EQUIPMENT SCHEDULE COMMENTS
A REFER TO FURNITURE VENDOR DRAWINGS FOR FINAL FURNITURE PLACEMENT
AND DETAILED FURNITURE SCHEDULE.
RESPONSIBLE PARTY LEGEND
MARK
100 CONTRACTOR FURNISHED/ INSTALLED CFCI
200 GOVERNMENT FURNISHED/ CONTRACTOR INSTALLED GFCI
300 GOVERNMENT FURNISHED/CONTRACTOR ROUGH IN GFCR
400 GOVERNMENT FURNISHED & INSTALLED GFGI
LUKE
J LEISING
43897-6
INDIANAPOLIS
IN
W I S
CONS
I N
P R O
F E S
S I O N A L
E N
G I N
E E R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil EngineerRING & DuCHATEAU LLP
117400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
MILWAUKEE VAMC FULLY-SPRINKLERED
CONSTRUCT NEW RADIATION
ONCOLOGY SUITE
MILWAUKEE VAMC
695-404
BLDG 111
PHASING IS DEFINED IN PROJECT SPECIFICATIONS AND PHASING PLANS. CONTRACTOR
TO COORDINATE THE FULL SCOPE OF WORK TO BE PHASED SO AS TO NOT IMPACT THE
OPERATION OF SURROUNDING SPACES OR PREVIOUS PHASES. SPECIFIC COORDINATION
SHOULD BE GIVEN FOR DEMOLITION, UTILITY ROUTING AND SHUTDOWNS.
C U s e rs \d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
R a d io lo g y O n c o lo g y S u it e d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/5
/2
:2
:2
P M
AF601
FINISHES SCHEDULE &
EQUIPMENT SCHEDULE
04 OCTOBER 2018 LL DV
FINAL CONSTRUCTION
DOCUMENTS
FINISH SCHEDULE
FINISH MARK FINISH MANUFACTURER PATTERN/STYLE COLOR SIZES COMMENTS
CEILING
ACT-1 ACOUSTICAL CEILING TILE ARMSTRONG DUNE ANGLED TEGULAR
WHITE 24" X 24" PROVIDE PRELUDE XL SUSPENSION GRID AND SYSTEM IN WHITE.
ACT-2 ACOUSTICAL CEILING TILE ARMSTRONG ULTIMA LAY-IN 1940 WHITE 24" X 24" PROVIDE PRELUDE SUSPENSION GRID AND SYSTEM IN WHITE. PROVIDE IN CT SCANNER, LINAC
ROOMS, AND ALL CLEAN AND SOILED ROOMS.
P-5 PAINTED GYPSUM CEILING BOAD SHERWIN WILLIAMS CEILING WHITE
FINISH CARPENTRY
PL-1 PLASTIC LAMINATE FORMICA WEATHERED ASH
8842-WR
RP-1 RESIN PANEL LUMICOR RAIN LAGO 1/2" THICK PROVIDE C-BRACKET MOUNTING HARDWARE
RP-2 RESIN PANEL LUMICOR CUSTOM PRINT 1/4" THICK PROVIDE PANEL WITH CUSTOM HIGH RES GRAPHIC DEPICTING BIRCH FOREST SCENE. PANEL
SHALL HAVE OPAQUE WHITE BACK. ADHERE PANEL DIRECTLY TO GYPSUM WALL.
SS-1 SOLID SURFACE WILSONART MYSTIQUE 9200CS
SS-2 SOLID SURFACE AVONITE CAT EYE K3-8330 GLOSS FINISH
FLOOR
CPT-1 CARPET TILE MOHAWK GROUP IT'S A SIGN II GT162 INSTINCT 579 24" X 24"
CPT-2 CARPET TILE MOHAWK GROUP COLORBEAT CYPRESS GROVE 675 24" X 24"
LVT-1 VINYL TILE BENTLEY MILLS CANVAS GCANV19X19 PEWTER LINEN 801588 19.5" X 19.5"
PT-1 PORCELAIN TILE AMERICAN OLEAN ULTRA MODERN PROGRESSIVE GRAY UM07 24" X 24" UNPOLISHED
RT-1 RUBBER TILE NORA SYSTEMS NORAMENT SATURA ORION 5109 39.5" X 39.5"
RT-2 RUBBER TILE NORA SYSTEMS NORAMENT SATURA DELPHINUS 5128 39.5" X 39.5"
RT-3 RUBBER TILE NORA SYSTEMS NORAMENT SATURA EARTH 5122 39.5" X 39.5"
RT-4 RUBBER TILE NORA SYSTEMS NORAMENT SATURA VELA 39.5" X 39.5"
SV-1 SHEET VINYL SHAW HARD
SURFACE
TATAMI 0796V ZEN 96515 COLOR MATCH HEAT WELD.
SV-2 SHEET VINYL SHAW HARD
SURFACE
TATAMI 0796V STROLL 96535 COLOR MATCH HEAT WELD.
SV-4 SHEET VINYL TEKNO FLOR FOREST SCAPES ENGLISH WALNUT 73903 6' SHEET GOOD - ROLL
SV-5 SHEET VINYL SHAW HARD
SURFACE
VITALITY SHEET 0873V INSPIRE 73104 COLOR MATCH HEAT WELD.
TS-1 TRANSITION STRIP METAL SCHLUTER SCHLUTER RENO-TK STAINLESS STEEL CERAMIC TO CARPET
TS-2 TRANSITION STRIP METAL SCHLUTER SCHLUTER RENO-U STAINLESS STEEL CERAMIC TO RESILIENT FLOOR
TS-3 TRANSITION STRIP RESILIENT JOHNSONITE CTA-XX-A MOONROCK 29 CARPET TO RESILENT FLOOR
TS-4 REDUCER STRIP RESILIENT JOHNSONITE RRS-XXX-D MOONROCK 29 RESILIENT FLOOR TO CONCRETE
TS-5 TRANSITION STRIP RESILIENT JOHNSONITE SLT-XXX-B MOONROCK 29 RUBBER TILE TO SHEET VINYL / LVT
VCT-1 VINYL COMPOSITE TILE ARMSTRONG DUSTY MILLER 51883
MISC.
CC-1 CUBICLE CURTAIN ARCHITEX REMEDE RX 6016 FIR PROVIDE INPRO CUBICLE CURTAIN TRACK.
WC-1 INTERIOR HORIZONTAL BLINDS SELECTED FROM FULL RANGE 1" SLATES VERIFY SIZES IN FIELD
WC-2 ROLLAR SHADE, BLOCK OUT SELECTED FROM FULL RANGE WITH RAILS
WALL BASE
RB-1 RESILIENT BASE JOHNSONITE TRADITIONAL MOONROCK 29 4" COVE BASE
WALL GRAPHIC
WG-1 WALL GRAPHIC TBD
WALLS
BR-1 BUMPER RAIL INPRO 1600 SERIES EGGSHELL 0111
CG-1 CORNER GUARD INPRO 160 SERIES EGGSHELL 0111 2" X 8'
HR-1 HANDRAIL INPRO 3130 SERIES AMERICAN TEAK 0553
IRWC-1 RIGID VINYL WALL PROTECTION INPRO EGGSHELL 0111 RIGID SHEET
IRWC-2 RIGID VINYL WALL PROTECTION INPRO AMERICAN TEAK 0553
MT-1 MOSAIC TILE AMERICAN OLEAN COLOR APPEAL SEA PEARL BLEND C128 RANDOM INTERLOCKING
P-1 PAINT SHERWIN WILLIAMS ACCESSIBLE BEIGE SW7036 EGGSHELL FINISH
P-2 PAINT SHERWIN WILLIAMS DOCKSIDE BLUE SW7701 EGGSHELL FINISH
P- 3 PAINT SHERWIN WILLIAMS REFLECTING POOL SW6486 EGGSHELL FINISH
P- 4 PAINT SHERWIN WILLIAMS COASTAL PLAIN SW6192 EGGSHELL FINISH
P- 5 PAINT SHERWIN WILLIAMS NUANCE SW7049
PT-2 PORCELAIN TILE AMERICAN OLEAN ULTRA MODERN PROGRESSIVE GRAY UM07 12" X 24" POLISHED
ROOM FINISH SCHEDULE
ROOM NUMBER ROOM NAME FLOOR BASE WALLS SIGN TYPE SIGN COPY COMMENTS
B0001 DOSIMETRY SV-2 RB-1 P-1, P-3 A5.G Dosimetry
B0002 CONTROL ROOM SV-2 RB P-1, P3 A4.G;F1;E15;E12 Control Room 1 INTEGRAL BASE W/ TRIM CAP.
B0003 CT ENTRY ROOM SV-1 RB P-1 A4G CT Scanner INTEGRAL BASE W/ TRIM CAP.
B0004 CT SCANNER SV-1, SV-4 RB P-1, RP-2 A4.G; F4 CAUTION Radiation Area INTEGRAL BASE W/ TRIM CAP.
B0005 CT EQUIPMENT N/A RB-1 P-1 A4.G CT Storage NO FLOOR FINISH
B0006 CT STORAGE SV-5 RB-1 P-1 A4.G CT Equipment
B0007 DRESSING / TOILET PT-1 PT PT-2, MT-1, P-4 A9; F9 B0007 Unisex Dressing /Restroom / Changing Station is available in B0103 and B0109
PROVIDE MATCHING COVE BASE AND BULLNOSE FROM SAME PT LINE.
B0008 DRESSING / TOILET PT-1 PT PT-2, MT-1, P-4 A9; F9 B0008 Unisex Dressing /Restroom / Changing Station is availabe in B0103 and B0109
PROVIDE MATCHING COVE BASE AND BULLNOSE FROM SAME PT LINE.
B0009 WAITING ROOM RT-4 RB-1 P-1, RP-1, IRWC-1 A4.G Waiting Area
B0010 DRESSING ROOM PT-1 PT PT-2, MT-1, P-4 (2) A4.G Dressing Room PROVIDE MATCHING COVE BASE AND BULLNOSE FROM SAME PT LINE.
B0011 CONTROL ROOM RT-2 RB-1 P-1, P-4 A4.G;F1;E15;E12 Control Room 2
B0012 LINAC 2 SV-1, SV-4 RB P-1, RP-2 A4.G; F4 LINAC 2 / CAUTION Radiation Area INTEGRAL BASE W/ TRIM CAP.
B0013 LINAC 1 SV-1, SV-4 RB P-1, RP-2 A4G; F4 LINAC 2 / CAUTION Radiation Area INTEGRAL BASE W/ TRIM CAP.
B0014 CONTROL ROOM RT-2 RB-1 P-1, P-3 A4.G;F1;E15;E12 Control Room 3
B0015 PET-MRI VESTIBULE RT-1 RB-1 P-1 A11.G PET-MRI Vestibule
B0016 MECHANICAL ROOM SV-5 RB-1 P-1 A4.G Mechanical Room
B0200 WAITING CPT-1, CPT-2 RB-1 IRWC-2, P-1, P-4 A4.G; E2.G; G6 Front;G6 Back; A11.G; E1.G Waiting Area / Self-Check-In / Patient Privacy Sign by Reception Desk / Radiology Oncology / Radiology Check-In / Oncology Check-In
B0201 RECEPTION CPT-1 RB-1 P-1, P-3 A4.G; A11.G Front, A11.G Back Reception Desk
B0202 SCHEDULERS CPT-1 RB-1 P-1, P-3 A5.G Scheduler Office
B0203 VITALS RT-1 RB-1 IRWC-1, P-1, P-4 A4.G only easy Control Room
B0204 CONSULT / EXAM SV-2 RB IRWC-1, P-1, P-3 A5.G; G8 Exam / Consult Room 1 / In-Use INTEGRAL BASE W/ TRIM CAP.
B0205 EXAM SV-1 RB IRWC-1, P-1, P-4 A5.G; G8 Exam Room 2 / In-Use INTEGRAL BASE W/ TRIM CAP.
B0206 EXAM SV-2 RB IRWC-1, P-1, P-3 A5.G; G8 Exam Room 3 / In-Use INTEGRAL BASE W/ TRIM CAP.
B0207 PROCEDURE HOLDING BAY SV-2 RB IRWC-1, P-1, P-3 (2) A4.G; (2) G8 Procedure/Holding / In-Use INTEGRAL BASE W/ TRIM CAP.
B0208 NURSE WORKSTATIONS RT-4 RB-1 P-1, P-4 (2) A4.G Nurse Work Area
B0209 EXAM SV-1 RB IRWC-1, P-1, P-4 A5.G; G8 Exam Room 4 / In-Use INTEGRAL BASE W/ TRIM CAP.
B0210 EXAM SV-1 RB IRWC-1, P-1, P-4 A5.G; G8 Exam Room 5 / In-Use INTEGRAL BASE W/ TRIM CAP.
B0211 EXAM SV-2 RB IRWC-1, P-1, P-3 A5.G; G8 Exam Room 6 / In-Use INTEGRAL BASE W/ TRIM CAP.
B0212 TOILET PT-1 PT PT-2, MT-1, P-4 A9; E9.G Front,;E9.G Back; F9 B0212 Unisex Restroom / Changing Station is available in B0103 and B0109 PROVIDE MATCHING COVE BASE AND BULLNOSE FROM SAME PT LINE.
B0213 NURSE PRACTITIONER CPT-1 RB-1 P-1, P-3 A5.G; E9.G Front; E9.G Back Nurse Practitioner
B0214 LEAD PHYSICIAN CPT-1 RB-1 P-1, P-3 A5.G Lead Physician
B0215 CLEAN SV-5 RB-1 P-1, IRWC-1 A6.G; F8 Clean Utility/Staff Only/ Keep Door
B0216 ADMIN CPT-1 RB-1 P-1, P-3 A5.G Staff Office
B0217 TOILET PT-1 PT PT-2, MT-1, P-4 A9; E9 Front, E9 Back; F9 B0217 Unisex Restroom / Changing Station is available in B0103 and B0109 PROVIDE MATCHING COVE BASE AND BULLNOSE FROM SAME PT LINE.
B0218 HAC SV-5 RB-1 IRWC-1, P-1 A1 B0218 HAC
B0219 LOCKERS RT-4 RB-1 P-1 A4.G Patient of Staff Lockers
B0220 CONFERENCE ROOM LVT-1 RB-1 P-1, P-4, IRWC-2 A8.G Conference Room
B0221 STAFF LOUNGE LVT-1 RB-1 P-1, P-4, IRWC-1 A4.G Staff Breakroom
B0222 PHYSICIST WORKROOM CPT-1 RB-1 P-1, P-3 A5.G Physicist Workroom
B0223 LEAD PHYSICIST CPT-1 RB-1 P-1, P-3 A5.G Lead Physicist
B0224 ADMIN CPT-1 RB-1 P-1, P-3 A5.G Staff Office
B0225 MECH / ELEC SV-5 RB-1 P-1 A4.G Mech./Elec.
B0226 PHYSICIAN WORKSTATIONS CPT-1 RB-1 P-1, P-3 A5.G Physician Office
B0227 RESIDENT WORKSTATIONS CPT-1 RB-1 P-1, P-3 A5.G Resident Office
B0228 CANCER CARE CPT-1 RB-1 P-1, P-3 A5.G Cancer Care
B0229 RESEARCH CPT-1 RB-1 P-1, P-3 A5.G Research
B0230 BLOCK MOLD FILM PROCESS STORAGE SV-5 RB-1 P-1, P-4, IRWC-1 A5.G Film Storage
B0231 CLEAN LINENS SV-5 RB-1 P-1, IRWC-1 A6.G Clean Linens
B0232 SOILED SV-5 RB-1 P-1, IRWC-1 A6.G Soiled
B0233 PHYSICS STORAGE SV-5 RB-1 P-1, IRWC-1 A4.G Physics Storage
B0234 LOGISTICS - CLEAN SV-5 RB-1 P-1, IRWC-1 N/A N/A
B0235 LOGISTICS - DIRTY SV-5 RB-1 P-1, IRWC-1 N/A N/A
B0240 LOCKER ROOM N/A N/A P-1 N/A N/A MATCH EXISTING PAINT.
C0A10 CORRIDOR CPT-1 RB-1 IRWC-1, P-1 C6.G Exit to Waiting Area with an Arrow
C0A12 CORRIDOR RT-1, RT-2, RT-3, RT-4 RB-1 IRWC-1,L P-1, P-4 C6.G Exit to Waiting Area with an Arrow
C0A13 CORRIDOR RT-1, RT-2, RT-3, RT-4 RB-1 IRWC-1, P-1 C6.G C0A13 Corridor
C0A14 CORRIDOR RT-1, RT-2, RT-3, RT-4 RB-1 IRWC-1, P-1, WG-1 C6.G C0A14 Corridor
C0A15 CORRIDOR RT-1, RT-2, RT-3, RT-4 RB-1 IRWC-1, P-1, P-4, WG-1, RP-1 C6.G C0A15 Corridor
C0A17 CORRIDOR RT-1, RT-2, RT-3 RB-1 IRWC-1, P-1 C6.G C0A17 Corridor
C0A19 CORRIDOR RT-1 RB-1 IRWC-1, P-1 A4.G C0A19 Corridor
EQUIPMENT AND FURNITURE SCHEDULE
MARK DESCRIPTION MANUFACTURER COMMENTS
CFCI
106 CUBICLE CURTAIN AND TRACK DIMENSIONS VARIES
CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED
101 REFRIGERATOR
102 MARKER BOARD
103 WALL MOUNTED LCD SCREEN - 72"
104 LOCKER
105 CUBICLE CURTAIN AND TRACK THE FLAT TRACK REFER TO FINISH SCHEDULE FOR CURTAIN SOLE SOURCE DOCUMENTS
106 COMPUTER MONITOR W/ KEYBOARD WALL MOUNT
107 FLAT SCREEN TELEVISION - 32" BASIS OF DESIGN: LG,
HOSPITAL GRADE
WITH WALL MOUNTING BRACKET, LCD, ENERGY STAR
108 CPU MOUNT
109 WALL MOUNTED MONITOR
GFCI - GOVERNMENT FURNISHED CONTRACTOR INSTALLED
200 SHARPS DISPOSAL
201 MOBILE FLOOR LAMP
202 WALL MOUNTED OTOSCOPE AND OPHTHALMOSCOPE
203 GLOVE DISPENSER
GFCRI - GOVERNMENT FURNISHED CONTRACTOR ROUGH - IN
301 DESKTOP TELEPHONE
302 DESKTOP COMPUTER W/ DUAL MONITOR
303 DESKTOP COMPUTER W/SINGLE MONITOR
304 COPIER/SCANNER
305 WALL MOUNTED COMPUTER MONITOR W/ KEYBOARD
306 COFFEE MACHINE
307 WATER COOLER AND WATER BOTTLE FILLER
309 KEYBOARD
GFI - GOVERNMENT FURNISHED AND INSTALLED
400 LOOSE FURNITURE
401 BLOCK MOLD PROCESSOR
Revisions: Date:
ADDENDUM 1 2018/11/26
ADDENDUM 4 2019/03/05
| Sheets |
| AF601 - FINISHES SCHEDULE & EQUIPMENT SCHEDULE |
File details come from the government source that posted it.