36E77619R0011 0002 ET500 - TECHNOLOGY DETAILS.pdf

View the file

Other files

File Type Posted
36E77619R0011-0007001.pdf PDF
36E77619R0011-0007000.docx DOCX document
36E77619R0011-0006003.pdf PDF
36E77619R0011-0006000.docx DOCX document
36E77619R0011-0006001.docx DOCX document
36E77619R0011-0006002.pdf PDF
36E77619R0011-0005005.pdf PDF
36E77619R0011-0005006.pdf PDF
36E77619R0011-0005003.pdf PDF
36E77619R0011-0005002.pdf PDF
36E77619R0011-0005004.pdf PDF
36E77619R0011-0005000.docx DOCX document
36E77619R0011-0005001.docx DOCX document
36E77619R0011-0004000.docx DOCX document
36E77619R0011-0004002.pdf PDF
36E77619R0011-0004003.pdf PDF
36E77619R0011-0004001.pdf PDF
36E77619R0011-0003000.docx DOCX document
36E77619R0011-0002005.pdf PDF
36E77619R0011-0002002.pdf PDF
36E77619R0011-0002010.docx DOCX document
36E77619R0011-0002000.docx DOCX document
36E77619R0011-0002001.pdf PDF
36E77619R0011-0002009.pdf PDF
36E77619R0011-0002008.pdf PDF
36E77619R0011-0002003.docx DOCX document
36E77619R0011-0002006.pdf PDF
36E77619R0011-0002004.pdf PDF
36E77619R0011-0001000.docx DOCX document
36E77619R0011-0001001.pdf PDF
36E77619R0011-000.docx DOCX document
36E77619R0011-005.pdf PDF
36E77619R0011-007.pdf PDF
36E77619R0011-012.pdf PDF
36E77619R0011-003.pdf PDF
36E77619R0011-008.pdf PDF
36E77619R0011-002.pdf PDF
36E77619R0011-001.pdf PDF
36E77619R0011-009.docx DOCX document
36E77619R0011-006.pdf PDF
36E77619R0011-010.docx DOCX document
36E77619R0011-011.pdf PDF
36E77619R0011-004.pdf PDF
36E77619R0011_1.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAIN RUN BRANCH RUN

ALLOWABLE J-HOOK ARRANGEMENTS LVC TO SELECT AS CONSTRUCTION DICTATEES

MAIN RUN WALL RUN

DETAIL NOTES -

KEYED NOTES -

ATR SUPPORTWALL

SUPPORT

WASHER & NUTWASHER & NUT

2 1 2

J HOOK SHALL BE SIZED FOR CABLE SIZE AND LOAD.

SPACING BETWEEN J HOOKS 4 FEET ON CENTER.

INSTALL ADDITIONAL J HOOKS AS REQUIRED.

1.

2.

3.

THIS HOOK IS DEDICATED FOR VOICE CABLING.

THIS HOOK IS DEDICATED FOR DATA CABLING.

THIS HOOK IS DEDICATED FOR TV CABLING.

NOT USED.

CONCRETE FLOOR

WORK AREA OUTLET (TYPICAL)

CONDUIT TO ABOVE LAY-IN CEILING

WALL SLEEVE

FLOOR ABOVE

HANGER SUPPORTED FROM STRUCTURE OF FLOOR

ABOVE - OR WALL

LAY-IN CEILING

J-HOOK (TYPICAL)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

ALL DEVICES SHOWN MAY NOT APPLY TO ALL DOORS. THE

DEVICES INDICATED ARE TYPICAL DEVICES REQUIRING

WORK BY THIS ELECTRICAL CONTRACTOR. THE EC SHALL

REFERENCE THE ARCHITECTURAL DOOR HARDWARE

SCHEDULE AND SPECIFICATION FOR ALL EQUIPMENT

ASSOCIATED WITH EACH DOOR HARDWARE GROUP.

ASSUME A SINGLE GANG JUNCTION BOX SHALL BE

FURNISHED BY THE EC FOR EACH DOOR HARDWARE

DEVICE FOR BIDDING. THE EC SHALL COORDINATE WITH

THE GC AND DOOR HARDWARE VENDOR PRIOR TO THE

START OF DOOR HARDWARE ROUGH-IN WORK. EC SHALL

PROVIDE JUNCTION BOXES AS DEFINED IN THE DOOR

HARDWARE VENDOR'S WIRING DIAGRAM.

EC SHALL PROVIDE THE 120V CIRCUIT, BOXES AND

RACEWAYS FOR EACH TYPICAL DOOR TYPE AS SHOWN

ABOVE. DOOR HARDWARE EQUIPMENT INSTALLATION WILL

BE BY OTHERS.

REFER TO ET101 AND ET102 FOR CARD READER

LOCATIONS.

THE DOOR HARDWARE VENDOR SHALL PROVIDE A JOB

SPECIFIC WIRING DIAGRAM INDICATING THE WIRING OF ALL

DEVICES ASSOCIATED WITH EACH DOOR HARDWARE

GROUP. THIS INCLUDES DEVICES PROVIDED BY THE DOOR

HARDWARE VENDOR, SECURITY INTERFACES, AND FIRE

ALARM INTERFACES. IF THIS WIRING DIAGRAM IS NOT

PROVIDED AT THE TIME OF DOOR HARDWARE ROUGH-IN,

THE EC SHALL CONTACT THE ARCHITECT/GC.

THE SIZE AND AMOUNT OF WIRING INDICATED IN THIS

DETAIL FOR EACH DEVICE IS PROVIDED FOR BIDDING, AND

IS A REASONABLE ESTIMATE ONLY. THE EC SHALL PROVIDE

THE SIZE AND QUANTITY OF WIRING AS DEFINED IN THE

DOOR HARDWARE VENDOR'S WIRING DIAGRAM.

THE EC SHALL BE RESPONSIBLE FOR WIRING EACH DEVICE

AS INDICATED IN THE DOOR HARDWARE VENDOR'S WIRING

DIAGRAMS. THIS INCLUDES TERMINATION AT THE DEVICE,

POWER SUPPLY, ANCILLARY DEVICES, AND TERMINATION

AT THE TERMINAL STRIP IN THE JUNCTION BOX ABOVE THE

CEILING.

AUTO DOOR OPENER PUSH PADDLES ARE SHOWN ON

ARCHITECTURAL PLANS. REFER TO ARCHITECTURAL PLANS,

DETAILS AND SCHEDULES FOR EXACT QUANTITIES AND

LOCATIONS.

DOUBLE DOOR SINGLE DOOR

DETAIL NOTES -

1/2"C.

STRUCTURE

CEILING

1/2"C. 1/2"C. 1/2"C.3/4"C.3/4"C.

STRUCTURE

CEILING

1/2"C. 1/2"C.1/2"C.

RM

EL EL

CR

DC

CR

DC

ES

DCES

DCDC

EL

EL

RM

HW-22 HW-20

S S

S

S S S S

S

SSS

S

S

D D

RM

S

1/2"C.

RM

S

DCS

DOUBLE DOOR

STRUCTURE

EL

HW#

S

S

S

D

DC

DC

ES

ES

S

ACCESS CONTROL DEVICES ARE SERVED FROM NEW

ACCESS CONTROL PANEL AS NOTED ON SHEET ET101.

EC SHALL PROVIDE JUNCTION BOX LOCATED ABOVE AN

ACCESSIBLE CEILING, ABOVE THE DOOR CONTROLLED.

JUNCTION BOX SHALL HAVE A MINIMUM SIZE OF 8"X8"X4".

WHEN BOTH DOOR HARDWARE COMPONENTS AND

SECURITY DEVICES ARE INSTALLED ON A DOOR, THIS

JUNCTION BOX SHALL BE SHARED WITH THE SECURITY

SYSTEM. SEE THE SECURITY ACCESS AND DOOR CONTROL

WIRING DETAIL FOR MORE INFORMATION.

EC SHALL PROVIDE A 20 POSITION TERMINAL STRIP FOR

DOOR HARDWARE WIRING, AND MOUNT WITHIN JUNCTION

BOX DEFINED IN KEYED NOTE #1 ABOVE DOOR.

SPECIAL OUTLET SHOWN FOR THE POWER SUPPLY SHALL

PROVIDE 120V POWER FOR ALL POWER SUPPLIES AT THIS

DOOR. SEE FLOOR PLAN FOR EXACT CIRCUIT INFORMATION.

FIRE ALARM CONTROL MODULE SHALL PROVIDE A SET OF

NORMALLY OPEN CONTACTS THAT WILL CLOSE UPON AN

ALARM CONDITION IN THE FIRE ALARM SYSTEM. THE

CLOSURE OF THESE CONTACTS SHALL RELEASE ANY

LOCKING MECHANISMS SECURING THIS DOOR FOR EGRESS

PURPOSES.

DEVICE IS A SECURITY DEVICE. ROUTE CABLING TO NEW

ACCESS CONTROL PANEL, SIMILAR TO THE CARD READER.

KEYED NOTES -

1/2"C.1/2"C. 3/4"C.3/4"C.

EL EL

DCSDCS

EL

S

D

PT

D

PT

D

PT

D

PT

1/2"C.

2 #18

1/2"C.

4 #12 4 #18

AO

CM

XX

JUNCTION

BOX

ABOVE

CEILING

PSD

F5

6 6

6 #18 2 #18 2 #18 6 #18 6 #18 2 #18 2 #18 2 #18 6 #18 6 #18

1/2"C.

2 #18

1/2"C.

4 #12 4 #18

AO

XX

JUNCTION

BOX

ABOVE

CEILING

PSD

F5

6 6

DD D

D

D

6 #18 2 #18 2 #18 2 #18

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

6.

7.

8.

DOUBLE DOOR

1/2"C.

STRUCTURE

CEILING

1/2"C. 1/2"C.3/4"C.

INACTIVE LEAF

CR

DC

DCDC

HW#

S S

S

S

D

DCS

ES

ES

S

D

PT

2 #18 2 #18 2 #18 6 #18

D

SINGLE DOOR

STRUCTURE

CEILING

ES

HW-2

S

D

1/2"C.

2 #18

1/2"C.

4 #12 4 #18

AO

XX

JUNCTION

BOX

ABOVE

CEILING

PSD

F5

1/2"C.

EMD

4 #18 1/2"C.

EM D

4 #18

HW-9DHW-3D

1/2"C.

ES

S

2 #18

HW-21D HW-25D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

FULLY-SPRINKLERED

PHASING IS DEFINED IN PROJECT SPECIFICATIONS AND PHASING PLANS. CONTRACTOR

TO COORDINATE THE FULL SCOPE OF WORK TO BE PHASED SO AS TO NOT IMPACT THE

OPERATION OF SURROUNDING SPACES OR PREVIOUS PHASES. SPECIFIC COORDINATION

SHOULD BE GIVEN FOR DEMOLITION, UTILITY ROUTING AND SHUTDOWNS.

C U s e rs

\p e rm o \D o c u m e n ts

\7

.0

E

M

P e re z ri n g d u .c o m

.r v t

/2

/2

:4

:4

A

M

ET500

TECHNOLOGY DETAILS CONSTRUCT NEW RADIATION

ONCOLOGY SUITE

MILWAUKEE VAMC

695-404

04 OCTOBER 2018 MGM MTP

FINAL CONSTRUCTION

DOCUMENTS BLDG 111

17400 West Capitol Drive, Brookfield, WI 53045 Phone: 414.778.1700 / Fax: 414.778.2360 / r-d@ringdu.com

R&D Project No.:

THIS BAR IS 1" LONG.

IF IT MEASURES ANYTHING OTHER THAN 1"

ADJUST SCALE ACCORDINGLY.

217164.00

NOT TO SCALEET500

2 TYPICAL CABLE SUPPORTS

NOT TO SCALEET500

ARCHITECTURAL DOOR HARDWARE INSTALLATION

GUIDELINES1

Revisions: Date:

ADDENDUM 1 02/22/2019

Sheets
ET101 - PARTIAL BASEMENT FLOOR PLAN - TECHNOLOGY
ET500 - TECHNOLOGY DETAILS
ET600 - TECHNOLOGY SCHEDULES