FLH_Culvert_Assessment_Form_274+88_App_A-11.pdf

PDF 139 KB Posted

Attached to
WA PRA OLYM 12(2), Hurricane Ridge Road, Phase II
Solicitation number
69056718B000005
Issued by

About this file

FLH Culvert Assessment Form_274+88_App A-11

View the file

Other files

File Type Posted
BidSum_Hurricane_Ridge.pdf PDF
Q&A_1-16-18.pdf PDF
Q&A_1-10-18.pdf PDF
A005.pdf PDF
Q&A_1-9-18.pdf PDF
A004.pdf PDF
Q&A_1-4-18.pdf PDF
A003.pdf PDF
Q&A_1-2-18.pdf PDF
114+75_INLET-E_OUTLET.mpg MPG file
119+58_INLET-E_OUTLET.mpg MPG file
191+29_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_307+27_App_A-13.pdf PDF
346+13_INLET-W_OUTLET.mpg MPG file
307+00_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_346+13_App_A-14.pdf PDF
196+76_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_191+28_App_A-7.pdf PDF
FLH_Culvert_Assessment_Form_141+46_App_A-4.pdf PDF
A002.pdf PDF
FLH_Culvert_Assessment_Form_196+76_App_A-8.pdf PDF
FLH_Culvert_Assessment_Form_153+25_App_A-5.pdf PDF
153+25_INLET-W_OUTLET.mpg MPG file
141+47_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_114+75_App_A-2.pdf PDF
FLH_Culvert_Assessment_Form_306+18_App_A-12.pdf PDF
306+00_INLET-W_OUTLET.mpg MPG file
FLH_Culvert_Assessment_Form_119+57_App_A-3.pdf PDF
274+89_INLET-W_OUTLET.mpg MPG file
Q&A_12-20-17.pdf PDF
A001.pdf PDF
10_WA_PRA_OLYM_12(2)_-_Plans.pdf.pdf PDF
SWPPP_WA_PRA_OLYM12(2)_Hurricane_Ridge_Rd..pdf PDF
IFB_Hurricane_Ridge.pdf PDF
Plan_Request_form_Hurricane_Ridge.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLH CULVERT ASSESSMENT FORM

Notes by:__________________________ Date: _________ Project: ___________________ Measurements by:___________________ Time: _________ Site Information:

Facility Location: __________________________________Lat/Long _________________________

Milepost:_____________ Project Station: _____________ GPS Road CL Waypoint No. _________ Named waterway:_________________________________ Direction of Flow:__________________ Culvert Information:

No. of Barrels: ______ Barrel Length (approx):________________ Barrel Slope: Mild / Steep / _____________________ Skew (0 degrees = perpendicular to road): ________ Approx Cover: Upstream ___________ Downstream____________ Barrel Shape (circle one) Circular Box Elliptical Pipe Arch Arch Diameter: _______ / Span ______ x Rise _______ Pipe Material (circle one): Metal - Concrete / RCP - Corrugated Plastic - Smooth Plastic - Timber – Masonry Appurtenances (circle one):

Upstream : Projecting / Mitered / Headwall / Headwall & Wingwalls / Flared End Section / ___________________ Downstream : Projecting / Mitered / Headwall / Headwall & Wingwalls / Flared End Section / ___________________

Flowing or standing water? N / Y Depth:____(ft) Est. Flow Velocity:______(ft/s) Possible AOP/fish passage? Y / N Utilities Present (list)? Y / N____________________ Possible historic features? Y / N Open Bottom? Y / N Culvert Condition and Performance (circle / check all that apply and provide appropriate explanations below)

Category Rating Performance Problems Requiring Level 1 Action Invert deterioration Good Fair Poor Crit Unk N/A Debris/Veg Blockage > 1/3 of rise at inlet or outlet �

Joints & Seams Good Fair Poor Crit Unk N/A Sediment Blockage 1/3 to 3/4 of rise at inlet/outlet �

Corrosion / Chemical Good Fair Poor Crit Unk N/A Buoyancy or Crushing-Related Inlet Failure �

Cross-Section Deform Good Fair Poor Crit Unk N/A Poor Channel Alignment �

Cracking Good Fair Poor Crit Unk N/A Previous and/or Frequent Overtopping �

Liner / Wall Good Fair Poor Crit Unk N/A Local Outlet Scour �

Mortar and Masonry Good Fair Poor Crit Unk N/A Performance Problems Requiring Level 2 Action

Rot and Marine Borers Good Fair Poor Crit Unk N/A Embankment Piping �

Headwall/Wingwall Good Fair Poor Crit Unk N/A Channel Degradation / Headcut (circle one) �

Apron Good Fair Poor Crit Unk N/A Embankment Slope Instability �

Flared End Section Good Fair Poor Crit Unk N/A Sediment Blockage > 3/4 Rise at Inlet or Outlet �

Pipe End Good Fair Poor Crit Unk N/A Sediment Blockage > 1/3 Rise Throughout Barrel �

Scour Protection Good Fair Poor Crit Unk N/A Other Problems Requiring Level 2 Action

No Access / Ends Totally Buried / Submerged �

Aggressive Abrasion/Corrosion/Chemical (circle) �

Exposed Footing (Open-Bottom Culvert Only) �

Photos (number): ___ Inlet ___ Outlet ___ Roadway (ahead) ___ Roadway (back) ___ View downstream

___ View upstream Others: ________________________________________________________

Notes / Recommendations:

� Additional notes / Sketches on back of form A.2

Overall Rating Good Fair Poor

Critical Unknown

Performance Problems wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval

Bravo Environmental 6705 NE 175th St

Kenmore, Wa 98028 Tel: 425-424-9000 Fax: 425-424-9002

E-mail:

City : Port Angeles

Inspection Report / Inspection: 1 Date P/O. No. Weather Surveyor's Name Pipe Segment Reference Section No.

Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category

Street Use of Sewer Upstream MH City Drainage Area Dowstream MH Loc. details Flow Control Dir. of Survey Location Code Length surveyed Section Length

Purpose of Survey Joint Length Year Laid Dia./Height Year Rehabilitated Material Tape / Media No. Lining Method

Add. Information :

5/18/2011 Dry jOEL vASEY 6 u-304-1198 No Pre-Cleaning

274+89 Port Angeles

Stormwater

93.11 ft

INLET-W

OUTLET

Upstream

93.11 ft

Maintenance Related

18 inch Corrugated Metal Pipe

1:240 Position Observation MPEG Photo

Hurricane Ridge // Page: 1

0.00 00:00:00End of Pipe / OUTLET

0.00 00:00:53Water Level, 5 %of cross sectional area

3.50 S1 00:01:00Roots Medium Barrell, from 05 to 08 o'clock, 10 %, within 8 inches of joint: YES, Start

7.45 00:03:35Infiltration Stain, from 03 to 06 o'clock, within 8 inches of joint: YES

7.45 F1 00:14:08Roots Medium Barrell, from 05 to 08 o'clock, 10 %, within 8 inches of joint: YES, Finish

58.88 00:08:01Infiltration Stain, from 02 to 09 o'clock, within 8 inches of joint: YES

65.42 00:09:35Infiltration Stain, at 03 o'clock, within 8 inches of joint: YES

77.38 00:11:18Infiltration Weeper, at 09 o'clock, within 8 inches of joint:

YES

93.11 00:14:10End of Pipe / INLET-W

OUTLET

INLET-W

QSR QMR SPR MPR OPR SPRI MPRI OPRI

0000 4C21 0 74 74 0 3.89 3.89

Notes by: PB/Bravo
Date: 5/18-19/11
Project: Hurricane Ridge Road
Measurements by: PB/Bravo
Time:
LatLong: N/A
Facility Location: Olympic National Park
Milepost: N/A
Project Station: 274+88
GPS Road CL Waypoint No: N/A
Named waterway: N/A
Direction of Flow: R to L
No of Barrels: 1
Barrel Length approx: 93'
Barrel Slope Mild Steep: 7%
Skew 0 degrees perpendicular to road: 32
Approx Cover Upstream: 15
Downstream: 20
Diameter: 18
Span:
x Rise:
Upstream Projecting Mitered Headwall Headwall Wingwalls Flared End Section:
Downstream Projecting Mitered Headwall Headwall Wingwalls Flared End Section:
Depth: 0.25
Utilities Present list Y N: UG-Elec.
Others: Video Record - See Written Summary Attached
Notes Recommendations 1: Infiltration wing wall has failed on left or East end.
Notes Recommendations 2: *Some data obtained from culvert inspection report 2003 - WA PRA-OLYM 12-1
Est Flow Velocity: 3
Possible Historic Features: Unkown