1050
870 1060
880 1070
890 1080
900 1090
910 1100
D.6
STATE PROJECT
o ly m ff .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22116
CP22115
CP22114
CP22113
CP22112
402242.268
402389.549
402651.038
403117.898
403752.427
1005110.945
1005474.106
1006274.795
1006542.926
1006435.322
1062.68'
1032.09'
969.74'
925.78'
872.90'
N
UV
U V
Install end sections and inlet/outlet protect.
51 LNFT 24" CMP
Schedule A and B: Remove and replace
105+24
See Sheet E.9 F
T
BT
type 4 concrete
Paved waterway, 115+49
See Sheet C.4
Subexcavation.
.0
.0
.0
.1
.0
.0
.0
.0
Guardrail LT curb and gutter RT
Concrete
Turnout RT
LT
Guardrail
RT
Guardrail curb LT
Concrete
Existing ground
Existing ground + 3"
Profile grade =
Existing ground
Existing ground + 3"
Profile grade =
Existing ground
Existing ground + 3"
Profile grade =
Existing ground + 3"
Profile grade =
Existing ground
See Sheet G.7 for details
Install utility vault.
101+25 LT
(approx. 1174 LNFT)
Remove guardrail existing roadway centerline of
Approximate
See Sheet G.7 for details
Install utility vault.
112+00 LT
Construct turnout. See sheet E.8
Remove guardrail (approx. 164 LNFT)
(approx. 247 LNFT)
Remove guardrail
Line to be constructed
.0
.0
.0
See Sheet C.5
Base Rehabilitation
E x is ti n g p ip e c u lv e r t p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g and inlet/outlet protection.
208 LNFT 24" CMP
Install lining in
Schedule A and B:
119+57 and inlet/outlet protection.
57 LNFT 24" CMP
Install lining in
Schedule A and B:
114+75
CP22118
CP22117
CP22116
CP22119
CP22120
V m p h c r o w n x s u p e r
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22120
CP22119
CP22118
CP22117
CP22116
399812.157
400482.095
401020.947
401666.677
402242.268
1005849.079
1005012.855
1004705.917
1004700.881
1005110.945
1282.05'
1207.97'
1167.22'
1118.20'
1062.68'
CUYD
EXC.
CUYD
EMB.
150 145 140 135 130 125 120
1080 1220
1090 1230
1100 1240
1110 1250
1120 1260
1130 1270
1140 1280
1150 1290
D.7
STATE PROJECT
o ly m fg .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
N
Install end sections and inlet/outlet protection.
Schedule A and B: Remove and replace 65 LNFT 24" CMP.
133+38
U V
UV
UV
T
B
.5
.0
.0 curb LT oncreteC
RT
Guardrail
LT
Guardrail
Existing ground + 3"
Profile grade =
Existing ground
Existing ground + 3"
Profile grade =
Existing ground
Existing ground + 3"
Profile grade =
See Sheet G.7 for details
Install utility vault.
124+00 LT
See Sheet G.7 for details
Install utility vault.
136+00 LT
existing roadway ofcenterline
Approximate
See Sheet G.7 for details
Install utility vault.
147+50 LT
Line to be constructed
Existing ground
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
Schedule B: Install lining in 67 LNFT 24" CMP
Schedule A and B: Install inlet/outlet protection for 24" CMP
141+46
Install end sections and inlet/outlet protection.
Schedule A and B: Remove and replace 43 LNFT 24" CMP.
138+48
Install end sections and inlet/outlet protection.
Remove and replace 45 LNFT 24" CMP.
Schedule A and B:
126+70 and install end sections.
Schedule B: Remove and replace 59 LNFT 24" CMP for 24" CMP
Schedule A and B: Install inlet/outlet protection
145+48
CP22121
CP22122
CP22123
P
CP22121
P
CP22122
P
CP22123
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22123
CP22122
CP22121
397852.184
398253.704
399092.952
1007501.267
1007011.473
1006501.893
1473.87'
1423.45'
1347.94'
CUYD
EXC.
CUYD
EMB.
180 175 170 165 160 155 150
1290 1440
1300 1450
1310 1460
1320 1470
1330 1480
1340 1490
1350 1500
1360 1510
D.8
STATE PROJECT
o ly m fh .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
.0
.0
.0
.0
.0
N
UV
UV
UV
T
TT
(approx. 190 LNFT)
Remove guardrail
(overpass)
Walking Horses Road
157+70
3 - 2" Conduit LT
Guardrail LT Guardrail LT curb LT Concrete
See Sheet G.7 for details
Install utility vault.
157+70 LT
existing roadway of centerline
Approximate
See Sheet G.7 for details
Install utility vault.
166+00 LT
See Sheet G.7 for details
Install utility vault.
178+00 LT
(approx. 1072 LNFT)
Remove guardrail
Existing ground + 3"
Profile grade =
Existing ground
Existing ground + 3"
Profile grade =
Existing ground
Existing ground + 3"
Profile grade =
Existing ground
Line to be constructed
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t c u lv e r t
E x is ti n g p x is ti n g p ip e c u lv e r t
Install end sections and inlet/outlet protection.
Schedule B: Remove & replace 65 LNFT 24" CMP.
156+89
Install end sections and inlet/outlet protection.
Schedule B: Remove & replace 67 LNFT 24" CMP.
158+81
Install end sections and inlet/outlet protection.
Schedule A and B: Remove & replace 42 LNFT 24" CMP.
168+35
Schedule B: Install lining in 67 LNFT 24" CMP
Schedule A and B: Install inlet/outlet protection
153+25 protection for 30" CMP
Install inlet/outlet
Schedule A and B:
165+42
CP22129
CP22128
CP22127
CP22126
CP22125
CP22124
5 2
CUYD
EMB.
210 205 200 195 190 185 180
1520 1670
1530 1680
1540 1690
1550 1700
1560 1710
1570 1720
1580 1730
1590 1740
D.9
STATE PROJECT
o ly m fi .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22129
CP22128
CP22127
CP22126
CP22125
CP22124
394976.504
395397.608
395881.345
396439.194
397082.121
397423.580
1008151.339
1007934.083
1007863.491
1008136.247
1008241.550
1008171.555
1707.29'
1686.16'
1659.51'
1617.82'
1565.81'
1537.77'
N
UV
UV
See Sheet E.9
T
B T
BTT
T
T
.0
.0
.5
.0
.0
.0
.5
.0
.5
.0
.0
.0
.3
(approx. 229 LNFT)
Remove guardrail
Guardrail LT Guardrail LT oncrete curb LTC
Concrete curb LT
Guardrail LT
Concrete curb RT Turnout LT
Guardrail RT
See Sheet G.7 for details
Install utility vault.
190+00 LT
(approx. 1072 LNFT)
Remove guardrail existing roadway of centerline
Approximate
See Sheet G.7 for details
Install utility vault.
202+00 LT
(approx. 201 LNFT)
Remove guardrail
(approx. 238 LNFT)
Remove guardrail
See Sheet E.9 turnout.
Construct (approx. 227 LNFT)
Remove guardrail
Existing ground
Existing ground + 3"
Profile grade =
Existing ground
Existing ground + 3"
Profile grade =
Existing ground
Existing ground + 3"
Profile grade =
Line to be constructed
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t p ip e c u lv e r t
E x is ti n g
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
Install inlet/outlet protection.
68 LNFT 24" CMP
Install lining in
Schedule A and B:
191+28
Install inlet/outlet protection.
114 LNFT 24" CMP.
Install lining in
Schedule A and B:
196+76
Install end sections and inlet/outlet protection.
Remove and replace 74 LNFT 24" CMP.
Schedule A and B:
199+08
.4
I
CP22201
CP22200
CP22132
CP22131CP22130
CP22133
X
.0
Y .6
CUYD
EXC.
CUYD
EMB.
240 235 230 220 215 210
1710 1760
1720 1770
1730 1780
1740 1790
1750 1800
1760 1810
1770 1820
1780 1830
D.10
STATE PROJECT
o ly m fj .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22201
CP22200
CP22133
CP22132
CP22131
CP22130
391984.229
392588.232
392808.932
393355.571
393949.493
394457.021
1008397.651
1008423.755
1008131.353
1008184.481
1007841.682
1007792.521
1807.36'
1788.09'
1778.52'
1762.98'
1744.03'
1731.12'
N
UV
UV
UV
curb
Remove
FT
TT
B
RR
.5
.0
.0
.0
.0
.0
.0
.5
.7
.4
.1
.1
.6
(approx. 239 LNFT)
Remove guardrail of existing roadway
Approximate centerline
See Sheet E.9
Turnout LT
Guardrail LT oncrete curb LTC
Guardrail LT Guardrail LT
Concrete curb LT Concrete sidewalk LT gutter LT
Concrete curb and
See Sheet G.7 for details
Install utility vault.
214+00 LT
See Sheet G.7 for details
Install utility vault.
226+00 LT
(approx. 244 LNFT) guardrailRemove
(approx. 200 LNFT) guardrailRemove See Sheet E.7
Construct Parking Area.
See Sheet K.10
Snow pole holder.
Existing ground + 3"
Profile grade =
Existing ground
Existing ground + 3"
Profile grade =
Existing ground
(island)
Concrete curb LT
See Sheet G.7 for details
Install utility vault.
238+00 LT
Line to be constructed
(approx. 227 LNFT)
Remove guardrail
.0
.0
.0
See Sheet C.4
Subexcavation
See Sheet C.5
Base Rehabilitation LT
.0
.0
See Sheet C.5
Base Rehabilitation
.0
.0
See Sheet C.5
Base Rehabilitation
See Sheet C.5
Base Rehabilitation p ip e c u lv e r t
E x is ti n g x is ti n g p ip e c u lv e r t p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g a n d p ip e c u lv e r t
E x is ti n g c a tc h b a s e c u lv e r t
E x is ti n g
Install inlet/outlet protection
Schedule B: Install lining in 254 LNFT 36" CMP.
221+57
Install inlet/outlet protection
Schedule B: Install lining in 108 LNFT 24" CMP.
230+40 sections and inlet/outlet protection.
67 LNFT 18" CMP. Install end
Schedule B: Remove and replace
238+79 protection for 24" CMP.
Schedule A and B: Install inlet/outlet
232+07 protection for 24" CMP
Schedule A and B: Install inlet/outlet
227+91
Install outlet end section and outlet protection.
Remove and replace 30 LNFT 24" CMP.
Remove and replace catch basin, type I.
Schedule A and B:
235+07 LT
protection for 24" CMP.
Install inlet/outlet
Schedule A and B:
233+20
.0
.5
Guardrail LT
.8
.0
.5
.0
.5
CP22203
CP22202
CP22201
CP22204
CP22205
CP22206
X=1
.0
Y=3
7.
EMB.
270 265 260 255 250 245 240
1770 1770
1780 1780
1790 1790
1800 1800
1810 1810
1820 1820
1830 1830
1840 1840
D.11
STATE PROJECT
o ly m fk .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22206
CP22205
CP22204
CP22203
CP22202
CP22201
390464.342
390659.300
390987.699
391192.649
391583.845
391984.229
1006345.821
1006862.971
1007189.703
1008035.657
1008289.182
1008397.651
1808.89'
1813.79'
1808.97'
1800.99'
1798.90'
1807.36'
N
UV
UV
See Sheet E.9
See Sheet E.9
See Sheet C.4
Subexcavation
5.5%
.5
A
A
268+
Lake D aw n Road
TT
.0
.0
.0
.0
.0
.0
.3
.1
3 - 2" Conduit LT
Guardrail LT
Turnout RT
Turnout LT
See Sheet G.7 for details
Install utility vault.
250+00 LT
(approx. 479 LNFT) guardrailRemove existing roadway of centerline
Approximate
See Sheet G.7 for details
Install utility vault.
262+00 LT
See Sheet E.9
Construct turnout.
Intersection. See Sheet E.5
Lake Dawn Road
See Sheet E.9 turnout.
Construct
Existing ground + 3" profile grade =
Existing ground
Line to be constructed
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
Install end sections and inlet/outlet protection.
Remove and replace 71 LNFT 24" CMP
Schedule A and B:
241+95
Install end sections and inlet/outlet protection.
Remove and replace 83 LNFT 18" CMP.
Schedule A and B:
265+30
Install end sections and inlet/outlet protection.
Remove and replace 101 LNFT 24" CMP
Schedule B:
Lake Dawn Road protection for 18" CMP.
Install inlet/outlet
Schedule A and B:
256+99
A C
C E
O
A D
H E
A T
H E
R
P
A R
K
CP22206
CP22208
CP22207
CONTROL POINTS
NAME NORTHING EASTING ELEVATION
CP22208
CP22207
CP22206
389364.227
390071.557
390464.342
1005415.486
1005802.980
1006345.821
1795.72'
1789.17'
1808.89'
CUYD
EXC.
CUYD
EMB.
300 295 290 285 280 275 270
1760 1760
1770 1770
1780 1780
1790 1790
1800 1800
1830 1830
D.12
STATE PROJECT
o ly m fl .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
N
UV
STA. 283+00.00
WA PRA OLYM 12(2)
A
A C
C E S S R
O A
D
H E
A T
H E
R P
A R
K
Campground road
Heart O' The Hills constructed
Line to be
.6
.7
3 - 2" Conduit LT
Concrete curb RT
See Sheet G.7 for details
Install utility vault.
280+00 LT
Intersection detail sheet E.6
See Heather Park
Existing ground
Existing ground + 3"
Profile grade =
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
E x is ti n g p ip e c u lv e r t
Install inlet/outlet protection.
Schedule B: Install lining in 142 LNFT 48" CMP.
281+80
Install inlet/outlet protection.
Install lining in 98 LNFT 18" CMP.
Schedule A and B:
274+88
See Sheet C.3
281+00.00 to 281+50.00
Profile grade transition
Hurricane Ridge Road Match profile grade 281+50.00
SUSPEND PROJECT
295+00 to 325+00
340+00 to 350+00 375+00 to 385+00
CP22217
CP22216
CP22211
CP22212
CP22213
CP22214
CP22221
CP22222
10 3
N
N N
D.13
STATE PROJECT
NUMBER
SHEET
U
S S u r ft c m y fi le s p w p r o d u c ti o n d m s o ly m fm .d g n
WA PRA OLYM 12(2)
M
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y : Install inlet/outlet protection.
Schedule A and B: Install lining in 47 LNFT 18" CMP.
306+18
Install inlet/outlet protection.
Schedule A and B: Install lining in 47 LNFT 18" CMP.
307+26
Install inlet/outlet protection.
Schedule A and B: Install lining in 75 LNFT 18" CMP.
346+12
Schedule A and B: Install inlet/outlet protection.
380+72
QUANTITIES
PARKING AREA
ROAD APPROACH AND
E.1
STATE PROJECT
o ly m q a .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b y
FOOTNOTE:
283+00 RT, and Heather Park Access Road RT.
Include auxilliary lane for entrance station from 281+85 RT to
1 1 1 1
DETAILS
TYPICAL SECTION AND
ROAD APPROACH,
E.2
STATE PROJECT
o ly m q b .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b
4.
3.
2.
1.
and sags 12%.
difference on crests should be 8% vertical curves the maximum algebraic
When grades on approaches meet without or a 2" depression in a 10' chord.
Vertical curves not to exceed a 3" hump
Finish Shoulder
NOTE:
V ariable
1:2 1:
V ariable
-15% maximum
+15% m axim um
Point G
Pavement slope ±4% max.
LC
LC
R/W R/W
R a d iu s
TYPE A APPROACH PLAN
TYPICAL SECTION
OR BOTTOM DRAG
TO PREVENT OVERHANG ROAD APPROACH SYMBOLOGY
PROFILE
CONNECTION DETAIL
RoadwayLC ty p
Point G
W (See notes) m in
Profile Grade
Width
Type A Pavement Limit
LC Hurricane Ridge Road base, 6" depth
Recycled aggregate residential driveways
Type A - 26' min.
Roadway
13'
LC
grade approach road
Match existing Approach
Reshape road approach
Profile existing
A
W id th
(fe e t)
T y p e
10'
10'
" crest
Maximum sag Maximum stationing
Mainline base, 6" depth
Recycled aggregate
45 to 90 degrees
Var.
unless otherwise shown on plans.
of approach beyond Point G, Grade shown is designed grade
E d g e o f
S h o u ld e r
H u r r ic a n R id g e R o a d
E d g e o f
S h o u ld e r
H u r r ic a n e R id g e R o a d
Paving Limits
Type A - to R/W adjacent mainline pavement section (3-inch depth).
Construct recycled aggregate base course to match or easement line unless otherwise shown on the plans.
Extend the surface course to the right-of-way compatible with adjacent roadway construction.
Construct sideslopes of finish approaches
Width - 18 -Feet or 20-feet
Radius - 20 Foot minimum
TYPE A APPROACH:
3" depth placed in two equal lifts
ESAL, type II pavement roughness, maximum size aggregate, 0.3 to <3 million
" nominal 4 3" or 2
1Superpave pavement placed in two equal lifts
ESAL, type II pavement roughness, 3" depth maximum size aggregate, 0.3 to <3 million
" nominal 4 3" or 2
1Superpave pavement
Section Sheet C.2
Varies - See Typical
TURNOUT TYPICAL SECTIONS
PARKING AREA AND
E.3
STATE PROJECT
o ly m q c .d g n
U
S S u r ft
J o h n s e c k e d b
S la n s ig n e d b
TYPICAL SECTION FOR TURNOUTS WITH CURB
WITH CURB AND GUTTER
TYPICAL SECTION FOR PAVED PARKING AREAS
Sheet C.2
Varies - See Typical Sections
Sheet C.2
Varies - See Typical Sections
Sheet C.2
Varies - See Typical Sections
Varies
Varies
Varies
LC
LC
LC
See sheet C.1 for locations
Concrete curb and gutter for locations
See sheet C.1
Concrete curb match adjacent pavement section depth. Compacted depth to
Recycled aggregate base, 6" match adjacent pavement section depth. Compacted depth to
Recycled aggregate base, 6" match adjacent pavement section depth. Compacted depth to
Recycled aggregate base, 6"
3" depth, placed in two equal lifts
ESAL, type III pavement roughness, maximum size aggregate, 0.3 to <3 million
" nominal 4 3" or 2
1Superpave pavemen
3" depth, placed in two equal lifts
ESAL, type II pavement roughness, maximum size aggregate, 0.3 to <3 million
" nominal 4 3" or 2
1Superpave pavemen roughness, placed in two equal lifts
ESAL, 3" depth, type II pavement maximum size aggregate, 0.3 to <3 million
" nominal 4 3" or 2
1Superpave pavemen
See Sheet E.1
Variable finished width
See Sheet E.1
Variable finished width
See Sheet E.1
Variable finished width
TYPICAL SECTION FOR PAVED TURNOUTS WITHOUT CURB
CP22101
10 E.4
STATE PROJECT
o ly m q d .d g n
U
S S u r
J o h n s e c k e d b
S la n s ig n e d b y
N
POINT NORTHING EASTING
411294.25
411342.02
411394.51
411422.38
411494.03
1007475.05
1007454.52
1007417.09
1007439.88
1007441.76
LAYOUT POINT TABLE
POINT NORTHING EASTING ELEVATION DESCRIPTION
411405.23
411343.79
411327.17
411369.59
411395.76
411391.10
411399.73
411403.72
411427.05
411494.67
411494.71
411351.48
411352.11
411422.58
411487.52
411545.13
411546.40
1007426.97
1007438.41
1007399.95
1007442.68
1007413.29
1007419.17
1007436.73
1007447.08
1007459.33
1007445.71
1007437.82
1007482.99
1007484.89
1007466.05
1007452.06
1007443.60
1007430.671
3 4
Flowline 24" culvert
Flowline 24" culvert
Edge of pavement
Edge of pavement
Top back curb/ 0.5' gutter transition
Top back curb/1.5' gutter transition
Top back curb
Top back curb
Top back curb
Top back curb/1.5' gutter transition
Top back curb/0.5' gutter transition
Sawcut/Edge of pavement
Sawcut
Sawcut
Sawcut
Sawcut
Sawcut/Edge of pavement
POINT TABLE
RADIUS CENTER
STATION 10+00
MT. ANGELES ROAD
INTERSECTION DETAIL
371.20
374.96
379.61
376.86
375.88
377.02
376.45
375.81
374.16
369.21
368.81 match match match match match match
Begin Line
A
Hurricane Ridge Rd.
Mt. Angeles Rd.
ROAD
MT. ANGELES
RIDGE
HURRICANE
ROADA
A
R=30'
R=4'
R
R
R=82 tr a n s it io n S e e S h e e t
C .3
B e g in p a v e m e n t
M a tc h L in e s A a n d B
S ta ti o n
.4
EL 373.84
E 1007440.423
N 411415.055
CP22101
LC
T B
C to island.
Existing rock…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.