FLH_Culvert_Assessment_Form_119+57_App_A-3.pdf
PDF 148 KB Posted
- Solicitation number
- 69056718B000005
About this file
FLH Culvert Assessment Form_119+57_App A-3
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLH CULVERT ASSESSMENT FORM
Notes by:__________________________ Date: _________ Project: ___________________ Measurements by:___________________ Time: _________ Site Information:
Facility Location: __________________________________Lat/Long _________________________
Milepost:_____________ Project Station: _____________ GPS Road CL Waypoint No. _________ Named waterway:_________________________________ Direction of Flow:__________________ Culvert Information:
No. of Barrels: ______ Barrel Length (approx):________________ Barrel Slope: Mild / Steep / _____________________ Skew (0 degrees = perpendicular to road): ________ Approx Cover: Upstream ___________ Downstream____________ Barrel Shape (circle one) Circular Box Elliptical Pipe Arch Arch Diameter: _______ / Span ______ x Rise _______ Pipe Material (circle one): Metal - Concrete / RCP - Corrugated Plastic - Smooth Plastic - Timber – Masonry Appurtenances (circle one):
Upstream : Projecting / Mitered / Headwall / Headwall & Wingwalls / Flared End Section / ___________________ Downstream : Projecting / Mitered / Headwall / Headwall & Wingwalls / Flared End Section / ___________________
Flowing or standing water? N / Y Depth:____(ft) Est. Flow Velocity:______(ft/s) Possible AOP/fish passage? Y / N Utilities Present (list)? Y / N____________________ Possible historic features? Y / N Open Bottom? Y / N Culvert Condition and Performance (circle / check all that apply and provide appropriate explanations below)
Category Rating Performance Problems Requiring Level 1 Action Invert deterioration Good Fair Poor Crit Unk N/A Debris/Veg Blockage > 1/3 of rise at inlet or outlet �
Joints & Seams Good Fair Poor Crit Unk N/A Sediment Blockage 1/3 to 3/4 of rise at inlet/outlet �
Corrosion / Chemical Good Fair Poor Crit Unk N/A Buoyancy or Crushing-Related Inlet Failure �
Cross-Section Deform Good Fair Poor Crit Unk N/A Poor Channel Alignment �
Cracking Good Fair Poor Crit Unk N/A Previous and/or Frequent Overtopping �
Liner / Wall Good Fair Poor Crit Unk N/A Local Outlet Scour �
Mortar and Masonry Good Fair Poor Crit Unk N/A Performance Problems Requiring Level 2 Action
Rot and Marine Borers Good Fair Poor Crit Unk N/A Embankment Piping �
Headwall/Wingwall Good Fair Poor Crit Unk N/A Channel Degradation / Headcut (circle one) �
Apron Good Fair Poor Crit Unk N/A Embankment Slope Instability �
Flared End Section Good Fair Poor Crit Unk N/A Sediment Blockage > 3/4 Rise at Inlet or Outlet �
Pipe End Good Fair Poor Crit Unk N/A Sediment Blockage > 1/3 Rise Throughout Barrel �
Scour Protection Good Fair Poor Crit Unk N/A Other Problems Requiring Level 2 Action
No Access / Ends Totally Buried / Submerged �
Aggressive Abrasion/Corrosion/Chemical (circle) �
Exposed Footing (Open-Bottom Culvert Only) �
Photos (number): ___ Inlet ___ Outlet ___ Roadway (ahead) ___ Roadway (back) ___ View downstream
___ View upstream Others: ________________________________________________________
Notes / Recommendations:
� Additional notes / Sketches on back of form A.2
Overall Rating Good Fair Poor
Critical Unknown
Performance Problems wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Oval wallett Line wallett Line wallett Oval
Bravo Environmental 6705 NE 175th St
Kenmore, Wa 98028 Tel: 425-424-9000 Fax: 425-424-9002
E-mail:
City : Port Angeles
Inspection Report / Inspection: 1 Date P/O. No. Weather Surveyor's Name Pipe Segment Reference Section No.
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Street Use of Sewer Upstream MH City Drainage Area Dowstream MH Loc. details Flow Control Dir. of Survey Location Code Length surveyed Section Length
Purpose of Survey Joint Length Year Laid Dia./Height Year Rehabilitated Material Tape / Media No. Lining Method
Add. Information :
5/19/2011 Dry jOEL vASEY 14 u-304-1198 No Pre-Cleaning
119+58 Port Angeles
Stormwater
195.70 ft
INLET-E
OUTLET
Downstream
195.70 ft
Maintenance Related
24 inch Corrugated Metal Pipe
1:270 Position Observation MPEG Photo
Hurricane Ridge // Page: 1
0.00 00:00:00End of Pipe / INLET-E
0.00 00:00:34Water Level, 5 %of cross sectional area
10.03 00:01:40Infiltration Weeper, at 03 o'clock, within 8 inches of joint:
YES
11.87 00:02:35Infiltration Stain, at 12 o'clock, within 8 inches of joint: YES
17.11 00:03:20Infiltration Gusher, at 07 o'clock, within 8 inches of joint:
YES
17.11 00:04:01Infiltration Weeper, from 02 to 05 o'clock, within 8 inches of joint: YES
20.89 00:05:04Infiltration Stain, at 12 o'clock, within 8 inches of joint: NO
21.16 00:05:42Infiltration Weeper, at 10 o'clock, within 8 inches of joint:
NO
26.22 00:06:51Infiltration Stain, at 12 o'clock, within 8 inches of joint: NO
28.52 00:07:41Infiltration Stain, at 12 o'clock, within 8 inches of joint: NO
29.99 00:08:15Infiltration Stain, at 12 o'clock, within 8 inches of joint: NO
40.76 00:09:33Infiltration Weeper, from 03 to 05 o'clock, within 8 inches of joint: YES
44.35 00:10:08Infiltration Weeper, at 10 o'clock, within 8 inches of joint:
NO
52.08 00:10:53Infiltration Weeper, at 09 o'clock, within 8 inches of joint:
NO
55.11 00:11:33Infiltration Weeper, at 09 o'clock, within 8 inches of joint:
NO
INLET-E
City : Kenmore, Wa 98028 Tel: 425-424-9000 Fax: 425-424-9002
Email:
City : Port Angeles
Inspection Report / Inspection: 1 Date P/O. No. Weather Surveyor's Name Pipe Segment Reference Section No.
Present Vehicle Camera Preset Pre-Cleaning Rate Dry jOEL vASEY 14
No Pre-Cleaning
1:270 Position Observation MPEG Photo
Hurricane Ridge // Page: 2
59.90 00:12:51Infiltration Weeper, from 04 to 08 o'clock, within 8 inches of joint: YES
71.76 00:15:03Infiltration Stain, at 09 o'clock, within 8 inches of joint: YES
74.52 00:15:27Infiltration Stain, at 09 o'clock, within 8 inches of joint: NO
83.36 00:16:47Infiltration Weeper, from 03 to 09 o'clock, within 8 inches of joint: YES
94.12 00:18:41Infiltration Stain, at 11 o'clock, within 8 inches of joint: NO
95.59 00:19:29Infiltration Weeper, at 09 o'clock, within 8 inches of joint:
NO
100.19 00:20:16Infiltration Stain, at 12 o'clock, within 8 inches of joint: NO
104.79 00:21:56Infiltration Weeper, from 03 to 09 o'clock, within 8 inches of joint: YES
124.12 00:24:11Deformed, 5 % / DENT@12:00
126.14 00:25:27Infiltration Weeper, from 09 to 01 o'clock, within 8 inches of joint: YES
149.05 00:27:53Infiltration Weeper, from 07 to 09 o'clock, within 8 inches of joint: YES
152.64 00:29:09Deformed, 5 % / DENT@10:00
157.33 00:30:08Infiltration Weeper, from 09 to 10 o'clock, within 8 inches of joint: YES
164.23 00:31:03Infiltration Weeper, from 02 to 05 o'clock, within 8 inches of joint: YES
168.55 00:31:38Infiltration Weeper, at 08 o'clock, within 8 inches of joint:
NO
171.59 00:32:36Infiltration Weeper, at 03 o'clock, within 8 inches of joint:
YES
171.96 00:32:51Infiltration Gusher, at 04 o'clock, within 8 inches of joint:
YES
City : Kenmore, Wa 98028 Tel: 425-424-9000 Fax: 425-424-9002
Email:
City : Port Angeles
Inspection Report / Inspection: 1 Date P/O. No. Weather Surveyor's Name Pipe Segment Reference Section No.
Present Vehicle Camera Preset Pre-Cleaning Rate Dry jOEL vASEY 14
No Pre-Cleaning
1:270 Position Observation MPEG Photo
Hurricane Ridge // Page: 3
195.70 00:34:54End of Pipe / OUTLET-WOUTLET
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4200 522B 8 44 52 4 2.32 2.48
| Notes by: PB/Bravo |
| Date: 5/18-19/11 |
| Project: Hurricane Ridge Road |
| Measurements by: PB/Bravo |
| Time: |
| LatLong: N/A |
| Facility Location: Olympic National Park |
| Milepost: N/A |
| Project Station: 119+57 |
| GPS Road CL Waypoint No: N/A |
| Named waterway: N/A |
| Direction of Flow: L to R |
| No of Barrels: 1 |
| Barrel Length approx: 195' |
| Barrel Slope Mild Steep: 15% |
| Skew 0 degrees perpendicular to road: -33 |
| Approx Cover Upstream: 40 |
| Downstream: 50 |
| Diameter: 24 |
| Span: |
| x Rise: |
| Upstream Projecting Mitered Headwall Headwall Wingwalls Flared End Section: |
| Downstream Projecting Mitered Headwall Headwall Wingwalls Flared End Section: |
| Depth: 0.25 |
| Utilities Present list Y N: UG-Elec. |
| Others: Video Record - See Written Summary Attached |
| Notes Recommendations 1: Infiltration at several locations. |
| Notes Recommendations 2: *Some data obtained from culvert inspection report 2003 - WA PRA-OLYM 12-1 |
| Est Flow Velocity: 3 |
| Possible Historic Features: Unkown |
File details come from the government source that posted it.