36E77619R0011-003.pdf
PDF 21 MB Posted
- Solicitation number
- 36E77619R0011
About this file
36E77619R0011 ATTACHMENT 3 - Radiation Oncology Drawings Final 1-60.pdf
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
PROJECT LOCATION
LUKE
J LEISING
43897-6
INDIANAPOLIS
IN
W I S
CONS
I N
P R O
F E S
S I O N A L
E N
G I N
E E R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil EngineerRING & DuCHATEAU LLP
117400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
MILWAUKEE VAMC FULLY-SPRINKLERED
CONSTRUCT NEW RADIATION
ONCOLOGY SUITE
MILWAUKEE VAMC
695-404
BLDG 111
PHASING IS DEFINED IN PROJECT SPECIFICATIONS AND PHASING PLANS. CONTRACTOR
TO COORDINATE THE FULL SCOPE OF WORK TO BE PHASED SO AS TO NOT IMPACT THE
OPERATION OF SURROUNDING SPACES OR PREVIOUS PHASES. SPECIFIC COORDINATION
SHOULD BE GIVEN FOR DEMOLITION, UTILITY ROUTING AND SHUTDOWNS.
C U s e rs \d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
R a d io lo g y O n c o lo g y S u it e d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/2 /2
:3
:4
P M
GI000
COVER SHEET
04 OCTOBER 2018 LL DV
FINAL CONSTRUCTION
DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
FIRE PROTECTION
FP000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FPD101 FIRE PROTECTION BASEMENT DEMOLITION PLAN
FP101 FIRE PROTECTION BASEMENT PLAN (SOUTH PARTIAL)
FP102 FIRE PROTECTION BASEMENT PLAN (NORTH PARTIAL)
PLUMBING
PL000 PLUMBING SYMBOLS AND ABBREVIATIONS
PD100 PLUMBING DEMOLITION CRAWL SPACE PLAN
PD101 PLUMBING BASEMENT DEMOLITION PLAN
PD201 MEDICAL GAS BASEMENT DEMOLITION PLAN
PL100 PLUMBING CRAWL SPACE PLAN (SOUTH PARTIAL)
PL101 PLUMBING CRAWL SPACE PLAN (NORTH PARTIAL)
PL102 PLUMBING BASEMENT PLAN (SOUTH PARTIAL)
PL103 PLUMBING BASEMENT PLAN (NORTH PARTIAL)
PL104 PLUMBING ROOF PLAN
PL200 MEDICAL GAS CRAWL SPACE PLAN (SOUTH PARTIAL)
PL202 MEDICAL GAS BASEMENT PLAN (SOUTH PARTIAL)
PL300 PLUMBING ISOMETRICS
PL400 PLUMBING SCHEDULES AND DETAILS
MECHANICAL
MI000 MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS
MD101 MECHANICAL BASEMENT DEMOLITION PLAN
MH101 MECHANICAL BASEMENT PLAN
MH102 MECHANICAL BASEMENT PLAN
MH121 MECHANICAL ROOF DEMOLITION AND NEW PLANS
M500 MECHANICAL DETAILS
MM501 MECHANICAL DETAILS
MM502 MECHANICAL DETAILS
MM600 HVAC SCHEDULES
MM601 HVAC SCHEDULES
MM602 HVAC SCHEDULES
MP101 MECHANICAL BASEMENT PIPING DEMOLITION PLAN
MP102 MECHANICAL CRAWL SPACE AND BASEMENT PIPING PLAN
- NORTH
MP103 MECHANICAL BASEMENT PIPING PLAN
ELECTRICAL
ES000 ELECTRICAL SYMBOLS, ABBREVIATIONS & SHEET INDEX
ES101D BASEMENT FLOOR PLAN - DEMOLITION
ES101P PARTIAL BASEMENT FLOOR PLAN - POWER
ES102P PARTIAL BASEMENT FLOOR PLAN - POWER
ES121P ROOF PLAN - POWER
ES201L PARTIAL BASEMENT FLOOR PLAN - LIGHTING
ES202L PARTIAL BASEMENT FLOOR PLAN - LIGHTING
ES300 ENLARGED PLANS
ES301 ENLARGED PLANS
ES302 ENLARGED PLANS
ES303 ENLARGED PLANS
ES400 ONE LINE SYMBOLS
ES401 ONE LINE DIAGRAM
ES500 ELECTRICAL DETAILS
ES501 ELECTRICAL DETAILS
ES502 LIGHTING DETAILS
ES600 ELECTRICAL SCHEDULES
ES601 ELECTRICAL SCHEDULES
ES602 ELECTRICAL SCHEDULES
ET000 SYMBOLS, ABBREVIATIONS & SHEET INDEX
ET101 PARTIAL BASEMENT FLOOR PLAN - TECHNOLOGY
ET101D BASEMENT FLOOR PLAN - DEMOLITION
ET102 PARTIAL BASEMENT FLOOR PLAN - TECHNOLOGY
ET300 ENLARGED PLANS
ET301 ENLARGED PLANS
ET500 TECHNOLOGY DETAILS
ET501 TECHNOLOGY DETAILS
ET600 TECHNOLOGY SCHEDULES
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 CODE ANALYSIS
GI102 BASEMENT LIFE SAFETY FLOOR PLAN
GI103 INFECTION CONTROL / PHASING PLAN
GI104 INFECTION CONTROL / PHASING PLAN
GI105 INFECTION CONTROL / PHASING PLAN
GI106 INFECTION CONTROL / PHASING PLAN
HA101 HAZARDOUS MATERIAL REMOVAL PLAN
CIVIL
VF101 TOPOGRAPHIC SURVEY
CC001 GENERAL NOTES
CC002 PHASING AND EROSION CONTROL PLAN
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS501 SITE DETAILS
CG101 GRADING PLAN
CU101 UTILITY PLAN
CU501 UTILITY DETAILS
Structure
SI001 STRUCTURAL ABBREVIATIONS AND SYMBOLS
SI002 GENERAL STRUCTURAL NOTES
SI003 LOAD MAPS
SB101 FOUNDATION AND SLAB ON GRADE PLANS
SB501 FOUNDATION SECTIONS AND DETAILS
SB502 FOUNDATION SECTIONS AND DETAILS
SF101 ROOF FRAMING PLANS
SF201 BRACE ELEVATIONS AND DETAILS
SF501 FRAMING SECTIONS AND DETAILS
SF502 FRAMING SECTIONS AND DETAILS
SF901 ISOMETRIC VIEWS
ARCHITECTURAL
AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AS002 ARCHITECTURAL STANDARDS
AD101 ARCHITECTURAL BASEMENT DEMOLITION PLAN
AS101 BASEMENT ARCHITECTURAL FLOOR PLAN
AS102 BASEMENT DIMENSION FLOOR PLAN
AS103 NORTH CORRIDOR AND PET-MRI VESTIBULE
AS111 BASEMENT REFLECTED CEILING PLAN
AS121 ARCHITECTURAL ROOF PLAN
AS201 ARCHITECTURAL BUILDING ELEVATIONS
AS202 ARCHITECTURAL BUILDING ELEVATIONS
AS301 ARCHITECTURAL BUILDING SECTIONS
AS311 ARCHITECTURAL WALL SECTIONS
AS501 ARCHITECURAL SECTION DETAILS
AS502 ARCHITECURAL SECTION DETAILS
AS601 OPENINGS SCHEDULES
AS801 ENLARGED PLANS
AS802 ENLARGED PLANS
AS803 ENLARGED PLANS
AS804 ENLARGED PLANS
AS805 ENLARGED TOILET PLANS AND ELEVATIONS
AS806 ENLARGED INTERIOR ELEVATIONS
AS807 ENLARGED INTERIOR ELEVATIONS
AS808 ENLARGED INTERIOR ELEVATIONS
AS809 ENLARGED INTERIOR ELEVATIONS
AS810 INTERIOR SECTIONS AND DETAILS
AS811 INTERIOR SECTIONS AND DETAILS
AS901 SIGNAGE PLAN
AS902 SIGNAGE TYPES
AF101 FINISH WALL TREATMENT PLAN
AF102 FINISH FLOOR PATTERN PLAN
AF601 FINISHES SCHEDULE & EQUIPMENT SCHEDULE
AQ101 BASEMENT EQUIPMENT FLOOR PLAN
Contact:Contact:Contact:Contact: Contact: Contact:
RING & DUCHATEAU
CONSULTING ENGINEERS
Mike Jushka
Mechanical Engineer
MECHANICAL
ENGINEER
GUIDON DESIGN INC.
Mark VanderWoude
Sr. Structural Engineer
STRUCTURAL
ENGINEER
GUIDON DESIGN INC.
David Counsell
Civil Engineer
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 109 e: dcounsell@guidondesign.com
CIVIL
ENGINEER
MILWAUKEE VAMC
Milwaukee VA Medical Center
5000 West National Avenue Milwaukee, WI 53295 p: 414.384.2000 x 41080
OWNER
GUIDON DESIGN INC.
David Vallandingham
Architect
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 130 e: dvallandingham@guidondesign.com
ARCHITECT
RING & DUCHATEAU
CONSULTING ENGINEERS
Mike McGann
Electrical Engineer
ELECTRICAL
ENGINEER
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 119 e: mvanderwoude@guidondesign.com
17400 West Capitol Drive Brookfield, WI 53045 p: 414.778.7414 e: mjushka@ringdu.com
17400 West Capitol Drive Brookfield, WI 53045 p: 414.778.1700 e: mmcgann@ringdu.com
AREA MAP
VICINITY MAP
CLEMENT J. ZABLOCKI VA MEDICAL CENTER
CONSTRUCT NEW RADIATION ONCOLOGY SUITE
FINAL CONSTRUCTION DOCUMENTS
04 OCTOBER 2018
VA PROJECT NO: 695-404
Contact:
RING & DUCHATEAU
CONSULTING ENGINEERS
Robert Wagner
Plumbing Engineer
PLUMBING / FIRE
PROTECTION ENGINEER
17400 West Capitol Drive Brookfield, WI 53045 p: 414.778.7401 e: rwagner@ringdu.com
N
N
GUIDON DESIGN PROJECT NO: 14.1020.10
Revisions: Date:
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA SHALL FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD
PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE CONSISTENCY SYSTEM WIDE.
CODE REVIEW
THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.
FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN
USED.
PROJECT SCOPE
THE PROJECT SCOPE INCLUDES RENOVATION OF EXISTING BUILDING 111 BASEMENT FOR EXPANSION OF THE EXISTING RADIATION ONCOLOGY SUITE AS WELL AS CONSTRUCTION OF A NEW ADDITION TO PROVIDE SPACE FOR NEW LINEAR ACCELERATORS AND CT EQUIPMENT INCLUDING A NEW CONNECTION FOR A MOBILE PET/MRI TRAILER. THE RENOVATED SPACE IS LOCATED EAST OF THE EXISTING RADIATION ONCOLOGY SUITE EXTENDING TO THE EXTERIOR WALL OF THE BUILDING WHERE THE
NEW ADDITION CONSTRUCTION AREA WILL BEGIN.
BOTH THE RENOVATED AND NEW CONSTRUCTION AREAS CONTAIN AREAS WHICH WILL BE USED FOR TREATMENT OF PATIENTS WHO ARE NOT CAPABLE OF TAKING ACTION FOR SELF-PRESERVATION THEREFORE CLASSIFIED AS A NEW AMBULATORY HEALTH CARE OCCUPANCY PER LSC 6.1.6.1 AND THE REQUIREMENT OF CHAPTER 20
APPLY IN GENERAL.
OVERALL CONSTRUCTION TYPE REQUIREMENTS FOR A NEW HEALTHCARE OCCUPANCY PER LSC CHAPTER 18 ARE REQUIRED (LSC 18.1.3.6) FOR EXISTING INPATIENT AREAS ABOVE AND SUPPORTED BY THE PROJECT AREA CLASSIFIED AS EXISTING HEALTHCARE. THE MAIN EGRESS COMPONENTS IN THE RENOVATED AREA WHICH SERVE ADJACENT EXISTING HEALTH CARE WILL ALSO BE REQUIRED TO COMPLY WITH THE HEALTH CARE OCCUPANCY REQUIREMENTS.
BASED ON THE AREAS OF THE PATIENT WAITING SPACES SHOWN, THE COMBINED ASSEMBLY OCCUPANT LOAD OF THESE AREAS DOES NOT APPEAR TO EXCEED THE LIMIT OF 50 FOR THE AREAS TO BE CONSIDERED AS INCIDENTAL ALLOWING THESE AREAS TO COMPLY WITH THE REQUIREMENTS FOR A NEW AMBULATORY HEALTH
CARE OCCUPANCY IN ACCORDANCE WITH LSC 6.1.2.1.
SMALLER AREAS OF THE RENOVATED AREAS ARE USED FOR STAFF WORK AREAS INCLUDING WORKROOMS, OFFICES, LOUNGE, AND CONFERENCE ROOMS WHICH ARE CLASSIFIED AS NEW BUSINESS PER LSC 6.1.11.1. LSC 6.1.14.3.2 CLARIFIES THAT WHERE A DESIGN FEATURE IS CONTAINED WHOLLY IN A SINGLE OCCUPANCY THEN THE DESIGN FEATURE NEED ONLY COMPLY WITH THE REQUIREMENT FOR THE APPROPRIATE OCCUPANCY. FOR EXAMPLE, A DEAD END CORRIDOR ENTIRELY IN THE BUSINESS AREA WOULD NEED NOT COMPLY WITH THE AMBULATORY HEALTH CARE REQUIREMENTS.
THE RESULTING MULTIPLE MIXED (NON-SEPARATED) OCCUPANCY IS PERMITTED PER NFPA 101 6.1.14.1.1(1) WHERE THE BUILDING COMPLIES "WITH THE MOST RESTRICTIVE REQUIREMENTS OF THE OCCUPANCIES INVOLVED, UNLESS SEPARATE SAFEGUARDS ARE APPROVED" PER NFPA 101 6.1.14.3.2 WHICH IN THIS CASE IS THE AMBULATORY HEALTH CARE OCCUPANCY IN ADDITION TO THE SMALLER BUSINESS OCCUPANCY SPACES WHERE ALL OTHER DESIGNATIONS (STORAGE AND ASSEMBLY) ARE INCIDENTAL AND CONSIDERED AS PART OF THE PREDOMINANT OCCUPANCY USE PER LSC 6.1.14.1.3.
IN ADDITION, THE VA HAS DEEMED ALL VA MEDICAL CENTERS, AMBULATORY CARE, AND HOSPITALS AS MISSION CRITICAL FACILITY TYPES REQUIRING COMPLIANCE WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES.
CODE ANALYSIS
THE NEW CONSTRUCTION AREA WILL BE USED FOR NON-SLEEPING OUTPATIENT CARE WHERE SOME OCCUPANTS ARE NOT CAPABLE OF TAKING ACTION FOR SELF- PRESERVATION RESULTING IN AN OCCUPANCY CLASSIFICATION OVERALL OF AN AMBULATORY CARE OCCUPANCY PER NFPA 101 6.1.6.1 AND REQUIREMENTS PER
CHAPTER 20.
CONSTRUCTION TYPE REQUIREMENTS TO SUPPORT REQUIREMENTS OF ADDITIONAL FLOORS OF HEALTH CARE OCCUPANCY ABOVE PER LSC 6.1.5.1, A.6.1.5.1, LSC
CHAPTER 18 AND IBC CHAPTER 5.
WHERE SHARED MEANS OF EGRESS PASS THROUGH THE CONSTRUCTION SPACE TO BE PER EGRESS REQUIREMENTS OF LSC CHAPTER 18.
CODE SUMMARY
THE CONSTRUCTION TYPE DETERMINES THE ALLOWABLE AREA AND HEIGHT FOR CONSTRUCTION PER THE REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC.
THE EXISTING BUILDING IS REPORTED TO BE TYPE I-A. NEW CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE I-B CONSTRUCTION WHICH PER TABLE 508.4 I-2 REQUIRES NO SEPARATION. NEW PET/MRI STRUCTURE WILL BE TYPE V CONSTRUCTION WHICH WILL REQUIRE A 2-HOUR SEPARATION.
CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2015 IBC. CONSTRUCTION TYPE AND
MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC AS FOLLOWS:
1A. FIRE RESISTIVE RATINGS TYPE II-B CONSTRUCTION, TYPE II-(000) IBC/NFPA 101:
STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: NONCOMBUSTIBLE, 2 -HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
EXTERIOR > 10' : NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
EXTERIOR < 5' : NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE
FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
ROOF: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE
SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 8.6.5(1))
SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 8.6.5(2))
1B. FIRE RESISTIVE RATING TYPE V-A CONSTRUCTION, TYPE V-(111) IBC/NFPA 101:
STRUCTURAL FRAME: COMBUSTIBLE, 1-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: COMBUSTIBLE, 1-HOUR FIRE RESISTIVE
INTERIOR: COMBUSTIBLE, 1-HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
INTERIOR: COMBUSTIBLE, 0-HOUR FIRE-RESISTIVE
FLOOR: COMBUSTIBLE, 1-HOUR FIRE RESISTIVE
ROOF: COMBUSTIBLE, 1-HOUR FIRE RESISTIVE
2. CORRIDOR SEPARATION
CORRIDOR AND LOBBY SEPARATION IS NOT REQUIRED WHERE THE BUILDING IS PROTECTED THROUGHOUT WITH A SPRINKLER SYSTEM.
3. STRUCTURAL DESIGN
STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.
4. EXTERIOR EXPOSURE OF EXIT STAIR ENCLOSURES
NONRATED WALLS OR UNPROTECTED OPENINGS WHICH ENCLOSE THE EXTERIOR OF A STAIRWAY AND ARE EXPOSED TO OTHER PARTS OF THE BUILDING AT AN ANGLE LESS THAN 180 DEGREES ARE REQUIRED TO BE PROTECTED AS A STAIRWAY ENCLOSURE, INCLUDING OPENING PROTECTION, WITHIN 10 FT HORIZONTALLY (LSC 7.2.2.5.2.1).
5. ALLOWABLE AREA
BASED UPON A GROUP I-2 (IBC) OCCUPANCY CLASSIFICATION FOR THE HEALTH CARE OCCUPANCIES SUPPORTED BY THE RENOVATED AREA AND TYPE I-A CONSTRUCTION (IBC) EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM PER TABLE 506.2 OF THE IBC:
ALLOWABLE AREA FACTOR, MULTIPLE STORIES ABOVE GRADE: UNLIMITED (IBC, TABLE 506.2)
6. SEPARATION OF BUILDINGS
BASED UPON A GROUP I OCCUPANCY (IBC) CLASSIFICATIONS AND TYPE I-A CONSTRUCTION PER IBC TABLE 602 NO SEPARATION IS REQUIRED PROVIDED EXTERIOR
WALLS ARE RATED AS FIRE RESISTIVE BASED ON THE SEPARATION DISTANCE
< 30' SEPARATION: EXTERIOR WALLS NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE
> 30' SEPARATION: EXTERIOR WALLS NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.
7. ALLOWABLE HEIGHT
BASED UPON A GROUP I-2 OCCUPANCY (IBC) CLASSIFICATION AND TYPE I-A CONSTRUCTION EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH IBV 903.3.1.2 PER IBC TABLES 504.3 AND 504.4, UNLIMITED BUILDING HEIGHT AND STORIES ARE PERMITTED.
8. OCCUPANCY SEPARATION: SEPARATION OF AMBULATORY HEALTH CARE FROM OTHER AREAS OF THE BUILDING THE RENOVATED AMBULATORY HEALTH CARE OCCUPANCY AREA IS REQUIRED BY LSC 20.3.7.1 TO BE SEPARATED FROM OTHER TENANTS AND OCCUPANCIES IN THE
REMAINDER OF THE BUILDING AND MEET THE FOLLOWING REQUIREMENTS:
• WALLS HAVING A MINIMUM 1-HOUR-FIRE-RESISTANCE RATING EXTENDING FROM THE FLOOR SLAB BELOW TO THE FLOOR OR ROOF SLAB ABOVE
• DOORS CONSTRUCTED OF 1 ¾ INCH THICK, SOLID-BONDED WOOD CORE OR EQUIVALENT
• DOORS EQUIPPED WITH POSITIVE LATCHES
• DOORS ARE REQUIRED TO BE SELF-CLOSING
• WINDOWS IN THE REQUIRED BARRIER ARE TO BE FIXED FIRE WINDOW ASSEMBLIES COMPLYING WITH THE REQUIREMENTS OF LSC 8.3.
9. OCCUPANCY SEPARATION: SEPARATION WITHIN THE AMBULATORY HEALTH CARE AREA
OCCUPANCY SEPARATION IS NOT REQUIRED WITHIN THE RENOVATED AMBULATORY HEALTH CARE OCCUPANCY SPACE.
THE MIXED OCCUPANCY IS PERMITTED PER NFPA 101 6.1.14.1.1(1) WHERE THE BUILDING COMPLIES “WITH THE MOST RESTRICTIVE REQUIREMENTS OF THE OCCUPANCIES INVOLVED, UNLESS SEPARATE SAFEGUARDS ARE APPROVED” PER NFPA 101 6.1.14.3.2 WHICH IN THIS CASE IS THE AMBULATORY HEALTH CARE OCCUPANCY WITHIN THE
RENOVATED SPACES.
THE LSC 20.1.3.3 REQUIRES SECTIONS OF THE AMBULATORY HEALTH CARE OCCUPANCY TO BE CLASSIFIED AS OTHER OCCUPANCY TYPES IF SEPARATION IS PROVIDED, HOWEVER SEPARATION IS NOT REQUIRED IN THIS CASE AS THE ENTIRE AREA IS TREATED AS AMBULATORY AND SEPARATED FROM THE REMAINDER OF THE BUILDING
AS REQUIRED BY 20.3.7.1.
10. HAZARDOUS ROOM PROTECTION: AMBULATORY HEALTH CARE OCCUPANCY HAZARDOUS AREAS
AREAS USED FOR GENERAL STORAGE REQUIRE SPRINKLER PROTECTION AND SEPARATION BY A SMOKE PARTITION.
11. HAZARDOUS ROOM PROTECTION: AMBULATORY HEALTH CARE OCCUPANCY HIGH HAZARD CONTENT AREAS:
1-HOUR FIRE RESISTANCE RATING WITH SELF-CLOSING ¾ HOUR FIRE DOORS AND AUTOMATIC EXTINGUISHING SYSTEM REQUIRED FOR HIGH HAZARD CONTENTS AREAS INCLUDING FLAMMABLE LIQUIDS, FLAMMABLE VAPORS, AND HAZARDOUS MATERIAL AS CLASSIFIED IN ACCORDANCE WITH NFPA 101 SECTION 6.2 (LSC 20.3.2.3).
12. HAZARDOUS ROOM PROTECTION: SPECIFIC HAZARD REQUIREMENTS
THE FOLLOWING AREAS ARE REQUIRED TO BE PROTECTED AS INDICATED:
• LABORATORIES IN WHICH CHEMICALS ARE HANDLED OR STORED ARE REQUIRED TO COMPLY WITH NFPA 45 (LSC 20.3.2.4)
• AREAS WHERE MEDICAL GAS IS STORED OR ADMINISTERED ARE REQUIRED TO COMPLY WITH NFPA 99 (LSC 20.3.2.5)
• COOKING FACILITIES ARE REQUIRED BY LSC §20.3.2.6 TO BE PROTECTED IN ACCORDANCE WITH LSC §9.2.3, EXCEPT WHERE DOMESTIC COOKING EQUIPMENT IS
USED FOR FOOD WARMING OR LIMITED COOKING, PROTECTION OR SEPARATION IS NOT REQUIRED (§20.3.2.7).
• WHERE HAZARDOUS MATERIALS, INCLUDING ALCOHOL-BASED HAND-RUB DISPENSERS, ARE STORED, USED, OR HANDLED, THE PROVISIONS OF LSC §8.7.3.1
SHALL APPLY.
CODE ANALYSIS - NFPA 101, CHAPTER 18
13. PROTECTION OF VERTICAL OPENINGS
VERTICAL OPENINGS SHALL BE ENCLOSED OR PROTECTED IN ACCORDANCE WITH SECTION 8.6, UNLESS OTHERWISE PERMITTED BY ANY OF THE FOLLOWING (LSC 20.3.1.1):
• UNENCLOSED VERTICAL CONVENIENCE OPENINGS IN ACCORDANCE WITH §8.6.9.1 SHALL BE PERMITTED.
14. PARTIAL ENCLOSURE OF TWO-STORY OPENING
A VERTICAL OPENING SERVING AS OTHER THAN AN EXIT ENCLOSURE, CONNECTING ONLY TWO ADJACENT STORIES AND PIERCING ONLY ONE FLOOR, IS ALLOWED TO BE
OPEN TO ONE OF THE TWO STORIES BY LSC 8.6.8.
15. CORRIDORS
EXIT ACCESS CORRIDORS DO NOT REQUIRE A FIRE-RESISTANCE RATING IN A FULLY SPRINKLED BUILDING. MISCELLANEOUS OPENINGS, SUCH AS MAIL SLOTS, PHARMACY PASS-THROUGH WINDOWS, LABORATORY PASS-THROUGH WINDOWS, AND CASHIER PASS-THROUGH WINDOWS, ARE ALLOWED TO BE INSTALLED IN VISION PANELS OR DOORS WITHOUT SPECIAL PROTECTION, PROVIDED THAT THE AGGREGATE AREA OF OPENINGS PER ROOM DOES NOT EXCEED 80 INCHES SQUARE IN SPRINKLER PROTECTED AND ARE INSTALLED AT OR BELOW HALF THE DISTANCE FROM THE FLOOR TO THE ROOM CEILING (LSC 20.3.6.2.1).
16. MEANS OF EGRESS
• MAXIMUM TRAVEL DISTANCE, (FULLY SPRINKLED): 200 FEET (LSC 20.2.6.2.2)
• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 20.2.5.2.1)
• DEAD END CORRIDORS SHALL NOT EXCEED 30 FEET. (LSC 20.2.5.2.1)
• EGRESS PATH REQUIREMENTS PER 4.3.1 PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES.
PROVIDE AN UNOBSTRUCTED AND ADEQUATELY LIGHTED PATH FROM EACH MEANS OF EGRESS TO A SAFE LOCATION OUTSIDE THE BUILDING.
WHERE THE MEANS OF EGRESS IS ACCESSIBLE TO PERSONS WITH DISABILITIES, PROVIDE AN ACCESSIBLE ROUTE TO A SAFE LOCATION OUTSIDE THE
BUILDING.
WHERE MEANS OF EGRESS LEAD TO LOADING DOCKS OR OTHER SERVICE AREAS, DIRECT USERS AWAY FROM HAZARDOUS AND BIOHAZARD WASTE STORAGE, MAILROOMS, AND OTHER AREAS THAT MAY BE THE SOURCE OF INJURY OR CONTAMINATION.
PLAN AND LOCATE EGRESS PATHS SO THAT THEY ARE NOT OBSTRUCTED BY THE ANTI-RAM BARRIERS OR OTHER SIMILAR DEVICES.
• TWO EXITS ARE REQUIRED WHEN OCCUPANCY LOAD IS LESS THAN 500 (LSC 7.4.1.1)
• NOT LESS THAN TWO SEPARATE EXITS SHALL BE ACCESSIBLE FROM EVERY PART OF EVERY STORY (LSC 20.2.4.3) HOWEVER A SINGLE EXIT ACCESS PATH IS
PERMITTED WHERE DISTANCE IS LESS THAN THE PERMITTED COMMON PATH OF TRAVEL (LSC 20.2.5.3)
• CLEAR WIDTH OF EXITS TO BE .2 INCHES PER OCCUPANT BUT NOT LESS THAN 36 INCHES MINIMUM UNLESS OTHERWISE SPECIFIED (LSC 7.3.4.1(2))
• 32 INCHES CLEAR MINIMUM WITH SEVERAL ALLOWABLE EXCEPTIONS PER LSC 7.2.1.2.3.2 AND WHERE IN THE MEANS OF EGRESS FROM DIAGNOSTIC OR
TREATMENT AREAS DOORS REQUIRE A CLEAR WIDTH OF NOT LESS THAN 32 INCHES (LSC 20.2.3.4).
• CLEAR WIDTH OF CORRIDORS AND PASSAGEWAYS TO BE .2 INCHES PER OCCUPANT BUT NOT LESS THAN 44 INCHES IN AMBULATORY.
• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 8 FEET IN I-2 AREAS.
• DISCHARGE FROM EXITS SHALL BE IN ACCORDANCE WITH LSC SECTION 7.7 (LSC 20.2.7).
• EXIT TERMINATION SHALL TERMINATE DIRECTLY AT A PUBLIC WAY OR AN EXTERIOR EXIT DISCHARGE (LSC 7.7.1)
UNLESS INTERIOR EXIT DISCHARGE AS OTHERWISE PROVIDED IN 7.7.2
17. EXIT DISCHARGE THROUGH INTERIOR BUILDING AREAS:
NOTE THAT THIS SECTION IS BASED ON 2018 NFPA 101 REQUIREMENTS IN WHICH THE WORDING OF REQUIREMENT (3) HAS BEEN CHANGED. NFPA 101 2012
REQUIREMENTS APPLICABLE FOR ACCREDITATION PURPOSES ARE MORE RESTRICTIVE.
EXITS SHALL BE PERMITTED TO DISCHARGE THROUGH INTERIOR BUILDING AREAS, PROVIDED THAT ALL OF THE FOLLOWING ARE MET (LSC §7.7.2):
(1) NOT MORE THAN 50 PERCENT OF THE REQUIRED NUMBER OF EXIT STAIRS SERVING NORMALLY OCCUPIED AREAS OF EACH FLOOR, AND NOT MORE THAN 50 PERCENT OF THE EXIT STAIR CAPACITY REQUIRED FOR NORMALLY OCCUPIED AREAS OF EACH FLOOR, SHALL DISCHARGE THROUGH AREAS ON ANY LEVEL OF
DISCHARGE, EXCEPT AS OTHERWISE PERMITTED BY ONE OF THE FOLLOWING::
(A) ONE HUNDRED PERCENT OF THE EXITS SHALL BE PERMITTED TO DISCHARGE THROUGH AREAS ON ANY LEVEL OF DISCHARGE IN DETENTION AND
CORRECTIONAL OCCUPANCIES AS OTHER-WISE PROVIDED IN CHAPTERS 22 AND 23.
(B) IN EXISTING BUILDINGS, THE 50 PERCENT LIMIT ON EGRESS CAPACITY SHALL NOT APPLY IF THE 50 PERCENT LIMIT ON THE REQUIRED NUMBER OF
EXITS IS MET.
(2) EACH LEVEL OF DISCHARGE SHALL DISCHARGE DIRECTLY OUTSIDE AT THE FINISHED GROUND LEVEL OR DISCHARGE DIRECTLY OUTSIDE AND PROVIDE
ACCESS TO THE FINISHED GROUND LEVEL BY OUTSIDE STAIRS OR OUTSIDE RAMPS.
(3) THE INTERIOR EXIT DISCHARGE SHALL LEAD TO A FREE AND UNOBSTRUCTED WAY TO THE EXTERIOR OF THE BUILDING, AND SUCH WAY SHALL BE READILY APPARENT OR SHALL BE IDENTIFIABLE BY EXIT SIGNAGE FROM THE POINT OF DISCHARGE FROM THE EXIT.
(4) THE INTERIOR EXIT DISCHARGE SHALL BE PROTECTED BY ONE OF THE FOLLOWING METHODS:
(A) THE LEVEL OF DISCHARGE SHALL BE PROTECTED THROUGHOUT BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 9.7, OR THE PORTION OF THE LEVEL OF DISCHARGE USED FOR INTERIOR EXIT DISCHARGE SHALL BE PROTECTED BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 9.7 AND SHALL BE SEPARATED FROM THE NONSPRINKLERED PORTION OF THE FLOOR BY FIRE BARRIERS WITH A FIRE RESISTANCE RATING MEETING THE REQUIREMENTS FOR THE ENCLOSURE OF EXITS. (SEE 7.1.3.2.1.)
(B) THE INTERIOR EXIT DISCHARGE AREA SHALL BE IN A VESTIBULE OR FOYER THAT MEETS ALL OF THE FOLLOWING CRITERIA:
I. THE DEPTH FROM THE EXTERIOR OF THE BUILDING SHALL BE NOT MORE THAN 10 FEET, AND THE LENGTH SHALL BE NOT MORE THAN 30
FEET.
II. THE FOYER SHALL BE SEPARATED FROM THE REMAINDER OF THE LEVEL OF DISCHARGE BY FIRE BARRIERS WITH A MINIMUM 1-HOUR FIRE RESISTANCE RATING, AND EXISTING INSTALLATIONS OF WIRED GLASS IN STEEL FRAMES SHALL BE PERMITTED TO BE CONTINUED IN USE.
III. THE FOYER SHALL SERVE ONLY AS MEANS OF EGRESS AND SHALL INCLUDE AN EXIT DIRECTLY TO THE OUTSIDE.
(5) THE ENTIRE AREA ON THE LEVEL OF DISCHARGE SHALL BE SEPARATED FROM AREAS BELOW BY CONSTRUCTION HAVING A FIRE RESISTANCE RATING NOT LESS THAN THAT REQUIRED FOR THE EXIT ENCLOSURE, UNLESS OTHERWISE PROVIDED IN 7.7.2(6).
18. ILLUMINATION OF MEANS OF EGRESS
MEANS OF EGRESS SHALL BE ILLUMINATED IN ACCORDANCE WITH NFPA 101 SECTION 7.8 (LSC 20.2.8).
19. EMERGENCY LIGHTING
EMERGENCY LIGHTING IS REQUIRED IN ACCORDANCE WITH NFPA 101 SECTION 7.9 (LSC 20.2.9.1)
20. ESSENTIAL ELECTRICAL SYSTEM.
WHERE GENERAL ANESTHESIA OR LIFE-SUPPORT EQUIPMENT IS USED, EACH AMBULATORY HEALTH CARE FACILITY SHALL BE PROVIDED WITH AN ESSENTIAL
ELECTRICAL SYSTEM (LSC 20.2.9.2):
21. MARKING OF MEANS OF EGRESS
EXIT SIGNS ARE REQUIRED TO BE PROVIDED IN AREAS ACCESSIBLE TO THE PUBLIC IN ACCORDANCE WITH NFPA 101 SECTION 7.10 (LSC §20.2.10).
22. INTERIOR FINISH
INTERIOR FINISHES ARE TO BE PER THE REQUIREMENTS OF NFPA 101 SECTION 10.2 (LSC 20.3.3.1, 20.3.3.3.1)).
WALLS AND CEILINGS (LSC 20.3.3.2) EXITS AND EXIT ACCESS CORRIDORS: CLASS A OR CLASS B (LSC 20.3.3.2.1)
OTHER AREAS: CLASS A, CLASS B, OR CLASS C (LSC 20.3.3.2.2)
FLOORS (LSC §20.3.3.3) INTERIOR FLOOR FINISH SHALL COMPLY WITH SECTION 10.2 (LSC 20.3.3.3.1)
EXIT ENCLOSURES. CLASS I OR CLASS II (LSC 20.3.3.3.2) COMPLYING WITH NFPA 101 10.2.7.1 OR 10.2.7.2 AS APPLICABLE (LSC 20.3.3.3.3)
SOME ALLOWANCE FOR SUBSTITUTION OF THE NEXT HIGHER RATING FOR WALL, CEILING, AND FLOOR MATERIAL RATINGS MAY BE POSSIBLE FOR SOME MATERIALS IN A
FULLY SPRINKLED BUILDING (LSC §10.2.8).
23. SOILED LINEN AND TRASH RECEPTACLES
SOILED LINEN OR TRASH COLLECTION RECEPTACLES ARE REQUIRED TO BE A MAXIMUM OF 32 GAL IN CAPACITY AND HAVE AN AVERAGE DENSITY OF 0.5GAL/FT SQUARED (LSC 20.7.5.5.1). CONTAINER SIZE AND DENSITY IS ALLOWED TO EXCEED THESE VALUES IN AN AREA PROTECTED AS A HAZARDOUS AREA.
CONTAINERS USED SOLELY FOR RECYCLING CLEAN WASTE OR FOR PATIENT RECORDS AWAITING DESTRUCTION ARE ALLOWED TO BE EXCLUDED FROM THE REQUIREMENTS OF SOILED LINEN AND TRASH RECEPTACLES WHERE CONTAINERS ARE A MAXIMUM OF 96 GALLONS AND LABELED AND LISTED PER FM APPROVAL 6921 (LSC 20.7.5.5.2). THE PROVISIONS OF §10.3.8, APPLICABLE TO CONTAINERS FOR WASTE, OR LINEN, DO NOT APPLY (LSC 20.7.5.5.3).
24. FIRE SUPPRESSION: SPRINKLER SYSTEM
MISSION CRITICAL FACILITIES SHALL BE SPRINKLER PROTECTED THROUGHOUT (8.4.2.1.3, 9.5.1, PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES).
BUILDINGS CONTAINING HEATH CARE OCCUPANCIES ARE REQUIRED BY LSC §18.3.5.1 TO BE PROTECTED THROUGHOUT WITH AN APPROVED, SUPERVISED, AUTOMATIC
SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 9.7.
25. FIRE SUPPRESSION: SPRINKLER INSTALLATION REQUIREMENTS
SPRINKLER SYSTEM INSTALLATION SHALL COMPLY WITH NFPA 13 AS APPLICABLE, EXCEPT AS INDICATED IN SECTIONS 6.1.B THROUGH 6.1.R (VA FIRE PROTECTION
DESIGN MANUAL, 6.1.B).
26. FIRE SUPPRESSION: SPRINKLER COVERAGE AREAS
IN NFPA 13 SYSTEMS, SPRINKLER PROTECTION SHALL BE PROVIDED IN ALL SPACES INCLUDING, BUT NOT LIMITED TO, ELEVATOR MACHINE ROOMS, WALK-IN FREEZERS AND COLD ROOMS, COMPUTER ROOMS, TELEPHONE SWITCH ROOMS, RADIOLOGY AND MRI SUITES, LOADING DOCKS, ELECTRICAL ROOMS*, PLUMBING OR UTILITY CLOSETS, AUDIOMETRIC BOOTHS, VAULTS, PAINT SPRAY BOOTHS, DRY TYPE LINT COLLECTORS, DUST COLLECTORS, AND GENERATOR ROOMS. EXCEPTION:
SPRINKLERS ARE NOT REQUIRED WHERE SPECIFICALLY EXEMPTED BY NFPA 13, 13R, AND 13D, AND AS SPECIFIED IN PARAGRAPHS 6.1.B.2 AND 6.1.B.3 (VA FIRE
PROTECTION DESIGN MANUAL, 6.1.B.1)).
* NOTE: WHILE NFPA 13 ALLOWS THE OMISSION OF SPRINKLER PROTECTION IN ELECTRICAL ROOMS WITHIN BUILDINGS UNDER SPECIFIC CONDITIONS, THE VA DOES NOT PERMIT THE USE OF THIS EXCEPTION. THE VA REQUIRES SPRINKLER PROTECTION IN ALL ELECTRICAL ROOMS EXCEPT STAND-ALONE BUILDINGS DEDICATED TO ELECTRICAL SERVICE WHERE APPLICABLE FM DATA SHEETS ARE FOLLOWED (VA FIRE PROTECTION DESIGN MANUAL, 6.1.B.1).
27. FIRE SUPPRESSION: INTERSTITIAL SPACES
SPRINKLERS ARE NOT REQUIRED IN INTERSTITIAL SPACES, EXCEPT (VA FIRE PROTECTION DESIGN MANUAL, 6.1(B.2)):
A. SPRINKLERS ARE REQUIRED IN ELECTRICAL CLOSETS, SIGNALING ROOMS, ETC., LOCATED WITHIN INTERSTITIAL SPACES, AND B. A SINGLE LINE OF SPRINKLERS IS REQUIRED ABOVE THE TRACKS OF ELECTRIC TRACK VEHICLE SYSTEMS (ETVS) IN INTERSTITIAL SPACES.
28. FIRE SUPPRESSION: AREAS SUBJECT TO FREEZING
DESIGN WET PIPE SPRINKLER SYSTEMS, UNLESS INSTALLED IN AREAS SUBJECT TO FREEZING. DRY PENDANT OR SIDEWALL SPRINKLERS, DRY PIPE, OR ANTIFREEZE SYSTEMS MAY BE USED IN AREAS SUBJECT TO FREEZING. PROPYLENE GLYCOL SHALL BE USED IF ANTIFREEZE SYSTEMS NEED TO BE INSTALLED. DO NOT USE PRE-
ACTION TYPE SYSTEMS (VA FIRE PROTECTION DESIGN MANUAL, 6.1(C)).
29. FIRE SUPPRESSION: BULK SUPPLY STORAGE AREAS
ROOMS CONTAINING BULK SUPPLY STORAGE SHALL BE CLASSIFIED AS REQUIRED BY NFPA 13. IF PROVIDED BY THE CONTRACT, STORAGE RACKS SHALL UTILIZE OPEN SHELVING SYSTEMS. ENSURE SHELVING WHICH OBSTRUCTS SPRINKLER WATER FROM PENETRATING DOWN THROUGH RACKS IS NOT USED (VA FIRE PROTECTION
DESIGN MANUAL, 6.1(H)).
30. FIRE SUPPRESSION: CPVC PIPING
CPVC PIPING SHALL NOT BE USED IN THE VA.
31. FIRE SUPPRESSION: MINIMUM DESIGN REQUIREMENTS
SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED BY ANY DESIGN APPROACH ALLOWED BY NFPA 13, EXCEPT THAT THE SPECIAL DESIGN APPROACH SHALL NOT BE USED IN HEALTH CARE. PIPE SCHEDULE SYSTEMS MAY BE USED FOR EXTENSION OF EXISTING PIPE SCHEDULE SYSTEMS WHERE WATER SUPPLY IS ADEQUATE.
SPRINKLER SYSTEMS SHALL BE DESIGNED BASED ON AVAILABLE WATER SUPPLY WITHOUT THE FIRE PUMP OPERATING, WHERE POSSIBLE. A SAFETY FACTOR SHALL BE INCLUDED BY CALCULATING THE DEMAND TO A POINT NO GREATER THAN 10% BELOW THE AVAILABLE WATER SUPPLY CURVE. OR, A TEN PERCENT SAFETY FACTOR SHALL BE PROVIDED (SUBTRACT 10% FROM THE AVAILABLE WATER SUPPLY CURVE) FOR EACH SPRINKLER DEMAND INCLUDING THE REQUIRED HOSE STREAMS (VA FIRE
PROTECTION DESIGN MANUAL, 6.1(D)).
SPRINKLER DENSITIES SHALL COMPLY WITH NFPA 13, EXCEPT IN ROOMS CONTAINING MOVABLE/MOBILE SHELVING (HIGH DENSITY STORAGE) WHERE THE DENSITY
SHALL BE ORDINARY HAZARD (GROUP 2) (VA FIRE PROTECTION DESIGN MANUAL, 6.1(E)).
30. FIRE SUPPRESSION: MINIMUM DESIGN REQUIREMENTS STORAGE, MECHANICAL, AND ELECTRICAL ROOMS
SHALL BE PROTECTED AS (NFPA 13 A.5.3):
ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT SQ OVER 1,500 SF.
HOSE STREAM ALLOWANCE: 250 GPM
31. FIRE SUPPRESSION: MINIMUM DESIGN REQUIREMENTS ALL OTHER AREAS
SHALL BE PROTECTED AS (NFPA 13 A.5.2):
LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT SQ OVER 1,500 SF.
HOSE STREAM ALLOWANCE: 100 GPM
32. FIRE SUPPRESSION: WATER SUPPLY REQUIREMENTS
ADEQUACY, CAPACITY, AND DURATION OF WATER SUPPLY FOR FIRE PROTECTION TO BE IN ACCORDANCE WITH VA FIRE PROTECTION DESIGN MANUAL, SECTIONS 5.1, 5.2, AND 5.4 RESPECTIVELY.
33. FIRE SUPPRESSION: FIRE PUMP REQUIREMENTS
WHERE A FIRE PUMP IS REQUIRED VA FIRE PROTECTION DESIGN MANUAL SECTION 5.3 SHALL APPLY.
34, FIRE SUPPRESSION: WATER STORAGE REQUIREMENTS
PROVIDE A MINIMUM VOLUME OF STORAGE WATER TO FIGHT A SINGLE FIRE FOR THE WORST CASE SCENARIO ON THE CAMPUS. INCLUDE BOTH MISSION CRITICAL AND LIFE SAFETY PROTECTED FACILITIES IN DETERMINING THE WORST CASE FIRE SCENARIO. THIS QUANTITY REPRESENTS THE VOLUME REQUIRED EXCLUSIVELY FOR FIRE PROTECTION AND SHALL NOT BE USED TO FULFILL THE REQUIREMENTS FOR ANY OTHER WATER SYSTEM DESIGN VOLUME. THE VOLUME OF FIRE PROTECTION WATER SHALL NOT BE ADJUSTED LOWER THAT THE CALCULATED REQUIREMENT. REQUIREMENTS FOR FIRE PROTECTION WATER STORAGE ARE BASED ON THE ASSUMPTION THAT THERE WILL BE ONLY ONE FIRE AT A TIME. THE CALCULATIONS SHALL ASSUME THAT THE WATER SUPPLY FROM OFF-SITE PUBLIC WATER PROVIDER(S) WILL NOT BE AVAILABLE. THE WATER SUPPLY FROM ON-SITE WATER SOURCES, SUCH AS GROUNDWATER WELLS, SHALL ONLY BE INCLUDED IN THE CALCULATIONS WHEN IT CAN BE DOCUMENTED THAT THE WATER SOURCE, PUMPING FACILITIES, AND CONVEYANCE SYSTEM ARE DESIGNED AND CONSTRUCTED TO PROVIDE CONTINUED OPERATION DURING THE EMERGENCY EVENT. (8.4.2.1.3, PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES).
35. FIRE SUPPRESSION: WATER STORAGE TANK REQUIREMENTS
WATER STORAGE TANKS SHALL BE DESIGNED IN ACCORDANCE WITH NFPA 22 “STANDARD FOR WATER TANKS FOR PRIVATE FIRE PROTECTION.” (VA FIRE PROTECTION DESIGN MANUAL, 5.1(C)) NEW WATER STORAGE TANKS SHALL BE PROVIDED WITH A HIGH AND LOW LEVEL WATER SWITCHES THAT ARE CONNECTED TO THE SITE FIRE ALARM SYSTEM AND INITIATE SUPERVISORY ALARM SIGNALS (VA FIRE PROTECTION DESIGN MANUAL, 5.1(D)).
36. FIRE SUPPRESSION: WATER DISTRIBUTION AND HYDRANT REQUIREMENTS
FIRE PROTECTION WATER DISTRIBUTION AND FIRE HYDRANTS SHALL BE IN ACCORDANCE WITH VA FIRE PROTECTION DESIGN MANUAL SECTIONS 5.5 AND 5.6, RESPECTIVELY.
37. FIRE SUPPRESSION: SIGNAGE REQUIREMENTS
FURNISH APPROPRIATE SIGNAGE FOR ALL POST INDICATOR VALVES, FIRE DEPARTMENT CONNECTIONS, AND SECTIONAL VALVES. SIGNAGE SHALL INDICATE SPECIFIC
BUILDING AND/OR ZONE/AREA SERVED (VA FIRE PROTECTION DESIGN MANUAL, 5.7).
38. FIRE SUPPRESSION: SEISMIC REQUIREMENTS SEISMIC PROTECTION IS NOT REQUIRED, THE BUILDING IS LOCATED IN AN AREA OF ‘LOW’ SEISMICITY (VA FIRE
PROTECTION DESIGN MANUAL, 6.1(I)).
39. FIRE SUPPRESSION: SPRINKLER HEAD REQUIREMENTS
QUICK RESPONSE HEAD REQUIREMENT
INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE SPECIFICALLY PROHIBITED OR NOTED ELSEWHERE IN THIS DOCUMENT. (E.G., IN AREAS REQUIRING HIGH TEMPERATURE HEADS WHERE NO QUICK RESPONSE SPRINKLERS ARE LISTED, DATA CENTERS, ELECTRICAL SWITCHGEAR ROOMS, ELEVATOR SHAFTS, OR ELEVATOR MACHINE ROOMS). ON RETROFIT PROJECTS, REPLACE EXISTING STANDARD RESPONSE SPRINKLERS WITH QRS WITHIN THE SMOKE COMPARTMENTS
BEING MODIFIED.
NOTE: IT IS PERMISSIBLE ON A CASE BY CASE BASIS TO INSTALL STANDARD RESPONSE SPRINKLERS IN SPACES WITHIN SMOKE ZONES THAT ARE PROTECTED BY QUICK RESPONSE SPRINKLERS, SUCH AS IN A MAIN ELECTRICAL SWITCH GEAR ROOM OR A DATA CENTER. (VA FIRE PROTECTION DESIGN MANUAL, 6.1(J)).
40. FIRE SUPPRESSION: QUICK RESPONSE HEAD REQUIREMENT
SPRINKLERS TO BE INSTALLED IN VA FACILITIES ARE REQUIRED TO BE FACTORY MUTUAL (FM) APPROVED AS QUICK RESPONSE EXCEPT AS IDENTIFIED BELOW.
CONCEALED SPRINKLERS ARE NOT PERMITTED TO BE USED FOR NEW CONSTRUCTION IN VA FACILITIES BECAUSE THERE ARE NONE THAT HAVE PASSED THE FM TEST FOR QUICK RESPONSE. ON RETROFIT PROJECTS, REPLACE EXISTING STANDARD RESPONSE SPRINKLERS WITH QRS WITHIN THE SMOKE COMPARTMENTS BEING
MODIFIED (VA FIRE PROTECTION DESIGN MANUAL, 6.1(K)).
NOTE: IT IS PERMISSIBLE ON A CASE BY CASE BASIS TO INSTALL STANDARD RESPONSE SPRINKLERS IN SPACES WITHIN SMOKE ZONES THAT ARE PROTECTED BY QUICK RESPONSE SPRINKLERS, SUCH AS IN A MAIN ELECTRICAL SWITCH GEAR ROOM. (IT IS GENERALLY NOT PERMISSIBLE TO MIX STANDARD AND QUICK RESPONSE
SPRINKLER HEADS WITHIN A ROOM OR CORRIDOR).
41. FIRE SUPPRESSION: FLOW CONTROL HEAD PROHIBITION
DO NOT USE FLOW CONTROL (ON/OFF) SPRINKLERS (VA FIRE PROTECTION DESIGN MANUAL, 6.1(N)).
42. FIRE SUPPRESSION: SPRINKLER ZONE REQUIREMENT
WHERE BUILDINGS ARE REQUIRED TO BE SUB-DIVIDED INTO SMOKE COMPARTMENTS, SEGREGATE SPRINKLERS INTO ZONES THAT CORRESPOND TO THE SMOKE COMPARTMENTS. COORDINATE SPRINKLER ZONES WITH SMOKE (COMPARTMENTS) AND FIRE ALARM EVACUATION ZONES. PROVIDE A FLOW SWITCH, ISOLATION VALVE, TAMPER SWITCH, AND PRESSURE GAGE FOR EACH ZONE. PROVIDE SEPARATE ZONES FOR PAINT SPRAY BOOTHS, DUST COLLECTORS, AND LINT COLLECTORS (VA FIRE
PROTECTION DESIGN MANUAL, 6.1(O)).
43. FIRE SUPPRESSION: SPRINKLER DRAIN REQUIREMENT
ROUTE THE DRAIN PIPES FOR EACH SPRINKLER RISER AND TEST CONNECTION TO THE BUILDING EXTERIOR TO FACILITATE TESTING. DO NOT TERMINATE AT SERVICE SINKS AS THEIR DRAINS ARE INADEQUATE FOR TEST FLOW. DRAIN PIPING SHALL BE 50 MM (2 IN) MINIMUM TO ACCOMMODATE DISCHARGE FROM FULL FLOW TESTS AT MAXIMUM SYSTEM PRESSURE. DESIGN EXTERIOR DRAINS TO PREVENT FLOODING OR DAMAGE TO LANDSCAPING, AND TO PREVENT WETTING OF WALKWAYS (VA FIRE
PROTECTION DESIGN MANUAL, 6.1(P)).
44. PORTABLE FIRE EXTINGUISHERS:
FIRE EXTINGUISHERS ARE REQUIRED TO BE PROVIDED IN ACCORDANCE WITH NFPA 101 SECTION 9.9, AND NFPA 10
(LSC 20.3.5.3).
HOWEVER, PER VA FIRE PROTECTION DESIGN MANUAL DO NOT PROVIDE FIRE EXTINGUISHERS. LOCATE FIRE EXTINGUISHER CABINETS TO COMPLY WITH NFPA 10.
LOCATE ADDITIONAL FIRE EXTINGUISHER CABINETS IN THE SURGICAL SUITE, HIGH VALUE IT (INFORMATION TECHNOLOGY) EQUIPMENT AND TELEPHONE SWITCH ROOMS, AND IN ELEVATOR MACHINE ROOMS (VA FIRE PROTECTION DESIGN MANUAL, 6.4(A)).
SIZE FIRE EXTINGUISHER CABINETS TO ACCOMMODATE A 9.5 L (2-1/2 GALLON) PRESSURIZED WATER EXTINGUISHER. RECESSED CABINETS ARE PREFERRED. SPECIFY CONSPICUOUS MARKING OF RECESSED CABINETS (VA FIRE PROTECTION DESIGN MANUAL, 6.4(B)).
45. FIRE ALARM SYSTEM
A FIRE ALARM SYSTEM IN ACCORDANCE WITH SECTION 9.6 SHALL BE PROVIDED FOR THE NEW AMBULATORY HEALTH CARE OCCUPANCY (LSC 20.3.4.1):
THE FIRE ALARM SYSTEM MUST BE INSTALLED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE, NFPA 101, NFPA 70 (NEC), AND NFPA 72 (LSC §9.6.1).
FIRE ALARM CONTROL PANEL (FACP)
POWER FOR THE EQUIPMENT MUST BE FROM THE EMERGENCY POWER SYSTEM. THE FACP MUST PROVIDE POWER, SUPERVISION, CONTROL AND LOGIC FOR THE ENTIRE SYSTEM. THE FACP MUST MONITOR ALL FIRE ALARM DEVICES AND CONTROL AND NOTIFICATION CIRCUITS FOR ALARM, SUPERVISORY AND TROUBLE
CONDITIONS.
46. FIRE ALARM SYSTEM: FIRE ALARM INITIATION
ALARM INITIATION IS TO BE BY ANY ONE OF THE FOLLOWING (LSC §20.3.4.2):
• MANUAL MEANS
• ANY REQUIRED DETECTION DEVICES OR DETECTION SYSTEMS
47. FIRE ALARM SYSTEM: OCCUPANT NOTIFICATION
OCCUPANT NOTIFICATION SHALL BE ACCOMPLISHED AUTOMATICALLY, WITHOUT DELAY, IN ACCORDANCE WITH 9.6.3 UPON OPERATION OF ANY FIRE ALARM ACTIVATING
DEVICE (LSC 20.3.4.3.1).
AUDIBLE AND VISUAL INDICATING APPLIANCES SHALL BE PROVIDED AS REQUIRED BY NFPA 72 (LSC 9.6.3.5).
48. FIRE ALARM SYSTEM: EMERGENCY FORCES NOTIFICATION
EMERGENCY FORCES NOTIFICATION SHALL BE PROVIDED AND SHALL INCLUDE NOTIFYING BOTH THE FIRE DEPARTMENT (IN ACCORDANCE WITH NFPA 101 §9.6.4) AND THE APPROVED LOCAL EMERGENCY ORGANIZATION, IF ONE IS PROVIDED (LSC 20.3.4.3.2.1). THE NEW NOTIFICATION SYSTEM SHALL BE TIED INTO THE EXISTING SYSTEM
IN BUILDING 111.
49. FIRE ALARM SYSTEM: FIRE ALARM DEVICES
MANUAL PULL STATIONS
MANUAL PULL STATIONS MUST BE DOUBLE ACTION ADDRESSABLE MANUAL PULL STATIONS.
MANUAL PULL STATIONS WILL BE PROVIDED WITHIN 60 INCHES OF EACH EXIT DOORWAY (LSC 9.6.2.3), ON BOTH SIDES OF GROUPED OPENINGS OVER 40 FEET IN WIDTH (LSC §9.6.2.4), AND AT INTERVALS AS REQUIRED TO LIMIT TRAVEL DISTANCE TO 200 FEET (LSC §9.6.2.5).
MANUAL PULL STATIONS SHALL BE ACCESSIBLE, UNOBSTRUCTED, AND VISIBLE (LSC 9.6.2.7).
A MINIMUM OF ONE MANUAL PULL STATION IS REQUIRED (LSC 9.6.2.6).
MANUAL PULL STATION WILL BE INSTALLED IN ACCORDANCE WITH ADA REQUIREMENTS AND LIMITATIONS.
50. FIRE ALARM SYSTEM: SMOKE DETECTORS
SMOKE DETECTORS WILL MEET THE INSTALLATION REQUIREMENTS OF NFPA 72.
SMOKE DETECTORS WILL BE PROVIDED AS FOLLOWS:
• AT SMOKE BARRIER DOORS.
• IN ALL ELEVATOR MACHINE ROOMS AND AT ELEVATOR DOORS.
• IN AREAS NOT CONTINUOUSLY OCCUPIED THAT CONTAIN FIRE ALARM CONTROL EQUIPMENT.
DUCT DETECTORS WILL BE PROVIDED ON THE SUPPLY AND RETURN AIR FANS OF AIR HANDLING UNITS IN ACCORDANCE WITH NFPA 101 OR NFPA 90A (VA FP DESIGN MANUAL 7.4-F). DUCT DETECTORS OBSTRUCTED FROM VIEW WILL BE PROVIDED WITH A REMOTE INDICATING LIGHT INSTALLED ON THE CEILING BELOW (VA FP DESIGN
MANUAL 7.4-F).
51. FIRE ALARM SYSTEM: SPRINKLER SYSTEM ALARMS AND SUPERVISORY DEVICES (LSC §9.6.2.8) WATER FLOW DETECTION DEVICES ON SPRINKLER SYSTEMS WILL BE MONITORED BY AN ADDRESSABLE INTERFACE DEVICE.
VALVE SUPERVISORY SWITCHES ON SPRINKLER SYSTEMS WILL BE MONITORED BY AN ADDRESSABLE INTERFACE DEVICE.
PRESSURE SWITCHES ON THE DRY PIPE SYSTEMS WILL BE MONITORED BY AN ADDRESSABLE INTERFACE DEVICE.
LUKE
J LEISING
43897-6
INDIANAPOLIS
IN
W I S
CONS
I N
P R O
F E S
S I O N A L
E N
G I N
E E R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil EngineerRING & DuCHATEAU LLP
117400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
MILWAUKEE VAMC FULLY-SPRINKLERED
CONSTRUCT NEW RADIATION
ONCOLOGY SUITE
MILWAUKEE VAMC
695-404
BLDG 111
PHASING IS DEFINED IN PROJECT SPECIFICATIONS AND PHASING PLANS. CONTRACTOR
TO COORDINATE THE FULL SCOPE OF WORK TO BE PHASED SO AS TO NOT IMPACT THE
OPERATION OF SURROUNDING SPACES OR PREVIOUS PHASES. SPECIFIC COORDINATION
SHOULD BE GIVEN FOR DEMOLITION, UTILITY ROUTING AND SHUTDOWNS.
C U s e rs \d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
R a d io lo g y O n c o lo g y S u it e d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/2 /2
:3
:4
P M
GI101
CODE ANALYSIS
04 OCTOBER 2018 LL DV
FINAL CONSTRUCTION
DOCUMENTS
UPUP
UP
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE / SMOKE BARRIER
SMOKE PARTITION / HAZARDOUS AREA
B
1500 SF
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
NFPA 101, LIFE SAFETY CODE, 2018 EDITION
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA
5000 AND NFPA 900
NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION
NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION
ICC, INTERNATIONAL PLUMBING CODE, 2018 EDITION (IPC)
ABAAS, ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ENERGY POLICY ACT OF 2005 (EPACT)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
ASHRAE 90.1-2016 HVAC SYSTEMS
ASHRAE 180 - 2012 VENTILATION FOR HEALTH CARE FACILITIES
ASHRAE 62.1 - 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
ASHRAE 55- 2013 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, DESIGN HANDBOOK
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016 EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE
PROTECTION, 2016 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
THEIR APPURTENANCE, 2016 EDITION.
NFPA 54 NATIONAL FUEL GAS CODE, 2015 EDITION
NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA
PROCESSING EQUIPMENT, 2017 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING
SYSTEMS, 2015 EDITION.
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION
NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS
NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.
NPFA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND
DEMOLITION OPERATIONS
NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017
EDITION
ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
RADIATION THERAPY DESIGN GUIDE, APRIL 2008
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, JANUARY 1, 2017
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2015
EQUIPMENT, JANUARY 2006
ESTIMATING, MARCH 8, 2011
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
HVAC DESIGN MANUAL, NOVEMBER 2017
INTERIOR DESIGN, MAY 2008
LIGHTING DESIGN, DECEMBER 2015
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015
PLUMBING, NOVEMBER 2014
SITE, APRIL 2013
STEAM HEATING, HOT WATER AND OUTSIDE DISTRIBUTION, SEPTEMBER 2016
STRUCTURAL, FEBRUARY 1, 2014
SUSTAINABILITY, AUGUST 2017
TELECOMMUNICATIONS, FEBRUARY 2016
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR
PROJECTS SEPTEMBER 30, 2010
VA DESIGN MANUALS PG-18-10:
GOVERNING CODES:
OCCUPANCY FOR RADIATION
ONCOLOGY SUITE
OCCUPANCY FOR LOGISTICS SUITE
OCCUPANCY FOR PET / MRI TRAILER
OCCUPANCY FOR ASSEMBLY
SUITE BOUNDARY FOR OCCUPANCY
SEPARATION
EXAM
B0205
EXAM
B0206
EXAM
B0209
TOILET
B0212
NURSE
PRACTITIONER
B0213
LEAD PHYSICIAN
B0214
TOILET
B0217
CLEAN
B0215
HAC
B0218
CONFERENCE ROOM
B0220
ADMIN
B0216
CANCER CARE
B0228
RESEARCH
B0229
BLOCK MOLD FILM
PROCESS STORAGE
B0230
EXAM
B0211
NURSE
WORKSTATIONS
B0208
RESIDENT
WORKSTATIONS
B0227
RECEPTION
B0201
WAITING
B0200
STAFF LOUNGE
B0221
PHYSICIST
WORKROOM
B0222
LEAD PHYSICIST
B0223
CONTROL ROOM
B0014
CONTROL ROOM
B0011
CONSULT / EXAM
B0204
VITALS
B0203
LOCKERS
B0219
ADMIN
B0224
EXAM
B0210
PHYSICIAN
WORKSTATIONS
B0226
PROCEDURE
HOLDING BAY
B0207
DRESSING / TOILET
B0007
CORRIDOR
C0A15
CORRIDOR
C0A14
CORRIDOR
C0A13
CORRIDOR
C0A12
CORRIDOR
C0A10
MECH / ELEC
B0225
SCHEDULERS
B0202
PET-MRI VESTIBULE
B0015
CORRIDOR
C0A17
LOGISTICS - CLEAN
B0234
OVERALL D
IA
GONAL D
IS
TANCE = 242'-
4"
DISTANCE BETWEEN EXITS = 129'-9
12055 SF
100121
I-2
EXIT
ACCESS
EXIT ACCESS
EXIT ACCESS
EXIT ACCESS
EXIT
ACCESS
EXIT
EXIT
EXIT
DRESSING / TOILET
B0008
WAITING ROOM
B0009
DRESSING ROOM
B0010
CT STORAGE
B0006
CT EQUIPMENT
B0005
CT SCANNER
B0004
CT ENTRY ROOM
B0003
CONTROL ROOM
B0002
DOSIMETRY
B0001
PHYSICS STORAGE
B0233
SOILED
B0232
CORRIDOR
C0A19
CLEAN LINENS
B0231
LOGISTICS - DIRTY
B0235
1693 SF
10017
I-2
272 SF
A
176 SF
A
608 SF
A
137 SF
A
689 SF
I-2
367 SF
I-2
FEC
FEC
FEC
FEC
FEC
FEC
FEC
RE: UL U418 FOR
ASSEMBLY DESCRIPTION
TYPE V-A CONSTRUCTION
SEPARATED FROM II-B
CONSTRUCTION BY 2-HOUR
BARRIER. 2 EXITS PROVIDED
FROM SPACE.
MAX. T
RAVEL DISTANCE = 180'-1"
TRAVEL DISTANCE = 117'-0"
EXIT
LUKE
J LEISING
43897-6
INDIANAPOLIS
IN
W I S
CONS
I N
P R O
F E S
S I O N A L
E N
G I N
E E R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil EngineerRING & DuCHATEAU LLP
117400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
MILWAUKEE VAMC FULLY-SPRINKLERED
CONSTRUCT NEW RADIATION
ONCOLOGY SUITE
MILWAUKEE VAMC
695-404
BLDG 111
PHASING IS DEFINED IN PROJECT SPECIFICATIONS AND PHASING PLANS. CONTRACTOR
TO COORDINATE THE FULL SCOPE OF WORK TO BE PHASED SO AS TO NOT IMPACT THE
OPERATION OF SURROUNDING SPACES OR PREVIOUS PHASES. SPECIFIC COORDINATION
SHOULD BE GIVEN FOR DEMOLITION, UTILITY ROUTING AND SHUTDOWNS.
C U s e rs \d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
R a d io lo g y O n c o lo g y S u it e d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/2 /2
:3
:4
P M
GI102
BASEMENT LIFE SAFETY FLOOR
PLAN
04 OCTOBER 2018 LL DV
FINAL CONSTRUCTION
DOCUMENTS
N
SCALE: 3/32" = 1'-0"GI102
1 FIRST FLOOR LIFE SAFETY PLAN
LIFE SAFETY OCCUPANCY COUNT
AREA SF OCC OCC FAC # OF OCC
BASEMENT LEVEL
RADIATION ONCOLOGY SUITE 12055 SF I-2 100 121
LOGISTICS 1693 SF I-2 100 17
ASSEMBLY 272 SF A 15 19
ASSEMBLY 176 SF A 15 12
ASSEMBLY 608 SF A 15 41
ASSEMBLY 137 SF A 15 10
PET / MRI TRAILER RAMP 689 SF I-2 100 7
RADIATION ONCOLOGY SUITE 367 SF I-2 100 4
EQUIPMENT WASH
ROOM
B0230
STORAGE
B0230C
CART HOLDING
B0230B
CART RECEIVING
AREA
B0212A
AUTO CART WATCH
B0212
STORAGE
B0212B
STERILIZER ROOM
CONTROLS
B0210
STERILIZER ROOM
B0208
ACCESS TO
STERILIZER
B0210A
UNASSIGNED
UNASSIGNEDSTORAGE
B0112A
LOGISTICS IMPLANT
OFFICE
B0112
STEAM STERILIZER
B0207
EQUIPMENT
HOLDING
B0209
EQUIPMENT ROOM
B0209A
HAC
B0205
TOILET, MALE
B0203B
TOILET, FEMALE
B0203C
LOCKER ROOM
B0203
STERILE SUPPLY
B0201
CORRIDOR
C0A5
CORRIDOR
COA2
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
CONSTRUCTION PHASE 1
DEMOLISH EXISTING PET/MRI RAMP, WORK IN/NEAR VESTIBULE AND ALL
ASSOCIATED STRUCTURE. CONSTRUCT RAMP, ALL SITE WORK AND
REQUIRED INTERIM LIFE SAFETY MEASURES TO INCLUDE DETOUR SIGNS
TO ALTERNATIVE HOSPITAL PEDESTRIAN ENTRANCE/EXIT. COORDINATE
FOUNDATIONS OF NEW OF PET/MRI RAMP TO NOT IMPACT FUTURE
PHASES OR CONSTRUCTION AREA. FOUNDATIONS CAN BE IN THIS PHASE
OR FUTURE PHASE AS NEEDED. PHASE CAN RUN CONCURRENTLY WITH
PHASE 2A.
CONSTRUCTION PHASE 2A
CONSTRUCT CORRIDOR C0A17. THIS CORRIDOR SHOULD BE COMPLETE
AND OPERATIONAL AS SOON AS POSSIBLE. REMOVE ANY INTERIM LIFE
SAFETY MEASURES NOT REQUIRED AT THE COMPLETION OF THIS PHASE.
PHASE IS COMPLETE WITH THE OPENING OF THE CORRIDOR TO VISITORS.
AFTER THE END OF THIS PHASE CONTRACTOR MUST KEEP CORRIDOR
CLEAR OF ANY MATERIALS AND/OR BARRIERS. PHASE CAN RUN
CONCURRENTLY WITH PHASE 2B AND 2C
CONSTRUCTION PHASE 2B
CONSTRUCT LOGISTICS CLEAN AND DIRTY SPACES (B2034 AND B0235). TO
BE COMPLETED AND OPERATIONAL AT THE END OF THIS PHASE. PHASE IS
COMPLETE WITH THE TURN OVER THIS SPACE TO THE VA AND VA’S
ACCEPTANCE.
CONSTRUCTION PHASE 2C
CONSTRUCT THE CORE AND SHELL OF BUILDING ADDITION. BUILDING
MUST BE WEATHERPROOF AT THE COMPLETION OF THIS PHASE. THIS
CONSTRUCTION PHASE CAN HAPPEN SIMULTANEOUSLY WITH PHASE 2A
AND 2B.
CONSTRUCTION PHASE 3
CONSTRUCT THE INTERIOR OF THE FULL PROJECT EXCLUDING THE WORK
INDICATED IN PHASE 4 AND PHASE 5 TO INCLUDE THE INSTALLATION OF
LINAC VAULT SHIELDING. CONSTRUCT TEMPORARY RECEPTION AND
WAITING AREAS IN ROOMS B0228, B0229, AND B0230 TO BE USED DURING
PHASE 4. PHASE IS COMPLETE WITH THE TURN OVER OF THE PORTION OF
WORK IN PHASE 2(A, B, C) AND PHASE 3 BOUNDARIES TURNED OVER TO
THE VA AND VA’S ACCEPTANCE. COORDINATE UTILITY WORK TO LIMIT ANY
DISRUPTIONS TO THE NEW SPACE PRIOR TO TURN OVER.
CONSTRUCTION PHASE 4
CONSTRUCT THE PORTION OF INTERIOR SCOPE WITHIN ROOMS: B0202,
B0200, B0201, COA10, B0204, B0205, B0203 AND PARTIAL COA12. INCLUDING
NEW WAITING AREA, RECEPTION, AND SCHEDULER SPACES. PHASE
COMPLETE WITH THE TURN OVER OF THIS AREA TO THE VA AND VA’S
ACCEPTANCE.
CONSTRUCTION PHASE 5
CONSTRUCT THE PORTION OF INTERIOR SCOPE WITHIN ROOMS: B0228,
B0229, AND B0230. PHASE COMPLETE WITH THE TURN OVER OF THIS AREA
TO THE VA. AND VA’S ACCEPTANCE.
CONSTRUCTION PHASE 6
CONSTRUCT NEW PET/MRI RAMP AND VESTIBULE. THIS PHASE CAN TAKE
PLACE AT ANY POINT AFTER THE ACCEPTANCE OF PHASE 2. MUST BE
COMPLETED PRIOR TO THE COMPLETION OF PHASE 3. PHASE COMPLETE
WITH THE TURN OVER OF THIS AREA TO THE VA. AND VA’S ACCEPTANCE.
AREA COMPLETE AND DELIVERED TO VA
INFECTION CONTROL PLAN NOTES #
INFECTION CONTROL PROJECT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.